CN201857996U - Coal face advance rate monitoring device - Google Patents

Coal face advance rate monitoring device Download PDF

Info

Publication number
CN201857996U
CN201857996U CN2010205867763U CN201020586776U CN201857996U CN 201857996 U CN201857996 U CN 201857996U CN 2010205867763 U CN2010205867763 U CN 2010205867763U CN 201020586776 U CN201020586776 U CN 201020586776U CN 201857996 U CN201857996 U CN 201857996U
Authority
CN
China
Prior art keywords
monitoring device
transmission interface
cable
fully mechanized
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205867763U
Other languages
Chinese (zh)
Inventor
王强
毛德兵
霍灵军
蓝航
秦子晗
李安洪
李社柱
李广兴
吴增光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandi Science and Technology Co Ltd
Shanxi Luan Environmental Energy Development Co Ltd
Original Assignee
Tiandi Science and Technology Co Ltd
Shanxi Luan Environmental Energy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Science and Technology Co Ltd, Shanxi Luan Environmental Energy Development Co Ltd filed Critical Tiandi Science and Technology Co Ltd
Priority to CN2010205867763U priority Critical patent/CN201857996U/en
Application granted granted Critical
Publication of CN201857996U publication Critical patent/CN201857996U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses a coal face advance rate monitoring device, which comprises a host, a ground surface transmission interface, at least one mine pressure communication substation and at least one fully mechanized support pressure recorder. KMJ30 mining stress monitoring system software is installed on the host, the host is connected with the ground surface transmission interface through a cable, the ground transmission interface is connected with the mine pressure communication substation through a cable, and the mine pressure communication substation is connected with the fully mechanized support pressure recorders through cables. The coal face advance rate monitoring device is used for monitoring curve of pressure variation of a working face support, controlling falling, moving and lifting of the working face support, and monitoring advancing situation of the working face support at different positions by the aid of the fully mechanized support pressure recorders arranged at different positions.

Description

Coal-face propelling degree monitoring device
Technical field
The utility model relates to a kind of coal-face propelling degree monitoring device, by arranging the fully mechanized mining supporter manograph at the coal-face hydraulic support, determine the process of shifting of falling of support by the variation of poppet pressure, thus the purpose of the monitoring face of realization propelling degree.
Background technology
The propelling degree refers to work plane in process of production, the advance of the face distance of every day.It has directly reflected the speed of face propulsion speed.
Show that after deliberation what of coal production advance of the face degree not only reflected, and be associated with a plurality of factors in the recovery process.At first advance of the face degree is to the coming the pressure cycle and come the pressure degree that material impact is arranged of work plane, and the size of degree of propelling also directly influences the gas emission of work plane in addition.When the easy spontaneous combustion of exploitation coal seam, the size of propelling degree has extremely important meaning for the safe working in colliery.Therefore, can better instruct coal production to the monitoring of advance of the face degree, exploitation ensures safety.
And present monitoring method at advance of the face degree, adopt the method for manual record mostly, this method is not only loaded down with trivial details but also have retardance, after normally each back production class comes off duty, by the operator on duty control room of reporting for work, and also can't illustrate for the propelling degree of work plane diverse location.Therefore, adopt advance of the face degree monitoring system, can realize the work plane diverse location is advanced the real-time monitoring of situation, more help instructing and produce.
The utility model content
The purpose of this utility model provides a kind of coal-face propelling degree monitoring device, and this device has reduced labour intensity, has improved operating efficiency.
To achieve these goals, the utility model is by the following technical solutions:
A kind of coal-face propelling degree monitoring device, it comprises: communication substation and at least one fully mechanized mining supporter manograph are pressed in main frame, ground transmission interface, at least one ore deposit that KMJ30 mine monitoring stress system software is housed; This main frame is connected with this ground transmission interface by cable, and this ground transmission interface presses the communication substation to link to each other by transmission cable and this ore deposit, is connected by cable between this ore deposit pressure communication substation and this fully mechanized mining supporter manograph.
The pressure sensor of described fully mechanized mining supporter manograph adopts pressure resistance type or capacitance type sensor.
Described main frame also is connected with the UPS back-up source.
On the transmission cable between described ground transmission interface and the described ore deposit pressure communication substation arrester is installed.
The beneficial effects of the utility model: the resulting coal-face propelling of the utility model degree monitoring device, be used for monitoring face poppet pressure change curve, grasp falling frame, move frame, rising the frame process of force piece; By arranging the fully mechanized mining supporter manograph, can grasp the propelling situation of work plane diverse location at diverse location.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, a kind of coal-face propelling degree monitoring device, it comprises: communication substation 3 and at least one fully mechanized mining supporter manograph 4 are pressed in main frame 1, ground transmission interface 2, at least one ore deposit that KMJ30 mine monitoring stress system software is housed; This main frame 1 is connected with this ground transmission interface 2 by cable, and this ground transmission interface 2 presses communication substation 3 to link to each other by cable and this ore deposit, is connected by cable between this ore deposit pressure communication substation 3 and this fully mechanized mining supporter manograph 4.
Fully mechanized mining supporter manograph 4 is installed on the working surface hydraulic support, and its pressure sensor adopts pressure resistance type or capacitance type sensor.
Main frame 1 is connected with UPS back-up source 5.UPS back-up source 5 is a kind of uninterrupted power source, and being used for provides uninterrupted power supply for whole monitoring system.
On the transmission cable between described ground transmission interface 2 and the described ore deposit pressure communication substation 3 arrester can be installed.Prevent thunderbolt with the protection control signal.
Main frame presses the communication substation to patrol and examine to described each ore deposit, gathers the data of each substation; Main frame comprises data sink, and data storage device and KMJ30 mine monitoring stress system software by this software, can be presented at the poppet pressure change curve on the screen, moves past journey by determining that support falls, thereby obtains advance of the face degree situation.
Described ground transmission interface is to convert downhole system to terrestrial interface.
The ore deposit presses the communication substation to connect a plurality of fully mechanized mining supporter manographs by cable.The ore deposit is pressed the communication substation generally to be positioned over tunnel, work plane the place ahead two and is helped the place, and its effect is to be used for record and storage fully mechanized mining supporter manograph data monitored.
Described ore deposit presses the communication substation to be responsible for the monitored area of down-hole, and each ore deposit presses the communication substation can connect a plurality of fully mechanized mining supporter manographs.
Described poppet pressure recorder is installed on the working surface hydraulic support, what be used for monitoring and store support falls, moves, rises process, and its record data are reached main frame, by KMJ30 mine monitoring stress system software analysis poppet pressure, obtain support and fall frame, move frame and rise the overall process of frame, thereby obtain the propelling degree of work plane.
The installation site of fully mechanized mining supporter manograph can be installed one by per ten according to face condition, or presses work plane upper, middle and lower diverse location and arrange.During installation, post before and after the support is respectively drawn a hydraulic oil pipe, be connected on the tubing interface place of fully mechanized mining supporter manograph, with cable the fully mechanized mining supporter recorder is coupled together with ore deposit pressure communication substation then and get final product.
More than be preferred embodiment of the present utility model and design graphic; above-mentioned preferred embodiment and designing graphicly only illustrates; be not to be used to limit interest field of the present utility model; all with equalization technological means or be the interest field that contained of the application's claim and the implementer does not all break away from protection domain of the present utility model.

Claims (4)

1. coal-face propelling degree monitoring device, it is characterized in that: it comprises: communication substation and at least one fully mechanized mining supporter manograph are pressed in main frame, ground transmission interface, at least one ore deposit that KMJ30 mine monitoring stress system software is housed; This main frame is connected with this ground transmission interface by cable, and this ground transmission interface presses the communication substation to link to each other by cable and this ore deposit, is connected by cable between this ore deposit pressure communication substation and this fully mechanized mining supporter manograph.
2. coal-face propelling degree monitoring device according to claim 1 is characterized in that: the pressure sensor of described fully mechanized mining supporter manograph adopts pressure resistance type or capacitance type sensor.
3. coal-face propelling degree monitoring device according to claim 2, it is characterized in that: described main frame is connected with the UPS back-up source.
4. coal-face propelling degree monitoring device according to claim 3 is characterized in that: on the transmission cable between described ground transmission interface and the described ore deposit pressure communication substation arrester is installed.
CN2010205867763U 2010-11-02 2010-11-02 Coal face advance rate monitoring device Expired - Fee Related CN201857996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205867763U CN201857996U (en) 2010-11-02 2010-11-02 Coal face advance rate monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205867763U CN201857996U (en) 2010-11-02 2010-11-02 Coal face advance rate monitoring device

Publications (1)

Publication Number Publication Date
CN201857996U true CN201857996U (en) 2011-06-08

Family

ID=44103806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205867763U Expired - Fee Related CN201857996U (en) 2010-11-02 2010-11-02 Coal face advance rate monitoring device

Country Status (1)

Country Link
CN (1) CN201857996U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103822657A (en) * 2014-03-18 2014-05-28 中国矿业大学 Dynamic monitoring instrument for advance distance of fully mechanized mining face of underground coal mine
CN113153402A (en) * 2021-03-15 2021-07-23 中煤科工开采研究院有限公司 Coal face propulsion degree measuring device and method
CN113323698A (en) * 2021-05-31 2021-08-31 国能神东煤炭集团有限责任公司 Fully mechanized coal mining face advancing distance calculation method, storage medium and electronic equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103822657A (en) * 2014-03-18 2014-05-28 中国矿业大学 Dynamic monitoring instrument for advance distance of fully mechanized mining face of underground coal mine
CN113153402A (en) * 2021-03-15 2021-07-23 中煤科工开采研究院有限公司 Coal face propulsion degree measuring device and method
CN113323698A (en) * 2021-05-31 2021-08-31 国能神东煤炭集团有限责任公司 Fully mechanized coal mining face advancing distance calculation method, storage medium and electronic equipment
CN113323698B (en) * 2021-05-31 2023-11-03 国能神东煤炭集团有限责任公司 Fully mechanized coal mining face propulsion distance calculation method, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
CN201696091U (en) Mine ground pressure displacement monitoring system
CN103883350B (en) The filling coal mining method of adopting is jumped at a kind of interval
CN103306714B (en) Coal seam group with near interval Di Chou holes in lane the mash gas harnessing method in a hole three
CN101949302A (en) Dynamic monitoring device of roadway-beside filling body and tunnel roof of gob-side entry and operating method thereof
CN101950035B (en) Rock burst and mine earthquake real-time monitoring system and method
CN202330733U (en) Micro-seismic monitoring system for working surface for thick seam full-mechanized caving mining
CN201215012Y (en) Hydraulic rock development machine
CN103256064A (en) Top coal caving hydraulic support intelligent control coal caving method
CN107201901A (en) Closely high gas layer group thin coal seam unmanned working face mining device and method
CN201857996U (en) Coal face advance rate monitoring device
CN202090952U (en) Device for monitoring stress of mine support anchor rods or anchor cables
CN105092147A (en) Experiment teaching system and method for rock strata movement simulation and top board pressure monitoring
CN203476332U (en) Crawler type coal mining machine
CN107121339A (en) The intelligent constant loading device of coal petrography wall confined pressure
CN202548338U (en) Real-time microquake monitoring system for coal mine
CN202250113U (en) Hydraulic bracket pose detecting device based on multi-sensor data fusion
CN201680827U (en) Digging height online monitoring system for coal mine underground fully-mechanized coal face
CN203702144U (en) Double-drum thin coal seam shearer
CN202381121U (en) Mine pressure detecting system of ARM (advanced RISC machine)-controlled multiplex pressure sensor
CN203177842U (en) A well wall deformation parameter detecting system based on the control of an ATMEGA128
CN201857953U (en) Advanced abutment pressure monitoring device on coal face
CN203224223U (en) Device for detecting layer separation of surrounding rock based on displacement sensors and wireless transmission
CN202645534U (en) Multi-terminal parameter monitoring system for underground tunnel drilling machine of coal mine
CN204286491U (en) A kind of based on pressure sensing shoe puncture supervising device
CN203285484U (en) Solid filling coal mining automatic control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110608

Termination date: 20141102

EXPY Termination of patent right or utility model