CN201680827U - Digging height online monitoring system for coal mine underground fully-mechanized coal face - Google Patents
Digging height online monitoring system for coal mine underground fully-mechanized coal face Download PDFInfo
- Publication number
- CN201680827U CN201680827U CN2010201311448U CN201020131144U CN201680827U CN 201680827 U CN201680827 U CN 201680827U CN 2010201311448 U CN2010201311448 U CN 2010201311448U CN 201020131144 U CN201020131144 U CN 201020131144U CN 201680827 U CN201680827 U CN 201680827U
- Authority
- CN
- China
- Prior art keywords
- digging height
- height
- digging
- substation
- mining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 31
- 239000003245 coal Substances 0.000 title claims abstract description 26
- 239000013307 optical fiber Substances 0.000 claims abstract description 12
- 238000005065 mining Methods 0.000 claims description 69
- 230000005540 biological transmission Effects 0.000 claims description 22
- 239000002699 waste material Substances 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000002354 daily effect Effects 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000003786 synthesis reaction Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 230000000737 periodic effect Effects 0.000 description 2
- 241001124569 Lycaenidae Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000002817 coal dust Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000008034 disappearance Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
Images
Landscapes
- Arrangements For Transmission Of Measured Signals (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201311448U CN201680827U (en) | 2010-03-15 | 2010-03-15 | Digging height online monitoring system for coal mine underground fully-mechanized coal face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201311448U CN201680827U (en) | 2010-03-15 | 2010-03-15 | Digging height online monitoring system for coal mine underground fully-mechanized coal face |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201680827U true CN201680827U (en) | 2010-12-22 |
Family
ID=43345867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201311448U Expired - Fee Related CN201680827U (en) | 2010-03-15 | 2010-03-15 | Digging height online monitoring system for coal mine underground fully-mechanized coal face |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201680827U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103543716A (en) * | 2013-10-11 | 2014-01-29 | 中国神华能源股份有限公司 | Remote-control system and remote-control method for equipment of fully-mechanized mining face |
CN104406556A (en) * | 2014-11-18 | 2015-03-11 | 天地科技股份有限公司 | Comprehensive mechanized coal mining face support multi place-states and plunger descending amount measuring system and method |
CN105806532A (en) * | 2016-03-15 | 2016-07-27 | 泰安泰烁岩层控制科技有限公司 | Concentrated monitoring and alarming system for pressure of coal face hydraulic support roof |
CN107907078A (en) * | 2017-10-24 | 2018-04-13 | 北京天地玛珂电液控制系统有限公司 | A kind of fully-mechanized mining working integrated sensor |
CN111997610A (en) * | 2020-09-03 | 2020-11-27 | 陕西陕煤黄陵矿业有限公司 | Mining height control method and control system of coal mining machine based on big data |
-
2010
- 2010-03-15 CN CN2010201311448U patent/CN201680827U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103543716A (en) * | 2013-10-11 | 2014-01-29 | 中国神华能源股份有限公司 | Remote-control system and remote-control method for equipment of fully-mechanized mining face |
CN104406556A (en) * | 2014-11-18 | 2015-03-11 | 天地科技股份有限公司 | Comprehensive mechanized coal mining face support multi place-states and plunger descending amount measuring system and method |
CN104406556B (en) * | 2014-11-18 | 2017-09-08 | 天地科技股份有限公司 | A kind of fully-mechanized mining working support multidigit state and descending amount of piston measurement system and method |
CN105806532A (en) * | 2016-03-15 | 2016-07-27 | 泰安泰烁岩层控制科技有限公司 | Concentrated monitoring and alarming system for pressure of coal face hydraulic support roof |
CN107907078A (en) * | 2017-10-24 | 2018-04-13 | 北京天地玛珂电液控制系统有限公司 | A kind of fully-mechanized mining working integrated sensor |
CN111997610A (en) * | 2020-09-03 | 2020-11-27 | 陕西陕煤黄陵矿业有限公司 | Mining height control method and control system of coal mining machine based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201680827U (en) | Digging height online monitoring system for coal mine underground fully-mechanized coal face | |
CN201696091U (en) | Mine ground pressure displacement monitoring system | |
CN201251564Y (en) | Device for monitoring stability of roof strata or concrete structure of well in real-time | |
CN101363824A (en) | Device for real time monitoring mine roof rock formation or concrete structure stability | |
CN103362553A (en) | Coal Mine Underground Safety Comprehensive Monitoring System Based on Fiber Bragg Grating Sensor | |
CN102021919A (en) | Foundation pit wireless monitoring and alarming device and monitoring method | |
CN103257009A (en) | Working face mine pressure on-line monitoring system based on fiber grating sensing | |
CN105203158A (en) | Automatic horizontal displacement and sedimentation monitoring system based on GPRS | |
CN106323223B (en) | Highway cutting slope deformation monitoring and early warning system | |
CN201202496Y (en) | On-line monitoring early warning apparatus of tunnel water burst mud projecting burst geologic hazard | |
CN103899357A (en) | System and method for real-time visual monitoring and early warning of mine floor water disasters | |
CN111691921A (en) | Rock burst online monitoring system and method based on support resistance monitoring | |
CN101936014B (en) | On-line real-time monitoring method for safety stability of foundation pit during stratum vibration | |
CN110984255A (en) | Foundation pit support structure horizontal displacement monitoring and early warning system | |
CN203173631U (en) | Coal mine vertical shaft equipment hoisting safety detection system | |
CN201857996U (en) | Coal face advance rate monitoring device | |
CN203809053U (en) | Novel mine water disaster monitoring and early warning system | |
CN201852656U (en) | Data acquisition device for monitoring stability of underground metal mine | |
CN202381121U (en) | Mine pressure detecting system of ARM (advanced RISC machine)-controlled multiplex pressure sensor | |
CN102705012A (en) | Monitoring system of coal roadway roof separation based on M-BUS | |
CN202033136U (en) | Intrinsic safety type active column shrinkage and hydraulic bracket pressure monitoring instrument for coal mine | |
CN204754989U (en) | Novel colliery data monitoring system | |
CN207923112U (en) | Ground Settlement Induced by Shield Tunnel Construction point intelligent integral auxiliary monitoring device | |
CN203022722U (en) | Remote metering system for oil well | |
CN206684904U (en) | A kind of Mine production monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SHANXI JU'AN ELECTRONIC TECHNOLOGY CO., LTD. Free format text: FORMER OWNER: ZHANG BIN Effective date: 20110412 Free format text: FORMER OWNER: ZHANG CHEN |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 044000 NO. 12, HONGYUN LANE 4, YUNCHENG CITY, SHANXI PROVINCE TO: 044000 SOUTH SIDE, GUANGONG WEST STREET, KONGGANG NEW DISTRICT, YUNCHENG CITY, SHANXI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20110412 Address after: 044000 Shanxi city in Yuncheng Province, the New Airport South West Guan Patentee after: Shanxi Ju'an Electronic Technology Co., Ltd. Address before: 044000, No. four, Lane 12, Hongyun, Yuncheng, Shanxi Co-patentee before: Zhang Chen Patentee before: Zhang Bin |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101222 Termination date: 20190315 |
|
CF01 | Termination of patent right due to non-payment of annual fee |