CN201857976U - 衬砌模板台车抗浮装置 - Google Patents

衬砌模板台车抗浮装置 Download PDF

Info

Publication number
CN201857976U
CN201857976U CN2010206207879U CN201020620787U CN201857976U CN 201857976 U CN201857976 U CN 201857976U CN 2010206207879 U CN2010206207879 U CN 2010206207879U CN 201020620787 U CN201020620787 U CN 201020620787U CN 201857976 U CN201857976 U CN 201857976U
Authority
CN
China
Prior art keywords
floating
regulating sleeve
base
lining
floating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206207879U
Other languages
English (en)
Inventor
高原荣之
赵勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd
Original Assignee
CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd filed Critical CHUANRONG HEAVY INDUSTRY MACHINERY (CHANGZHOU) Co Ltd
Priority to CN2010206207879U priority Critical patent/CN201857976U/zh
Application granted granted Critical
Publication of CN201857976U publication Critical patent/CN201857976U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型涉及隧道工程机械领域,尤其是一种衬砌模板台车抗浮装置。其包括抗浮杆、调节套、底座和提手,底座焊接在台车的模板上,调节套套在底座上,抗浮杆穿在调节套内。抗浮杆和调节套上都设有销孔,抗浮杆通过销轴与调节套连接固定。调节套与底座螺纹连接。采用多点分布的方法将此装置安装在台车的模板上,通过将抗浮杆顶紧隧道洞壁来实现抵消浇注过程中的浮力,简单、方便、高效。

Description

衬砌模板台车抗浮装置
技术领域
本实用新型涉及隧道工程机械领域,尤其是一种衬砌模板台车抗浮装置。。
背景技术
使用隧道衬砌模板台车进行混凝土浇注时,某些断面特别是圆形断面衬砌时底部常出现浮力很大的情况,严重时会引起模板台车移位,影响到工程质量,常用的解决方法是在台车上部的两端各增加一个抗浮支座,通过油缸或千斤顶顶住隧道和混凝土洞壁来实现抗浮目的,但当浮力较大时,会破坏已成型好的混凝土洞壁,并且,如果衬砌台车长度较长时,中间位置就起不到作用,抗浮效果较差。
发明内容
为了克服现有的抗浮支座副作用大,抗浮效果差的不足,本实用新型提供了一种衬砌模板台车抗浮装置。
本实用新型解决其技术问题所采用的技术方案是:一种衬砌模板台车抗浮装置,包括抗浮杆、调节套、底座和提手,底座焊接在台车的模板上,调节套套在底座上,抗浮杆穿在调节套内。
抗浮杆和调节套上都设有销孔,抗浮杆通过销轴与调节套连接固定。
调节套与底座螺纹连接。
本实用新型的有益效果是,采用多点分布的方法将此装置安装在台车的模板上,通过将抗浮杆顶紧隧道洞壁来实现抵消浇注过程中的浮力,简单、方便、高效。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型的示意图。
图中1. 抗浮杆,2. 调节套,3. 底座,4. 提手,5. 销轴。
具体实施方式
如图1是本实用新型的示意图,一种衬砌模板台车抗浮装置,包括抗浮杆1、调节套2、底座3和提手4,底座3焊接在台车的模板上,调节套2套在底座3上,抗浮杆1穿在调节套2内。抗浮杆1和调节套2上都设有销孔,抗浮杆1通过销轴5与调节套2连接固定。调节套2与底座3螺纹连接。
衬砌模板台车的模板是由多块单位模板连接成一体的,通过在每块单位模板的上部位置左右对称布置两个抗浮装置,利用多点分布,抵消底部传递来的浮力,从而实现了整体抗浮的目的。
抗浮杆1可根据隧道尺寸设计相应的长度,并在杆体上开有多个销轴孔,可根据施工现场情况,使用不同的销轴孔调节长度,调节套2与底座3螺纹连接,可通过转动调节套2实现微调的目的,单位模板上开有与抗浮杆(1)直径一样大小的孔,使用时,将抗浮杆1穿过调节套2和模板孔,调节好尺寸后,将销轴5插入销轴孔进行固定,整个抗浮装置即安装完毕,在混凝土浇注前把抗浮杆1顶紧隧道洞壁实现抵消浇注过程中的浮力;当混凝土浇注到上半部分,接近抗浮装置位置时,抽出抗浮杆(1),并用塞子堵住模板孔,直至混凝土浇注完毕。

Claims (3)

1.一种衬砌模板台车抗浮装置,其特征是:包括抗浮杆(1)、调节套(2)、底座(3)和提手(4),底座(3)焊接在台车的模板上,调节套(2)套在底座(3)上,抗浮杆(1)穿在调节套(2)内。
2.根据权利要求1所述的衬砌模板台车抗浮装置,其特征是:抗浮杆(1)和调节套(2)上都设有销孔,抗浮杆(1)通过销轴(5)与调节套(2)连接固定。
3.根据权利要求1所述的衬砌模板台车抗浮装置,其特征是:调节套(2)与底座(3)螺纹连接。
CN2010206207879U 2010-11-24 2010-11-24 衬砌模板台车抗浮装置 Expired - Fee Related CN201857976U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206207879U CN201857976U (zh) 2010-11-24 2010-11-24 衬砌模板台车抗浮装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206207879U CN201857976U (zh) 2010-11-24 2010-11-24 衬砌模板台车抗浮装置

Publications (1)

Publication Number Publication Date
CN201857976U true CN201857976U (zh) 2011-06-08

Family

ID=44103786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206207879U Expired - Fee Related CN201857976U (zh) 2010-11-24 2010-11-24 衬砌模板台车抗浮装置

Country Status (1)

Country Link
CN (1) CN201857976U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747211A (zh) * 2015-04-08 2015-07-01 山东省路桥集团有限公司 隧道施工用抗浮装置及钢模衬砌台车和抗浮施工方法
CN108119167A (zh) * 2017-12-18 2018-06-05 中国十九冶集团有限公司 模板台车垂直度调节结构及调节方法
CN113914895A (zh) * 2021-08-30 2022-01-11 中铁十六局集团第五工程有限公司 衬砌模板装置及施工方法
CN113944482A (zh) * 2021-08-30 2022-01-18 中铁十六局集团第五工程有限公司 衬砌施工方法及模板装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747211A (zh) * 2015-04-08 2015-07-01 山东省路桥集团有限公司 隧道施工用抗浮装置及钢模衬砌台车和抗浮施工方法
CN104747211B (zh) * 2015-04-08 2017-03-08 山东省路桥集团有限公司 隧道施工用抗浮装置及钢模衬砌台车和抗浮施工方法
CN108119167A (zh) * 2017-12-18 2018-06-05 中国十九冶集团有限公司 模板台车垂直度调节结构及调节方法
CN113914895A (zh) * 2021-08-30 2022-01-11 中铁十六局集团第五工程有限公司 衬砌模板装置及施工方法
CN113944482A (zh) * 2021-08-30 2022-01-18 中铁十六局集团第五工程有限公司 衬砌施工方法及模板装置
CN113914895B (zh) * 2021-08-30 2023-11-03 中铁十六局集团第五工程有限公司 衬砌模板装置及施工方法
CN113944482B (zh) * 2021-08-30 2023-11-03 中铁十六局集团第五工程有限公司 衬砌施工方法及模板装置

Similar Documents

Publication Publication Date Title
CN201857976U (zh) 衬砌模板台车抗浮装置
CN203961423U (zh) 一种架设电线杆的工具车
CN202672773U (zh) 一种可调钢管支撑
CN203284176U (zh) 一种便携杠杆式井盖开启装置
CN203439956U (zh) 塔式起重机套架的顶升结构
CN201236340Y (zh) 新型工具式吊筋
CN204080793U (zh) 钢筋笼吊装装置
CN203804897U (zh) 一种多功能拉码器
CN204376279U (zh) 水电站gis母线辅助检修可调节支撑装置
CN202742251U (zh) 管件固定装置
CN203891910U (zh) 激光指向仪安装架
CN203712869U (zh) 湿料搅拌机
CN203755682U (zh) 一种混凝土结构楼板小洞口二次浇筑模板施工结构
CN204252403U (zh) 一种用于现浇板负弯矩筋的定位马凳
CN205151656U (zh) 半自动线缆提升架
CN202899619U (zh) 一种模板的固定装置
CN203383525U (zh) 一种浇注梁板用支架
CN205503148U (zh) 一种用于隧道台车上的模板固定系统
CN202559747U (zh) 一种铝合金剪力墙模板的脚部支撑及尺寸控制装置
CN203961278U (zh) 建筑施工梁架
CN201573120U (zh) 一种叶片湿吹砂夹具
CN206479151U (zh) 一种三坐标测量夹具快速更换底座
CN204826422U (zh) 一种用于钢筋保护层的垫块
CN205187502U (zh) 线缆提升架
CN204983644U (zh) 一种改进可调顶托

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110608

Termination date: 20131124