CN201850645U - Combined steel box girder building system - Google Patents

Combined steel box girder building system Download PDF

Info

Publication number
CN201850645U
CN201850645U CN2010206198352U CN201020619835U CN201850645U CN 201850645 U CN201850645 U CN 201850645U CN 2010206198352 U CN2010206198352 U CN 2010206198352U CN 201020619835 U CN201020619835 U CN 201020619835U CN 201850645 U CN201850645 U CN 201850645U
Authority
CN
China
Prior art keywords
box
box girder
case beam
well
building system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206198352U
Other languages
Chinese (zh)
Inventor
赵宪文
王宇伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Construction Group Co Ltd
Original Assignee
Zhejiang Zhongnan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Co Ltd filed Critical Zhejiang Zhongnan Construction Group Co Ltd
Priority to CN2010206198352U priority Critical patent/CN201850645U/en
Application granted granted Critical
Publication of CN201850645U publication Critical patent/CN201850645U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a combined steel box girder building system, which comprises a groined box girder frame, a plurality of layers of galleries which are sequentially arranged below the groined box girder frame, a plurality of hanging posts which are used for erecting the galleries, and eight supporting columns which are used for supporting the groined box girder frame, wherein the groined box girder frame consists of two groups of transverse box girders and two groups of longitudinal box girders which are respectively intersected with each other, the two ends of the transverse box girders and the two ends of the longitudinal box girders are respectively erected on the ground through the supporting columns, the upper ends of the hanging posts are respectively and fixedly connected with the lower ends of the two groups of transverse box girders, and the galleries are respectively connected with the hanging posts and are sequentially hung below the groined box girder frame. The combined steel box girder building system has the advantages that the structure is novel and the space of a bottom floor is large; and since other floors above the bottom floor are sequentially hung below the groined box girder frame from the top to the bottom, no supports are arranged between the other floors and the bottom floor and the other floors are erected by the galleries, the overall fabrication cost is low and the fabrication process is simple.

Description

Combination steel case beam building system
Technical field
The utility model relates to a kind of building system, particularly a kind of combination steel case beam building system.
Background technology
Steel building of the prior art system, its floor is built from the bottom up successively, and not only construction is complicated, and cost of manufacture is big, and because bottom needs support column or carrying wall to support all the other floors, causes bottom space little.
Summary of the invention
The purpose of this utility model is exactly the weak point in the background technology, and a kind of combination steel case beam building system and building method thereof are provided.
For achieving the above object, the utility model adopts following technical scheme: combination steel case beam building system, comprise " well " font box-girder framework, several layers is successively set on the vestibule of " well " font box-girder framework below, somely be used to set up the davit of vestibule and the support column of eight supports " well " font box-girder framework, " well " font box-girder framework is intersected in twos respectively by two groups of horizontal case beams and two groups of vertical box beams and constitutes, set up on the ground by support column respectively at the two ends of horizontal case beam and the two ends of vertical box beam, fixedly connected with two groups of horizontal case beam lower ends respectively in each davit upper end, each vestibule is connected with each davit respectively and is hung at successively below " well " font box-girder framework.
For a kind of optimization of the present utility model, the cross section of described horizontal case beam and vertical box beam is trapezoidal, and the area of the cross section at horizontal case beam or vertical box beam two ends is less than the cross sectional area at horizontal case beam or vertical box beam middle part.
The utility model is compared with background technology, has novel structure, bottom space is big, above other floors of bottom all hang successively from top to bottom and are located under " well " font box-girder framework, do not have between other floors and the bottom and support, described other floors are built by vestibule, and the integral manufacturing cost is low, make simple.
Description of drawings
Fig. 1 is the structural representation of combination steel case beam building system.
Fig. 2 is the structural representation of " well " font box-girder framework.
The specific embodiment
Embodiment 1: with reference to Fig. 1 and 2.Combination steel case beam building system, comprise " well " font box-girder framework 1, several layers is successively set on the vestibule 4 of " well " font box-girder framework 1 below, somely be used to set up the davit 3 of vestibule 4 and the support column 2 of eight supports " well " font box-girder framework, " well " font box-girder framework 1 is intersected in twos respectively by two groups of horizontal case beam 1b and two groups of vertical box beam 1a and constitutes, set up on the ground by support column 2 respectively at the two ends of horizontal case beam 1b and the two ends of vertical box beam 1a, fixedly connected with two groups of horizontal case beam 1b lower ends respectively in each davit 3 upper end, each vestibule 4 is connected with each davit 3 respectively and is hung at " well " font box-girder framework 1 below successively.The cross section of described horizontal case beam 1b and vertical box beam 1a is trapezoidal, and the area of the cross section at horizontal case beam 1b or vertical box beam 1a two ends is less than the cross sectional area at horizontal case beam 1b or vertical box beam 1a middle part.Described horizontal case beam 1b whole height direction is curved, and vertical box beam 1a short transverse and horizontal direction are all curved, and its low degree down.
A kind of building method that makes up steel case beam building system, it may further comprise the steps:
A, assembling and welding " well " font box-girder framework 1;
B, respectively at eight support columns 2 of ground assigned address fixed installation;
C, 1 of " well " font box-girder framework is winched to support column 2 upper ends, eight external parts of " well " font box-girder framework 1 are fixedlyed connected with eight support columns 2 respectively by lifting machine;
D, fixedly mount some davits 3 respectively in the horizontal case beam 1b lower end of " well " font box-girder framework 1;
E, davit 3 is divided into some aspects, sets up vestibule 4 from top to bottom successively on each aspect, each vestibule 4 is fixedlyed connected with davit 3 respectively.
What need understand is: though present embodiment is to the utility model detailed explanation of contrasting; but these explanations; just to simple declaration of the present utility model; rather than to the restriction of utility model; any innovation and creation that do not exceed in the utility model connotation all fall in the protection domain of the present utility model.

Claims (2)

1. one kind is made up steel case beam building system, it is characterized in that: described combination steel case beam building system comprises " well " font box-girder framework, several layers is successively set on the vestibule of " well " font box-girder framework below, somely be used to set up the davit of vestibule and the support column of eight supports " well " font box-girder framework, " well " font box-girder framework is intersected in twos respectively by two groups of horizontal case beams and two groups of vertical box beams and constitutes, set up on the ground by support column respectively at the two ends of horizontal case beam and the two ends of vertical box beam, fixedly connected with two groups of horizontal case beam lower ends respectively in each davit upper end, each vestibule is connected with each davit respectively and is hung at successively below " well " font box-girder framework.
2. combination steel case beam building system according to claim 1, it is characterized in that: the cross section of described horizontal case beam and vertical box beam is trapezoidal, and the area of the cross section at horizontal case beam or vertical box beam two ends is less than the cross sectional area at horizontal case beam or vertical box beam middle part.
CN2010206198352U 2010-11-23 2010-11-23 Combined steel box girder building system Expired - Fee Related CN201850645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206198352U CN201850645U (en) 2010-11-23 2010-11-23 Combined steel box girder building system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206198352U CN201850645U (en) 2010-11-23 2010-11-23 Combined steel box girder building system

Publications (1)

Publication Number Publication Date
CN201850645U true CN201850645U (en) 2011-06-01

Family

ID=44093044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206198352U Expired - Fee Related CN201850645U (en) 2010-11-23 2010-11-23 Combined steel box girder building system

Country Status (1)

Country Link
CN (1) CN201850645U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827468A (en) * 2020-07-13 2020-10-27 扬州大学 Assembled hangs steel-wood structural system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827468A (en) * 2020-07-13 2020-10-27 扬州大学 Assembled hangs steel-wood structural system
CN111827468B (en) * 2020-07-13 2022-02-11 扬州大学 Assembled hangs steel-wood structural system

Similar Documents

Publication Publication Date Title
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN105442853B (en) A kind of long-span deformed Elements of Space Grid Truss and landing Steel Structure Installation construction method
CN104196163A (en) Two-direction pre-stressed prefabricated hollow concrete slab and manufacturing method thereof
CN105421741B (en) A kind of self-supporting tower crane integrated operation platform system integrated with mould bases
CN103790229B (en) A kind of multilayer cantilever steel construction and constructive method thereof
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN102828616B (en) High-formwork support system for roof
CN101633483A (en) Integral lifting apparatus for steel structure net rack
CN201850645U (en) Combined steel box girder building system
CN203160116U (en) Overturning prevention bridge pier mechanism
CN102011494A (en) Combined steel box girder building system and building method thereof
CN207526141U (en) Small-section tower-shaped steel structure assembled operating platform
CN202899639U (en) Concrete column structure
CN110878525B (en) Double-layer steel box girder bridge installation method and combined support for installation
CN213014697U (en) Corner structure of encorbelmenting and building structure
CN105113541A (en) Self-supporting bent-frame-free and template-free basement beam-free floor and inverse construction method of same
CN215671292U (en) Prefabricated wallboard supporting system
CN205444935U (en) Special -shaped steel space frame construction and installation structure of complicated large -span department
CN211004170U (en) A frame-type row of hanging for hoisting of overlength pipe gallery land module
CN113846543A (en) Portal steel type coal conveying trestle bridge gallery integral structure and mounting method thereof
CN202745351U (en) Bailey truss supporting structure
CN203225074U (en) Advertising board of net rack structure
CN210263361U (en) Frame structure for reducing torsional deformation
CN2811427Y (en) Storehouse construction
CN203201127U (en) Temporary support system for steel truss

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110601

Termination date: 20171123

CF01 Termination of patent right due to non-payment of annual fee