CN201843351U - Multifunctional positioning tool - Google Patents

Multifunctional positioning tool Download PDF

Info

Publication number
CN201843351U
CN201843351U CN2010202856131U CN201020285613U CN201843351U CN 201843351 U CN201843351 U CN 201843351U CN 2010202856131 U CN2010202856131 U CN 2010202856131U CN 201020285613 U CN201020285613 U CN 201020285613U CN 201843351 U CN201843351 U CN 201843351U
Authority
CN
China
Prior art keywords
profiling
support post
steel
positioning tool
bracing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202856131U
Other languages
Chinese (zh)
Inventor
王宏
欧阳超
徐重良
陈韬
曹辉发
徐聪
马于广
严小霞
陈江
刘礼荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN2010202856131U priority Critical patent/CN201843351U/en
Application granted granted Critical
Publication of CN201843351U publication Critical patent/CN201843351U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a multifunctional positioning tool, which belongs to the technical field of steel structure construction and comprises a base, a box type support column, an auxiliary support column and a profiling support. The box type support column is disposed on the base, the auxiliary support columns is disposed on the base on one side of the box type support column, the profiling support is disposed on the box type support column, and the profiling support is provided with an arc supporting face matching with a supported face of a supported steel member. The multifunctional positioning tool is simple in structure, is capable of supporting steel members in various shapes by the aid of the box type support column and the profiling support matching with each other, and is applicable to mounting and demounting of the steel members with complex structures.

Description

Multi-functional positioning tool
Technical field
The utility model relates to the realm of building construction, particularly relates to the multi-functional positioning tool that is used to support the steel member in a kind of Construction of Steel Structure.
Background technology
Construction technology crucial in the field of steel structure construction comprises mounting technique and Unloading Technology.Any type of steel work all can comprise node and install and support uninstall process, and can adopt independently two cover supports or equipment to finish this two processes respectively, as design the interim frock auxiliary node of a cover and install, to be installed finishing, increase unloading equipments such as cover sandbox equipment or jack and remove frock simultaneously, unload construction after finishing replacement process.
At present, the shaped steel frock that generally adopts in the node installation process is rigid support such as H shaped steel or channel-section steel.Though during this support is used the time spent short, set up simple and easyly, the actual node lifting set-up time is long, meets the huge node of the irregular multi-branched of profile and lifts, and takies the loop wheel machine time may reach 4~5 days, the work efficiency extreme difference.During the structure unloading, frock is done disposable flame cutting, the shaped steel frock only is applicable to the little structure of unloading total position shape, and the big structure of position shape also needs to look for again supporting-point to change discharge mechanism, not only takes time and effort, and returns construction and brings security risk.
Existing steel work project, the shaped steel frock that adopts when node is installed mostly is the firm skeleton that H shaped steel combines, and does not have the gauge finder design.According to node location and size, determine the frame configuration and the H shaped steel size of frock substantially, then node is winched on the frock, utilize loop wheel machine, jack and various measuring method to carry out the three dimensions adjustment of node, repair the H beam steel shape of frock and node contact position simultaneously, until reaching installation requirement, it is fixing to remake welding.The time that this process continues may reach several days.Structure when unloading, adopt jack to replace the carrying effect of frock earlier, remove frock then and change unloading equipment, as equipment such as sandbox or special jack, pads.This shaped steel frock is applicable to that not needing extra temporary supporting system or structural element is the steel work of the geometry of rule.
There is following problems at least in frock of the prior art:
(1) it is long that node is installed the time that takies equipment such as loop wheel machine, need dispose available manpower for a long time and carry out work high above the ground, and frock is revised;
(2) between installation period, amount of labour demanded is big, time-consuming length, the carrying out rapidly of the continuous productive process that is unfavorable for constructing;
Replacement equipment process complexity when (3) unloading, unavailable machinery substitutes manpower, the security risk height, unfavorable safe construction, the process of replacement equipment is limited by the place, high-altitude, is difficult for finding reliable supporting-point, also needs to calculate in addition and simulate;
(4) the synchronism control accuracy is poor, and the flame cutting easy damaged member paint of spark that splashes produces disaster hidden-trouble.
The utility model content
Based on above-mentioned existing in prior technology problem, the utility model embodiment provides a kind of multi-functional positioning tool, can be used for supporting in the Construction of Steel Structure steel member, can assist the installation and the unloading of steel member simultaneously, do not need during this time to change and support, improve and support the convenience that uses with frock in the Construction of Steel Structure, reduced the Construction of Steel Structure cost.
The purpose of this utility model is achieved through the following technical solutions:
The utility model embodiment provides a kind of multi-functional positioning tool, comprising:
Base, box support post, supplemental support post and profiling bracing frame;
Described box support post is arranged on the base, on the base of described box support post one side the supplemental support post is set; On the described box support post profiling bracing frame is set, the supporting surface of profiling bracing frame is an arc, is complementary with the supported face of support steel member.
Described base is made of two shaped steel that be arranged in parallel.
Described box support post is a case structure, on the sidewall of casing opening is set.
Described box support post is four, and four box support posts are provided with two mode with a side and distribute and be arranged on the base.
Described supplemental support post is circle or square bar column, and is fixedly connected by crossbeam between two steel posts.
Described two steel post end faces are curve slope.
Described profiling bracing frame bottom surface is provided with cushion block, and the profiling bracing frame is arranged on the end face of box support post by cushion block.
Described profiling bracing frame is made of shaped steel bottom girder and gauge finder, and described gauge finder is fixedly installed on the described shaped steel bottom girder.
Described gauge finder is welded by supporting steel plate, stiffener and strengthening steel slab, and described supporting steel plate is provided with the arc groove as supporting surface, fixing reinforcement of weld steel plate on the plate body of supporting steel plate, between the plate body of strengthening steel slab and supporting steel plate at right angles.
Described profiling bracing frame is two, is separately positioned on the box support post that is oppositely arranged, and connects by fixed cross beam between two profiling bracing frames.
The technical scheme that provides by the utility model embodiment as can be seen, the utility model embodiment cooperates by base, box support post, supplemental support post and profiling bracing frame, forms a kind of positioning tool.Because, the jacking equipment of unloading can be arranged in the box support post, this positioning tool can be assisted the installation and the unloading of steel member simultaneously, the profiling bracing frame particularly is set on the box support post, can be complementary by the supporting surface of profiling bracing frame and the supported face of the steel member that supports, both are agreed with at profile, be applicable to the steel member that supports the labyrinth form is installed and unloaded, improve the installation and unloading efficient of labyrinth steel member.This positioning tool is simple in structure, uses reliably, has improved the installation or the discharge rate of labyrinth steel member greatly, can solve in the Construction of Steel Structure the problem of large deformation structure high-stroke steel member unloading operation, has avoided the danger of work high above the ground.
Description of drawings
The structural representation of the positioning tool that Fig. 1 provides for the utility model embodiment;
The structural representation of the profiling bracing frame of the positioning tool that Fig. 2 provides for the utility model embodiment;
The user mode schematic diagram of the positioning tool that Fig. 3 provides for the utility model embodiment;
Each parts label is among the figure: at the bottom of the 1-seat; 2-box support post; 3-profiling bracing frame; 4-supplemental support post; The 5-crossbeam; 6-lateral support crossbeam; The 7-cushion block; 8-moulding bed top platform plate; 30-shaped steel bottom girder; The 31-gauge finder; The 32-supporting steel plate; The 33-arc groove; The 34-stiffener; The 35-strengthening steel slab; 9-steel member.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Embodiment
Present embodiment provides a kind of multi-functional positioning tool, is used in to support the steel member in the Construction of Steel Structure, can assist the installation and the unloading of steel member simultaneously, and as shown in Figure 1, this positioning tool comprises: base, box support post, supplemental support post and profiling bracing frame;
Wherein, base 1 is made of two shaped steel that be arranged in parallel, box support post 2 is arranged on the base 1, box support post 2 is a case structure, on the sidewall of casing opening is set, can jacking equipment be set by this opening in casing, box support post 2 is generally four, mode with two of sides, distribution is arranged on two shaped steel of base 1, on the base 1 of box support post 2 one sides supplemental support post 4 is set, supplemental support post 4 is two, is separately positioned on two shaped steel of base 1, and is fixedly connected by crossbeam 5 between two supplemental support posts 4, the steel post end face of two supplemental support posts 4 can be set to curve slope, is convenient to the steel member supports; Profiling bracing frame 3 is set on the box support post 2, and the supporting surface of profiling bracing frame 3 is an arc, is complementary with the supported face of support steel member 9, between two profiling bracing frames 3 frock lateral support 6 is set.
The structure of the profiling bracing frame 3 in the above-mentioned positioning tool as shown in Figure 2, profiling bracing frame 3 bottom surfaces are provided with cushion block 7, profiling bracing frame 3 is arranged on the end face of box support post 2 by cushion block 7; Profiling bracing frame 3 is made of shaped steel bottom girder 30 and gauge finder 31, gauge finder 31 is by supporting steel plate 32, stiffener 34 and strengthening steel slab 35 constitute, supporting steel plate 32 is provided with the arc groove 33 as supporting surface, supporting steel plate 32 and stiffener 32 and strengthening steel slab 35 fixing welding, all at right angles form gauge finder between the plate body of stiffener 34 and strengthening steel slab 35 and supporting steel plate 32, the gauge finder overall fixed is welded on the shaped steel bottom girder 31, by adopting the bracing frame of this gauge finder 31 as supporting surface, make this positioning tool can finish agreeing with of design position shape fast, improve the installation and unloading efficient of special-shaped multi-branched node steel member special-shaped multi-branched node steel member.
Profiling bracing frame in the above-mentioned positioning tool is two, is separately positioned on the box support post that is oppositely arranged, and connects by fixed cross beam between two profiling bracing frames.
Below in conjunction with manufacturing process above-mentioned positioning tool is described further:
Positioning tool of the present invention can be undertaken by following step when making:
Can set up steel work and temporary supporting system model with 1: 1 ratio by design software Xsteel; Space between the two is used for designing the reliable positioning tool of a cover, and positioning tool need satisfy following condition:
(1) satisfies the bearing capacity and the stability requirement in construction period in arbitrary stage;
(2) do not produce fatal influence to supporting the moulding bed bearing capacity;
(3) arbitrary stage does not produce local excessive mechanics influence to the steel component node;
(4) there are enough spaces and mechanism can insert unloading equipment.
During making, the positioning tool of the embodiment of the invention by steel plate be welded into can built-in jack the box support post, top is rigidly connected by the profiling bracing frame and the node that are provided with gauge finder, the bottom by girder steel formula base with support moulding bed and be rigidly connected; Gauge finder wherein can be undertaken the gauge finder supporting surface structure that shape that curve modeling generates is agreed with fully to support steel component node and frock contact surface by professional software, with the welding of steel component node, guaranteed so not act directly on the node steel member that is supported during the jack unloading in utilization is arranged on the box support post.Can insert jack in the box support post, box support post number can design according to unloading tonnage and jack specification, it as shown in 3 figure the back of the body paddy node of Games for university students stadium, Shenzhen steel work, the unloading tonnage reaches more than 900 ton, 4 jack need be set, and wherein the tonnage of two jack reaches 320 tons.According to the installation needs a little supplemental support column can be set helps steel structure node to keep stable.The pad that is provided with on the profiling bracing frame bottom surface can be determined specification and quantity according to unloading stroke and progression, generally can be designed to 10mm or 20mm.Construction period before unloading can block pad with bearing pin or U sections, keeps stability.
When using above-mentioned frock that the steel member of multi-pipe tubular joint is installed, the concrete operations step comprises:
Before steel member 9 was installed, frock was by design coordinate installation in position; 9 of steel members winch to the position of positioning tool top near the gauge finder 31 of profiling bracing frame 3, slowly the arm of steel member 9 correspondences is placed on the gauge finder 31 by design position shape, utilize the jack fine setting to proofread and correct simultaneously, to meeting design requirement, at last gauge finder 31 and steel member 9 are welded, the structure behind the location as shown in Figure 3.
In sum, positioning tool can be assisted the installation and the unloading of steel member simultaneously among the utility model embodiment.Improve the efficient of large-scale loop wheel machine mechanized construction; When high-altitude application, need not dispose available manpower for a long time and carry out correction work, effectively reduce operation danger, the generation that avoid object to hit, fall in the high-altitude etc. injured; Solve the high a series of problems that are subjected to the high-stroke unloading construction of place restriction in the air, as altitude plant replacement, operating personnel etc.; Solved the shortcoming of other discharging method synchronism control accuracy differences, and the problem of paint finished product protection.
The utility model embodiment positioning tool has following advantage: (1) flexibility is strong: can design different frock forms and select suitable unloading jack specification at different engineering structures characteristics; (2) efficient height: increased substantially the service efficiency of large-scale loop wheel machine, the fast precision height of installation rate, each grade unloading only needs time a few minutes; (3) safety is good: reduce the above high-altitude application personnel of twice in installation and the uninstall process, uninstall process provides duplicate protection for the steel work main body; (4) Synchronization Control is strong: the present invention provides to unloading equipment and has stablized good activity space, for the computer Synchronization Control has been created primary condition; (5) recovery value is big: all can stand intact by the jack that calculates analog selection remains, and all devices is lossless substantially; (6) workable: simple to operate, the general operation personnel all can grasp hints on operation, carry out suitable on-site training and can form large-scale construction, and are artificial, management cost is lower.
The above; it only is the preferable specific embodiment of the utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.

Claims (10)

1. a multi-functional positioning tool is characterized in that, comprising:
Base, box support post, supplemental support post and profiling bracing frame;
Described box support post is arranged on the base, on the base of described box support post one side the supplemental support post is set; On the described box support post profiling bracing frame is set, the supporting surface of profiling bracing frame is an arc, is complementary with the supported face of support steel member.
2. multi-functional positioning tool as claimed in claim 1 is characterized in that, described base is made of two shaped steel that be arranged in parallel.
3. multi-functional positioning tool as claimed in claim 1 is characterized in that, described box support post is a case structure, on the sidewall of casing opening is set.
4. as claim 1 or 3 described multi-functional positioning tools, it is characterized in that described box support post is four, four box support posts are provided with two mode with a side and distribute and be arranged on the base.
5. multi-functional positioning tool as claimed in claim 1 is characterized in that, described supplemental support post is circle or square bar column, and is fixedly connected by crossbeam between two steel posts.
6. multi-functional positioning tool as claimed in claim 5 is characterized in that, described two steel post end faces are curve slope.
7. multi-functional positioning tool as claimed in claim 1 is characterized in that, described profiling bracing frame bottom surface is provided with cushion block, and the profiling bracing frame is arranged on the end face of box support post by cushion block.
8. multi-functional positioning tool as claimed in claim 1 is characterized in that, described profiling bracing frame is made of shaped steel bottom girder and gauge finder, and described gauge finder is fixedly installed on the described shaped steel bottom girder.
9. multi-functional positioning tool as claimed in claim 8, it is characterized in that, described gauge finder is welded by supporting steel plate, stiffener and strengthening steel slab, described supporting steel plate is provided with the arc groove as supporting surface, fixing welding stiffener and strengthening steel slab on the plate body of supporting steel plate, stiffener and strengthening steel slab are all and rectangular between the plate body of supporting steel plate.
10. as claim 1 or 8 described multi-functional positioning tools, it is characterized in that described profiling bracing frame is two, be separately positioned on the box support post that is oppositely arranged, connect by the lateral support crossbeam between two profiling bracing frames.
CN2010202856131U 2010-08-06 2010-08-06 Multifunctional positioning tool Expired - Lifetime CN201843351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202856131U CN201843351U (en) 2010-08-06 2010-08-06 Multifunctional positioning tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202856131U CN201843351U (en) 2010-08-06 2010-08-06 Multifunctional positioning tool

Publications (1)

Publication Number Publication Date
CN201843351U true CN201843351U (en) 2011-05-25

Family

ID=44038244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202856131U Expired - Lifetime CN201843351U (en) 2010-08-06 2010-08-06 Multifunctional positioning tool

Country Status (1)

Country Link
CN (1) CN201843351U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276909A (en) * 2013-04-16 2013-09-04 中建钢构有限公司 Arc-shaped grid structure assembly method and grid structure assembly jig frame used by same
CN103758356A (en) * 2013-12-25 2014-04-30 中建钢构有限公司 Jig frame top tool for temporarily supporting and uploading steel structure
CN104526601A (en) * 2014-11-29 2015-04-22 沈阳中辰钢结构工程有限公司 Assembling jig for sheet slab steel structural bridge
CN104929376A (en) * 2015-06-15 2015-09-23 中石化南京工程有限公司 Steel structural modular prefabricating tool
CN107090983A (en) * 2016-02-18 2017-08-25 左红 The equipment that builds a house and its assemble method
CN107130808A (en) * 2017-05-23 2017-09-05 中建钢构有限公司 A kind of assembled support jig
CN108216488A (en) * 2018-01-10 2018-06-29 上海外高桥造船有限公司 The tool part built for SPAR platform hards cabin
CN110748176A (en) * 2019-09-30 2020-02-04 上海二十冶建设有限公司 Sliding jig frame device for manufacturing broken line steel column beam and using method thereof
CN114278102A (en) * 2021-12-21 2022-04-05 中铁三局集团建筑安装工程有限公司 Combined beam column joint and construction method thereof
CN114991016A (en) * 2022-06-24 2022-09-02 中国五冶集团有限公司 Positioning device and positioning installation method for inclined steel column base

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276909A (en) * 2013-04-16 2013-09-04 中建钢构有限公司 Arc-shaped grid structure assembly method and grid structure assembly jig frame used by same
CN103276909B (en) * 2013-04-16 2015-10-28 中建钢构有限公司 The assembled moulding bed of rack of arch-shaped space truss assembling method and use thereof
CN103758356B (en) * 2013-12-25 2016-03-09 中建钢构有限公司 For the moulding bed top tool of steel work temporary support and unloading
CN103758356A (en) * 2013-12-25 2014-04-30 中建钢构有限公司 Jig frame top tool for temporarily supporting and uploading steel structure
CN104526601A (en) * 2014-11-29 2015-04-22 沈阳中辰钢结构工程有限公司 Assembling jig for sheet slab steel structural bridge
CN104929376B (en) * 2015-06-15 2017-06-27 中石化南京工程有限公司 A kind of prefabricated frock of steel structure modularization
CN104929376A (en) * 2015-06-15 2015-09-23 中石化南京工程有限公司 Steel structural modular prefabricating tool
CN107090983A (en) * 2016-02-18 2017-08-25 左红 The equipment that builds a house and its assemble method
CN107130808A (en) * 2017-05-23 2017-09-05 中建钢构有限公司 A kind of assembled support jig
CN108216488A (en) * 2018-01-10 2018-06-29 上海外高桥造船有限公司 The tool part built for SPAR platform hards cabin
CN108216488B (en) * 2018-01-10 2023-12-19 上海外高桥造船有限公司 Tooling piece for building SPAR platform hard cabin
CN110748176A (en) * 2019-09-30 2020-02-04 上海二十冶建设有限公司 Sliding jig frame device for manufacturing broken line steel column beam and using method thereof
CN110748176B (en) * 2019-09-30 2021-05-04 上海二十冶建设有限公司 Sliding jig frame device for manufacturing broken line steel column beam and using method thereof
CN114278102A (en) * 2021-12-21 2022-04-05 中铁三局集团建筑安装工程有限公司 Combined beam column joint and construction method thereof
CN114991016A (en) * 2022-06-24 2022-09-02 中国五冶集团有限公司 Positioning device and positioning installation method for inclined steel column base

Similar Documents

Publication Publication Date Title
CN201843351U (en) Multifunctional positioning tool
CN202194244U (en) Positioning support for embedding of ultra-high steel-work pedestals
CN203256761U (en) Tower crane foundation arranged on top plate of basement
CN111719892A (en) Jack unloading support device and use method thereof
CN103266778B (en) Detachable triangular scaffold and steel truss assembly construction method
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN201738597U (en) Sectional steel and steel pipe combined type support system of beam with high and large cross section
CN111506952A (en) Honeycomb steel structure construction method guided by BIM modeling pile foundation
CN105604183A (en) Construction method of rear welded joints of a truss
CN109812021A (en) A kind of installation method of large span welding ball grid
CN204645706U (en) Super large Steel Cantilever Truss installs supporting apparatus
WO2023206851A1 (en) Drum joint installation method, steel reticulated shell, and assembly unit construction method
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN101774516B (en) Lifting device and construction method for replacing rake crane bridge
CN206319624U (en) Construction for frame ball node locating conversion equipment
CN212249325U (en) Jack unloading support device
CN204663027U (en) For the bracing or strutting arrangement that rack is installed
CN209468099U (en) A kind of hydraulic device of pair of supporting frame with steel structure unloading
CN105715055B (en) A kind of nuclear power station large size penetration piece adjustable tool and adjusting method
CN114687567A (en) Ultrahigh heavy embedded part hanging construction tool and method
CN201778495U (en) Jig frame for overhead assembly of large-span truss
CN208415294U (en) Steam turbine platen constructing device
CN203383563U (en) Fast assembled communication iron tower
CN202220438U (en) Diving platform steel formwork support system
CN212688712U (en) Box girder supporting pedestal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110525

CX01 Expiry of patent term