CN201826587U - 特高压直流重冰转角塔 - Google Patents

特高压直流重冰转角塔 Download PDF

Info

Publication number
CN201826587U
CN201826587U CN2010205040869U CN201020504086U CN201826587U CN 201826587 U CN201826587 U CN 201826587U CN 2010205040869 U CN2010205040869 U CN 2010205040869U CN 201020504086 U CN201020504086 U CN 201020504086U CN 201826587 U CN201826587 U CN 201826587U
Authority
CN
China
Prior art keywords
arm
wire jumper
jumper
cross arm
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205040869U
Other languages
English (en)
Inventor
肖兵
肖宇
郭跃明
王永刚
肖洪伟
王强
刘勇
李力
黄兴
梁明
邓安全
辜良雨
刘翔云
李澄宇
董碧霞
刘庆生
龙明全
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN2010205040869U priority Critical patent/CN201826587U/zh
Application granted granted Critical
Publication of CN201826587U publication Critical patent/CN201826587U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)

Abstract

本实用新型公开了特高压直流重冰转角塔,包括塔身(1)、导线横担(2)及地线支架(3),所述导线横担(2)的左右两端分别设置有第一跳线横担(4)与第二跳线横担(5),中部设置有第三跳线横担(6),所述第一跳线横担(4)与第二跳线横担(5)均具有2个跳线挂点,所述第三跳线横担(6)具有4个跳线挂点,位于所述导线横担(2)同侧左右相邻的所述第一跳线横担(4)与第三跳线横担(6)挂点之间均连接有绝缘子串(7)。本实用新型结构简单、构思巧妙、通过对原跳线横担结构及连接方式的改型,保证了特高压重冰区跳线横担的稳定性、确保安全,同时还起到了节约成本的目的。

Description

特高压直流重冰转角塔
技术领域
本实用新型属于输电设备技术领域,具体的讲涉及特高压直流重冰转角塔。
背景技术
±800kV特高压直流输电工程是目前世界上电压等级最高的直流输电线路,在此之前我国已投运的直流输电线路最大电压等级为±500kV,国外已投运的直流输电线路最大电压等级为±660kV。
与常规±500kV直流输电线路相比,±800kV特高压直流输电线路的特点:①输送容量大,是±500kV直流输电线路的2倍左右;②同等条件下,塔高较±500kV要高15.0m左右;③铁塔荷载大;④横担长、塔头大。
由于±800kV直流重冰区转角塔绝缘子片数多,串长长,跳线长达40m以上,常用的跳线方式(软跳线))因其跳线弧垂和风偏,势必造成铁塔加高、横担加长,很明显不是经济的。因此,重冰区转角塔跳线采用硬跳线方式。而硬跳线的固定方式有悬垂的“I串”方式,常用的“I串”方式由于风偏、摇摆、及不均匀覆冰脱冰等问题,容易发生闪络。且,当转角度数过大时,内角侧跳线处在地线保护范围外,容易发生跳线雷击闪络事故,要避免此种事故的发生,势必加长地线横担的长度,对铁塔受力而言,无形中增长了扭力臂,加大了扭距。
实用新型内容
本实用新型的目的是提供了一种结构简单、将跳线的悬挂方式设置为双“V”串形式,确保跳线连接的稳定性、能有效防止跳线发生闪烁,保证使用安全的特高压直流重冰转角塔。
本实用新型的技术方案如下:
特高压直流重冰转角塔,包括塔身、导线横担及地线支架,所述导线横担的左右两端分别设置有第一跳线横担与第二跳线横担,中部设置有第三跳线横担,所述第一跳线横担与第二跳线横担均具有2个跳线挂点,所述第三跳线横担具有4个跳线挂点,位于所述导线横担同侧左右相邻的所述第一跳线横担与第三跳线横担挂点之间均连接有绝缘子串,两挂点之间连接的所述绝缘子串形成“V”形结构,在所述导线横担两侧连接的所述绝缘子串之间悬挂跳线。
采用上述结构关键在于,对跳线横担结构、连接方式及挂点的设计,实现了在塔身的左右两侧跳线采用双“V”悬挂的方式,具体的讲,位于塔身左侧的第一跳线横担的两个挂点与第三跳线横担靠左侧的两个挂点之间连接绝缘子串,绝缘子串形成双“V”的悬挂形式,跳线即悬挂于两“V”型绝缘子串之间,该跳线的悬挂方式将大大增加跳线悬挂的稳定性,减小跳线摆动幅度,从而避免闪络的的问题,提高其安全性。同时跳线悬挂在保证稳定的条件下,可以不增加横担长度,起到节约成本目的。作为塔身右侧与左侧结构原理相同。
有益效果:本实用新型结构简单、构思巧妙、通过对原跳线横担结构及连接方式的改型,保证了特高压重冰区跳线横担的稳定性、确保安全,同时还起到了节约成本的目的。
附图说明
本实用新型将通过例子并参照附图的方式说明,其中:
图1本实用新型的结构示意图;
图2为图1中导线横担及相关部件连接的俯视图。
具体实施方式
如图1所示:特高压直流重冰转角塔,包括塔身1、导线横担2及地线支架3,所述导线横担2的左右两端分别设置有第一跳线横担4与第二跳线横担5,中部设置有第三跳线横担6,所述第一跳线横担4与第二跳线横担5均具有2个跳线挂点,所述第三跳线横担6具有4个跳线挂点,位于所述导线横担2同侧左右相邻的所述第一跳线横担4与第三跳线横担6挂点之间均连接有绝缘子串7,两挂点之间连接的所述绝缘子串7形成“V”形结构,在所述导线横担2两侧连接的所述绝缘子串7之间悬挂跳线8。
如图2所示,导线横担2上的第一跳线横担4具有跳线挂点A、B,第三跳线横担具有跳线挂点C、D、E、F,第二跳线横担具有跳线挂点G、H。绝缘子串具体的悬挂形式是,在AC之间、BD之间、EG之间、FH之间连接绝缘子串,AC、BD连接的绝缘子串形成双“V”结构,在其之间悬挂跳线8,同理EG、FH之间采用相同的方式。

Claims (1)

1.特高压直流重冰转角塔,包括塔身(1)、导线横担(2)及地线支架(3),其特征在于:所述导线横担(2)的左右两端分别设置有第一跳线横担(4)与第二跳线横担(5),中部设置有第三跳线横担(6),所述第一跳线横担(4)与第二跳线横担(5)均具有2个跳线挂点,所述第三跳线横担(6)具有4个跳线挂点,位于所述导线横担(2)同侧左右相邻的所述第一跳线横担(4)与第三跳线横担(6)挂点之间均连接有绝缘子串(7),两挂点之间连接的所述绝缘子串(7)形成“V”形结构,在所述导线横担(2)两侧连接的所述绝缘子串(7)之间悬挂跳线(8)。
CN2010205040869U 2010-08-25 2010-08-25 特高压直流重冰转角塔 Expired - Lifetime CN201826587U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205040869U CN201826587U (zh) 2010-08-25 2010-08-25 特高压直流重冰转角塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205040869U CN201826587U (zh) 2010-08-25 2010-08-25 特高压直流重冰转角塔

Publications (1)

Publication Number Publication Date
CN201826587U true CN201826587U (zh) 2011-05-11

Family

ID=43965132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205040869U Expired - Lifetime CN201826587U (zh) 2010-08-25 2010-08-25 特高压直流重冰转角塔

Country Status (1)

Country Link
CN (1) CN201826587U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835567A (zh) * 2013-12-03 2014-06-04 国家电网公司 一种特高压直流线路上绕式耐张塔

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835567A (zh) * 2013-12-03 2014-06-04 国家电网公司 一种特高压直流线路上绕式耐张塔

Similar Documents

Publication Publication Date Title
CN105514877B (zh) 同塔双回钢管杆更换绝缘子作业用横担卡具
CN201953131U (zh) 220kV同塔双回直线转角钻越塔
CN202167811U (zh) 输电线路刚性跳线非对称v型绝缘子串布置结构
CN204046060U (zh) 一种不停电更换耐张绝缘子串组合工具
CN203260976U (zh) 电缆终端塔
CN105155907A (zh) 耐张塔
CN203119413U (zh) 防风偏v型串
CN206128808U (zh) 一种新型单回路电缆终端塔
CN202954612U (zh) 一种新型单回路t接输电杆塔
CN201826587U (zh) 特高压直流重冰转角塔
CN201933831U (zh) ±800kV直流线路与接地极线路共塔的输电铁塔
CN206722513U (zh) 一种架空输电线路复合材料穿心直线塔
CN201924635U (zh) 架空绝缘导线塔杆
CN204926930U (zh) 一种用于四联悬垂串复合绝缘子的跑道型均压环
CN205509427U (zh) 500千伏紧凑型输电线路转常规型输电线路过渡耐张塔
CN204928052U (zh) 一种杆式垂直排列紧凑型输电线路
CN203871807U (zh) 一种配电线路直线分支防鸟绝缘保护罩
CN203631193U (zh) 针式绝缘子
CN102383639A (zh) 紧凑结构杆塔
CN202711876U (zh) ±500kV同塔双回线路用悬垂软跳线合成绝缘子串
CN205921338U (zh) 一种弹性双串件及弹性双串悬垂塔
CN206220622U (zh) 一种单回架空输电线路电缆开断引下转角塔
CN202227763U (zh) 紧凑结构杆塔
CN201549852U (zh) 特高压输电线路小转角直线塔用l串悬垂联板
CN205070380U (zh) 一种320kV直流电缆户外终端

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP SOUTHWEST

Free format text: FORMER NAME: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP03 Change of name, title or address

Address after: 610041 No. 18 Dongfeng Road, Sichuan, Chengdu

Patentee after: China Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd.

Address before: 610041 18 power grid engineering branch of Dongfeng Road, Chengdu, Sichuan

Patentee before: Southwest Electric Power Design Institute of China Power Engineering Consulting Group Corporation

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110511