CN201826517U - Scaffold-wall connecting component in construction - Google Patents
Scaffold-wall connecting component in construction Download PDFInfo
- Publication number
- CN201826517U CN201826517U CN2010205714700U CN201020571470U CN201826517U CN 201826517 U CN201826517 U CN 201826517U CN 2010205714700 U CN2010205714700 U CN 2010205714700U CN 201020571470 U CN201020571470 U CN 201020571470U CN 201826517 U CN201826517 U CN 201826517U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- steel pipe
- nuts
- wall
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold-wall connecting component in construction, which comprises a steel pipe transversely arranged in a scaffold and bolts and nuts matched with the steel pipe, wherein the end of the steel pipe facing to a wall is fixedly connected with the bolts; the nuts are butterfly-shaped; a threaded hole positioned in the middle is a blind hole; and bent plates symmetrically expanding outward are arranged on a blind plate at the rear end of the nut. When in site operation, craft screw plugs are filled in the nuts before pre-embedding so as to prevent the nuts from being blocked by concrete in the pre-embedding. When the scaffold is set up, the craft screw plugs are detached firstly, the bolts at the steel pipe end are screwed in the target nuts, and then a fastener is used for locking the steel pipe with the scaffold, therefore, the scaffold and the wall form an integral structure by connecting wall connecting components in sequence so as to greatly improve the stability and reliability of the scaffold. The scaffold-wall connecting component is simple in structure, convenient to install and reliable in connection, and is particularly applicable to setting up high-level scaffolds.
Description
Technical field
The utility model relates to a kind of construction equipment, and particularly a kind of building scaffold connects the member of body of wall.
Background technology
Scaffold is the platform and the guardrail of constructor's ascend operation in the construction work.Current era, the scaffold of using in the construction work generally is barricaded as with steel pipe and fastener, and whether the scaffold of this frame construction reliably is directly connected to constructor's life security.In the engineering in order to increase the reliability of steel pipe scaffold, usually with scaffold be connected building body of wall, company's wall construction of prior art is to put the steel pipe that stretches within the walls at interval to connect pre-pile anchoring on the flooring in scaffold, make scaffold become one with the building that leans on mutually, this structure significantly increases the stability of scaffold, thereby promotes reliability.But also there is shortcoming in this structure, at first is that steel pipe is passed in the body of wall of building, and pre-pile anchoring all hinders follow-up construction on the flooring.Next is that the naked light of generation easily constitutes the potential safety hazard of job site when slicing off on the flooring pre-pile anchoring the engineering later stage, and there is the defect of seepage in the filling-up hole place on the body of wall.
The utility model content
The utility model is primarily aimed at the deficiencies in the prior art, propose a kind of simple in structure, make easy, easy for installation, connect reliably, neither hinder follow-up construction, do not have the building scaffold of work with torches to connect wall member yet.
The utility model is achieved through the following technical solutions technical goal.
Building scaffold connects wall member, and it is made of steel pipe horizontal in the scaffold and the bolt, the nut that match.Its improvements are: described steel pipe is in the face of an end axial restraint connecting bolt of body of wall.Described nut is butterfly, and the M16mm~25mm screwed hole in the middle of being positioned at is a blind hole, and the nut back end blind plate is provided with the outer bent plate that launches of symmetry, and both sides bent plate abduction total length is greater than 1~2 times of diameter of steel tube, the wide 30mm~50mm of bent plate, thick 1.5mm~3mm.
In the said structure, the bent plate of nut back end is quarter bend or arc bend member.
The utility model compared with prior art has following benefit:
1, even wall construction is simple, easy to manufacture, easy for installation, connection is reliable;
2, the outer installation of wall does not hinder follow-up construction, improves construction environment greatly;
3, the installation site does not need hole to be provided, need not filling-up hole after the dismounting, does not have the body of wall hidden leakage defect;
4, the pre-pile anchoring that does not expose on the flooring is saved and is cut off operation afterwards, so there is not the condition of initiation fire.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the local enlarged diagram of steel pipe and bolt syndeton.
Fig. 3 is that the nut structure master looks enlarged diagram.
Fig. 4 is Fig. 3 lateral view.
The specific embodiment
Below with reference to the accompanying drawings and in conjunction with the embodiments, the utility model is described in further detail.
Building scaffold shown in the accompanying drawing 1 connects wall member, and it is made of steel pipe horizontal in the scaffold 1 and the bolt 2, the nut 3 that match.Described steel pipe 1 is in the face of an end axial restraint connecting bolt 2 of body of wall, and bolt 2 is M25mm in the present embodiment.In the middle of the screwed hole of described nut 3 was positioned at, screwed hole was a blind hole, and nut 3 rear end blind plates 3.1 are provided with the outer bent plate 3.2 that launches of symmetry, and the bent plate 3.2 in the present embodiment is the quarter bend member, and bent plate 3.2 abduction total lengths in both sides are 60mm, wide 45mm, thick 2mm.Nut 3 is embedded in the concrete by desired location.
During site operation, flow in the screwed hole in order to prevent nut 3 concrete when pre-buried, plug is adorned the technology plug screw in the screw of nut 3 in advance, and the screwed hole of nut 3 flushes outwardly and with concrete edge when laying.Lay down the technology plug screw when scaffolding erecting earlier, an end that then steel pipe 1 is provided with bolt 2 nut 3 that aims at the mark screws, then with fastener with steel pipe 1 and scaffold locking.The utility model is linked in sequence by the above-mentioned wall member that connects, and makes scaffold and body of wall become an overall structure, strengthens the stability of scaffold greatly, thereby significantly improves the reliability of scaffold.
Claims (3)
1. a building scaffold connects wall member, and it is made of steel pipe horizontal in the scaffold (1) and the bolt (2) that matches, nut (3); It is characterized in that: described steel pipe (1) is in the face of an end axial restraint connecting bolt (2) of body of wall; Described nut (3) is butterfly, M16mm~25mm screwed hole in the middle of being positioned at is a blind hole, nut (3) rear end blind plate (3.1) is provided with the outer bent plate (3.2) that launches of symmetry, both sides bent plate (3.2) abduction total length is greater than 1~2 times of steel pipe (1) diameter, wide 30mm~the 50mm of bent plate (3.2), thick 1.5mm~3mm.
2. building scaffold according to claim 1 connects wall member, it is characterized in that: the bent plate (3.2) of described nut (3) rear end is the quarter bend member.
3. building scaffold according to claim 1 connects wall member, it is characterized in that: the bent plate (3.2) of described nut (3) rear end is the arc bend member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205714700U CN201826517U (en) | 2010-10-21 | 2010-10-21 | Scaffold-wall connecting component in construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205714700U CN201826517U (en) | 2010-10-21 | 2010-10-21 | Scaffold-wall connecting component in construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201826517U true CN201826517U (en) | 2011-05-11 |
Family
ID=43965063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205714700U Expired - Fee Related CN201826517U (en) | 2010-10-21 | 2010-10-21 | Scaffold-wall connecting component in construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201826517U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733591A (en) * | 2012-07-18 | 2012-10-17 | 湖南长大建设集团股份有限公司 | Scaffold mounting seat of concrete building |
CN104074350A (en) * | 2014-06-11 | 2014-10-01 | 安徽长青电子机械(集团)有限公司 | Wall connecting type scaffold connecting element |
CN105804387A (en) * | 2016-05-24 | 2016-07-27 | 中铁五局集团建筑工程有限责任公司 | Wall connecting piece and assembling and disassembling method thereof |
CN106437149A (en) * | 2015-08-10 | 2017-02-22 | 广西建工集团第四建筑工程有限责任公司 | Simple claw type wall connecting part |
CN107246141A (en) * | 2017-07-18 | 2017-10-13 | 中建四局第六建筑工程有限公司 | A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk and its construction method |
CN107447975A (en) * | 2016-05-31 | 2017-12-08 | 桂林建筑安装工程有限公司 | Exterior wall scaffold tapered cup nut wall-connecting piece |
CN107762135A (en) * | 2016-08-22 | 2018-03-06 | 中国二十冶集团有限公司 | The construction method of skin scaffold wall connecting piece |
CN110206291A (en) * | 2019-06-28 | 2019-09-06 | 中建三局集团有限公司 | It is not through walls to have enough to meet the need assembled overhanging beam |
-
2010
- 2010-10-21 CN CN2010205714700U patent/CN201826517U/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733591A (en) * | 2012-07-18 | 2012-10-17 | 湖南长大建设集团股份有限公司 | Scaffold mounting seat of concrete building |
CN104074350A (en) * | 2014-06-11 | 2014-10-01 | 安徽长青电子机械(集团)有限公司 | Wall connecting type scaffold connecting element |
CN104074350B (en) * | 2014-06-11 | 2016-09-07 | 安徽长青电子机械(集团)有限公司 | A kind of even wall scaffold fastenings |
CN106437149A (en) * | 2015-08-10 | 2017-02-22 | 广西建工集团第四建筑工程有限责任公司 | Simple claw type wall connecting part |
CN106437149B (en) * | 2015-08-10 | 2019-01-08 | 广西建工集团第四建筑工程有限责任公司 | A kind of easy claw wall-connecting piece |
CN105804387A (en) * | 2016-05-24 | 2016-07-27 | 中铁五局集团建筑工程有限责任公司 | Wall connecting piece and assembling and disassembling method thereof |
CN107447975A (en) * | 2016-05-31 | 2017-12-08 | 桂林建筑安装工程有限公司 | Exterior wall scaffold tapered cup nut wall-connecting piece |
CN107762135A (en) * | 2016-08-22 | 2018-03-06 | 中国二十冶集团有限公司 | The construction method of skin scaffold wall connecting piece |
CN107762135B (en) * | 2016-08-22 | 2020-01-14 | 中国二十冶集团有限公司 | Construction method of scaffold wall connecting piece of building outer wall |
CN107246141A (en) * | 2017-07-18 | 2017-10-13 | 中建四局第六建筑工程有限公司 | A kind of steel pipe opens the pre-buried assembling wall-connecting piece of silk and its construction method |
CN110206291A (en) * | 2019-06-28 | 2019-09-06 | 中建三局集团有限公司 | It is not through walls to have enough to meet the need assembled overhanging beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826517U (en) | Scaffold-wall connecting component in construction | |
CN202039590U (en) | Steel pipe type scaffold wall connecting device | |
CN103967246B (en) | Welding post-install system and construction method thereof | |
CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
CN103255909A (en) | Wall connecting attachment device of construction engineering outer wall scaffold | |
CN203441069U (en) | Outer wall dangling working platform capable of overturning | |
CN204756173U (en) | Stifled hole of general adjustable cable of transformer substation device | |
US8316992B2 (en) | Method and apparatus for securing a scaffold to a building | |
CN204552132U (en) | A kind of adjustable type tool type stairs temporary guard rail | |
CN103225412A (en) | Vertical connector for workside guard rails | |
CN204111114U (en) | A kind of novel wall-attached frame for building hoist | |
CN202359583U (en) | Detachable emergency cover plate | |
CN204023422U (en) | A kind of assembling Coping Construction operating platform | |
CN205063315U (en) | Outer wall scaffold connecting piece | |
CN103556813B (en) | Steel pipe scaffold wall-connecting piece | |
CN204370825U (en) | Assembled architecture faces frontier defense protection unit | |
CN209179465U (en) | To pull-up screw rod wall-connecting piece | |
CN210067407U (en) | Scaffold wall connecting piece | |
CN201152014Y (en) | Scaffolding connector | |
CN206016231U (en) | A kind of new type scaffold wall-connecting piece | |
CN203603490U (en) | Supporting structure used for erecting formwork truss on prefabricated beam | |
CN203603444U (en) | Steel pipe scaffold wall connecting piece | |
CN203821871U (en) | Safe enclosing handrail for construction | |
CN202706511U (en) | Fixing device for hanging scaffold used in dismantling high structures | |
CN201649615U (en) | Underground wall-linking part of outer scaffold seat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20151021 |
|
EXPY | Termination of patent right or utility model |