CN201818035U - Novel intelligent exterior wall lifting scaffold - Google Patents

Novel intelligent exterior wall lifting scaffold Download PDF

Info

Publication number
CN201818035U
CN201818035U CN2010205408917U CN201020540891U CN201818035U CN 201818035 U CN201818035 U CN 201818035U CN 2010205408917 U CN2010205408917 U CN 2010205408917U CN 201020540891 U CN201020540891 U CN 201020540891U CN 201818035 U CN201818035 U CN 201818035U
Authority
CN
China
Prior art keywords
steel
steel bolt
roof beam
beam structure
exterior wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205408917U
Other languages
Chinese (zh)
Inventor
陈荣达
陈华鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010205408917U priority Critical patent/CN201818035U/en
Application granted granted Critical
Publication of CN201818035U publication Critical patent/CN201818035U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a novel intelligent exterior wall lifting scaffold. The novel intelligent exterior wall lifting scaffold comprises a connecting part adhered to a wall, lifting racks, beam frames, a dynamic system, an overload induction autonomous system and a balance induction warning system, wherein the connecting part adhered to the wall is fixed on a building exterior wall concrete beam column, the beam frames are placed at the upper parts of two groups or more than two groups of lifting racks; first steel pins that are arranged as per the given spacing are arranged in the C-shaped steels on one sides of the lifting racks; the connecting part adhered with the wall comprises one baseplate and two lateral plates; the overload induction autonomous system is respectively connected with suspension loops of third steel pins and electric chain hoists; and the balance induction warning system is mounted on a main steel girder arranged at the bottom of the beam frame and longitudinally spanning one side. The utility model has the advantages that conventional marginal material is utilized to build fewer layers of frame bodies and other supporting structures, and the electric chain hoists are used for supplying power, so that the frame bodies can be lifted to the required height, and the social and economic benefits are revealed unlimitedly with the continuous expansion of the building construction scale.

Description

Novel intelligent exterior wall hoisting scaffold
Technical field
The utility model belongs to the scaffold field, especially a kind of novel intelligent exterior wall hoisting scaffold.
Background technology
Building construction at present is more and more higher, high-rise, super highrise building is appearance in enormous quantities, its building technology and equipment have reached advanced international standard, and exterior wall scaffold is as one of most important link in the building construction technology measure, its original method of setting up does not layer by layer but have good improvement and serious the hysteresis, directly influence carrying out with safety smoothly of construction operation, and be related to the raising of workmanship and business economic benefit, caused raw material and artificial significant wastage.In the case, proposed very urgent and higher requirement, in No. 659 bulletin of the Ministry of Construction, at first attachment type raise scaffold has been classified as the Eleventh Five-Year Plan research and development and applied one of project the building operations scaffold.The suitable modern high-rise building construction of research and development is of great practical significance with scaffold for this reason.
The utility model content
The utility model will solve the shortcoming of above-mentioned prior art, and a kind of novel intelligent exterior wall hoisting scaffold is provided.
The technical scheme that the technical problems to be solved in the utility model adopts: this novel intelligent exterior wall hoisting scaffold, it comprises that mainly robot control system(RCS) is responded in attached wall connector, hoisting frame, roof beam structure, dynamical system, the overload of being fixed on the external wall of house wall beam column built from concrete, compositions such as warning system are answered by the sense of equilibrium, described roof beam structure is shelved on the top of two groups or more hoisting frame, and hoisting frame is welded by various shaped steel; The first steel bolt that is provided with is at a certain distance arranged in the C shaped steel of hoisting frame one side; Described attached wall connector is made up of a base plate and two blocks of side plates, on this base plate, be provided with and supply the slotted eye that screw rod and exterior wall beam column built from concrete are connected and fixed and the Heibei provincial opera that can supply water saves, symmetrically arranged clamping block is arranged in the attached wall connector, this clamping block is the axle center with the second steel bolt, tie by connecting rod and the 3rd steel and to connect, have spring to be connected between the 3rd steel bolt two ends and the 4th steel bolt, when applying working condition, play steadily and the link and the first steel bolt that adjusting screw(rod) that the load-carrying effect connects together and wire rope two ends are hung in the 5th steel bolt on; Described overload induction self-con-tained unit is connected with electric chain hoist with the link of the 3rd steel bolt respectively, and the electric chain hoist lower draw-bar tangles the first steel bolt on the C shaped steel; The described sense of equilibrium answers warning device to be installed in roof beam structure bottom vertically on the span centre one side master girder steel, below roof beam structure, the side of hoisting frame is provided with can be for the operation post of personnel's hook electric chain hoist and wire rope.
As preferably, described clamping block is the distortion circle, and the corresponding centre of this two clamping block one side is the thigh shape inner groovy of wire rope outer surface features, and two ends respectively hung on the first steel bolt after the bifilar insurance steel cable that plays safety effect passed inner groovy in the clamping block.
As preferably, described roof beam structure becomes the roof beam structure of certain span for adopting the boniness frame with the junction plate assembling combination, roof beam structure after the assembly unit moulding is laid bed board, hangs safety net and railing is installed according to the instructions for use of scaffold, and roof beam structure can be made into one or more layers as required.
As preferably, the contiguous block of described attached wall connector is connected with the C shaped steel of hoisting frame one side and plays guiding, anti-dumping effect, and first chute in the contiguous block can be used as vertical adjustment and the effect by bolton.
The effect that the utility model is useful is: utilize existing a spot of material to set up seldom support body and other supporting structures of the number of plies, use electric chain hoist to be power, can make support body be elevated to needed height, at aspects such as raw material, artificial, safety compared with prior art, its integrated cost have only prior art 1/3 to more than 1/15, along with the lasting expansion of building construction scale, its social benefit and economic benefit more infinitely show.
Description of drawings
Fig. 1 is main TV structure figure of the present utility model.
Fig. 2 is the right TV structure figure after the installation of the present utility model.
Fig. 3 is a right TV structure detail drawing of the present utility model.
Fig. 4 is a right TV structure vertical view of the present utility model.
Fig. 5 is support body of the present utility model clamping block schematic diagram when lock-out state when static.
Fig. 6 is support body of the present utility model clamping block schematic diagram when opening when lifting.
Fig. 7 is C shaped steel of the present utility model and attached wall connector organigram.
Fig. 8 is a roof beam structure main framing joint construction schematic diagram of the present utility model.
Fig. 9 is a roof beam structure main framing sectional drawing of the present utility model.
Figure 10 is wire rope of the present utility model and adjusting screw(rod) schematic diagram.
Figure 11 is a clamping block front view of the present utility model.
Figure 12 is a clamping block inner groovy organigram of the present utility model.
Figure 13 is the 3rd a steel bolt schematic diagram of the present utility model.
Figure 14 is operation post of the present utility model and hoisting frame structural representation.
Label in the accompanying drawing is divided into: 1, roof beam structure, 2, hoisting frame, 3, junction plate, 4, C shaped steel, 5, the first steel bolt, 6, the attached wall connector, 7, contiguous block, 8, bolt, 9, first chute, 10, clamping block, 11, groove, 12, the second steel bolt, 13, connecting rod, 14, the 3rd steel bolt, 15, the 4th steel bolt, 16, spring, 17, the 5th steel bolt, 18, wire rope, 19, adjusting screw(rod), 20, overload induction self-con-tained unit, 21, electric chain hoist, 22, insurance steel cable, 23, warning device is answered by the sense of equilibrium, and 24, slotted eye, 25, screw rod, 26, second chute, 27, base plate, 28, side plate, 29, operation post.
The specific embodiment
The utility model is described in more detail below in conjunction with accompanying drawing:
As shown in drawings: this novel intelligent exterior wall hoisting scaffold, mainly comprise roof beam structure (work layer) 1 and hoisting frame 2, roof beam structure 1 becomes the roof beam structure 1 of certain span for adopting the boniness frame with junction plate 3 assembling combination, roof beam structure 1 after the assembly unit moulding is laid bed board, hangs safety net and railing is installed according to the instructions for use of scaffold, and roof beam structure 1 can be made into one or more layers as required.Roof beam structure 1 is shelved on the top of two groups or more hoisting frame 2, and hoisting frame 2 is welded by various shaped steel; The first steel bolt 5 that is provided with is at a certain distance arranged in the C shaped steel 4 of hoisting frame 2 one sides.Attached wall connector 6 is made up of a base plate 27 and two blocks of side plates 28, being provided with on this base plate 27 can be for the slotted eye 24 that screw rod 25 and exterior wall beam column built from concrete are connected and fixed and the Heibei provincial opera that can supply water saves, the contiguous block 7 of attached wall connector 6 is connected with the C shaped steel 4 of hoisting frame 2 one sides and plays guiding, anti-dumping effect, and first chute 9 in the contiguous block 7 can be used as vertical adjustment and by the fastening effect of bolt 8.Symmetrically arranged clamping block 10 is arranged in the attached wall connector 6, clamping block 10 is the distortion circle, this two clamping blocks, 10 corresponding centres, one side is the thigh shape inner groovy 11 of wire rope outer surface features, clamping block 10 is the axle center with the second steel bolt 12, be connected with the 3rd steel bolt 14 by connecting rod 13, there is spring 16 to be connected between the 3rd steel bolt 14 two ends and the 4th steel bolt 15, when applying working condition, play steadily and the link and the first steel bolt 5 that adjusting screw(rod) 19 that the load-carrying effect connects together and wire rope 18 two ends are hung in the 5th steel bolt 17 on, overload induction self-con-tained unit 20 is connected with electric chain hoist 21 with the link of the 3rd steel bolt 14 respectively, electric chain hoist 21 lower draw-bars tangle the first steel bolt 5 on the C shaped steel 4, playing the two ends, inner groovy 11 back that the bifilar insurance steel cable 22 of safety effect passes in the clamping block 10 respectively hangs on the first steel bolt 5, the sense of equilibrium answers warning device 23 to be installed on the vertical span centre one side master girder steel in roof beam structure 1 bottom, at roof beam structure below 1, the side of hoisting frame 2 is provided with can be for the operation post 29 of personnel's hook electric chain hoist 21 and wire rope 18.
As shown in Figure 1:, support body can be established single span, multispan around building or be connected any combination of striding according to the building surface.
The action principle of locking device: when electric chain hoist 21 starts when making the first steel bolt 5 of chain on hoisting frame 2 stressed, when the 3rd steel bolt 14 of connection spring 16 is drawn into second chute, 26 bottoms, clamping block 10 is subjected to the effect of the 3rd steel bolt 14 and rotates at connecting rod 13, make interspersed clamping block 10 and 22 of the insurance steel cables that wherein retrains insurance steel cable 22 produce the gap and unrestricted, support body can move up and down.And when electric chain hoist 21 stop to start and chain loosened or during at lift work chain etc. rupture suddenly or when the situation of support body tenesmus suddenly occurring, the 3rd steel bolt 14 is because of the retraction of high-strength spring 16, clamping block 10 is rotated being connected in connecting rod 13 effects on the 3rd steel bolt 14 insurance steel cable 22 is firmly clamped, because of inner groovy on the clamping block 10 11 and insurance steel cable 22 external surfaces match; Because the downward pulling force and the spring 16 of support body insurance steel cable 22 when tenesmus are provided at the thrust of giving clamping block on the connecting rod 13, make clamping block 10 give the snap-in force of insurance steel cable 22 also bigger again.So have perfect locking, anti-fall effect.
Overload induction self-con-tained unit: be connected on the electric chain hoist, when support body surpasses when limiting load weight, can send sound, light is reported to the police and cut off the electricity supply automatically.
Warning device is answered by the sense of equilibrium: when support body can sound the alarm when the support body horizontal angle surpasses the angle that limits during in lifting, take measures to submit operating personnel to.
Operating process of the present utility model is:
Behind the good above-mentioned various assemblies of fabrication and installation, when doing rising or decline according to instructions for use, connect power supply, after startup is done to rise as the electric chain hoist 21 of power set slightly, releasing wire rope 18 is connected with the first steel bolt 5, in addition, when making the rising operating mode, interting the upper end of the insurance steel cable 22 in locking device this moment tangles on the first steel bolt 5 by this attached wall connector 6 nearest C shaped steel 4, the lower end hangs on the first steel bolt 5 of the nearest C shaped steel 4 in next attached wall connector 6 tops, as when doing the decline operating mode, its hook position is then opposite; Electric chain hoist 21 starts once more and is elevated to needed certain altitude when high slightly, with wire rope 18 two ends of band adjusting screw(rod) 19 respectively with last layer or down in the 5th steel bolt 17 of one deck attached wall connector 6 link be connected with the first steel bolt 5 on the C shaped steel 4, insurance steel cable 22 is installed to the station that the next one needs lifting, electric chain hoist 21 descend the wire rope 18 that makes band adjusting screw(rod) 19 stressed after, withdraw electric chain hoist 21 to next station, so just, finish the lifting of a height, and can use this program to make the scaffold lifting to needed height, use flexible and convenient.
In addition to the implementation, all employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.

Claims (4)

1. novel intelligent exterior wall hoisting scaffold, comprise that robot control system(RCS) is responded in attached wall connector, hoisting frame, roof beam structure, dynamical system, the overload of being fixed on the external wall of house wall beam column built from concrete, warning system is answered by the sense of equilibrium, it is characterized in that: described roof beam structure (1) is shelved on the top of two groups or more hoisting frame (2), and hoisting frame (2) is welded by shaped steel; The first steel bolt (5) that is provided with is at a certain distance arranged in the C shaped steel (4) of hoisting frame (2) one sides; Described attached wall connector (6) is made up of a base plate (27) and two blocks of side plates (28), on this base plate (27), be provided with and supply screw rod (25) and exterior wall beam column built from concrete to be connected and fixed, and the slotted eye (24) of the Heibei provincial opera that can supply water joint, symmetrically arranged clamping block (10) is arranged in the attached wall connector (6), this clamping block (10) is the axle center with the second steel bolt (12), be connected with the 3rd steel bolt (14) by connecting rod (13), have spring (16) to be connected between the 3rd steel bolt (14) two ends and the 4th steel bolt (15), when applying working condition, play steadily and the adjusting screw(rod) that links together (19) of load-carrying effect and the link and the first steel bolt (5) that wire rope (18) two ends are hung in the 5th steel bolt (17) on; Described overload induction self-con-tained unit (20) is connected with electric chain hoist (21) with the link of the 3rd steel bolt (14) respectively, and electric chain hoist (21) lower draw-bar tangles the first steel bolt (5) on the C shaped steel (4); The described sense of equilibrium answers warning device (23) to be installed in roof beam structure (1) bottom vertically on the span centre one side master girder steel, roof beam structure (1) below, the side of hoisting frame (2) is provided with the operation post (29) that can supply personnel's hook electric chain hoist (21) and wire rope (18).
2. novel intelligent exterior wall hoisting scaffold according to claim 1, it is characterized in that: described clamping block (10) is the distortion circle, this corresponding centre of two clamping block (10) one side is the thigh shape inner groovy (11) of wire rope outer surface features, and the two ends of passing in the clamping block (10) as the bifilar insurance steel cable (22) of safety effect, inner groovy (11) back respectively hang on the first steel bolt (5).
3. novel intelligent exterior wall hoisting scaffold according to claim 1, it is characterized in that: described roof beam structure (1) becomes the roof beam structure (1) of certain span for adopting the boniness frame with junction plate (3) assembling combination, roof beam structure after the assembly unit moulding (1) is laid bed board, hangs safety net and railing is installed according to the instructions for use of scaffold, and roof beam structure (1) is made into one or more layers as required.
4. novel intelligent exterior wall hoisting scaffold according to claim 1, it is characterized in that: the contiguous block (7) of described attached wall connector (6) is connected with the C shaped steel (4) of hoisting frame (2) one sides, and vertical first chute of adjusting (9) of the conduct in the contiguous block (7) is fastening by bolt (8).
CN2010205408917U 2010-09-21 2010-09-21 Novel intelligent exterior wall lifting scaffold Expired - Lifetime CN201818035U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205408917U CN201818035U (en) 2010-09-21 2010-09-21 Novel intelligent exterior wall lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205408917U CN201818035U (en) 2010-09-21 2010-09-21 Novel intelligent exterior wall lifting scaffold

Publications (1)

Publication Number Publication Date
CN201818035U true CN201818035U (en) 2011-05-04

Family

ID=43915999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205408917U Expired - Lifetime CN201818035U (en) 2010-09-21 2010-09-21 Novel intelligent exterior wall lifting scaffold

Country Status (1)

Country Link
CN (1) CN201818035U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985855A (en) * 2010-09-21 2011-03-16 陈华鸿 Novel intelligent external wall lifting scaffold
CN104032941A (en) * 2014-05-19 2014-09-10 龙彬 Layered lifting scaffold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985855A (en) * 2010-09-21 2011-03-16 陈华鸿 Novel intelligent external wall lifting scaffold
CN104032941A (en) * 2014-05-19 2014-09-10 龙彬 Layered lifting scaffold
CN104032941B (en) * 2014-05-19 2016-05-18 龙彬 Layering elevating scaffold

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN109319652B (en) laminated slab hoisting tool and laminated slab hoisting method
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN101985855B (en) Novel intelligent external wall lifting scaffold
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN101892736A (en) High altitude moving hanging basket construction method
CN207244452U (en) A kind of suspension bridge vice saddle adjusting apparatus in place
CN201818035U (en) Novel intelligent exterior wall lifting scaffold
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN208702174U (en) A kind of Node In Large-span Pipe Truss roof truss air translation mounting bracket system
CN213268983U (en) Self-climbing discharging platform
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN203878957U (en) Protective screen module unit
CN207277197U (en) A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN206784960U (en) Lower supporting type overhanging unloading platform
CN106988543A (en) Lower supporting type overhanging unloading platform and construction technology
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN103899078B (en) Attachment automatic lifting protecting screen mounting method
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN208347279U (en) A kind of building faces side structural column construction protecting rack
CN203373954U (en) Attached type lifting canopy frame or scaffold
CN202201650U (en) Four-supporting-column combined hoisting device for ultra-high voltage serial compensation platform
CN110212843A (en) A kind of bracing means and its localization method of photovoltaic bracket template
CN215829977U (en) A suspended door formula support for high altitude tower building vestibule fitment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110504

Effective date of abandoning: 20120404