CN201809880U - Curtain wall upright post hanging connecting structure - Google Patents

Curtain wall upright post hanging connecting structure Download PDF

Info

Publication number
CN201809880U
CN201809880U CN2010205048610U CN201020504861U CN201809880U CN 201809880 U CN201809880 U CN 201809880U CN 2010205048610 U CN2010205048610 U CN 2010205048610U CN 201020504861 U CN201020504861 U CN 201020504861U CN 201809880 U CN201809880 U CN 201809880U
Authority
CN
China
Prior art keywords
peg
column
connecting structure
curtain
wall stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205048610U
Other languages
Chinese (zh)
Inventor
欧阳德华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI LINGZHI DECORATION ENGINEERING Co Ltd
Original Assignee
HUBEI LINGZHI DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI LINGZHI DECORATION ENGINEERING Co Ltd filed Critical HUBEI LINGZHI DECORATION ENGINEERING Co Ltd
Priority to CN2010205048610U priority Critical patent/CN201809880U/en
Application granted granted Critical
Publication of CN201809880U publication Critical patent/CN201809880U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model discloses a curtain wall upright post hanging connecting structure. The structure comprises a connecting piece fixed on the civil structure of a building, wherein a hanging rod is connected onto the connecting piece, and a hanger is hung on the hanging rod and connected with an upright post. The design provided by the utility model completely changes the traditional construction method by firstly fabricating all of main keels (i.e. upright posts) in a workshop and then transporting the main keels to the site for assembly, so as to shorten on-site assembly time and improve safety of workers. Also, the fabrication precision in the workshop is high, and the construction time is greatly shortened at the site. The curtain wall upright post hanging connecting structure can be rapidly and simply assembled with high precision. The utility model is an important improvement of assembly and construction process and structure of a half-unit type curtain wall.

Description

Curtain-wall stand-column articulating connecting structure
Technical field
The utility model belongs to curtain wall construction, is specifically related to a kind of curtain-wall stand-column syndeton.
Background technology
In the joint structure of half-cell formula building curtain wall, the traditional construction technology of the installation of column is to install built-in fitting iron plate earlier, it is that column is holed on main joist facing to the circular hole on the adaptor on a ground at the construction field (site) again with main joist that adaptor is installed then, is clipped in the adaptor main joist fastening with bolt again.Such form of construction work, backward time-consuming labour intensity is big.On building body the construction time spent longer, added time of work high above the ground, also just increased workman's danger.
Summary of the invention
The purpose of this utility model is to provide a kind of curtain-wall stand-column articulating connecting structure, makes column scene of being transported to after the workshop processes hang connection; Thereby the installation that overcomes above-mentioned column connects defective.
The technical solution of the utility model is: curtain-wall stand-column articulating connecting structure; It comprises the connector that is fixed on the building civil engineering structure, is connected with peg on the connector, is hung and connected with hook on the peg, and hook is connected with column.
Described connector comprises the base that is connected with the building civil engineering structure, and the both sides of base are provided with the connection wing plate, connects peg between two connection wing plates.
Offer the horizontal adjustment hole on the described connection wing plate, peg passes the horizontal adjustment hole, and the peg two ends are connected with the adjustment hold-down nut, adjusts hold-down nut and is connected the wing plate contact.
Described hook comprises with peg and articulates the hanger plate that is connected, and the hanger plate both sides are provided with the junction plate that is connected with column, and hanger plate is provided with the adjusting screw(rod) that is connected with the peg locking.
Offer screw hole on the top board of described hanger plate, screw hole is passed in the adjusting screw(rod) connection, and the adjusting screw(rod) end face contacts with peg, attaching nut on the adjusting screw(rod), and described nut contacts with the top board of hanger plate.
Described hanger plate both sides are provided with the location lasso, and the location lasso is fixed by screw and peg.
Described junction plate is connected by bolt with column.
The invention of present technique has thoroughly changed traditional form of construction work, and all main joist is that column all is transported to on-the-spot the installation after the workshop processes, and has shortened the set-up time at the scene, has also just improved workman's safety.And, greatly shortened the engineering time at the scene when installing at the scene at workshop machining accuracy height.During installation, quick, easy and precision height; It is the great improvement of half-cell formula curtain wall construction technique and structure.
Description of drawings
Fig. 1 curtain-wall stand-column articulating connecting structure schematic top plan view.
Fig. 2 curtain-wall stand-column articulating connecting structure elevational schematic view.
The specific embodiment
As shown in Figure 1, connector 1 comprises the base 1.1 that is connected with the building civil engineering structure, and the both sides of base are provided with and connect wing plate 1.2, constitute " U " shape or are called saddle-shaped connector 1; Base 1.1 is connected with slot type built-in fitting 1.4 in being embedded in building civil engineering structure 2 by bolt 1.3, and slot type built-in fitting 1.4 is structures of a routine.
As shown in Figure 2, offer horizontal adjustment hole 3 on the connection wing plate 1.2 of connector 1, horizontal adjustment hole 3 is oblong hole, peg 4 passes the two horizontal adjustment holes 3 that connect on the wing plate 1.2, the two ends of peg 4 are provided with screw thread and form screw rod, and screw rod is connected with adjustment hold-down nut 5, and adjusting hold-down nut 5 is two, two adjustment hold-down nuts 5 wing plate 1.2 that is clamped and connected makes peg 4 be fixed on the connector 1; Because the horizontal adjustment hole 3 on the connection wing plate 1.2 that passes of peg 4 is Long Circles, so the front and back position of the level of peg 4 can regulate, to adapt to the position of adjusting curtain-wall stand-column.
Column 6 coupling hooks 7, hook 7 is hung on the peg 4;
Specifically as shown in Figure 1, 2, hook 7 comprises hanger plate 7.1, and hanger plate 7.1 is " U " shape or is called the shape of a saddle, can be hung on like this on the peg 4; The hanger plate both sides are provided with the junction plate 7.2 that is connected with column and also are called clamping plate; Junction plate 7.2 is connected with column 6 by bolt 8, and in the present embodiment, junction plate 7.2 is clamped and connected on the top of column 6.
Hanger plate 7.1 both sides are provided with location lasso 9, and location lasso 9 is fixing with peg 4 by screw 9.1.Hanger plate 7.1 is after the position about peg 4 levels also can be regulated, and is fixing by location lasso 9 again.
Hanger plate is provided with the adjusting screw(rod) that is connected with the peg locking.As shown in Figure 2, offer screw hole 7.4 on the top board 7.3 of " U " shape hanger plate 7.1 in the present embodiment, screw hole is passed in adjusting screw(rod) 10 connections, and adjusting screw(rod) 10 end faces contact with peg 4; The attaching nut 10.1 on the adjusting screw(rod), and described nut contacts with the top board of hanger plate.This structure can be crossed and realize hook 7 adjustings with respect to the peg height, promptly can realize the adjustment of the height of the column that hangs;
Originally be that the utility model solves the carry connection that the curtain wall main joist is a column with the three-dimensional regulation method.During installation, in processing plant column and hook are coupled together earlier, on-the-spot connector is fixedly built in built the thing civil engineering structure, adjust the horizontal front and back position of peg 4, after hook 7 hung on the peg 4 position about the adjustment level and height and levelness, to link up with location lasso 9 and to fix, finish the installation of column.Quick, easy and precision height is installed.

Claims (8)

1. curtain-wall stand-column articulating connecting structure, it comprises the connector that is fixed on the building civil engineering structure, it is characterized in that being connected with peg on the connector, is hung and connected with hook on the peg, hook is connected with column.
2. curtain-wall stand-column articulating connecting structure according to claim 1 is characterized in that connector comprises the base that is connected with the building civil engineering structure, and the both sides of base are provided with the connection wing plate, and two connect between the wing plates and connect peg.
3. as curtain-wall stand-column articulating connecting structure as described in the claim 2, it is characterized in that connecting and offer the horizontal adjustment hole on the wing plate, peg passes the horizontal adjustment hole, and the peg two ends are connected with the adjustment hold-down nut, adjust hold-down nut and are connected wing plate and contact.
4. curtain-wall stand-column articulating connecting structure according to claim 1 is characterized in that linking up with and comprises with peg and articulate the hanger plate that is connected, and the hanger plate both sides are provided with the junction plate that is connected with column, and hanger plate is provided with the adjusting screw(rod) that is connected with the peg locking.
5. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that offering screw hole on the top board of hanger plate, adjusting screw(rod) connects and passes screw hole, and the adjusting screw(rod) end face contacts with peg, attaching nut on the adjusting screw(rod), described nut contacts with the top board of hanger plate.
6. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that the hanger plate both sides are provided with the location lasso, the location lasso is fixed by screw and peg.
7. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that junction plate is connected by bolt with column.
8. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that hanger plate is " U " shape.
CN2010205048610U 2010-08-25 2010-08-25 Curtain wall upright post hanging connecting structure Expired - Fee Related CN201809880U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205048610U CN201809880U (en) 2010-08-25 2010-08-25 Curtain wall upright post hanging connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205048610U CN201809880U (en) 2010-08-25 2010-08-25 Curtain wall upright post hanging connecting structure

Publications (1)

Publication Number Publication Date
CN201809880U true CN201809880U (en) 2011-04-27

Family

ID=43892821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205048610U Expired - Fee Related CN201809880U (en) 2010-08-25 2010-08-25 Curtain wall upright post hanging connecting structure

Country Status (1)

Country Link
CN (1) CN201809880U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888918A (en) * 2012-09-26 2013-01-23 苏州金螳螂幕墙有限公司 Upright hanging piece for inverted glass curtain wall
CN102888921A (en) * 2012-09-26 2013-01-23 苏州金螳螂幕墙有限公司 Stand column for inversion type glass curtain wall
CN103290955A (en) * 2013-05-22 2013-09-11 广东金刚幕墙工程有限公司 Fixing support capable of quickly mounting integrated building external wall panel
CN111441517A (en) * 2020-05-14 2020-07-24 中国建筑一局(集团)有限公司 Connecting node and connecting method for photovoltaic double-layer curtain wall and steel structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888918A (en) * 2012-09-26 2013-01-23 苏州金螳螂幕墙有限公司 Upright hanging piece for inverted glass curtain wall
CN102888921A (en) * 2012-09-26 2013-01-23 苏州金螳螂幕墙有限公司 Stand column for inversion type glass curtain wall
CN102888921B (en) * 2012-09-26 2015-08-19 苏州金螳螂幕墙有限公司 A kind of column of inversion type curtain wall
CN103290955A (en) * 2013-05-22 2013-09-11 广东金刚幕墙工程有限公司 Fixing support capable of quickly mounting integrated building external wall panel
CN103290955B (en) * 2013-05-22 2015-04-15 金刚幕墙集团有限公司 Fixing support capable of quickly mounting integrated building external wall panel
CN111441517A (en) * 2020-05-14 2020-07-24 中国建筑一局(集团)有限公司 Connecting node and connecting method for photovoltaic double-layer curtain wall and steel structure

Similar Documents

Publication Publication Date Title
CN101906838A (en) Curtain-wall stand-column articulating connecting structure
CN201809880U (en) Curtain wall upright post hanging connecting structure
CN102808509A (en) Assembly type concrete prefabricated external wall panel anchoring assembly and pouring construction method
CN102251586B (en) Beam hanger, building framework structure and installation method
CN204920240U (en) Curtain cement link plate positioning adjustment device
CN112112274B (en) Assembly type steel structure building assembly and assembly method
CN206554487U (en) A kind of roofing hanging basket
CN111173249B (en) Overhanging support system attached to rectangular beam and column
CN102926554A (en) Steel hanging seat formwork support and construction method thereof
CN210050544U (en) Assembled finished product supporting and hanging frame
CN108222339B (en) High-precision unit system easy to construct
CN208347296U (en) A kind of belt lacing rod piece
CN214785148U (en) Back bolt device of concrete curtain wall plate
CN112962856B (en) Suspended ceiling mounting structure
CN203603450U (en) Clamping slot type steel pipe scaffold
CN109610802B (en) External hanging frame operation platform
CN207739551U (en) A kind of dry-hanging keel mounting structure
CN203640313U (en) Floor beam installing support
CN207377132U (en) A kind of construction safety protection supporting frame
CN218376309U (en) Disc socket joint formula steel cat ladder
CN204738524U (en) Safe quick construction scaffold constructional device
CN215978408U (en) Wall-attached foot stool for civil construction
CN216239024U (en) Wall connecting piece
CN214785176U (en) Concrete curtain wall plate dry hanging device
CN109267647A (en) A kind of connection structure of right angle building wall board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110427

Termination date: 20180825