CN101906838A - Curtain-wall stand-column articulating connecting structure - Google Patents
Curtain-wall stand-column articulating connecting structure Download PDFInfo
- Publication number
- CN101906838A CN101906838A CN 201010262866 CN201010262866A CN101906838A CN 101906838 A CN101906838 A CN 101906838A CN 201010262866 CN201010262866 CN 201010262866 CN 201010262866 A CN201010262866 A CN 201010262866A CN 101906838 A CN101906838 A CN 101906838A
- Authority
- CN
- China
- Prior art keywords
- column
- peg
- curtain
- connecting structure
- wall stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Curtains And Furnishings For Windows Or Doors (AREA)
Abstract
The invention discloses a curtain-wall stand-column articulating connecting structure, comprising a connecting element fixedly arranged on an earth structure of the building. A hanging rod is connected on the connecting element; a hook is hung on the hanging rod; and the hook is connected with the stand column. The structure completely changes the traditional construction form; all the key keels, i.e. the stand columns are transported to the scene to mount after being processed in the workshop, thereby shortening the mounting time at the scene and increasing the safety of the workers; the processing precision in the workshop is high; the construction time at the scene is largely shortened while mounting at the scene. The mounting is quick, simple, convenient and has high precision; and the structure is an important improvement of the mounting construction technique and structure of the half-cell type curtain wall.
Description
Technical field
The invention belongs to curtain wall construction, be specifically related to a kind of curtain-wall stand-column syndeton.
Background technology
In the joint structure of half-cell formula building curtain wall, the traditional construction technology of the installation of column is to install built-in fitting iron plate earlier, it is that column is holed on main joist facing to the circular hole on the adaptor on a ground at the construction field (site) again with main joist that adaptor is installed then, is clipped in the adaptor main joist fastening with bolt again.Such form of construction work, backward time-consuming labour intensity is big.On building body the construction time spent longer, added time of work high above the ground, also just increased workman's danger.
Summary of the invention
The object of the present invention is to provide a kind of curtain-wall stand-column articulating connecting structure, make column scene of being transported to after the workshop processes hang connection; Thereby the installation that overcomes above-mentioned column connects defective.
Technical scheme of the present invention is: curtain-wall stand-column articulating connecting structure; It comprises the connector that is fixed on the building civil engineering structure, is connected with peg on the connector, is hung and connected with hook on the peg, and hook is connected with column.
Described connector comprises the base that is connected with the building civil engineering structure, and the both sides of base are provided with the connection wing plate, connects peg between two connection wing plates.
Offer the horizontal adjustment hole on the described connection wing plate, peg passes the horizontal adjustment hole, and the peg two ends are connected with the adjustment hold-down nut, adjusts hold-down nut and is connected the wing plate contact.
Described hook comprises with peg and articulates the hanger plate that is connected, and the hanger plate both sides are provided with the junction plate that is connected with column, and hanger plate is provided with the adjusting screw(rod) that is connected with the peg locking.
Offer screw hole on the top board of described hanger plate, screw hole is passed in the adjusting screw(rod) connection, and the adjusting screw(rod) end face contacts with peg, attaching nut on the adjusting screw(rod), and described nut contacts with the top board of hanger plate.
Described hanger plate both sides are provided with the location lasso, and the location lasso is fixed by screw and peg.
Described junction plate is connected by bolt with column.
The invention of present technique has thoroughly changed traditional form of construction work, and all main joist is that column all is transported to on-the-spot the installation after the workshop processes, and has shortened the set-up time at the scene, has also just improved workman's safety.And, greatly shortened the engineering time at the scene when installing at the scene at workshop machining accuracy height.During installation, quick, easy and precision height; It is the great improvement of half-cell formula curtain wall construction technique and structure.
Description of drawings
Fig. 1 curtain-wall stand-column articulating connecting structure schematic top plan view.
Fig. 2 curtain-wall stand-column articulating connecting structure elevational schematic view.
The specific embodiment
As shown in Figure 1, connector 1 comprises the base 1.1 that is connected with the building civil engineering structure, and the both sides of base are provided with and connect wing plate 1.2, constitute " U " shape or are called saddle-shaped connector 1; Base 1.1 is connected with slot type built-in fitting 1.4 in being embedded in building civil engineering structure 2 by bolt 1.3, and slot type built-in fitting 1.4 is structures of a routine.
As shown in Figure 2, offer horizontal adjustment hole 3 on the connection wing plate 1.2 of connector 1, horizontal adjustment hole 3 is oblong hole, peg 4 passes the two horizontal adjustment holes 3 that connect on the wing plate 1.2, the two ends of peg 4 are provided with screw thread and form screw rod, and screw rod is connected with adjustment hold-down nut 5, and adjusting hold-down nut 5 is two, two adjustment hold-down nuts 5 wing plate 1.2 that is clamped and connected makes peg 4 be fixed on the connector 1; Because the horizontal adjustment hole 3 on the connection wing plate 1.2 that passes of peg 4 is Long Circles, so the front and back position of the level of peg 4 can regulate, to adapt to the position of adjusting curtain-wall stand-column.
Specifically as shown in Figure 1, 2, hook 7 comprises hanger plate 7.1, and hanger plate 7.1 is " U " shape or is called the shape of a saddle, can be hung on like this on the peg 4; The hanger plate both sides are provided with the junction plate 7.2 that is connected with column and also are called clamping plate; Junction plate 7.2 is connected with column 6 by bolt 8, and in the present embodiment, junction plate 7.2 is clamped and connected on the top of column 6.
Hanger plate 7.1 both sides are provided with location lasso 9, and location lasso 9 is fixing with peg 4 by screw 9.1.Hanger plate 7.1 is after the position about peg 4 levels also can be regulated, and is fixing by location lasso 9 again.
Hanger plate is provided with the adjusting screw(rod) that is connected with the peg locking.As shown in Figure 2, offer screw hole 7.4 on the top board 7.3 of " U " shape hanger plate 7.1 in the present embodiment, screw hole is passed in adjusting screw(rod) 10 connections, and adjusting screw(rod) 10 end faces contact with peg 4; The attaching nut 10.1 on the adjusting screw(rod), and described nut contacts with the top board of hanger plate.This structure can be crossed and realize hook 7 adjustings with respect to the peg height, promptly can realize the adjustment of the height of the column that hangs;
Originally be that the present invention solves the carry connection that the curtain wall main joist is a column with the three-dimensional regulation method.During installation, in processing plant column and hook are coupled together earlier, on-the-spot connector is fixedly built in built the thing civil engineering structure, adjust the horizontal front and back position of peg 4, after hook 7 hung on the peg 4 position about the adjustment level and height and levelness, to link up with location lasso 9 and to fix, finish the installation of column.Quick, easy and precision height is installed.
Claims (8)
1. curtain-wall stand-column articulating connecting structure, it comprises the connector that is fixed on the building civil engineering structure, it is characterized in that being connected with peg on the connector, is hung and connected with hook on the peg, hook is connected with column.
2. curtain-wall stand-column articulating connecting structure according to claim 1 is characterized in that connector comprises the base that is connected with the building civil engineering structure, and the both sides of base are provided with the connection wing plate, and two connect between the wing plates and connect peg.
3. as curtain-wall stand-column articulating connecting structure as described in the claim 2, it is characterized in that connecting and offer the horizontal adjustment hole on the wing plate, peg passes the horizontal adjustment hole, and the peg two ends are connected with the adjustment hold-down nut, adjust hold-down nut and are connected wing plate and contact.
4. curtain-wall stand-column articulating connecting structure according to claim 1 is characterized in that linking up with and comprises with peg and articulate the hanger plate that is connected, and the hanger plate both sides are provided with the junction plate that is connected with column, and hanger plate is provided with the adjusting screw(rod) that is connected with the peg locking.
5. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that offering screw hole on the top board of hanger plate, adjusting screw(rod) connects and passes screw hole, and the adjusting screw(rod) end face contacts with peg, attaching nut on the adjusting screw(rod), described nut contacts with the top board of hanger plate.
6. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that the hanger plate both sides are provided with the location lasso, the location lasso is fixed by screw and peg.
7. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that junction plate is connected by bolt with column.
8. as curtain-wall stand-column articulating connecting structure as described in the claim 4, it is characterized in that hanger plate is " U " shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010262866 CN101906838A (en) | 2010-08-25 | 2010-08-25 | Curtain-wall stand-column articulating connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010262866 CN101906838A (en) | 2010-08-25 | 2010-08-25 | Curtain-wall stand-column articulating connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101906838A true CN101906838A (en) | 2010-12-08 |
Family
ID=43262413
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010262866 Pending CN101906838A (en) | 2010-08-25 | 2010-08-25 | Curtain-wall stand-column articulating connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101906838A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953465A (en) * | 2011-08-18 | 2013-03-06 | 上海美特幕墙有限公司 | Half-unit glass curtain wall system |
CN103243843A (en) * | 2012-02-14 | 2013-08-14 | 沈阳远大铝业工程有限公司 | Single hanging system of unitized curtain wall |
CN105350739A (en) * | 2015-10-13 | 2016-02-24 | 宁波翰室阁雅集成家居有限公司 | Wall panel installation assembly |
CN105370004A (en) * | 2015-11-11 | 2016-03-02 | 丁勇冠 | Panel opening system and method with three-dimensional adjustment and independent disassembly-assembly functions |
CN111719803A (en) * | 2020-05-09 | 2020-09-29 | 广东省建筑装饰工程有限公司 | Unit type colored glaze laminated glass inner wallboard structure and construction method |
CN111997246A (en) * | 2020-08-21 | 2020-11-27 | 苏州市华丽美登装饰装璜有限公司 | Steel round pipe single-column universal multi-dimensional special-shaped curtain wall construction structure and method |
CN115199060A (en) * | 2022-08-15 | 2022-10-18 | 中国建筑第八工程局有限公司 | Bidirectional accurate positioning device for installing dry-hanging curtain wall and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2642883Y (en) * | 2003-10-08 | 2004-09-22 | 徐跃华 | Stone suspension back lock member |
CN2893033Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall beam plate end hanging pieces |
CN2893032Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall vertical hanging pieces |
CN201162295Y (en) * | 2008-01-30 | 2008-12-10 | 深圳金粤幕墙装饰工程有限公司 | Three-dimensional adjustable non-soldering type steel connection device of curtain wall |
CN201202191Y (en) * | 2007-12-29 | 2009-03-04 | 方大集团股份有限公司 | Unit type curtain wall connection structure |
CN201420317Y (en) * | 2009-05-08 | 2010-03-10 | 辽宁圣维机电科技有限公司 | Three-dimensional adjustable curtain wall installation connecting piece |
-
2010
- 2010-08-25 CN CN 201010262866 patent/CN101906838A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2642883Y (en) * | 2003-10-08 | 2004-09-22 | 徐跃华 | Stone suspension back lock member |
CN2893033Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall beam plate end hanging pieces |
CN2893032Y (en) * | 2006-06-14 | 2007-04-25 | 北京建工一建工程建设有限公司 | Unit type curtain wall vertical hanging pieces |
CN201202191Y (en) * | 2007-12-29 | 2009-03-04 | 方大集团股份有限公司 | Unit type curtain wall connection structure |
CN201162295Y (en) * | 2008-01-30 | 2008-12-10 | 深圳金粤幕墙装饰工程有限公司 | Three-dimensional adjustable non-soldering type steel connection device of curtain wall |
CN201420317Y (en) * | 2009-05-08 | 2010-03-10 | 辽宁圣维机电科技有限公司 | Three-dimensional adjustable curtain wall installation connecting piece |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953465A (en) * | 2011-08-18 | 2013-03-06 | 上海美特幕墙有限公司 | Half-unit glass curtain wall system |
CN103243843A (en) * | 2012-02-14 | 2013-08-14 | 沈阳远大铝业工程有限公司 | Single hanging system of unitized curtain wall |
CN103243843B (en) * | 2012-02-14 | 2015-11-25 | 沈阳远大铝业工程有限公司 | Single hanger system of cell curtain wall |
CN105350739A (en) * | 2015-10-13 | 2016-02-24 | 宁波翰室阁雅集成家居有限公司 | Wall panel installation assembly |
CN105370004A (en) * | 2015-11-11 | 2016-03-02 | 丁勇冠 | Panel opening system and method with three-dimensional adjustment and independent disassembly-assembly functions |
CN111719803A (en) * | 2020-05-09 | 2020-09-29 | 广东省建筑装饰工程有限公司 | Unit type colored glaze laminated glass inner wallboard structure and construction method |
CN111997246A (en) * | 2020-08-21 | 2020-11-27 | 苏州市华丽美登装饰装璜有限公司 | Steel round pipe single-column universal multi-dimensional special-shaped curtain wall construction structure and method |
CN111997246B (en) * | 2020-08-21 | 2022-02-01 | 苏州市华丽美登装饰装璜有限公司 | Steel round pipe single-column universal multi-dimensional special-shaped curtain wall construction structure and method |
CN115199060A (en) * | 2022-08-15 | 2022-10-18 | 中国建筑第八工程局有限公司 | Bidirectional accurate positioning device for installing dry-hanging curtain wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101906838A (en) | Curtain-wall stand-column articulating connecting structure | |
CN204920240U (en) | Curtain cement link plate positioning adjustment device | |
CN201809880U (en) | Curtain wall upright post hanging connecting structure | |
CN202899361U (en) | Drilling avoiding device with hook type connection piece for stone or porcelain plate curtain wall plate blocks and cross rod | |
CN110439249B (en) | Overhanging bearing frame and mounting method thereof | |
CN209799136U (en) | Mounting structure of stainless steel furred ceiling | |
CN102926554A (en) | Steel hanging seat template supports and construction method thereof | |
CN207646965U (en) | A kind of secondary connector for construction installation and construction installation structure | |
CN204342302U (en) | For the tower machine attachment changed course bracing or strutting arrangement be arranged in parallel | |
CN104328795A (en) | Locator for tower frame connection stand bar and mounting foundation bolt and using method of locator for tower frame connection stand bars and mounting foundation bolts | |
CN207739551U (en) | A kind of dry-hanging keel mounting structure | |
CN207377132U (en) | A kind of construction safety protection supporting frame | |
CN203846655U (en) | Short-cantilever dry-hanging device of stone curtain wall | |
CN107217771B (en) | All-aluminum non-welding large-stroke switching system and construction method thereof | |
CN203603450U (en) | Clamping slot type steel pipe scaffold | |
CN113047602A (en) | Adjustable scaffold wall connecting piece structure and construction method thereof | |
CN218643837U (en) | Can have enough to meet need formula scaffold frame even wall spare | |
CN205224356U (en) | Unit side hangs sign indicating number system | |
CN205153127U (en) | Stabilize steel construction | |
CN218952856U (en) | Quick installation device of jib | |
CN204040495U (en) | A kind of suspension fixing support rack of high-order cast-in fixing bolt | |
CN214785176U (en) | Concrete curtain wall plate dry hanging device | |
CN220451183U (en) | Stone dry-hanging curtain wall system | |
CN204826220U (en) | Location built -in fitting with U type groove | |
CN218757600U (en) | Mould fixing device is hung to piece assembled piping lane roof post-cast joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20101208 |