CN201801961U - Connecting structure of girders and uprights of integrated housing - Google Patents

Connecting structure of girders and uprights of integrated housing Download PDF

Info

Publication number
CN201801961U
CN201801961U CN201020271091XU CN201020271091U CN201801961U CN 201801961 U CN201801961 U CN 201801961U CN 201020271091X U CN201020271091X U CN 201020271091XU CN 201020271091 U CN201020271091 U CN 201020271091U CN 201801961 U CN201801961 U CN 201801961U
Authority
CN
China
Prior art keywords
shaped steel
ground
steel wall
girder
uprights
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020271091XU
Other languages
Chinese (zh)
Inventor
凌红兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yaohai Steel Structure Co., Ltd.
Original Assignee
ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI YAOHAI STEEL STRUCTURE Co Ltd filed Critical ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Priority to CN201020271091XU priority Critical patent/CN201801961U/en
Application granted granted Critical
Publication of CN201801961U publication Critical patent/CN201801961U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a connecting structure of girders and uprights of an integrated housing, which comprises a ground girder, a roof girder, C-shaped steel wall uprights, and a double-faced color steel wallboard in which a thermal-insulating foaming/filling layer is arranged. The connecting structure is characterized in that the double-faced color steel wallboard in which the thermal-insulating foaming/filling layer is arranged is arranged in a wall unit structure formed by fixedly connecting two parallel vertically-arranged C-shaped steel wall uprights with the ground girder and the roof girder, the ground girder is arranged on the two C-shaped steel wall uprights close to the ground, and a diagonal-drawn reinforcing rib is arranged between the lower part of the ground girder and the C-shaped steel wall uprights. The connected structure of the utility model has the advantages that because the ground girder of the light integrated housing is subject to field assembling after separated from the ground, therefore, the integral movement and integral lifting of the novel light integrated housing are realized; in addition, the diagonal-drawn reinforcing rib of a C-shaped steel structure is selected, therefore, the strength of the C-shaped steel wall upright of the integrated housing is integrally increased, and the indexes of compression resistance and wind resistance are obviously strengthened and greatly improved, so that the stability of the integrated housing is greatly improved, and the appearance of the housing is more beautiful.

Description

The syndeton of integrated house beam and column
Technical field
The utility model relates to the light-weight house technical field of civilian or industrial construction class, the syndeton of a kind of specifically integrated house beam and column.
Background technology
As everyone knows, in the realm of building construction, be life and the inhabitation that makes things convenient for the building operations personnel in the last few years, and then used the integrated room of light body widely, face build a house room and box house.And the integrated room of light body that uses in the market, face build a house room and box house, main one deck double-layer structure that adopts, and be batch production production, its critical piece, as: ground beam, C shaped steel column, shingle nail unit, roof panel unit, roof girder and relevant connection accessory etc., adopt assembled on site to realize.The present integrated room of light body, face build a house room and box house and be not only and be convenient to assembled on site, but also have convenient whole moving, that is: as required, carry out integral hoisting on lorry by crane, after arriving the appointed place, after integral hoisting is unloaded again, finished whole moving.But, when the light integrated room of body of tradition is assembled at the scene, the ground beam is directly to be layered on the ground, by concrete itself and ground are become one structure simultaneously, certain like this rock-steady structure that increases integrated house, still be necessary for the integrated room of light body of two-layer or two-layer above structure, but just need not so to have reinforced for the light body integrated house of one deck structure, the integrated room of light body that the more important thing is this structure be can't realize wholely moving, integral hoisting.
Summary of the invention
The purpose of this utility model provide a kind ofly be convenient to whole move, the integrated house beam of integral hoisting and the syndeton of column.
The purpose of this utility model is achieved in that it includes: the ground beam, roof girder, C shaped steel wall column, in establish the two-sided color steel wallboard of thermal insulation foaming packed layer, it is characterized in that: fixedly connected the two-sided color steel wallboard that is provided with the thermal insulation foaming packed layer in the formed wall element structure at the C of two parallel vertical settings shaped steel wall column and with ground beam, roof girder, the ground beam is arranged near on two C shaped steel wall columns on ground, is provided with between the bottom of this ground beam and the C shaped steel wall column and tiltedly draws reinforcing rib.
On-the-spot for convenience the installation, then the ground beam is to adopt bolt fixedly connected with the mode that welding combines with C shaped steel wall column in flakes by angled metal.
In order to increase the intensity of reinforcing rib, selected tiltedly draw reinforcing rib be the C formed steel construction tiltedly draw reinforcing rib.
The utility model carries out the assembled on site light body integrated house of one deck structure (particularly to) because the ground beam of light body integrated house is broken away from ground, therefore, has realized that the integral body in the integrated room of the light body of utility model moves, integral hoisting.That selects the C formed steel construction in addition for use tiltedly draws reinforcing rib, increased the intensity of integrated house C shaped steel wall column on the whole, resistance to compression windproof index obviously strengthens greatly and improves, the stability of integrated house is also improved greatly, and the external form in house is more attractive in appearance, thereby has realized the purpose of this utility model.The utility model also has simple and reasonable, and this integral body integrated house is convenient to dismounting and assembling, whole move and safe and reliable, and cost is low, long service life, characteristics such as range of application is wide.
Description of drawings
Fig. 1 is an integrated house metope block construction simplified schematic diagram of the present utility model;
Fig. 2 is that A cuts open simplified schematic diagram to the office of stereochemical structure among Fig. 1.
Below in conjunction with accompanying drawing and by example the utility model is described in further detail; but following example only is one of them a example of the utility model; the rights protection scope of not representing the utility model and being limited, rights protection scope of the present utility model is as the criterion with claims.
The specific embodiment
Example 1:
Shown in Fig. 1-2, among the figure 3 is C shaped steel wall column, 4 is the ground beam, 10 is roof girder, 9 establish the two-sided color steel wallboard of thermal insulation foaming packed layer in being, fixedly connected the two-sided color steel wallboard 9 that is provided with the thermal insulation foaming packed layer in the formed wall element structure at the C of two parallel vertical settings shaped steel wall column 3 and with ground beam 4, roof girder 10, ground beam 4 is arranged near on two C shaped steel wall columns 3 on ground, and this ground beam 4 is 2 to adopt bolts with C shaped steel wall column 3 and to weld the mode that combines fixedly connected in flakes by angled metal; What be provided with the C formed steel construction between the bottom of ground beam 4 and C shaped steel wall column 3 tiltedly draws reinforcing rib 1, and this tiltedly draws reinforcing rib 1 to adopt bolts to be connected with ground beam 4, then adopts welding with C shaped steel wall column 3, prevents that it is subjected to external force and deforms.In addition, 5 among the figure, 6 is bolt connecting hole, and 7,8 is solder joint.

Claims (3)

1. the syndeton of integrated house beam and column, it includes: the ground beam, roof girder, C shaped steel wall column, in establish the two-sided color steel wallboard of thermal insulation foaming packed layer, it is characterized in that: fixedly connected the two-sided color steel wallboard that is provided with the thermal insulation foaming packed layer in the formed wall element structure at the C of two parallel vertical settings shaped steel wall column and with ground beam, roof girder, the ground beam is arranged near on two C shaped steel wall columns on ground, is provided with between the bottom of this ground beam and the C shaped steel wall column and tiltedly draws reinforcing rib.
2. the syndeton of integrated house beam according to claim 1 and column is characterized in that: the ground beam is fixedlyed connected with C shaped steel wall column in flakes by angled metal.
3. the syndeton of integrated house beam according to claim 1 and column is characterized in that: tiltedly draw reinforcing rib be the C formed steel construction tiltedly draw reinforcing rib.
CN201020271091XU 2010-07-27 2010-07-27 Connecting structure of girders and uprights of integrated housing Expired - Fee Related CN201801961U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020271091XU CN201801961U (en) 2010-07-27 2010-07-27 Connecting structure of girders and uprights of integrated housing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020271091XU CN201801961U (en) 2010-07-27 2010-07-27 Connecting structure of girders and uprights of integrated housing

Publications (1)

Publication Number Publication Date
CN201801961U true CN201801961U (en) 2011-04-20

Family

ID=43871468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020271091XU Expired - Fee Related CN201801961U (en) 2010-07-27 2010-07-27 Connecting structure of girders and uprights of integrated housing

Country Status (1)

Country Link
CN (1) CN201801961U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290951A (en) * 2013-05-09 2013-09-11 中国矿业大学 Wind-resistant wall with portal rigid frame comprising special-shaped columns

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103290951A (en) * 2013-05-09 2013-09-11 中国矿业大学 Wind-resistant wall with portal rigid frame comprising special-shaped columns

Similar Documents

Publication Publication Date Title
CN202831235U (en) Assembled pitch joint of rectangular steel pipe column and H-shaped steel girder of internally installed sleeve
CN205000553U (en) Fire prevention steel column and building body
CN101818579B (en) Bridge cutoff type integrated house and installation method thereof
CN201801961U (en) Connecting structure of girders and uprights of integrated housing
CN201704967U (en) Broken cold and heat bridge type integrated house
CN201649708U (en) Hanging type corridor structure of integrated house
CN201567818U (en) Assembled-type steel-structured mobile house capable of overall movement
CN205024920U (en) Portable glass steel house beam structure for house
CN201649363U (en) Broken bridge connecting structure for wall stand column and wall panels
CN204940521U (en) A kind of steel work movable plank house
CN201801982U (en) Integrated house wall block structure
CN205153585U (en) Portable aluminum alloy house
CN205036108U (en) Take mobile home of glass steel U -shaped slot type collar tie beam
CN203613698U (en) Roof for mobile house
CN204326241U (en) A kind of transportable Split mounting type building
CN203546908U (en) Assembly type building wall beam stable connection structure
CN2480438Y (en) Assembling box type house
CN204940526U (en) A kind of steel work board house of heat-insulation and heat-preservation
CN202131672U (en) Combined-type steel structure house
CN203856350U (en) Bay window of steel structure factory building
CN204703527U (en) The plane hoisting structure of the complete prefabricated wire mesh frame sandwich wallboard of a kind of assembling
CN204139308U (en) Promotion formula is built
CN2566623Y (en) Assembly environmental protection energy-saving greenhouse
CN206667471U (en) Lightning protection steel house
CN204940538U (en) A kind of shockproof steel work movable plank house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ANHUI YAOHAI STEEL STRUCTURE CO., LTD.

Free format text: FORMER OWNER: HEFEI YAOHAI LIGHT BUILDING MATERIAL CO., LTD.

Effective date: 20111220

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20111220

Address after: 230011 in Anhui Province in the northwest of Hefei Yaohai City Industrial Park, Dangtu Road and road intersection 1 latitude B

Patentee after: Anhui Yaohai Steel Structure Co., Ltd.

Address before: 230011 in Anhui Province in the northwest of Hefei Yaohai City Industrial Park, Dangtu Road and road intersection 1 latitude B

Patentee before: Anhui Yaohai Steel Structure Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110420

Termination date: 20150727

EXPY Termination of patent right or utility model