CN201789232U - Device for handling failure of overhead line without power cut - Google Patents

Device for handling failure of overhead line without power cut Download PDF

Info

Publication number
CN201789232U
CN201789232U CN2010205087526U CN201020508752U CN201789232U CN 201789232 U CN201789232 U CN 201789232U CN 2010205087526 U CN2010205087526 U CN 2010205087526U CN 201020508752 U CN201020508752 U CN 201020508752U CN 201789232 U CN201789232 U CN 201789232U
Authority
CN
China
Prior art keywords
temporary cable
cable
work area
overhead
power cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205087526U
Other languages
Chinese (zh)
Inventor
张洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Zhengzhou Power Supply Co of Henan Electric Power Co
Priority to CN2010205087526U priority Critical patent/CN201789232U/en
Application granted granted Critical
Publication of CN201789232U publication Critical patent/CN201789232U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a device for handling failure of an overhead line without power cut. The device comprises supporting poles and a temporary cable. A bearing steel rope is erected between the two supporting poles; a tackle is arranged on the bearing steel rope; the temporary cable is arranged on the tackle; two ends of the temporary cable are respectively connected overhead lines at two ends of a work area; overhead lines in the work area are powered off; and the temporary cable consisting of three single-phase flexible cables is respectively connected user circuits in the work area by the aid of branch lines. The device bridges the overhead lines in the work area by the aid of the temporary cable, powers off the overhead lines in the work area so that staff can examine, repair and maintain the power-off overhead lines while the temporary cable supplies power for users in the work area, ensures no power cut or less power cut for the users, and reduces economic loss.

Description

The do not have a power failure device of handling failure of overhead transmission line
One, technical field: the utility model relates to a kind of power failure processing unit, particularly relates to the do not have a power failure device of handling failure of a kind of overhead transmission line.
Two. background technology: along with the raising of development and national economy and living standards of the people, society is more and more higher to the reliability requirement of power supply, because the restriction of various conditions, most of user can not reach dual power supply, thereby shows out the necessity of the comprehensive uninterrupted operation of distribution line especially.
The 10KV distribution line is a part and parcel in the distribution network, is directly in the face of user's infrastructure, because distribution line network complexity, area coverage are big, makes it be covered with each corner in supply power in the business office's scope.But, the distribution network insulation level is low, break down easily under atmospheric over-voltage, equipment natural aging or other extraneous factor effects, maintenance workload is big, no matter is social benefit or economic benefit, and the 10KV power distribution network is forced to stop transport and all can produces the loss that can't estimate.
Three. the content of utility model:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, a kind of device of reasonable in design, simple in structure, efficient is high and the overhead transmission line that reduces loss of outage does not have a power failure handling failure is provided.
The technical solution of the utility model is: the do not have a power failure device of handling failure of a kind of overhead transmission line, contain support bar and temporary cable, set up messenger cable between the described support bar, this messenger cable is provided with coaster, temporary cable is arranged on the described coaster, the two ends of described temporary cable are connected with the overhead wire at two ends, working region respectively and make the power failure of opening circuit of overhead wire in the working region, and described temporary cable is connected with subscriber line circuit in the working region respectively by branch line.
Described temporary cable is made up of three single-phase flexible cables.
The beneficial effects of the utility model are:
1, the utility model utilizes temporary cable with the overhead wire cross-over connection in the working region, make overhead wire power failure in the working region, the staff overhauls the overhead wire that has a power failure and safeguards, and temporary cable provides power supply for the user in the working region, guarantee that the user does not have a power failure or few the power failure, reduce economic loss.
2, the utility model sets up messenger cable between support bar, and coaster is set on the messenger cable, is convenient to quick, the light temporary cable that sets up, high efficiency, and interruption duration is short, loss of outage is little.
3, the utility model is reasonable in design, simple in structure, efficient is high and reduce loss of outage, has good economic benefit and social benefit after the popularization.
Four. description of drawings:
Fig. 1 is a structural representation of the present utility model.
Five. embodiment:
Embodiment: referring to Fig. 1, among the figure, 1-circuit breaker, 2-overhead wire, 3-line bar, 4-user, 5-support bar, 6-temporary cable, 7-messenger cable, 8-coaster.
The do not have a power failure device of handling failure of overhead transmission line contains support bar 5 and temporary cable 6, set up messenger cable 7 between the support bar 5, this messenger cable 7 is provided with coaster 8, temporary cable 6 is arranged on the coaster 8, be convenient to move, the two ends of temporary cable 6 are connected with the overhead wire 2 at two ends, working region respectively and make the power failure of opening circuit of overhead wire 1 in the working region, and temporary cable 6 is connected with user 4 circuit in the working region respectively by branch line.
Temporary cable 6 is made up of three single-phase flexible cables.Certainly, as required and field condition, also can not set up support bar 5, but utilize original line bar 3 (perhaps other parallel line bars) to set up messenger cable 7, to reduce engineering time and expense.
During use,, temporary cable 6 is moved along messenger cable 7, realize setting up fast, shorten interruption duration by hoist engine with connecting rope and drafting tool.Overhead wire 2 maintenances finish, and remove temporary cable 6, support bar 5 and messenger cable 7, remove circuit breaker 1 again, connect overhead wire 2, carry out normal power supply.

Claims (2)

1. the overhead transmission line device of handling failure that do not have a power failure, contain support bar and temporary cable, it is characterized in that: set up messenger cable between the described support bar, this messenger cable is provided with coaster, temporary cable is arranged on the described coaster, the two ends of described temporary cable are connected with the overhead wire at two ends, working region respectively and make the power failure of opening circuit of overhead wire in the working region, and described temporary cable is connected with subscriber line circuit in the working region respectively by branch line.
2. the do not have a power failure device of handling failure of overhead transmission line according to claim 1, it is characterized in that: described temporary cable is made up of three single-phase flexible cables.
CN2010205087526U 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut Expired - Fee Related CN201789232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205087526U CN201789232U (en) 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205087526U CN201789232U (en) 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut

Publications (1)

Publication Number Publication Date
CN201789232U true CN201789232U (en) 2011-04-06

Family

ID=43821185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205087526U Expired - Fee Related CN201789232U (en) 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut

Country Status (1)

Country Link
CN (1) CN201789232U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638016A (en) * 2011-11-22 2012-08-15 嘉兴电力局 Bypass connection device for uninterrupted operation of power distribution network
CN104577879A (en) * 2015-01-22 2015-04-29 苏州威肯工业设备有限公司 Route inspection method for overhead power transmission line
US10367337B2 (en) 2015-04-09 2019-07-30 Quanta Associates, L.P. Conductor as a tool
CN112701609A (en) * 2020-12-22 2021-04-23 广东电网有限责任公司广州供电局 High-voltage line power failure maintenance method, system and related device
CN114301003A (en) * 2021-11-24 2022-04-08 国网浙江省电力有限公司舟山供电公司 Load switching method for flexible cable between adjacent strain towers

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638016A (en) * 2011-11-22 2012-08-15 嘉兴电力局 Bypass connection device for uninterrupted operation of power distribution network
CN104577879A (en) * 2015-01-22 2015-04-29 苏州威肯工业设备有限公司 Route inspection method for overhead power transmission line
US10367337B2 (en) 2015-04-09 2019-07-30 Quanta Associates, L.P. Conductor as a tool
CN112701609A (en) * 2020-12-22 2021-04-23 广东电网有限责任公司广州供电局 High-voltage line power failure maintenance method, system and related device
CN112701609B (en) * 2020-12-22 2023-10-20 广东电网有限责任公司广州供电局 High-voltage line power failure maintenance method, system and related device
CN114301003A (en) * 2021-11-24 2022-04-08 国网浙江省电力有限公司舟山供电公司 Load switching method for flexible cable between adjacent strain towers

Similar Documents

Publication Publication Date Title
CN201789232U (en) Device for handling failure of overhead line without power cut
CN102916481B (en) A kind of energy management method of direct current micro-grid system
CN102522764A (en) Hybrid two-end direct-current power transmission system
CN102522811A (en) Configuration system of intelligent power supply cube of data computer room
CN103280705B (en) Multifunctional integration photovoltaic power generation device
CN208890461U (en) Communication base station Remote Power Supply and solar energy mixed power supply system
CN103812041A (en) Method for overhauling ring main unit of 10kV cable circuit without switching power supply off
CN203618131U (en) Mining wireless communication system
CN202840533U (en) Flexible direct-current closed-loop power distribution network system converter station with bypass direct-current bus
CN103683328B (en) Automatic switching module and photovoltaic from net full-automatic power generation system
CN201868896U (en) Economic operation system of transformer
CN113783196A (en) Power supply system of intelligent energy station
CN202634059U (en) Uninterruptible power supply POE (Power Over Ethernet) device
CN203813510U (en) Transformer substation system with microgrid system
CN203250989U (en) Multifunctional integrated photovoltaic power generation device
CN204030629U (en) A kind of mixed type micro-grid system
CN201601529U (en) Power supply system for electric power communication computer room
CN201160345Y (en) Energy conservation server machine cabinet
CN201724992U (en) Embedded test vehicle
CN201845024U (en) Test wiring tooling for locomotive traction converter
CN203415986U (en) Disperse reactive compensation system of low voltage power distribution station area based on wireless network
CN217656474U (en) Portable direct current emergency power supply device
CN204696796U (en) Centralized alternating current-direct current dual input d. c. remote is powered far end system
CN201066797Y (en) A remote monitoring UPS system
CN219164074U (en) Power maintenance operation platform for high-altitude overhaul

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406