CN201789232U - Device for handling failure of overhead line without power cut - Google Patents
Device for handling failure of overhead line without power cut Download PDFInfo
- Publication number
- CN201789232U CN201789232U CN2010205087526U CN201020508752U CN201789232U CN 201789232 U CN201789232 U CN 201789232U CN 2010205087526 U CN2010205087526 U CN 2010205087526U CN 201020508752 U CN201020508752 U CN 201020508752U CN 201789232 U CN201789232 U CN 201789232U
- Authority
- CN
- China
- Prior art keywords
- temporary
- overhead lines
- cables
- cable
- power failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种架空线路不停电处理故障的装置,它含有支撑杆和临时电缆,所述支撑杆之间架设有承力钢索,该承力钢索上设置有滑车,临时电缆设置在所述滑车上,所述临时电缆的两端分别与工作区域两端的架空线连接且使工作区域内的架空线断路停电,所述临时电缆通过支线分别与工作区域内的用户电路连接。所述临时电缆由三根单相柔性电缆组成。本实用新型利用临时电缆将工作区域内的架空线跨接,使工作区域内架空线停电,工作人员对停电的架空线进行检修和维护,而临时电缆为工作区域内的用户提供电源,保证用户不停电或少停电,降低经济损失。
The utility model discloses a device for handling faults of overhead lines without power failure. On the trolley, the two ends of the temporary cable are respectively connected to the overhead lines at both ends of the working area and the overhead lines in the working area are disconnected and powered off, and the temporary cables are respectively connected to the user circuits in the working area through branch lines. The temporary cable consists of three single-phase flexible cables. The utility model uses temporary cables to bridge the overhead lines in the work area, so that the overhead lines in the work area are powered off, and the staff repair and maintain the overhead lines in the power failure, and the temporary cables provide power for users in the work area, ensuring that users No power outage or less power outage, reduce economic loss.
Description
一、技术领域:本实用新型涉及一种电力故障处理装置,特别是涉及一种架空线路不停电处理故障的装置。1. Technical field: The utility model relates to a power fault processing device, in particular to a device for processing faults of overhead lines without power failure.
二.背景技术:随着国民经济的发展和人民生活水平的提高,社会对供电的可靠性要求越来越高,由于各种条件的限制,大部分用户不可能达到双电源供电,因而凸现出配电线路综合不停电作业的必要性。2. Background technology: With the development of the national economy and the improvement of people's living standards, the society has higher and higher requirements for the reliability of power supply. Due to the limitations of various conditions, it is impossible for most users to achieve dual power supply. The necessity of comprehensive non-stop operation of distribution lines.
10KV配电线路是配电网络中重要的部分,是直接面对用户的基础设施,由于配电线路网络复杂、覆盖面积大的特点,使其布满供电营业所范围内的每一角落。但是,配电网络绝缘水平低、大气过电压、设备自然老化或其他外界因素作用下容易发生故障,检修工作量大,无论是社会效益还是经济效益,10KV配电网被迫停运都会产生无法估算的损失。The 10KV distribution line is an important part of the power distribution network, and it is the infrastructure that directly faces the users. Due to the complexity of the distribution line network and the characteristics of large coverage area, it covers every corner of the power supply business. However, the distribution network is prone to failure due to low insulation level, atmospheric overvoltage, natural aging of equipment or other external factors, and the workload of maintenance is heavy. Whether it is social or economic benefits, forced outage of the 10KV distribution network will cause failure. Estimated loss.
三.实用新型的内容:3. Contents of the utility model:
本实用新型所要解决的技术问题是:克服现有技术的不足,提供一种设计合理、结构简单、效率高且减小停电损失的架空线路不停电处理故障的装置。The technical problem to be solved by the utility model is: to overcome the deficiencies of the prior art, and provide a device for handling faults of overhead lines with reasonable design, simple structure, high efficiency and reduced power loss loss without power failure.
本实用新型的技术方案是:一种架空线路不停电处理故障的装置,含有支撑杆和临时电缆,所述支撑杆之间架设有承力钢索,该承力钢索上设置有滑车,临时电缆设置在所述滑车上,所述临时电缆的两端分别与工作区域两端的架空线连接且使工作区域内的架空线断路停电,所述临时电缆通过支线分别与工作区域内的用户电路连接。The technical scheme of the utility model is: a device for handling faults of overhead lines without power failure, which includes support rods and temporary cables, load-bearing steel cables are set up between the support rods, pulleys are arranged on the load-bearing steel cables, temporary The cables are arranged on the trolley, and the two ends of the temporary cables are respectively connected to the overhead lines at both ends of the working area and the overhead lines in the working area are disconnected and powered off, and the temporary cables are respectively connected to the user circuits in the working area through branch lines .
所述临时电缆由三根单相柔性电缆组成。The temporary cable consists of three single-phase flexible cables.
本实用新型的有益效果是:The beneficial effects of the utility model are:
1、本实用新型利用临时电缆将工作区域内的架空线跨接,使工作区域内架空线停电,工作人员对停电的架空线进行检修和维护,而临时电缆为工作区域内的用户提供电源,保证用户不停电或少停电,降低经济损失。1. The utility model uses temporary cables to bridge the overhead lines in the work area, so that the overhead lines in the work area are powered off, and the staff repair and maintain the overhead lines in the power outage, and the temporary cables provide power for users in the work area. Ensure that users have no or less power outages and reduce economic losses.
2、本实用新型在支撑杆之间架设承力钢索,承力钢索上设置滑车,便于快速、轻便的架设临时电缆,工作效率高,停电时间短、停电损失小。2. The utility model erects load-bearing steel cables between the support rods, and a pulley is set on the load-bearing steel cables, which is convenient for fast and light erection of temporary cables, with high work efficiency, short power-off time and low power-off loss.
3、本实用新型设计合理、结构简单、效率高且减小停电损失,推广后具有良好的经济效益和社会效益。3. The utility model is reasonable in design, simple in structure, high in efficiency and reduces power failure loss, and has good economic and social benefits after popularization.
四.附图说明:4. Description of drawings:
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
五.具体实施方式:Five. Specific implementation methods:
实施例:参见图1,图中,1-断路器,2-架空线,3-线杆,4-用户,5-支撑杆,6-临时电缆,7-承力钢索,8-滑车。Embodiment: Referring to Fig. 1, among the figure, 1-circuit breaker, 2-overhead line, 3-wire pole, 4-user, 5-support rod, 6-temporary cable, 7-bearing steel cable, 8-pull block.
架空线路不停电处理故障的装置含有支撑杆5和临时电缆6,支撑杆5之间架设有承力钢索7,该承力钢索7上设置有滑车8,临时电缆6设置在滑车8上,便于移动,临时电缆6的两端分别与工作区域两端的架空线2连接且使工作区域内的架空线1断路停电,临时电缆6通过支线分别与工作区域内的用户4的电路连接。The device for troubleshooting overhead lines without power failure includes support rods 5 and temporary cables 6, load-bearing steel cables 7 are erected between the support rods 5, pulleys 8 are arranged on the load-bearing steel cables 7, and temporary cables 6 are set on the pulleys 8 , easy to move, the two ends of the temporary cable 6 are respectively connected to the overhead lines 2 at both ends of the work area and the overhead line 1 in the work area is disconnected and powered off, and the temporary cables 6 are respectively connected to the circuits of the users 4 in the work area through branch lines.
临时电缆6由三根单相柔性电缆组成。当然,根据需要和现场情况,也可以不架设支撑杆5,而是利用原来的线杆3(或者其他平行的线杆)架设承力钢索7,以减少施工时间和费用。Temporary cable 6 consists of three single-phase flexible cables. Of course, according to needs and site conditions, the supporting rod 5 may not be erected, but the original wire rod 3 (or other parallel wire rods) is used to erect the load-bearing steel cable 7, so as to reduce construction time and cost.
使用时,用连接绳索及牵引工具,通过卷扬机将临时电缆6沿承力钢索7移动,实现快速架设,缩短停电时间。架空线2维修完毕,拆除临时电缆6、支撑杆5和承力钢索7,再拆除断路器1,接通架空线2,进行正常供电。During use, use the connecting rope and the traction tool to move the temporary cable 6 along the load-bearing steel cable 7 by the winch, so as to realize rapid erection and shorten the power failure time. After the maintenance of the overhead line 2 is completed, the temporary cable 6, the support rod 5 and the load-bearing steel cable 7 are removed, and then the circuit breaker 1 is removed, and the overhead line 2 is connected for normal power supply.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205087526U CN201789232U (en) | 2010-08-30 | 2010-08-30 | Device for handling failure of overhead line without power cut |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205087526U CN201789232U (en) | 2010-08-30 | 2010-08-30 | Device for handling failure of overhead line without power cut |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201789232U true CN201789232U (en) | 2011-04-06 |
Family
ID=43821185
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010205087526U Expired - Fee Related CN201789232U (en) | 2010-08-30 | 2010-08-30 | Device for handling failure of overhead line without power cut |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201789232U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102638016A (en) * | 2011-11-22 | 2012-08-15 | 嘉兴电力局 | Bypass connection device for uninterrupted operation of power distribution network |
| CN104577879A (en) * | 2015-01-22 | 2015-04-29 | 苏州威肯工业设备有限公司 | Route inspection method for overhead power transmission line |
| US10367337B2 (en) | 2015-04-09 | 2019-07-30 | Quanta Associates, L.P. | Conductor as a tool |
| CN112701609A (en) * | 2020-12-22 | 2021-04-23 | 广东电网有限责任公司广州供电局 | High-voltage line power failure maintenance method, system and related device |
| CN114301003A (en) * | 2021-11-24 | 2022-04-08 | 国网浙江省电力有限公司舟山供电公司 | Load switching method for flexible cable between adjacent strain towers |
-
2010
- 2010-08-30 CN CN2010205087526U patent/CN201789232U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102638016A (en) * | 2011-11-22 | 2012-08-15 | 嘉兴电力局 | Bypass connection device for uninterrupted operation of power distribution network |
| CN104577879A (en) * | 2015-01-22 | 2015-04-29 | 苏州威肯工业设备有限公司 | Route inspection method for overhead power transmission line |
| US10367337B2 (en) | 2015-04-09 | 2019-07-30 | Quanta Associates, L.P. | Conductor as a tool |
| CN112701609A (en) * | 2020-12-22 | 2021-04-23 | 广东电网有限责任公司广州供电局 | High-voltage line power failure maintenance method, system and related device |
| CN112701609B (en) * | 2020-12-22 | 2023-10-20 | 广东电网有限责任公司广州供电局 | High-voltage line power failure maintenance method, system and related device |
| CN114301003A (en) * | 2021-11-24 | 2022-04-08 | 国网浙江省电力有限公司舟山供电公司 | Load switching method for flexible cable between adjacent strain towers |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201789232U (en) | Device for handling failure of overhead line without power cut | |
| CN103573011B (en) | A kind ofly build the device and method organizing vertical crossing frame | |
| CN202039638U (en) | Lead screw lifting type insulating cross arm | |
| CN203569959U (en) | Device for building up assembled type crossing frame | |
| CN203892136U (en) | Movable fully-automatic water drawing apparatus | |
| CN203728474U (en) | Substation special elevator | |
| CN201502207U (en) | Overhead line high voltage tower pole | |
| CN201853968U (en) | Single-hook insulating yoke plate | |
| CN206053825U (en) | A kind of upper font combines insulation elevator | |
| CN205193122U (en) | Multifunctional electricity meter linking bridge of transformer substation | |
| CN103532052A (en) | Live erection of simple crossing structure on ADSS (all-dielectric self-supporting optic fiber cable) and implementation method | |
| CN202424285U (en) | A bridge hole wind power generation system | |
| CN203813320U (en) | Tool for live exchange of 220 kV narrow base tower strain insulator string | |
| CN201887408U (en) | Rigid lead fixer of needle type bottle | |
| CN201845024U (en) | Test wiring tooling for locomotive traction converter | |
| CN203456828U (en) | Overhead wire type terminal wire pulling device | |
| CN207276078U (en) | Portable hoisting device | |
| CN203536864U (en) | Simple spanning rack of ADSS optical cable capable of being erected in live-line manner | |
| CN202121251U (en) | 220kV Li Xu line overhead earth wire overhauling plate ladder | |
| CN202084839U (en) | Holding pole support rod device for high-voltage line to span high-density high-voltage power transmission line | |
| CN205050492U (en) | Announce electric force information's device fast | |
| CN203504287U (en) | Intelligent power distribution terminal based on synchronization check technology | |
| CN204258441U (en) | The electric supply installation of equipment on a kind of iron tower of power transmission line | |
| CN204696796U (en) | Centralized alternating current-direct current dual input d. c. remote is powered far end system | |
| CN203521964U (en) | Inflatable assembling and disassembling device for current transformer in switchgear |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110406 Termination date: 20120830 |
