CN201789232U - Device for handling failure of overhead line without power cut - Google Patents
Device for handling failure of overhead line without power cut Download PDFInfo
- Publication number
- CN201789232U CN201789232U CN2010205087526U CN201020508752U CN201789232U CN 201789232 U CN201789232 U CN 201789232U CN 2010205087526 U CN2010205087526 U CN 2010205087526U CN 201020508752 U CN201020508752 U CN 201020508752U CN 201789232 U CN201789232 U CN 201789232U
- Authority
- CN
- China
- Prior art keywords
- temporary cable
- cable
- work area
- overhead
- power cut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a device for handling failure of an overhead line without power cut. The device comprises supporting poles and a temporary cable. A bearing steel rope is erected between the two supporting poles; a tackle is arranged on the bearing steel rope; the temporary cable is arranged on the tackle; two ends of the temporary cable are respectively connected overhead lines at two ends of a work area; overhead lines in the work area are powered off; and the temporary cable consisting of three single-phase flexible cables is respectively connected user circuits in the work area by the aid of branch lines. The device bridges the overhead lines in the work area by the aid of the temporary cable, powers off the overhead lines in the work area so that staff can examine, repair and maintain the power-off overhead lines while the temporary cable supplies power for users in the work area, ensures no power cut or less power cut for the users, and reduces economic loss.
Description
One, technical field: the utility model relates to a kind of power failure processing unit, particularly relates to the do not have a power failure device of handling failure of a kind of overhead transmission line.
Two. background technology: along with the raising of development and national economy and living standards of the people, society is more and more higher to the reliability requirement of power supply, because the restriction of various conditions, most of user can not reach dual power supply, thereby shows out the necessity of the comprehensive uninterrupted operation of distribution line especially.
The 10KV distribution line is a part and parcel in the distribution network, is directly in the face of user's infrastructure, because distribution line network complexity, area coverage are big, makes it be covered with each corner in supply power in the business office's scope.But, the distribution network insulation level is low, break down easily under atmospheric over-voltage, equipment natural aging or other extraneous factor effects, maintenance workload is big, no matter is social benefit or economic benefit, and the 10KV power distribution network is forced to stop transport and all can produces the loss that can't estimate.
Three. the content of utility model:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, a kind of device of reasonable in design, simple in structure, efficient is high and the overhead transmission line that reduces loss of outage does not have a power failure handling failure is provided.
The technical solution of the utility model is: the do not have a power failure device of handling failure of a kind of overhead transmission line, contain support bar and temporary cable, set up messenger cable between the described support bar, this messenger cable is provided with coaster, temporary cable is arranged on the described coaster, the two ends of described temporary cable are connected with the overhead wire at two ends, working region respectively and make the power failure of opening circuit of overhead wire in the working region, and described temporary cable is connected with subscriber line circuit in the working region respectively by branch line.
Described temporary cable is made up of three single-phase flexible cables.
The beneficial effects of the utility model are:
1, the utility model utilizes temporary cable with the overhead wire cross-over connection in the working region, make overhead wire power failure in the working region, the staff overhauls the overhead wire that has a power failure and safeguards, and temporary cable provides power supply for the user in the working region, guarantee that the user does not have a power failure or few the power failure, reduce economic loss.
2, the utility model sets up messenger cable between support bar, and coaster is set on the messenger cable, is convenient to quick, the light temporary cable that sets up, high efficiency, and interruption duration is short, loss of outage is little.
3, the utility model is reasonable in design, simple in structure, efficient is high and reduce loss of outage, has good economic benefit and social benefit after the popularization.
Four. description of drawings:
Fig. 1 is a structural representation of the present utility model.
Five. embodiment:
Embodiment: referring to Fig. 1, among the figure, 1-circuit breaker, 2-overhead wire, 3-line bar, 4-user, 5-support bar, 6-temporary cable, 7-messenger cable, 8-coaster.
The do not have a power failure device of handling failure of overhead transmission line contains support bar 5 and temporary cable 6, set up messenger cable 7 between the support bar 5, this messenger cable 7 is provided with coaster 8, temporary cable 6 is arranged on the coaster 8, be convenient to move, the two ends of temporary cable 6 are connected with the overhead wire 2 at two ends, working region respectively and make the power failure of opening circuit of overhead wire 1 in the working region, and temporary cable 6 is connected with user 4 circuit in the working region respectively by branch line.
Temporary cable 6 is made up of three single-phase flexible cables.Certainly, as required and field condition, also can not set up support bar 5, but utilize original line bar 3 (perhaps other parallel line bars) to set up messenger cable 7, to reduce engineering time and expense.
During use,, temporary cable 6 is moved along messenger cable 7, realize setting up fast, shorten interruption duration by hoist engine with connecting rope and drafting tool.Overhead wire 2 maintenances finish, and remove temporary cable 6, support bar 5 and messenger cable 7, remove circuit breaker 1 again, connect overhead wire 2, carry out normal power supply.
Claims (2)
1. the overhead transmission line device of handling failure that do not have a power failure, contain support bar and temporary cable, it is characterized in that: set up messenger cable between the described support bar, this messenger cable is provided with coaster, temporary cable is arranged on the described coaster, the two ends of described temporary cable are connected with the overhead wire at two ends, working region respectively and make the power failure of opening circuit of overhead wire in the working region, and described temporary cable is connected with subscriber line circuit in the working region respectively by branch line.
2. the do not have a power failure device of handling failure of overhead transmission line according to claim 1, it is characterized in that: described temporary cable is made up of three single-phase flexible cables.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205087526U CN201789232U (en) | 2010-08-30 | 2010-08-30 | Device for handling failure of overhead line without power cut |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205087526U CN201789232U (en) | 2010-08-30 | 2010-08-30 | Device for handling failure of overhead line without power cut |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201789232U true CN201789232U (en) | 2011-04-06 |
Family
ID=43821185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205087526U Expired - Fee Related CN201789232U (en) | 2010-08-30 | 2010-08-30 | Device for handling failure of overhead line without power cut |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201789232U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638016A (en) * | 2011-11-22 | 2012-08-15 | 嘉兴电力局 | Bypass connection device for uninterrupted operation of power distribution network |
CN104577879A (en) * | 2015-01-22 | 2015-04-29 | 苏州威肯工业设备有限公司 | Route inspection method for overhead power transmission line |
US10367337B2 (en) | 2015-04-09 | 2019-07-30 | Quanta Associates, L.P. | Conductor as a tool |
CN112701609A (en) * | 2020-12-22 | 2021-04-23 | 广东电网有限责任公司广州供电局 | High-voltage line power failure maintenance method, system and related device |
CN114301003A (en) * | 2021-11-24 | 2022-04-08 | 国网浙江省电力有限公司舟山供电公司 | Load switching method for flexible cable between adjacent strain towers |
-
2010
- 2010-08-30 CN CN2010205087526U patent/CN201789232U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638016A (en) * | 2011-11-22 | 2012-08-15 | 嘉兴电力局 | Bypass connection device for uninterrupted operation of power distribution network |
CN104577879A (en) * | 2015-01-22 | 2015-04-29 | 苏州威肯工业设备有限公司 | Route inspection method for overhead power transmission line |
US10367337B2 (en) | 2015-04-09 | 2019-07-30 | Quanta Associates, L.P. | Conductor as a tool |
CN112701609A (en) * | 2020-12-22 | 2021-04-23 | 广东电网有限责任公司广州供电局 | High-voltage line power failure maintenance method, system and related device |
CN112701609B (en) * | 2020-12-22 | 2023-10-20 | 广东电网有限责任公司广州供电局 | High-voltage line power failure maintenance method, system and related device |
CN114301003A (en) * | 2021-11-24 | 2022-04-08 | 国网浙江省电力有限公司舟山供电公司 | Load switching method for flexible cable between adjacent strain towers |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201789232U (en) | Device for handling failure of overhead line without power cut | |
CN102916481B (en) | A kind of energy management method of direct current micro-grid system | |
CN102522764A (en) | Hybrid two-end direct-current power transmission system | |
CN102522811A (en) | Configuration system of intelligent power supply cube of data computer room | |
CN103280705B (en) | Multifunctional integration photovoltaic power generation device | |
CN208890461U (en) | Communication base station Remote Power Supply and solar energy mixed power supply system | |
CN103812041A (en) | Method for overhauling ring main unit of 10kV cable circuit without switching power supply off | |
CN203618131U (en) | Mining wireless communication system | |
CN202840533U (en) | Flexible direct-current closed-loop power distribution network system converter station with bypass direct-current bus | |
CN103683328B (en) | Automatic switching module and photovoltaic from net full-automatic power generation system | |
CN201868896U (en) | Economic operation system of transformer | |
CN113783196A (en) | Power supply system of intelligent energy station | |
CN202634059U (en) | Uninterruptible power supply POE (Power Over Ethernet) device | |
CN203813510U (en) | Transformer substation system with microgrid system | |
CN203250989U (en) | Multifunctional integrated photovoltaic power generation device | |
CN204030629U (en) | A kind of mixed type micro-grid system | |
CN201601529U (en) | Power supply system for electric power communication computer room | |
CN201160345Y (en) | Energy conservation server machine cabinet | |
CN201724992U (en) | Embedded test vehicle | |
CN201845024U (en) | Test wiring tooling for locomotive traction converter | |
CN203415986U (en) | Disperse reactive compensation system of low voltage power distribution station area based on wireless network | |
CN217656474U (en) | Portable direct current emergency power supply device | |
CN204696796U (en) | Centralized alternating current-direct current dual input d. c. remote is powered far end system | |
CN201066797Y (en) | A remote monitoring UPS system | |
CN219164074U (en) | Power maintenance operation platform for high-altitude overhaul |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |