CN201789232U - Device for handling failure of overhead line without power cut - Google Patents

Device for handling failure of overhead line without power cut Download PDF

Info

Publication number
CN201789232U
CN201789232U CN2010205087526U CN201020508752U CN201789232U CN 201789232 U CN201789232 U CN 201789232U CN 2010205087526 U CN2010205087526 U CN 2010205087526U CN 201020508752 U CN201020508752 U CN 201020508752U CN 201789232 U CN201789232 U CN 201789232U
Authority
CN
China
Prior art keywords
temporary
overhead lines
cables
cable
power failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205087526U
Other languages
Chinese (zh)
Inventor
张洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Zhengzhou Power Supply Co of Henan Electric Power Co
Priority to CN2010205087526U priority Critical patent/CN201789232U/en
Application granted granted Critical
Publication of CN201789232U publication Critical patent/CN201789232U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种架空线路不停电处理故障的装置,它含有支撑杆和临时电缆,所述支撑杆之间架设有承力钢索,该承力钢索上设置有滑车,临时电缆设置在所述滑车上,所述临时电缆的两端分别与工作区域两端的架空线连接且使工作区域内的架空线断路停电,所述临时电缆通过支线分别与工作区域内的用户电路连接。所述临时电缆由三根单相柔性电缆组成。本实用新型利用临时电缆将工作区域内的架空线跨接,使工作区域内架空线停电,工作人员对停电的架空线进行检修和维护,而临时电缆为工作区域内的用户提供电源,保证用户不停电或少停电,降低经济损失。

Figure 201020508752

The utility model discloses a device for handling faults of overhead lines without power failure. On the trolley, the two ends of the temporary cable are respectively connected to the overhead lines at both ends of the working area and the overhead lines in the working area are disconnected and powered off, and the temporary cables are respectively connected to the user circuits in the working area through branch lines. The temporary cable consists of three single-phase flexible cables. The utility model uses temporary cables to bridge the overhead lines in the work area, so that the overhead lines in the work area are powered off, and the staff repair and maintain the overhead lines in the power failure, and the temporary cables provide power for users in the work area, ensuring that users No power outage or less power outage, reduce economic loss.

Figure 201020508752

Description

架空线路不停电处理故障的装置 A device for troubleshooting overhead lines without power failure

一、技术领域:本实用新型涉及一种电力故障处理装置,特别是涉及一种架空线路不停电处理故障的装置。1. Technical field: The utility model relates to a power fault processing device, in particular to a device for processing faults of overhead lines without power failure.

二.背景技术:随着国民经济的发展和人民生活水平的提高,社会对供电的可靠性要求越来越高,由于各种条件的限制,大部分用户不可能达到双电源供电,因而凸现出配电线路综合不停电作业的必要性。2. Background technology: With the development of the national economy and the improvement of people's living standards, the society has higher and higher requirements for the reliability of power supply. Due to the limitations of various conditions, it is impossible for most users to achieve dual power supply. The necessity of comprehensive non-stop operation of distribution lines.

10KV配电线路是配电网络中重要的部分,是直接面对用户的基础设施,由于配电线路网络复杂、覆盖面积大的特点,使其布满供电营业所范围内的每一角落。但是,配电网络绝缘水平低、大气过电压、设备自然老化或其他外界因素作用下容易发生故障,检修工作量大,无论是社会效益还是经济效益,10KV配电网被迫停运都会产生无法估算的损失。The 10KV distribution line is an important part of the power distribution network, and it is the infrastructure that directly faces the users. Due to the complexity of the distribution line network and the characteristics of large coverage area, it covers every corner of the power supply business. However, the distribution network is prone to failure due to low insulation level, atmospheric overvoltage, natural aging of equipment or other external factors, and the workload of maintenance is heavy. Whether it is social or economic benefits, forced outage of the 10KV distribution network will cause failure. Estimated loss.

三.实用新型的内容:3. Contents of the utility model:

本实用新型所要解决的技术问题是:克服现有技术的不足,提供一种设计合理、结构简单、效率高且减小停电损失的架空线路不停电处理故障的装置。The technical problem to be solved by the utility model is: to overcome the deficiencies of the prior art, and provide a device for handling faults of overhead lines with reasonable design, simple structure, high efficiency and reduced power loss loss without power failure.

本实用新型的技术方案是:一种架空线路不停电处理故障的装置,含有支撑杆和临时电缆,所述支撑杆之间架设有承力钢索,该承力钢索上设置有滑车,临时电缆设置在所述滑车上,所述临时电缆的两端分别与工作区域两端的架空线连接且使工作区域内的架空线断路停电,所述临时电缆通过支线分别与工作区域内的用户电路连接。The technical scheme of the utility model is: a device for handling faults of overhead lines without power failure, which includes support rods and temporary cables, load-bearing steel cables are set up between the support rods, pulleys are arranged on the load-bearing steel cables, temporary The cables are arranged on the trolley, and the two ends of the temporary cables are respectively connected to the overhead lines at both ends of the working area and the overhead lines in the working area are disconnected and powered off, and the temporary cables are respectively connected to the user circuits in the working area through branch lines .

所述临时电缆由三根单相柔性电缆组成。The temporary cable consists of three single-phase flexible cables.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1、本实用新型利用临时电缆将工作区域内的架空线跨接,使工作区域内架空线停电,工作人员对停电的架空线进行检修和维护,而临时电缆为工作区域内的用户提供电源,保证用户不停电或少停电,降低经济损失。1. The utility model uses temporary cables to bridge the overhead lines in the work area, so that the overhead lines in the work area are powered off, and the staff repair and maintain the overhead lines in the power outage, and the temporary cables provide power for users in the work area. Ensure that users have no or less power outages and reduce economic losses.

2、本实用新型在支撑杆之间架设承力钢索,承力钢索上设置滑车,便于快速、轻便的架设临时电缆,工作效率高,停电时间短、停电损失小。2. The utility model erects load-bearing steel cables between the support rods, and a pulley is set on the load-bearing steel cables, which is convenient for fast and light erection of temporary cables, with high work efficiency, short power-off time and low power-off loss.

3、本实用新型设计合理、结构简单、效率高且减小停电损失,推广后具有良好的经济效益和社会效益。3. The utility model is reasonable in design, simple in structure, high in efficiency and reduces power failure loss, and has good economic and social benefits after popularization.

四.附图说明:4. Description of drawings:

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

五.具体实施方式:Five. Specific implementation methods:

实施例:参见图1,图中,1-断路器,2-架空线,3-线杆,4-用户,5-支撑杆,6-临时电缆,7-承力钢索,8-滑车。Embodiment: Referring to Fig. 1, among the figure, 1-circuit breaker, 2-overhead line, 3-wire pole, 4-user, 5-support rod, 6-temporary cable, 7-bearing steel cable, 8-pull block.

架空线路不停电处理故障的装置含有支撑杆5和临时电缆6,支撑杆5之间架设有承力钢索7,该承力钢索7上设置有滑车8,临时电缆6设置在滑车8上,便于移动,临时电缆6的两端分别与工作区域两端的架空线2连接且使工作区域内的架空线1断路停电,临时电缆6通过支线分别与工作区域内的用户4的电路连接。The device for troubleshooting overhead lines without power failure includes support rods 5 and temporary cables 6, load-bearing steel cables 7 are erected between the support rods 5, pulleys 8 are arranged on the load-bearing steel cables 7, and temporary cables 6 are set on the pulleys 8 , easy to move, the two ends of the temporary cable 6 are respectively connected to the overhead lines 2 at both ends of the work area and the overhead line 1 in the work area is disconnected and powered off, and the temporary cables 6 are respectively connected to the circuits of the users 4 in the work area through branch lines.

临时电缆6由三根单相柔性电缆组成。当然,根据需要和现场情况,也可以不架设支撑杆5,而是利用原来的线杆3(或者其他平行的线杆)架设承力钢索7,以减少施工时间和费用。Temporary cable 6 consists of three single-phase flexible cables. Of course, according to needs and site conditions, the supporting rod 5 may not be erected, but the original wire rod 3 (or other parallel wire rods) is used to erect the load-bearing steel cable 7, so as to reduce construction time and cost.

使用时,用连接绳索及牵引工具,通过卷扬机将临时电缆6沿承力钢索7移动,实现快速架设,缩短停电时间。架空线2维修完毕,拆除临时电缆6、支撑杆5和承力钢索7,再拆除断路器1,接通架空线2,进行正常供电。During use, use the connecting rope and the traction tool to move the temporary cable 6 along the load-bearing steel cable 7 by the winch, so as to realize rapid erection and shorten the power failure time. After the maintenance of the overhead line 2 is completed, the temporary cable 6, the support rod 5 and the load-bearing steel cable 7 are removed, and then the circuit breaker 1 is removed, and the overhead line 2 is connected for normal power supply.

Claims (2)

1. the overhead transmission line device of handling failure that do not have a power failure, contain support bar and temporary cable, it is characterized in that: set up messenger cable between the described support bar, this messenger cable is provided with coaster, temporary cable is arranged on the described coaster, the two ends of described temporary cable are connected with the overhead wire at two ends, working region respectively and make the power failure of opening circuit of overhead wire in the working region, and described temporary cable is connected with subscriber line circuit in the working region respectively by branch line.
2. the do not have a power failure device of handling failure of overhead transmission line according to claim 1, it is characterized in that: described temporary cable is made up of three single-phase flexible cables.
CN2010205087526U 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut Expired - Fee Related CN201789232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205087526U CN201789232U (en) 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205087526U CN201789232U (en) 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut

Publications (1)

Publication Number Publication Date
CN201789232U true CN201789232U (en) 2011-04-06

Family

ID=43821185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205087526U Expired - Fee Related CN201789232U (en) 2010-08-30 2010-08-30 Device for handling failure of overhead line without power cut

Country Status (1)

Country Link
CN (1) CN201789232U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638016A (en) * 2011-11-22 2012-08-15 嘉兴电力局 Bypass connection device for uninterrupted operation of power distribution network
CN104577879A (en) * 2015-01-22 2015-04-29 苏州威肯工业设备有限公司 Route inspection method for overhead power transmission line
US10367337B2 (en) 2015-04-09 2019-07-30 Quanta Associates, L.P. Conductor as a tool
CN112701609A (en) * 2020-12-22 2021-04-23 广东电网有限责任公司广州供电局 High-voltage line power failure maintenance method, system and related device
CN114301003A (en) * 2021-11-24 2022-04-08 国网浙江省电力有限公司舟山供电公司 Load switching method for flexible cable between adjacent strain towers

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102638016A (en) * 2011-11-22 2012-08-15 嘉兴电力局 Bypass connection device for uninterrupted operation of power distribution network
CN104577879A (en) * 2015-01-22 2015-04-29 苏州威肯工业设备有限公司 Route inspection method for overhead power transmission line
US10367337B2 (en) 2015-04-09 2019-07-30 Quanta Associates, L.P. Conductor as a tool
CN112701609A (en) * 2020-12-22 2021-04-23 广东电网有限责任公司广州供电局 High-voltage line power failure maintenance method, system and related device
CN112701609B (en) * 2020-12-22 2023-10-20 广东电网有限责任公司广州供电局 High-voltage line power failure maintenance method, system and related device
CN114301003A (en) * 2021-11-24 2022-04-08 国网浙江省电力有限公司舟山供电公司 Load switching method for flexible cable between adjacent strain towers

Similar Documents

Publication Publication Date Title
CN201789232U (en) Device for handling failure of overhead line without power cut
CN103573011B (en) A kind ofly build the device and method organizing vertical crossing frame
CN202039638U (en) Lead screw lifting type insulating cross arm
CN203569959U (en) Device for building up assembled type crossing frame
CN203892136U (en) Movable fully-automatic water drawing apparatus
CN203728474U (en) Substation special elevator
CN201502207U (en) Overhead line high voltage tower pole
CN201853968U (en) Single-hook insulating yoke plate
CN206053825U (en) A kind of upper font combines insulation elevator
CN205193122U (en) Multifunctional electricity meter linking bridge of transformer substation
CN103532052A (en) Live erection of simple crossing structure on ADSS (all-dielectric self-supporting optic fiber cable) and implementation method
CN202424285U (en) A bridge hole wind power generation system
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN201887408U (en) Rigid lead fixer of needle type bottle
CN201845024U (en) Test wiring tooling for locomotive traction converter
CN203456828U (en) Overhead wire type terminal wire pulling device
CN207276078U (en) Portable hoisting device
CN203536864U (en) Simple spanning rack of ADSS optical cable capable of being erected in live-line manner
CN202121251U (en) 220kV Li Xu line overhead earth wire overhauling plate ladder
CN202084839U (en) Holding pole support rod device for high-voltage line to span high-density high-voltage power transmission line
CN205050492U (en) Announce electric force information's device fast
CN203504287U (en) Intelligent power distribution terminal based on synchronization check technology
CN204258441U (en) The electric supply installation of equipment on a kind of iron tower of power transmission line
CN204696796U (en) Centralized alternating current-direct current dual input d. c. remote is powered far end system
CN203521964U (en) Inflatable assembling and disassembling device for current transformer in switchgear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110406

Termination date: 20120830