CN201785732U - Waterproof layer structure of artificial lake bottom - Google Patents

Waterproof layer structure of artificial lake bottom Download PDF

Info

Publication number
CN201785732U
CN201785732U CN2010205230929U CN201020523092U CN201785732U CN 201785732 U CN201785732 U CN 201785732U CN 2010205230929 U CN2010205230929 U CN 2010205230929U CN 201020523092 U CN201020523092 U CN 201020523092U CN 201785732 U CN201785732 U CN 201785732U
Authority
CN
China
Prior art keywords
waterproof layer
layer structure
artificial lake
thick
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205230929U
Other languages
Chinese (zh)
Inventor
鄢春梅
李从文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Wenke Landscape Co Ltd
Original Assignee
SHENZHEN WENKE GARDENING INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN WENKE GARDENING INDUSTRY CO LTD filed Critical SHENZHEN WENKE GARDENING INDUSTRY CO LTD
Priority to CN2010205230929U priority Critical patent/CN201785732U/en
Application granted granted Critical
Publication of CN201785732U publication Critical patent/CN201785732U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the technical field of landscape engineering, in particular to waterproof layer structure of an artificial lake bottom. The waterproof layer structure comprises a cushion, a waterproof layer and a protective layer which are sequentially laid from top to bottom. Composite geomembrane is used as the waterproof layer, and pure soil or shoal soil can be obtained from local sources to be used as the cushion, so that multiple layers of structures are integrated to realize the waterproof effect of the artificial lake bottom, the overall water-proof effect is good, the cost is relatively lower, and the waterproof layer structure is suitable for various soil environments, thereby enhancing the construction quality of artificial lakes.

Description

A kind of artificial lake lakebed waterproof layer structure
Technical field
The utility model belongs to the landscape engineering technical field, is specifically related to a kind of artificial lake lakebed waterproof layer structure.
Background technology
In the urban landscaping engineering, do wetly for forming in conjunction with, ecoscape that sound is suitable, usually excavation is built artificial lake, runs off fast for preventing artificial lake lake water, must carry out waterproof construction.In the prior art, the artificial lake lakebed often adopts cement mortar to make waterproofing course on the bottom cushion basis, is easy to generate the crack after being impacted, and destroys waterproof effect; Simultaneously, the waterproof layer material of can not suiting measures to local conditions to choose causes the construction cost height.
Summary of the invention
The purpose of this utility model is to provide a kind of artificial lake lakebed waterproof layer structure, adopts geomembrane as main waterproofing course, is aided with sandwich construction as protection, gathers materials on the spot and chooses the job site material, makes artificial lake reach the excellent waterproof effect.
The technical solution of the utility model is as follows: a kind of artificial lake lakebed waterproof layer structure, constitute by bed course, waterproofing course, topping, and described bed course, waterproofing course, topping are laid from bottom to top successively.
Described bed course is re-layed layer of fine sand and is constituted by rammed earth on it, plain soil pressure real coefficient>93%, and about 10cm is thick for fine sand layer.Under the beach condition, can gather materials on the spot and select for use beach soil to make bed course.
Described waterproofing course is the thick composite geo-membrane of 4mm, lays in the artificial lake lakebed is whole.Composite geo-membrane is as waterproofing course, and good water-proof effect is applicable to strong acid and strong base soil.
Described topping is by the thick fine sand of the about 10cm of one deck, and the top re-lays the thick one deck pea gravel concreten of about 10cm and constitutes.Adopt pea gravel concreten to replace the conventional cement mortar of selecting for use as topping, intensity is bigger, can more effectively protect the fine sand of lower floor.
The beneficial effects of the utility model are: gather materials on the spot and select plain soil or beach soil as bed course, economically feasible is saved cost, and is not reduced workmanship; Under the beach condition, effectively soft more as the topping of geomembrane with beach soil.Select for use composite geo-membrane as waterproofing course, the integrated multilayer structure is carried out artificial lake lakebed waterproof, and integral waterproofing is effective, and cost is relatively low, is suitable for various soil environments, has promoted the artificial lake construction quality.
Description of drawings
Fig. 1 is the lakebed waterproof layer structure schematic diagram of excavation artificial lake under the ordinary soil.
Fig. 2 is the lakebed waterproof layer structure schematic diagram of beach artificial lake.
The specific embodiment
The utility model mainly contains two kinds of specific embodiment, below in conjunction with accompanying drawing to being described further:
Embodiment one when implementing the utility model under ordinary soil, at first will excavate good artificial lake lakebed rammed earth, formin soil padding (1), coefficient of consolidation>93% as shown in Figure 1; Lay the thick fine sand bed course of about 10cm (2) then thereon; The whole thick composite geo-membrane of 4mm (3) of laying of lakebed; Re-lay the thick fine sand for protection layer of about 10cm (4); Make the thick pea gravel concreten topping (5) of about 10cm at last.
Embodiment two when beach is implemented the utility model, at first with artificial lake lakebed beach rammed earth, forms beach soil padding (6), coefficient of consolidation>90% as shown in Figure 2; The whole thereon then thick composite geo-membrane of 4mm (3) of laying; Gather materials on the spot again and lay about 10cm thick beach silt topping (7) with beach soil; Make the thick pea gravel concreten topping (5) of about 10cm at last.

Claims (4)

1. an artificial lake lakebed waterproof layer structure is made of bed course, waterproofing course, topping, it is characterized in that: described bed course, waterproofing course, topping are laid from bottom to top successively.
2. artificial lake lakebed waterproof layer structure according to claim 1 is characterized in that: described bed course is re-layed layer of fine sand and is constituted by rammed earth on it, plain soil pressure real coefficient>93%, and about 10cm is thick for fine sand layer.
3. artificial lake lakebed waterproof layer structure according to claim 1 is characterized in that: described waterproofing course is the thick composite geo-membrane of 4mm, lays in the artificial lake lakebed is whole.
4. artificial lake lakebed waterproof layer structure according to claim 1 is characterized in that: described topping is by the thick fine sand of the about 10cm of one deck, and the top re-lays the thick one deck pea gravel concreten of about 10cm and constitutes.
CN2010205230929U 2010-09-07 2010-09-07 Waterproof layer structure of artificial lake bottom Expired - Lifetime CN201785732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205230929U CN201785732U (en) 2010-09-07 2010-09-07 Waterproof layer structure of artificial lake bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205230929U CN201785732U (en) 2010-09-07 2010-09-07 Waterproof layer structure of artificial lake bottom

Publications (1)

Publication Number Publication Date
CN201785732U true CN201785732U (en) 2011-04-06

Family

ID=43817703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205230929U Expired - Lifetime CN201785732U (en) 2010-09-07 2010-09-07 Waterproof layer structure of artificial lake bottom

Country Status (1)

Country Link
CN (1) CN201785732U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326863A (en) * 2017-08-29 2017-11-07 广州市轻能建材有限公司 A kind of lakebed hardening structure
CN109610410A (en) * 2018-11-15 2019-04-12 成都建工第八建筑工程有限公司 A kind of artificial revetment structure of assembled and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326863A (en) * 2017-08-29 2017-11-07 广州市轻能建材有限公司 A kind of lakebed hardening structure
CN107326863B (en) * 2017-08-29 2023-02-24 广州轻能科技有限公司 Lake bottom hardening structure
CN109610410A (en) * 2018-11-15 2019-04-12 成都建工第八建筑工程有限公司 A kind of artificial revetment structure of assembled and its construction method

Similar Documents

Publication Publication Date Title
CN103898870B (en) A kind of gabion net Ecotypic Stone Mesh-box river course slope protection construction method
US20090050025A1 (en) Use of Encapsulated Water Soluble Material as a Construction Material
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN106193066A (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN102839630A (en) Construction method for embankment by using mucky soil filling bags
CN111335100A (en) Embankment structure suitable for coastal region and construction method thereof
CN109024458A (en) A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage
CN201183955Y (en) Side slope ecological protection structure
CN201785732U (en) Waterproof layer structure of artificial lake bottom
CN1804239A (en) Construction method for deformation resistant building foundation in subsidence area
CN202247789U (en) Seepage-proofing structure for river bottom
CN202073069U (en) Waterproof revetment of artificial lake
CN102518136A (en) Flexible reinforcement combination protection structure for controlling humidification and damage for soft rock strong weathering zone
CN207998829U (en) A kind of drop type revetment structure
CN104863176A (en) Natural gas pipeline engineering retaining wall and construction method thereof
CN207582412U (en) A kind of ecological revetment
CN101691765B (en) Double-ash well pole stress relief coordination and rectification method for complex foundation
CN207244553U (en) A kind of flexible offshore type breakwater system for sandy beach protection
CN202187253U (en) Roadbed structure of high-speed railway on unsaturated soil foundation in flat area
CN215518594U (en) Water taking and draining heat insulation dike for direct current system of coastal power plant
CN105839653A (en) Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
CN113338315B (en) Earth-rock cofferdam structure of silt soft soil foundation and construction method thereof
CN210636386U (en) Reservoir seepage prevention structure for dam face of rock-fill dam and backfill reservoir bottom of soil and stone materials
CN210031693U (en) Trinity original ecology prevention of seepage system
CN208996057U (en) Gear protection structure for soft base side slope near water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN WENKE LANDSCAPE CORP., LTD.

Free format text: FORMER NAME: SHENZHEN WENKE HORTICULTURE INDUSTRY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 26, east block, 518034 floor, CLP information building, 1 news Road, Shenzhen, Guangdong, Futian District

Patentee after: Shenzhen Wenke Landscape Co., Ltd.

Address before: 26, east block, 518034 floor, CLP information building, 1 news Road, Shenzhen, Guangdong, Futian District

Patentee before: Shenzhen Wenke Gardening Industry Co.,Ltd

DD01 Delivery of document by public notice

Addressee: Shenzhen Wenke Landscape Co., Ltd.

Document name: Notification to Pay the Fees

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110406