CN201780495U - Remote diagnosis system for waste grab crane - Google Patents
Remote diagnosis system for waste grab crane Download PDFInfo
- Publication number
- CN201780495U CN201780495U CN201020265928XU CN201020265928U CN201780495U CN 201780495 U CN201780495 U CN 201780495U CN 201020265928X U CN201020265928X U CN 201020265928XU CN 201020265928 U CN201020265928 U CN 201020265928U CN 201780495 U CN201780495 U CN 201780495U
- Authority
- CN
- China
- Prior art keywords
- controller
- remote
- diagnosis system
- grab crane
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The utility model discloses a remote diagnosis system for a waste grab crane, which comprises a diagnosis module, a remote gateway and a controller, wherein the controller is connected with the waste grab crane; the diagnosis module is connected with the remote gateway and the controller in sequence through the network; and the controller that remotely controls the operation of the waste grab crane diagnoses or corrects control programs. Through the use of the remote diagnosis system for the waste grab crane, without going to the site, technical staff can perform the on-site maintenance and the fault treatment conveniently by cooperating with proprietors in any places where the network is connected, so that the on-site accident treatment time is greatly decreased, and the work efficiency and the production efficiency of the proprietors are greatly improved.
Description
Technical field
The utility model relates to automation field, particularly a kind of garbage grab bucket crane remote diagnosis system.
Background technology
Generally,, can't open speed and effectively search the trouble spot, may cause garbage grab bucket crane normally to move when serious, and then influence whole production line because the maintenance electrician does not possess electric, the complete knowledge of instrument, technical ability and equipment.And when production technology is adjusted, the accurate source program of Correction and Control garbage grab bucket crane.
The utility model content
One of the purpose of this utility model provides a kind ofly anyly has the place of network to cooperate the owner to carry out field maintemance and fault handling convenient, need not to arrive the garbage grab bucket crane remote diagnosis system of site disposal problem again.
According to an aspect of the present utility model, a kind of garbage grab bucket crane remote diagnosis system is provided, comprise diagnostic module, remote gateway and controller; Described controller is connected with garbage grab bucket crane; Described diagnostic module is connected with described remote gateway, controller successively by network, and long-range described controller to the work of control garbage grab bucket crane is diagnosed and/or the Correction and Control program.
Also be provided with interchanger between described remote gateway and the described controller.
Described controller is a plurality of.
Described controller adopts Siemens S7-300.
The garbage grab bucket crane remote diagnosis system that the utility model provides, make the technician have the place of network to cooperate the owner to carry out field maintemance and fault handling easily any, need not to arrive again the site disposal problem, significantly reduce the field accident processing time, improve proprietor's work efficiency and throughput rate greatly.
Description of drawings
Fig. 1 is the structured flowchart of the garbage grab bucket crane remote diagnosis system that provides of the utility model embodiment.
The utility model purpose, function and advantage will be in conjunction with the embodiments, are described further with reference to accompanying drawing.
Embodiment
As shown in Figure 1, the garbage grab bucket crane remote diagnosis system that provides of the utility model embodiment comprises diagnostic module 10, network 20, remote gateway 30, switch 40 and at least one controller 50.Wherein, controller adopts Siemens S7-300.Siemens S7-300 can be a plurality of, and each Siemens S7-300 is connected with garbage grab bucket crane, is used to control garbage grab bucket crane work.Remote gateway adopts the DLAN ZH120 of independent research.Diagnostic module 10 is connected to remote gateway 30 by network 20 (comprising wide area network, LAN (Local Area Network) or Metropolitan Area Network (MAN)).10 pairs of remote gateways 30 of diagnostic module, switch 40 are configured, and the configuration back is diagnosed and/or the Correction and Control program controller 50.For example: a certain parts of on-the-spot garbage grab bucket crane break down, but working condition solves unit failure after requiring to finish work at present earlier.Can connect on-the-spot PLC (PLC is connected with on-the-spot garbage grab bucket crane) accurately failure judgement parts and reason by the said equipment, require online adjustment PLC program, satisfy service requirement, and after fault restoration, recover original function according to the owner.
Wherein, DLAN ZH120 has the following advantages: 1, comprehensively security protection: the cryptographic algorithm of comprehensively supporting multiple international mainstream, realize the data high strength encrypting, the close dedicated encrypted algorithm of doing of the built-in state of this equipment, meet the close requirement of the merchant of country, guarantee safety of data transmission, and enciphering rate and encryption efficiency faster are provided; Authenticating based on hardware device features attribute realization hardware certificate of original creation guaranteed to insert remote gateway and moved the unique determinacy of identity that inserts the user; Support VPN special line function, other Internet connections of automatic cutout behind the remote terminal access VPN network are broken off unsafe factor with the threat of terminal as springboard attack Intranet from the source.2, visit is experienced fast: exclusive transmission optimization technology effectively solves VPN visit and transmitting speed problem under transnational, the contour packet loss environment of cross operator; Support multi-line technology realizes that the circuit between many circuits is active and standby, bandwidth superposes and load balancing, improves data rate greatly when ensureing track stability; The multi-line strategy refinement of innovation is to the user, can provide the high speed access of maximum possible according to the different network environment of branch for it distributes only multi-line strategy; Support the efficient stream compress technique, when saving bandwidth resources, significantly promote transmission speed.3, superior ease for use: support single armed multi-line technology down, the optimization of realization speed under the situation that does not change the legacy network environment; Support NAT in the vpn tunneling, realize that same network segment branch need not to change the IP address and still can insert the VPN network, the integrality of maximum protection network structure; Support fluidics in the tunnel, rationally divide each branch's access bandwidth, the visit that promotes the user is experienced; The integrated centralized management platform of support hardware is realized centralized management, monitoring in real time, remote maintenance, auto upgrading and daily record unified management function, has improved managerial personnel's work efficiency greatly.
The foregoing description is the utility model preferred implementation; but embodiment of the present utility model is not restricted to the described embodiments; other any do not deviate from change, the modification done under spirit of the present utility model and the principle, substitutes, combination, simplify; all should be the substitute mode of equivalence, be included within the protection domain of the present utility model.
Claims (4)
1. a garbage grab bucket crane remote diagnosis system is characterized in that, comprising:
Diagnostic module, remote gateway and controller; Described controller is connected with garbage grab bucket crane; Described diagnostic module is connected with described remote gateway, controller successively by network.
2. system according to claim 1 is characterized in that:
Also be provided with interchanger between described remote gateway and the described controller.
3. system according to claim 1 is characterized in that:
Described controller is a plurality of.
4. system according to claim 3 is characterized in that:
Described controller adopts Siemens S7-300.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020265928XU CN201780495U (en) | 2010-07-21 | 2010-07-21 | Remote diagnosis system for waste grab crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201020265928XU CN201780495U (en) | 2010-07-21 | 2010-07-21 | Remote diagnosis system for waste grab crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201780495U true CN201780495U (en) | 2011-03-30 |
Family
ID=43793704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201020265928XU Expired - Lifetime CN201780495U (en) | 2010-07-21 | 2010-07-21 | Remote diagnosis system for waste grab crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201780495U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102633191A (en) * | 2012-04-17 | 2012-08-15 | 河南高翔电器有限公司 | Distributed crane detection and control system |
CN105988408A (en) * | 2015-01-28 | 2016-10-05 | 上海远动科技有限公司 | VPN-based programmable logic controller (PLC) remote diagnostic device and application thereof |
CN109901498A (en) * | 2017-12-08 | 2019-06-18 | 上海远动科技有限公司 | A kind of remotely monitoring fuel gas leak alarm systems and its monitoring method |
-
2010
- 2010-07-21 CN CN201020265928XU patent/CN201780495U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102633191A (en) * | 2012-04-17 | 2012-08-15 | 河南高翔电器有限公司 | Distributed crane detection and control system |
CN105988408A (en) * | 2015-01-28 | 2016-10-05 | 上海远动科技有限公司 | VPN-based programmable logic controller (PLC) remote diagnostic device and application thereof |
CN109901498A (en) * | 2017-12-08 | 2019-06-18 | 上海远动科技有限公司 | A kind of remotely monitoring fuel gas leak alarm systems and its monitoring method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3301783B1 (en) | Protection and control system for intelligent substation based on industrial internet architecture | |
ES2773490T3 (en) | Software-defined implementation method based on protection and control system for smart substation | |
CN100524125C (en) | Solution method for remote monitoring and maintenance of automatization system | |
CN102393715A (en) | Method and system for monitoring and diagnosing large scale equipment remotely | |
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
CN108663980A (en) | Station boiler remote online diagnostic system and its inline diagnosis method | |
CN106790436A (en) | A kind of traffic system monitoring method and control centre's Cloud Server based on cloud framework | |
CN201780495U (en) | Remote diagnosis system for waste grab crane | |
Das et al. | Process-to-bay level peer-to-peer network delay in IEC 61850 substation communication systems | |
CN104895547A (en) | Intelligent mobile monitoring and full-automatic maintenance method and device of electric control system of drilling machine | |
CN105629961A (en) | Industrial furnace remote debugging and diagnosing system and method thereof | |
CN103279083B (en) | A kind of ORC genset wireless supervisory control system and long-distance monitoring method | |
CN202363972U (en) | Remote operation and maintenance platform of substation secondary system | |
CN104375471A (en) | Remote data monitoring system of air purifying device | |
CN202772610U (en) | Monitoring system for battery management systems of electric vehicles | |
KR101698997B1 (en) | System and method for integrated energy management | |
CN101738974A (en) | System for monitoring auxiliary engine state | |
CN203870440U (en) | Network centralized control platform of transformer station main transformation oil chromatogram on-line monitoring devices | |
CN108243096A (en) | A kind of oil field multifunctional security gateway | |
CN202339500U (en) | System used for carrying out remote monitoring and diagnosis on large scale equipment | |
CN203894341U (en) | Electric energy quality monitoring analysis system based on WiFi and virtual device | |
CN105703479A (en) | Method for upper and lower linkage of master station automation device and plant station automation device through extension of channel | |
CN215494685U (en) | Industrial data remote debugging acquisition platform | |
CN205453295U (en) | Electric power dispatching automation secondary equipment operational monitoring alarm system | |
RU2576975C1 (en) | System of relay protection, monitoring and control of electrical equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100007 Lama Temple street, Dongcheng District, Dongcheng District, Beijing Patentee after: Beijing lifting and conveying machinery design and Research Institute Co., Ltd. Address before: 100007 Lama Temple street, Dongcheng District, Dongcheng District, Beijing Patentee before: Beijing Materials Handling Research Institute |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110330 |