CN201778351U - Triphibian diker for earthwork of beach - Google Patents

Triphibian diker for earthwork of beach Download PDF

Info

Publication number
CN201778351U
CN201778351U CN2010202584387U CN201020258438U CN201778351U CN 201778351 U CN201778351 U CN 201778351U CN 2010202584387 U CN2010202584387 U CN 2010202584387U CN 201020258438 U CN201020258438 U CN 201020258438U CN 201778351 U CN201778351 U CN 201778351U
Authority
CN
China
Prior art keywords
diker
beach
earthwork
buoyancy aid
mudflat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202584387U
Other languages
Chinese (zh)
Inventor
陶松垒
童晶
周荣鑫
俞元洪
黄钜海
应林江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HONGYANG CONSTRUCTION GROUP CO Ltd
Zhejiang Lover Health Science and Technology Development Co Ltd
Original Assignee
HONGYANG CONSTRUCTION GROUP CO Ltd
Zhejiang Lover Health Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HONGYANG CONSTRUCTION GROUP CO Ltd, Zhejiang Lover Health Science and Technology Development Co Ltd filed Critical HONGYANG CONSTRUCTION GROUP CO Ltd
Priority to CN2010202584387U priority Critical patent/CN201778351U/en
Application granted granted Critical
Publication of CN201778351U publication Critical patent/CN201778351U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A triphibian diker for the earthwork of a beach can be operated in a manner of floating on water and placing on the beach, and integrate the functions of digging, transporting and building. The triphibian diker comprises a floating body, a bracket, a truss girder, a guy cable, guide rails, cranes and grab buckets, and is characterized in that the truss girder is fixed on two floating body bracket with wheels, and the cranes with grab buckets are arranged on the guide rails on both sides of the truss girder. To solve the problem that the diker is difficult to displace on a sticky beach, an anti-vacuum suction sticky device is arranged at the bottom of the floating body. The triphibian diker has the advantages of fast soil body consolidation speed, small formed side slope, wide application range, and good using effect, and is suitable for the earthwork of various beaches such as rocky beaches, sand beaches, mud flats, high tidal flats, middle tidal flats and low tidal flats.

Description

Three-stay mudflat earthwork diker
Technical field:
The utility model relates to the construction work of beach dyke, belongs to earthmoving equipment.
Background technology:
Beach is the general name of seabeach, river shoal and lakeshore, refer to that the tide between coastal high water level of spring tide and the low tide soaks the area, the rivers and lakes ordinary water level is to the beach between flood level, seaonal lake, the following beach of river flood level, the beach area of the normal pool level of reservoir, swag and maximum flood interdigit.On the geomorphology, be called " intertidal zone ".
China is the country of bay and shallow sea prosperity, and coastal beach mainly is distributed in North gets Liaoning, reach the area, beach in Guangdong, Guangxi and Hainan, 217.04 ten thousand hectares of the beach gross areas in the south.Beach is the important reserve land resources of China, has the advantages that area is big, distribution is concentrated, the position condition is good, farming, animal husbandry and fishery comprehensive development potentiality are big.In China mountain waste, waste hillside, wild grass ground, waste alkali ground and waste sand dune six big reserve development and Utilization of Land Resources, it is the most reasonable that the beach resources economy is worth, and invests the most feasiblely, and potentiality to be exploited is huge.The beach development of resources is important territorial development cause of China's Coastal Areas, also is the important growth point of the national economic development.Coastal beach has formed new round land development upsurge, in Bohai Sea Gulf, Jiaozhou Bay, entrance of Changjiang River, Hangzhou Wan, and the beach investigation work carried out of various places, beach all will play a role for aspects such as further developing aquatic products, salt industry, tidal power generation, irrigation and water conservancy, shipping.
The utilization of beach is is mainly enclosed and cultivated.China advocates and encourages the coastal area to utilize beach to reclaim land from marshes, and brings more land under cultivation, because the effect of morning and evening tides, beach is not had by water logging sometimes, the exposure water surface again sometimes, and often surface in its top, and its underpart is not then often had by water logging.
Existing land earth moving plant as scraper, loader, transporter etc., all can only be constructed on land, and earth moving plant waterborne as dredge boat, hopper etc., can only be constructed on the water.And a large amount of projects of cultivation all is that machinery does not remove the beach ground belt construction that does not mechanically come waterborne down by land.At present, also do not have a large amount of beach engineering of perfect construction equipment all to adopt " sea of faces's campaign ", work hard, work efficiency is extremely low, and progress is slow.
Summary of the invention:
The utility model is in order to solve an above-mentioned difficult problem, provides a kind of and swims and put Tu Junneng work, and collection digs, transports, builds the three-stay mudflat earthwork diker into one.Be suitable for and rock beach, sandy beach, mud bank the earthmoving equipment of various beach such as high tidal flat, middle tidal flat, low tidal flat.
The utility model comprises buoyancy aid, support, girder truss, drag-line, guide rail, loop wheel machine, grab bucket, it is characterized in that: girder truss is fixed on two buoyancy aid supports that have a wheel, and the both sides guide rail of girder truss is provided with the loop wheel machine of band grab bucket.
Described buoyancy aid is the ship shape structure, two perk, on establish two windlass, divide into four wheels at least, also have generating set and living facilities, the windlass at the buoyancy aid two ends is a hoist engine, anchor hawser is a wire rope, and windlass is selected being connected with motor of one with wheels by clutch two.In order to solve the problem of diker, there is anti-vacuum to inhale sticking the setting in the bottom of buoyancy aid in viscosity beach displacement difficulty.
Described support is " A " shape structure, and the bottom is fixed on the buoyancy aid, and the middle part is girder truss fixedly, and the GPS positioner is equipped with at the top.
Described girder truss cross section is a triangle, and top and many drag-lines link, and there are two guide rails on both sides, and guide rail is provided with loop wheel machine, and loop wheel machine connects grab bucket.
It has mainly solved two difficult problems the utility model: the firstth, and the mobile problem of equipment on beach can be on the water, walk on seashore and the intertidal zone; The secondth, equipment will dig and grab earth, carry earth and fill the earth problem of body that combines, so be called as three-stay mudflat earthwork diker, be a kind of earthwork equipment into one that digs at beach intertidal zone collection, transports, builds.It is smaller, applied widely to have soil solidifying speed side slope fast, that form, the advantage that result of use is good.Be applicable to rock beach, sandy beach, mud bank, the ground works of various beach such as high tidal flat, middle tidal flat, low tidal flat.
Description of drawings
Fig. 1 is a front view of the present utility model; Fig. 2 is the support right view.Comprise grab bucket (1) loop wheel machine (2) earth (3) guide rail (4) buoyancy aid (5) support (6) girder truss (7) drag-line (8) windlass (9) position indicator (10) operating room (11) anchor hawser (12) wheel (13)
The specific embodiment:
Below in conjunction with accompanying drawing the utility model is further specified.
Embodiment as shown in Figure 1 and Figure 2, three-stay mudflat earthwork diker, ultimate range is carried 120 meters, output is 60m3/h.It comprises buoyancy aid (5), support (6), girder truss (7), drag-line (8), guide rail (4), grab bucket (1), loop wheel machine (2).
Establish windlass (9), wheel (13), generating set and living facilities on the buoyancy aid (5).The windlass at buoyancy aid two ends (9) is a hoist engine, and anchor hawser (12) is a wire rope, and windlass is connected with motor by clutch with wheels (13).With windlass (9) displacement, be shifted with wheel (13) when putting the beach operation when swimming operation.The bottom of buoyancy aid has anti-vacuum to inhale sticking the setting, when the viscosity beach is put the beach operation, the problem of displacement difficulty no longer occurs.
Support (6) is fixed on the buoyancy aid (5), and the middle part is girder truss (7) fixedly, and position indicator (10) is equipped with at the top.Position indicator (10) adopts coastal engineering ship's fix device.Be provided with operating room (11) on the support (6) near the end of dredging, grab bucket (1) loop wheel machine (2) drag-line (8) windlass (9) all concentrates on operating room (11) control.
Girder truss (7) top and many drag-lines (8) link, and drag-line (8) other end connects with support (6) top.Girder truss (7) both sides are provided with guide rail (4), and guide rail (4) connects loop wheel machine (2), and loop wheel machine (2) connects grab bucket (1).
During construction, three-stay mudflat earthwork diker is at first dispatched engineering site, plans walking route on computers according to drawing of engineering design, throws following four anchors along the direction of diker walking.Finish accurate location with position indicator (10) and windlass (9).One grab bucket (1) is moved to the end of dredging, and the earth that grasps from the sea runs to the position that the earthwork is filled by truss, utilizes automatic discharge unit, and earth material is unloaded to dam body, and another grab bucket meanwhile (1) is returned by truss and being moved to the end of dredging and fetch earth, and comes and goes and circulates.Diker fetches earth on one side and fills, on one side move, when shallow water or soft beach with windlass (9) displacement, deep water or when not having the hydraulic beach with wheel (13) displacement.Realization swims and puts to be coated with dual-purposely, digs the river and fill is gone forward side by side, and operating efficiency significantly improves.Very be used in the ground works of various beach.

Claims (5)

1. three-stay mudflat earthwork diker comprises buoyancy aid, support, girder truss, drag-line, guide rail, loop wheel machine, grab bucket, it is characterized in that: girder truss is fixed on two buoyancy aid supports that have a wheel, and the both sides guide rail of girder truss is provided with the loop wheel machine of band grab bucket.
2. three-stay mudflat earthwork diker according to claim 1, it is characterized in that: buoyancy aid is the ship shape structure, two perk, on establish two windlass, divide into four wheels at least, also have generating set and living facilities, the windlass at the buoyancy aid two ends is a hoist engine, anchor hawser is a wire rope, and windlass is selected being connected with motor of one with wheels by clutch two.
3. three-stay mudflat earthwork diker according to claim 1 is characterized in that: support is " A " shape structure, and the bottom is fixed on the buoyancy aid, and the middle part is girder truss fixedly, and the GPS positioner is equipped with at the top.
4. three-stay mudflat earthwork diker according to claim 1 is characterized in that: the girder truss cross section is a triangle, and top and many drag-lines link, and there are two guide rails on both sides, and guide rail is provided with loop wheel machine, and loop wheel machine connects grab bucket.
5. three-stay mudflat earthwork diker according to claim 1 is characterized in that: the bottom of buoyancy aid is provided with anti-vacuum and inhales sticking the setting.
CN2010202584387U 2010-07-13 2010-07-13 Triphibian diker for earthwork of beach Expired - Fee Related CN201778351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202584387U CN201778351U (en) 2010-07-13 2010-07-13 Triphibian diker for earthwork of beach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202584387U CN201778351U (en) 2010-07-13 2010-07-13 Triphibian diker for earthwork of beach

Publications (1)

Publication Number Publication Date
CN201778351U true CN201778351U (en) 2011-03-30

Family

ID=43791565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202584387U Expired - Fee Related CN201778351U (en) 2010-07-13 2010-07-13 Triphibian diker for earthwork of beach

Country Status (1)

Country Link
CN (1) CN201778351U (en)

Similar Documents

Publication Publication Date Title
CN105970875B (en) Promote the method for the solid sand of silt at seabeach using natural energy
CN101736717B (en) Method for dredging silt and harnessing river
CN107630444B (en) A kind of salt-soda soil planting beach remodeling method
CN104846787A (en) Construction method for carrying out sand-blowing sea-filling land-making in shallow sea area by using cutter suction dredger
CN1773022A (en) Fast soft foundation dyke building method and technology
CN109626581A (en) A kind of method of hydraulic reclamation silty sand and fine sand construction artificial swamp
CN102733351A (en) Method for treating river entrance
CN103850218B (en) Desilting mud Application way
CN101929162B (en) Construction method for three-stay mudflat earthwork diker
CN206956794U (en) Bionic grass device for underwater scour prevention protection
CN103397646B (en) Technique for fast filling constructed wetland in shore area
CN104060573B (en) Quick fill method on coral island
CN104452852A (en) Operating mechanism of bucket-wheel dredger
Gottesfeld et al. Salmon bioturbation and stream process
CN201778351U (en) Triphibian diker for earthwork of beach
CN108951540B (en) Algae collecting, blocking and guiding enclosure system
CN206319353U (en) River course collection silt Accrete clearing device
CN114382048B (en) Shellfish-algae reef type ecological seawall structure
CN214994168U (en) Underwater foundation structure scouring pit repairing structure
CN105256764B (en) Waves ecological riparian structure
CN212223817U (en) Bottom-sitting type offshore wind power installation platform
CN208917805U (en) River sea offshore estuary source rubbish intercepts and collects serial control system
CN106400728A (en) River and lake reclamation area
CN205116087U (en) Ecological river bank of ripples formula structure
Ahn et al. Submarine Cable Installation and Protection Methods According as Characteristics of Ocean Environment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110330

Termination date: 20110713