CN201762648U - Light-weight jack hanger - Google Patents

Light-weight jack hanger Download PDF

Info

Publication number
CN201762648U
CN201762648U CN2010202553139U CN201020255313U CN201762648U CN 201762648 U CN201762648 U CN 201762648U CN 2010202553139 U CN2010202553139 U CN 2010202553139U CN 201020255313 U CN201020255313 U CN 201020255313U CN 201762648 U CN201762648 U CN 201762648U
Authority
CN
China
Prior art keywords
channel
section steel
jack
light
primary load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202553139U
Other languages
Chinese (zh)
Inventor
崔建伟
孙修德
曹会芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN2010202553139U priority Critical patent/CN201762648U/en
Application granted granted Critical
Publication of CN201762648U publication Critical patent/CN201762648U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a light-weight jack hanger which is used for the tensioning operation of a precast beam. The light-weight jack hanger consists of a main load-carrying framework, an anchoring device and a hoisting and sliding device; wherein the main load-carrying framework comprises first steel channels, second steel channels and a screw rod. A rectangle framework is formed between the two second steel channels arranged horizontally and the screw rod arranged between the two second steel channels; the two first steel channels are vertically arranged at the lower part of the rectangle framework; the anchoring device consists of a cable fastener and a reverse bolt, and the two ends of the reverse bolt are respectively connected with the cable fastener and the main load-carrying framework; the hoisting and sliding device consists of a sliding trolley and a chain block, wherein the sliding trolley rotates on the second steel channels; and the chain block is arranged at the lower part of the sliding trolley. By utilizing the light-weight jack hanger, the construction efficiency is high, the labor intensity is low, and the construction plant can be saved.

Description

A kind of light-duty jack suspension bracket
Technical field
The member of using when the utility model relates to a kind of precast beam stretch-draw, especially a kind of light-duty jack suspension bracket.
Background technology
The post stressed concrete precast beam is widely used in the bridge construction, and steel strand tension is a most key procedure in the precast beam construction.The jack weight of using during stretch-draw is big, and it moves horizontally all very difficult with vertical top.Fixing and the mobile dependence of jack heavy in the present construction manually cooperates jack to finish with easy tripod, and the tripod heaviness of field machining wastes time and energy when mobile, and the stretch-draw of a slice precast beam needs 6 people to cooperate just at least can finish inefficiency.Present engineering construction duration majority is all very nervous, uses heavy tripod its drawback of constructing more and more outstanding.Press for a kind of easy instrument successively and assist the stretch-draw of finishing steel strand.
The utility model content
The technical problems to be solved in the utility model provides a kind of efficiency of construction height, in light weight and can save the light-duty jack suspension bracket of construction plant.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of light-duty jack suspension bracket, and its key technology is: it is made up of primary load bearing framework, anchor device and lifting slide device;
Described primary load bearing framework comprises first channel-section steel, second channel-section steel and screw rod, and two horizontally disposed second channel-section steels and the screw rod of being located between two second channel-section steels constitute rectangular frame, vertically are provided with two first channel-section steels in described rectangular frame bottom;
Described anchor device is made up of sling and reverse bolt, and oppositely the bolt two ends connect sling and described primary load bearing framework respectively;
Described lifting slide device is made up of sliding machine and jack, and sliding machine rolls on described second channel-section steel, is provided with jack in described sliding machine bottom.
Further improve, above-mentioned primary load bearing framework also comprises is located at the 3rd channel-section steel that is used to play fixed supporting role between first channel-section steel and second channel-section steel.
Further improve, above-mentioned primary load bearing framework also comprises the crotch of being located at the first channel-section steel bottom.
Above-mentioned reverse bolt is reverse turnbuckle.
Preferably, above-mentioned sliding machine comprises that two two ends are provided with the roller bearing of rolling bearing, is provided with connecting rod between two roller bearings, is provided with the suspension reinforcing bar that is used to hang jack between two connecting rods, and described rolling bearing rolls in the groove of second channel-section steel.
Adopt the beneficial effect that technique scheme produced to be: 1, the utility model is in light weight, and conveniently moving can reduce labour intensity significantly, and the stretch-draw of a slice precast beam only needs two people just can easily finish, and good stability when constructing, and is difficult for toppling.
2, do not take the place of Liang Chang because of the utility model, but directly with it on the beam face, can save the place greatly.
The installation accuracy rate height of jack when 3, adopting the utility model construction, it is vertical, move horizontally conveniently, and translational speed is fast, and the work efficiency height can be saved the duration.
Description of drawings
Fig. 1 is a front view of the present utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Wherein, 1, sling; 2, reverse bolt; 3, second channel-section steel; 4, screw rod; 5, first channel-section steel; 6, the 3rd channel-section steel; 7, roller bearing; 8, connecting rod; 9, rolling bearing; 10, jack; 11, jack; 12, crotch; 13, beam slab to be tensioned; 14, hang reinforcing bar.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Referring to accompanying drawing, first channel-section steel 5 vertically is provided with, it stands on top surface of the beam, second channel-section steel 3 is horizontally disposed with, first channel- section steel 5 and 3 welding of second channel-section steel, and rolling in the groove of second channel-section steel 3 has sliding machine, be arranged with two crotches 12 in each first channel-section steel, 5 bottom, crotch 12 adopts round steel to make, and it is closely buckled in beam-ends, can prevent that the primary load bearing framework from moving backward.Obliquely between first channel-section steel 5 and second channel-section steel 3 be provided with passive the 3rd channel-section steel 6.Sliding machine is made by reinforcing bar and rolling bearing, and level is provided with two roller bearings 7 in its structure, is provided with rolling bearing 9 at the two ends of roller bearing 7, and rolling bearing 9 can move horizontally in second channel-section steel 3.Be connected with two connecting rods 8 between two roller bearings 7, connecting rod 8 bottoms are provided with suspension hook, and jack 11 can hang on the suspension hook, also can weld one and hang reinforcing bar 14 between two connecting rods 8, are hanging suspension jack 11 on the reinforcing bar 14.Be hung with jack 10 below the jack 11, can finish the jack vertical lift.Be connected with reverse bolt 2 on the screw rod of being located at second channel-section steel, 3 left ends (being as the criterion with front view), oppositely the bolt other end connects sling 1.Sling 1 is a wire line hitch herein, and two ends are buckled on back wing plate (or guardrail) reinforcing bar, and oppositely bolt 2 is a turnbuckle, it is adjusted can strain sling 1 and primary load bearing framework, guarantees that the primary load bearing framework does not topple forward under the load-bearing state.
During use, earlier sling 1 is hung on the beam body wing plate, the primary load bearing framework is installed in beam-ends, guarantee that first channel-section steel 5 and crotch 12 are close to the beam-ends surface; With reverse bolt 2 primary load bearing framework and sling 1 are coupled together then, adjust the length of reverse bolt 2 (turnbuckle), make sling 1 and primary load bearing framework stressed; Again jack 11 is hung on the suspension hook (suspension hook is not shown) of sliding machine bottom, pulling jack 11 makes jack 10 arrive the stretch-draw height, to spurring jack 10 away from the beam-ends direction, sliding machine drives jack 10 to moving away from the beam-ends direction, after steel hinge line penetrates jack 10 smoothly, promote jack 10 to moving near the beam-ends direction, sliding machine drives jack 10 and is close to till the anchor ring.Installation work anchor ring and intermediate plate carry out the stretch-draw operation.

Claims (5)

1. light-duty jack suspension bracket is characterized in that: it is made up of primary load bearing framework, anchor device and lifting slide device;
Described primary load bearing framework comprises first channel-section steel (5), second channel-section steel (3) and screw rod (4), two horizontally disposed second channel-section steels (3) and the screw rod of being located between two second channel-section steels (3) (4) constitute rectangular frame, vertically are provided with two first channel-section steels (5) in described rectangular frame bottom;
Described anchor device is made up of sling (1) and reverse bolt (2), and oppositely bolt (2) two ends connect sling (1) and described primary load bearing framework respectively;
Described lifting slide device is made up of sliding machine and jack (11), and sliding machine rolls on described second channel-section steel (3), is provided with jack (11) in described sliding machine bottom.
2. light-duty jack suspension bracket according to claim 1 is characterized in that: described primary load bearing framework also comprises is located at the 3rd channel-section steel (6) that is used to play fixed supporting role between first channel-section steel (5) and second channel-section steel (3).
3. light-duty jack suspension bracket according to claim 2 is characterized in that: described primary load bearing framework also comprises the crotch (12) of being located at first channel-section steel (5) bottom.
4. light-duty jack suspension bracket according to claim 1 is characterized in that: described reverse bolt (2) is reverse turnbuckle.
5. light-duty jack suspension bracket according to claim 1, it is characterized in that: described sliding machine comprises that two two ends are provided with the roller bearing of rolling bearing (9) (7), be provided with connecting rod (8) between two roller bearings (7), be provided with the suspension reinforcing bar (14) that is used to hang jack (11) between two connecting rods (8), described rolling bearing (9) rolls in the groove of second channel-section steel (3).
CN2010202553139U 2010-07-13 2010-07-13 Light-weight jack hanger Expired - Fee Related CN201762648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202553139U CN201762648U (en) 2010-07-13 2010-07-13 Light-weight jack hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202553139U CN201762648U (en) 2010-07-13 2010-07-13 Light-weight jack hanger

Publications (1)

Publication Number Publication Date
CN201762648U true CN201762648U (en) 2011-03-16

Family

ID=43715259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202553139U Expired - Fee Related CN201762648U (en) 2010-07-13 2010-07-13 Light-weight jack hanger

Country Status (1)

Country Link
CN (1) CN201762648U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102689168A (en) * 2012-05-29 2012-09-26 中国海洋石油总公司 Fitting connection technique for large precision equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102689168A (en) * 2012-05-29 2012-09-26 中国海洋石油总公司 Fitting connection technique for large precision equipment
CN102689168B (en) * 2012-05-29 2014-02-05 中国海洋石油总公司 Fitting connection technique for large precision equipment

Similar Documents

Publication Publication Date Title
CN101672018A (en) Trackless hanging bracket with traveling truss
CN202322177U (en) Portable carrier for heavy electrical equipment
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN102363512A (en) Portable heavy electrical equipment carrier
CN201762648U (en) Light-weight jack hanger
CN103774841A (en) Track type sliding formwork device
CN109457619A (en) A kind of mobile bracket of composite multi-functional for concrete girder cast-in-place construction
CN202830889U (en) Rail type slip form device
CN201526013U (en) Positive sprocket wheel walking type cradle
CN201526014U (en) Internal cable-stayed bailey cradle
CN202023353U (en) Integral lifting scaffold for building operations
CN110344560B (en) High-rise building outside steel construction bearing frame
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN109455626A (en) It is a kind of to rise gantry type two-way lifter certainly
CN202707066U (en) Manual hole digging pile wall-protecting integral template
CN202990389U (en) Vertical double-frame guide rail attaching lift scaffold
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN200988272Y (en) Brick blank stocking machine
CN209722743U (en) A kind of mobile bracket of composite multi-functional for concrete girder cast-in-place construction
CN209367692U (en) It is a kind of to rise gantry type two-way lifter device certainly
CN210766433U (en) Trapezoidal hanging basket structure
CN202379616U (en) Movable simple hoisting device
CN202969379U (en) Hoisting support for rock bolt tensioning jack
CN202138937U (en) Electric hanging basket
CN211421123U (en) Joist steel mounting bracket based on TRD construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20150713

EXPY Termination of patent right or utility model