CN201729510U CN2010201938280U CN201020193828U CN201729510U CN 201729510 U CN201729510 U CN 201729510U CN 2010201938280 U CN2010201938280 U CN 2010201938280U CN 201020193828 U CN201020193828 U CN 201020193828U CN 201729510 U CN201729510 U CN 201729510U
Authority
CN
China
Prior art keywords
pipeline
local
check valve
transmitting
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201938280U
Other languages
Chinese (zh)
Inventor
金立全
刘鹏
陈新
万里
段大伟
吴永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Hepu Railway Science & Technology Co Ltd
Original Assignee
Shenyang Hepu Railway Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Hepu Railway Science & Technology Co Ltd filed Critical Shenyang Hepu Railway Science & Technology Co Ltd
Priority to CN2010201938280U priority Critical patent/CN201729510U/en
Application granted granted Critical
Publication of CN201729510U publication Critical patent/CN201729510U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model provides a long-distance freight bill pipeline transmission system, aiming at solving the problems of the complex structure and the low reliability of the pneumatic pipeline transmission device disclosed by CN2690355Y. The long-distance freight bill pipeline transmission system has the key point that: a pump station is respectively arranged at a place A and a place B; the pump stations takes a change valve as the hinge; the four ports of the change valve are respectively to be connected with a local air charging-discharging port, a local fan wind charging pipe, a local fan wind discharging port and a wind offering pipeline; the other port of the wind offering pipeline is connected with a check valve in a local receiving-transmitting device; the check valve is arranged between the wind offering pipeline and a transmitting pipeline; the check valve is arranged at the upper end of the local receiving-transmitting device; the direction of the check valve is faced to the wind offering pipeline from the transmitting pipeline; the transmitting pipeline consists of a section A and a section B; the two sections of the transmitting pipeline are connected with each other by a tee joint; the other joint of the tee joint is communicated with the atmosphere; and the transmitting pipes at the two sides of the tee joint are respectively provided with a photoelectric tube. The long-distance freight bill pipeline transmission system has the benefit effects of eliminating a bypass pipeline, a forward direction air current pressure release valve and a communication pipe between the fan at the place A and the gas discharging device at the place B, being succinct in system, and improving the reliability of the system.

Description

Long apart from the cargo ticket pipe transmission system
Technical field
The utility model relates to a kind of system that utilizes air-flow to transmit cargo ticket in pipeline.
Background technology
The applicant has applied for that to Patent Office of the People's Republic of China name is called " cargo ticket pipe transmission system " on October 23rd, 2009, number of patent application is 200920247497.1 utility model patent, specifically be that a transmit receive unit respectively is set in first and second two places, between two transmit receive units, delivery duct is set, change-over valve and blower fan (pumping plant) are set to ground therein such as first.When from first ground transport box to second during ground, blower fan blows out in delivery duct by the positive draft of first to second, promote container from first ground to second ground; Otherwise blower fan blows out back draught in delivery duct, forms negative pressure, and container is inhaled to first ground from second ground.As seen the air pressure that forms in pipeline is to be finished by a blower fan that is arranged on a ground, and formed air pressure is limited, and correspondingly the length of the delivery duct of this system also is restricted, and generally is no more than 2500 meters.
Summary of the invention
For solving the problems of the technologies described above, the purpose of this utility model is to provide a kind of length apart from the cargo ticket pipe transmission system.
The purpose of this utility model is achieved in that a transmit receive unit respectively is set in first and second two places, between two transmit receive units, delivery duct is set, it is characterized in that: a pumping plant is respectively established in first and second two places, this pumping plant is to be hinge with the change-over valve, four mouths of change-over valve connect respectively: local porting, local fan wind inleting tube, local blower fan air outlet tube mouth, air supply line, the another port of air supply line connects the check valve in the local transceiver device, between air supply line and delivery duct, check valve is set, this check valve is arranged on the upper end of local transceiver device, and direction is to lead to air supply line by delivery duct; Delivery duct is formed by the first and second two sections, is connected by threeway between two sections delivery ducts, and another of threeway be atmosphere all, and an electro-optical tubes or sensor respectively are set in the delivery duct of threeway both sides.The mouth of electro-optical tubes or sensor is connected with PLC (Programmable Logic Controller) input end, and PLC controls the blower fan rotation of first and second two places.
Working process is: the container that cargo ticket will be housed when needs is when first ground transmit receive unit is transferred to second ground transmit receive unit, blower fan blows out positive draft by change-over valve to the first section of first ground transmit receive unit and delivery duct, container is blown to threeway along first section delivery duct, container triggers first electro-optical tubes, first electro-optical tubes requires second ground fan starting to PLC output control signal, second ground fan starting, back draught enters second section delivery duct from threeway; Container by threeway after the positive draft of first section by the threeway pressure release.The back draught of second section promotes container and enters second section delivery duct and trigger second electro-optical tubes, and second electro-optical tubes requires first ground blower fan to shut down to PLC output control signal.When walking to transmit receive unit top, second ground, container falls into second ground transmit receive unit by gravity, back draught is through the check valve and the air supply line on second ground, and the pumping plant that enters second ground promptly drains into atmosphere through change-over valve, fan air inlet, blower fan exhausr port and the porting on second ground successively.
The container that cargo ticket will be housed when needs is when second ground transmit receive unit is transferred to first ground transmit receive unit, and working process is with above-mentioned opposite.
Compared with prior art, the beneficial effects of the utility model are: it is provided with two pumping plants in first and second two places, and container is carried by the pipeline relay that forms positive draft and back draught, delivery stroke is added be twice.
Description of drawings
Further specify the utility model below in conjunction with accompanying drawing.
Fig. 1 is a scheme drawing of the present utility model.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the enlarged drawing of pumping plant 61 among Fig. 2.
Fig. 4 is the enlarged drawing of pumping plant 62 among Fig. 2.
The specific embodiment
Referring to Fig. 1 and 2, a transmit receive unit 11 and 12 respectively are set in first and second two places, delivery duct 31 and 32 are set between two transmit receive units, a pumping plant 61 and 62 are respectively established in first and second two places, referring to Fig. 3, with first ground pumping plant 61 is example, and pumping plant 61 is to be hinge with change-over valve 613, and four mouths of change-over valve connect respectively: the air inlet pipe 615 of first ground porting 614, first ground blower fan 611, first ground blower fan discharge pipe 612, air supply line 71.The another port of air supply line 71 connects the check valve in the first ground transmit receive unit 11, between air supply line 71 and delivery duct 31 check valve 21 is set, and this check valve 21 is arranged on the upper end of first ground transmit receive unit, and direction is to air supply line 71 by delivery duct logical 31.Referring to Fig. 4, second ground pumping plant 62 is identical with first ground pumping plant 61, no longer repeats; Delivery duct is formed by the first and second two section 31 and 32, and two segment length are identical, is connected by threeway 5 between two sections delivery ducts, and another of threeway crossed filtering installation 51 logical atmosphere all, and an electro- optical tubes 41 and 42 respectively are set in the delivery duct of threeway both sides.The mouth of electro-optical tubes is connected with PLC (Programmable Logic Controller) input end, and a PLC controls the blower fan rotation of first and second two places, and two PLC also can be set, and each controls a typhoon machine.
Working process is: the container that cargo ticket will be housed when needs is when first ground transmit receive unit is transferred to second ground transmit receive unit, (referring to Fig. 3) wind enters air inlet pipe 615 from first ground porting 614 successively, blower fan 611, discharge pipe 612, change-over valve 613, air supply line 71 blows out positive draft (referring to Fig. 1) to the first section 31 of first ground transmit receive unit 11 and delivery duct, container is blown to threeway 5 along first section delivery duct 31, container triggers first electro-optical tubes 41, first electro-optical tubes 41 requires second ground fan starting to PLC output control signal, second ground blower fan 621 starts, and back draught enters second section delivery duct 32 from threeway; The positive draft of container by threeway 5 back first sections is by the threeway pressure release.The back draught of second section is inhaled container and is entered second section delivery duct and trigger 42, the second electro-optical tubess 42 of second electro-optical tubes to blower fan 611 shutdown of PLC output control signal with requiring first.When walking to transmit receive unit 12 tops, second ground, container falls into second ground transmit receive unit 12 by gravity, back draught is through the check valve 22 and the air supply line 72 on second ground, and the pumping plant 62 that enters second ground promptly drains into atmosphere through change-over valve 623, fan inleting pipe 625, blower fan discharge pipe 622 and the porting 624 on second ground successively.
The container that goods, ticket will be housed when needs is when second ground transmit receive unit is transferred to first ground transmit receive unit, and working process is with above-mentioned opposite.

Claims (1)

1. one kind long apart from the cargo ticket pipe transmission system, a transmit receive unit respectively is set in first and second two places, between two transmit receive units, delivery duct is set, it is characterized in that: a pumping plant is respectively established in first and second two places, this pumping plant is to be hinge with the change-over valve, four mouths of change-over valve connect respectively: local porting, local fan wind inleting tube, local blower fan air outlet tube mouth, air supply line, the another port of air supply line connects the check valve in the local transceiver device, between air supply line and delivery duct, check valve is set, this check valve is arranged on the upper end of local transceiver device, and direction is to lead to air supply line by delivery duct; Delivery duct is formed by the first and second two sections, is connected by threeway between two sections delivery ducts, and another of threeway be atmosphere all, and an electro-optical tubes respectively is set in the delivery duct of threeway both sides.
CN2010201938280U 2010-05-18 2010-05-18 Long-distance freight bill pipeline transmission system Expired - Fee Related CN201729510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201938280U CN201729510U (en) 2010-05-18 2010-05-18 Long-distance freight bill pipeline transmission system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201938280U CN201729510U (en) 2010-05-18 2010-05-18 Long-distance freight bill pipeline transmission system

Publications (1)

Publication Number Publication Date
CN201729510U true CN201729510U (en) 2011-02-02

Family

ID=43520666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201938280U Expired - Fee Related CN201729510U (en) 2010-05-18 2010-05-18 Long-distance freight bill pipeline transmission system

Country Status (1)

Country Link
CN (1) CN201729510U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495380A (en) * 2014-11-06 2015-04-08 上海美诺福科技股份有限公司 Method for transporting test samples

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495380A (en) * 2014-11-06 2015-04-08 上海美诺福科技股份有限公司 Method for transporting test samples

Similar Documents

Publication Publication Date Title
CN204777673U (en) Strength grain absorber
CN209160942U (en) A kind of coal sample empty bottle full-automatic multistation delivery system
CN201062167Y (en) Alternating-pressure pneumatic pipe conveying apparatus
CN108974946A (en) Multistation annular terminal formula work station
CN108265983A (en) A kind of high-rise building appts. for transferring ready-mixed concrete
CN201729510U (en) Long-distance freight bill pipeline transmission system
CN110027912A (en) A kind of Pneumatic logistic transportation storage system of the more storage warehouses of aggregation pipe
CN103072824A (en) Improved pneumatic coal conveying device
CN201447225U (en) Pneumatic air conveying system
CN203497734U (en) Additionally-arranged blowing assisting device of exhaust pipe of pneumatic ash conveying bin pump
CN202414692U (en) Device for remotely conveying powdered active carbon
CN107364720A (en) A kind of twin flue transmitting-receiving work station, pneumatic sample Transmission system and control method
CN105347038B (en) Centralized control pipe transmission system and its transmission method
CN218433761U (en) Powder conveying device
CN201236071Y (en) Negative pressure pneumatic device for pneumatic conveying system for garbage
CN201378952Y (en) Pneumatic cotton picker
CN207090513U (en) A kind of twin flue transmitting-receiving work station and pneumatic sample Transmission system
CN216689589U (en) Assembled fast-assembling water supply system
CN208683947U (en) Multistation annular terminal formula work station
CN205634201U (en) Pneumatic conveying pipeline decelerator
CN212334034U (en) Train charging devices of environmental protection
CN201516985U (en) Freight bill pipeline transmission system
CN201302252Y (en) Fresh air conveying device
CN210527861U (en) Pneumatic conveying device for lime
CN203127763U (en) Automatic filler loading and unloading device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20170518