CN201722900U - Industrial factory building piping shaft - Google Patents

Industrial factory building piping shaft Download PDF

Info

Publication number
CN201722900U
CN201722900U CN201020195954XU CN201020195954U CN201722900U CN 201722900 U CN201722900 U CN 201722900U CN 201020195954X U CN201020195954X U CN 201020195954XU CN 201020195954 U CN201020195954 U CN 201020195954U CN 201722900 U CN201722900 U CN 201722900U
Authority
CN
China
Prior art keywords
shaped steel
factory building
connector
derrick
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020195954XU
Other languages
Chinese (zh)
Inventor
王万洪
李少洪
吴国强
徐顺飞
柳振宇
葛银锁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HONGYE INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Original Assignee
JIANGSU HONGYE INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HONGYE INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical JIANGSU HONGYE INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201020195954XU priority Critical patent/CN201722900U/en
Application granted granted Critical
Publication of CN201722900U publication Critical patent/CN201722900U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)

Abstract

The utility model provides an industrial factory building piping shaft, comprising a piping inlet, a piping outlet and a derrick. The industrial factory building piping shaft is characterized in that the derrick is formed by connecting C-type steel through C-type steel connecting pieces and is fixed outside a power pipeline, the external periphery of the derrick is provided with a plastic-spraying metal plate, and a piping port is arranged on the plastic-spraying metal plate. Because of adopting the C-type steel connecting piece to connect the C-type steel into a detachable piping shaft, the piping shaft and the pipeline inside the piping shaft can be dismounted together when the pipeline inside the piping shaft is dismounted, thereby realizing the convenient and free dismounting of the piping shaft and the pipeline inside the piping shaft, and in addition, the used materials can be recycled.

Description

A kind of industrial factory building pipe shaft
Technical field
The utility model relates to the hidden technical field of factory building pipeline, is specially a kind of industrial factory building pipe shaft.
Background technology
At present,, be linked into the needed service line of production equipment (as pure water, cooling water, bulk gas, special gas, electrical source of power etc.) in the production department particularly in the pipeline installation process of electronics industry clean room at industrial premises.The kind and the quantity of the power source of device requirement are more, and the pipeline that inserts does not have unified planning, concentrates setting, and it is comparatively in disorder that shop production line often seems.For clean room, often there is not attractive in appearance, waste clean room space, influences the problems such as inconvenience of cleanliness factor and operational management.Address these problems some piping shafts will be installed, and existing piping shaft is to pile up or pipeline is wrapped in the inside and a kind of piping shaft of forming with the sheet material of moulding with constructional materialss such as bricks, if remove the piping shaft interior conduit, to destroy the whole pipe well and remove, this piping shaft can not make things convenient for, dismounting freely, and employed material can not reuse, from causing the waste of material to a great extent.
Summary of the invention
At the problems referred to above, the utility model provides a kind of industrial factory building pipe shaft, in the time of removing the piping shaft interior conduit, can make things convenient for piping shaft and piping shaft interior conduit in the lump, freely dismantle, and employed material can reuse.
Its technical scheme is such: a kind of industrial factory building pipe shaft, comprise entrance, pipe outlet and derrick, it is characterized in that: described derrick is formed by connecting by C shaped steel connector by C shaped steel, described derrick is fixed in outside the service line, described derrick outside is provided with the plastic-blasting metal sheet, and described pipe outlet is arranged on the described plastic-blasting metal sheet.
It is further characterized in that: described C shaped steel connector comprises the L shaped shaped steel connector of level and tee bar connector, vertical L shaped shaped steel connector, the L shaped shaped steel connector of described level, tee bar connector, vertical L shaped shaped steel connector are by bolt, the square nut described C shaped steel that is connected, described vertical L shaped shaped steel connector fitted bolt, square nut are fixed on described derrick on the factory building floor by expansion bolt, and angle aluminium is fixed on described derrick on the factory building ceiling by self-tapping screw; Described plastic-blasting metal sheet is installed on the described derrick by self-tapping screw, and described plastic-blasting metal sheet is provided with access door; Described service line is connected on the described C shaped steel by connector, and described service line connector is a P shape clip; There is neutral fluid sealant junction between junction between the described plastic-blasting metal sheet, described plastic-blasting metal sheet and the described angle aluminium.
The utility model industrial factory building pipe shaft, owing to adopted C shaped steel connector that C shaped steel is connected into dismountable piping shaft, so when removing the piping shaft interior conduit, as long as piping shaft and piping shaft interior conduit are removed in the lump, thereby realized convenient, the dismounting freely of piping shaft and piping shaft interior conduit, and employed material can reuse.
Description of drawings
Fig. 1 is a piping shaft structural representation of the present invention;
Fig. 2 is the piping shaft structural representation of band access hole of the present invention and pipe outlet;
Fig. 3 is the syndeton schematic diagram of piping shaft of the present invention and factory building smallpox top board;
Fig. 4 is the structural representation that the L shaped shaped steel connector of level connects C shaped steel;
Fig. 5 connects the structural representation of C shaped steel for the tee bar connector;
Fig. 6 is the structural representation that vertical L shaped shaped steel connector connects C shaped steel;
Fig. 7 is that vertical L shaped shaped steel connector fitted bolt, square nut connect C formed steel construction schematic diagram;
Fig. 8 is the fixed connection structure schematic diagram of medium power pipeline of the present invention and C shaped steel.
The specific embodiment
See Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, shown in Figure 8, C shaped steel connector 2(comprises the L shaped shaped steel connector 13 of level, tee bar connector 14, vertical L shaped shaped steel connector 15) C shaped steel 1 is connected into a derrick 10, derrick 10 is installed in outside the service line, exterior tubing is introduced in the derrick 10 from entrance 6, in derrick 10, form service line group 4, pipeline 20 is installed on the C shaped steel 1 by P shape clip 19, plastic-blasting metal sheet 7 is installed on the derrick 10 by self-tapping screw 8, plastic-blasting metal sheet 7 adopts the plastic-blasting powder (to mainly contain acrylic clear powder, polyester powder) under 180~220 ℃ high temperature, toasts again through electrostatic spraying, making powder smelting be attached on the metal surface forms, the appropriate location of plastic-blasting metal sheet 7 is provided with pipe outlet 5, pipeline is drawn supply equipment to be used, the position that is suitable for overhauling on plastic-blasting metal sheet 7 is provided with an organic glass door that is used to overhaul 9, and the junction 12 between the outside plastic-blasting metal sheet 7 is sealed with neutral fluid sealant.See Fig. 3, Fig. 4, Fig. 5, Fig. 6, shown in Figure 7, with the L shaped shaped steel connector 13 of level, tee bar connector 14, vertical L shaped shaped steel connector 15 and bolt 17, square nut 18 connects C shaped steel 1, with vertical L shaped shaped steel connector 15 fitted bolts 17, square nut 18 is fixed on C shaped steel on the factory building floor by expansion bolt 16, thereby the piping shaft 11 of whole moulding is fixed on the floor, with angle aluminium 21, self-tapping screw 23 is fixed on piping shaft 11 on the factory building ceiling 22, thereby 11 fixed installations of whole pipe well in position, neutral fluid sealant 24 sealings are arranged between angle aluminium 21 and the plastic-blasting metal sheet 7.Because the utility model adopts C shaped steel connector 2(to comprise the L shaped shaped steel connector 13 of level, tee bar connector 14, vertical L shaped shaped steel connector 15) the C shaped steel piping shaft that is formed by connecting, so when removing the piping shaft interior conduit, as long as piping shaft and piping shaft interior conduit are removed in the lump, thereby realized convenient, the dismounting freely of piping shaft and piping shaft internally-powered pipeline, and employed material can reuse, because the outside plastic-blasting metal sheet that adopts of piping shaft can reach more that factory building is attractive in appearance, the requirement of cleanliness factor.
Certainly, except the foregoing description, can also change the shape of C shaped steel connector, with the C shaped steel connector of supporting shape piping shaft be done triangularity, other shapes such as polygon.Above-mentioned piping shaft can endwaysly be installed in the factory building appropriate location, also can be installed in the appropriate location of factory building sidewards, as long as the whole pipe well can be dismantled.

Claims (5)

1. industrial factory building pipe shaft, comprise entrance, pipe outlet and derrick, it is characterized in that: described derrick is formed by connecting by C shaped steel connector by C shaped steel, described derrick is fixed in outside the service line, described derrick outside is provided with the plastic-blasting metal sheet, and described pipe outlet is arranged on the described plastic-blasting metal sheet.
2. a kind of industrial factory building pipe shaft according to claim 1, it is characterized in that: described C shaped steel connector comprises the L shaped shaped steel connector of level and tee bar connector, vertical L shaped shaped steel connector, the L shaped shaped steel connector of described level, tee bar connector, vertical L shaped shaped steel connector are by bolt, the square nut described C shaped steel that is connected, described vertical L shaped shaped steel connector fitted bolt, square nut are fixed on described derrick on the factory building floor by expansion bolt, and angle aluminium is fixed on described derrick on the factory building ceiling by self-tapping screw.
3. a kind of industrial factory building pipe shaft according to claim 1 and 2 is characterized in that: described plastic-blasting metal sheet is installed on the described derrick by self-tapping screw, and described plastic-blasting metal sheet is provided with access door.
4. A kind of industrial factory building pipe shaft according to claim 3 is characterized in that: described service line is connected on the described C shaped steel by connector, and described connector is a P shape clip.
5. a kind of industrial factory building pipe shaft according to claim 4 is characterized in that: there is neutral fluid sealant the junction between the junction between the described plastic-blasting metal sheet, described plastic-blasting metal sheet and the described angle aluminium.
CN201020195954XU 2010-05-19 2010-05-19 Industrial factory building piping shaft Expired - Lifetime CN201722900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020195954XU CN201722900U (en) 2010-05-19 2010-05-19 Industrial factory building piping shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020195954XU CN201722900U (en) 2010-05-19 2010-05-19 Industrial factory building piping shaft

Publications (1)

Publication Number Publication Date
CN201722900U true CN201722900U (en) 2011-01-26

Family

ID=43491217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020195954XU Expired - Lifetime CN201722900U (en) 2010-05-19 2010-05-19 Industrial factory building piping shaft

Country Status (1)

Country Link
CN (1) CN201722900U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818558A (en) * 2010-05-19 2010-09-01 江苏洪业工业设备安装有限公司 Industrial factory building pipe shaft and installing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818558A (en) * 2010-05-19 2010-09-01 江苏洪业工业设备安装有限公司 Industrial factory building pipe shaft and installing method thereof

Similar Documents

Publication Publication Date Title
CN202469251U (en) Combined support hanger
CN202402815U (en) Split mounting type concrete lined metal corrugated pipe
CN202530571U (en) Box type house convenient to dismount and mount
CN101818558B (en) Industrial factory building pipe shaft and installing method thereof
CN201722900U (en) Industrial factory building piping shaft
CN208991117U (en) A kind of curtain wall rock wool board spray-painting plant
CN203640115U (en) Modular curtain wall panel
CN201314313Y (en) Multi-directional connecting part
CN201943226U (en) Insertion and hang type pottery tube curtain wall
CN204137656U (en) A kind of bell reverse buckling type reserve tank
CN210274936U (en) Self-contained data center refrigerating device
CN203452231U (en) Ceramic rod curtain wall installing structure
CN108167549B (en) Suspension type comprehensive support and hanger
CN201916600U (en) Pipeline bracket for large-diameter horizontal tube arranged along wall
CN207724270U (en) Piping lane bottom plate parapet construction tool special case
CN207196844U (en) A kind of integrated air-line system
CN206681160U (en) One kind goes along with sb. to guard him steel tube fixing device
CN219388821U (en) Novel assembled building wall pipeline is fixed device
CN204590333U (en) Rapid detachable partition wall system
CN205276649U (en) Suspended ceiling section steel structure
CN205242998U (en) Typical forms of building engineering movement joint department
CN204752642U (en) Gasifier water -cooling wall
CN203081036U (en) Simple hoarding capable of being rapidly assembled and disassembled
CN216717002U (en) Improved furnace cover of antimony white furnace
CN213361307U (en) A face electric utility tunnel that is in water for job site foundation ditch is peripheral

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110126

Effective date of abandoning: 20120307