CN101818558A - Industrial factory building pipe shaft and installing method thereof - Google Patents
Industrial factory building pipe shaft and installing method thereof Download PDFInfo
- Publication number
- CN101818558A CN101818558A CN 201010176770 CN201010176770A CN101818558A CN 101818558 A CN101818558 A CN 101818558A CN 201010176770 CN201010176770 CN 201010176770 CN 201010176770 A CN201010176770 A CN 201010176770A CN 101818558 A CN101818558 A CN 101818558A
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- factory building
- derrick
- metal sheet
- pipe shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention provides an industrial factory building pipe shaft and an installing method thereof. The industrial factory building pipe shaft comprises a pipeline inlet, a pipeline outlet and a well frame, and is characterized in that: the well frame is formed by connecting C-shaped steels through C-shaped steel connecting pieces; the well frame is fixed outside a power pipeline; sprayed plastic metal plates are arranged at the outer periphery of the well frame; and the pipeline outlet is formed on the sprayed plastic metal plate. The detachable pipe shaft is formed by connecting C-shaped steels through the C-shaped steel connecting pieces, and when pipelines in the pipe shaft are to be dismounted, the pipe shaft and the pipelines in the pipe shaft are dismounted together, so that the pipe shaft and the pipelines in the pipe shaft are conveniently and freely dismounted, and the used materials can be repeatedly used.
Description
Technical field
The present invention relates to the technical field of factory building pipeline concealment method, be specially a kind of industrial factory building pipe shaft and mounting method thereof.
Background technology
At present,, be linked into the needed service line of production equipment (as pure water, cooling water, bulk gas, special gas, electrical source of power etc.) in the production department particularly in the pipeline installation process of electronics industry clean room at industrial premises.The kind and the quantity of the power source of device requirement are more, and the pipeline that inserts does not have unified planning, concentrates setting, and it is comparatively in disorder that shop production line often seems.For clean room, often there is not attractive in appearance, waste clean room space, influences the problems such as inconvenience of cleanliness factor and operational management.Address these problems some piping shafts will be installed, and existing piping shaft is to pile up or pipeline is wrapped in the inside and a kind of piping shaft of forming with the sheet material of moulding with constructional materialss such as bricks, if remove the piping shaft interior conduit, to destroy the whole pipe well and remove, this piping shaft can not make things convenient for, dismounting freely, and employed material can not reuse, from causing the waste of material to a great extent.
Summary of the invention
At the problems referred to above, the invention provides a kind of industrial factory building pipe shaft and mounting method thereof, in the time of removing the piping shaft interior conduit, can make things convenient for piping shaft and piping shaft interior conduit in the lump, freely dismantle, and employed material can reuse.
Its technical scheme is such: a kind of industrial factory building pipe shaft, comprise entrance, pipe outlet and derrick, it is characterized in that: described derrick is formed by connecting by C shaped steel connector by C shaped steel, described derrick is fixed in outside the service line, described derrick outside is provided with the plastic-blasting metal sheet, and described pipe outlet is arranged on the described plastic-blasting metal sheet.
It is further characterized in that: described C shaped steel connector comprises the L shaped shaped steel connector of level and tee bar connector, vertical L shaped shaped steel connector, the L shaped shaped steel connector of described level, tee bar connector, vertical L shaped shaped steel connector are by bolt, the square nut described C shaped steel that is connected, described vertical L shaped shaped steel connector fitted bolt, square nut are fixed on described derrick on the factory building floor by expansion bolt, and angle aluminium is fixed on described derrick on the factory building ceiling by self-tapping screw; Described plastic-blasting metal sheet is installed on the described derrick by self-tapping screw, and described plastic-blasting metal sheet is provided with access door; Described service line is connected on the described C shaped steel by connector; Described service line connector is a P shape clip; There is neutral fluid sealant junction between junction between the described plastic-blasting metal sheet, described plastic-blasting metal sheet and the described angle aluminium.
A kind of mounting method of industrial factory building pipe shaft is characterized in that: realize by following step: a. connects into a derrick to C shaped steel by C shaped steel connector; B. exterior tubing is introduced described derrick from entrance, forms the service line group in described derrick; C. in described derrick outside dismountable plastic-blasting metal sheet is installed, pipe outlet is arranged on the described plastic-blasting metal sheet; D. described derrick is fixed on the factory building floor and or the factory building ceiling on.
It is further characterized in that: described plastic-blasting metal sheet is installed on the described derrick by self-tapping screw, junction between the described plastic-blasting metal sheet is sealed with neutral fluid sealant, described plastic-blasting metal sheet adopts the plastic-blasting powder that mainly contains acrylic clear powder, polyester powder composition to toast under 180~220 ℃ high temperature through electrostatic spraying again, makes powder smelting be attached on the metal surface and forms.
Industrial factory building pipe shaft of the present invention and mounting method, owing to adopted C shaped steel connector that C shaped steel is connected into dismountable piping shaft, so when removing the piping shaft interior conduit, as long as piping shaft and piping shaft interior conduit are removed in the lump, thereby realized convenient, the dismounting freely of piping shaft and piping shaft interior conduit, and employed material can reuse.
Description of drawings
Fig. 1 is a piping shaft structural representation of the present invention;
Fig. 2 is the piping shaft structural representation of band access hole of the present invention and pipe outlet;
Fig. 3 is the syndeton schematic diagram of piping shaft of the present invention and factory building smallpox top board;
Fig. 4 is the structural representation that the L shaped shaped steel connector of level connects C shaped steel;
Fig. 5 connects the structural representation of C shaped steel for the tee bar connector;
Fig. 6 is the structural representation that vertical L shaped shaped steel connector connects C shaped steel;
Fig. 7 is that vertical L shaped shaped steel connector fitted bolt, square nut connect C formed steel construction schematic diagram;
Fig. 8 is the fixed connection structure schematic diagram of medium power pipeline of the present invention and C shaped steel.
The specific embodiment
See Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, shown in Figure 8, C shaped steel connector 2(comprises the L shaped shaped steel connector 13 of level, tee bar connector 14, vertical L shaped shaped steel connector 15) C shaped steel 1 is connected into a derrick 10, derrick 10 is installed in outside the service line, exterior tubing is introduced in the derrick 10 from entrance 6, in derrick 10, form service line group 4, pipeline 20 is installed on the C shaped steel 1 by P shape clip 19, plastic-blasting metal sheet 7 is installed on the derrick 10 by self-tapping screw 8, plastic-blasting metal sheet 7 adopts the plastic-blasting powder (to mainly contain acrylic clear powder, polyester powder) under 180~220 ℃ high temperature, toasts again through electrostatic spraying, making powder smelting be attached on the metal surface forms, the appropriate location of plastic-blasting metal sheet 7 is provided with pipe outlet 5, pipeline is drawn supply equipment to be used, the position that is suitable for overhauling on plastic-blasting metal sheet 7 is provided with an organic glass door that is used to overhaul 9, and the junction 12 between the outside plastic-blasting metal sheet 7 is sealed with neutral fluid sealant.See Fig. 3, Fig. 4, Fig. 5, Fig. 6, shown in Figure 7, with the L shaped shaped steel connector 13 of level, tee bar connector 14, vertical L shaped shaped steel connector 15 and bolt 17, square nut 18 connects C shaped steel 1, with vertical L shaped shaped steel connector 15 fitted bolts 17, square nut 18 is fixed on C shaped steel on the factory building floor by expansion bolt 16, thereby the piping shaft 11 of whole moulding is fixed on the floor, with angle aluminium 21, self-tapping screw 23 is fixed on piping shaft 11 on the factory building ceiling 22, thereby 11 fixed installations of whole pipe well in position, neutral fluid sealant 24 sealings are arranged between angle aluminium 21 and the plastic-blasting metal sheet 7.Because the present invention adopts C shaped steel connector 2(to comprise the L shaped shaped steel connector 13 of level, tee bar connector 14, vertical L shaped shaped steel connector 15) the C shaped steel piping shaft that is formed by connecting, so when removing the piping shaft interior conduit, as long as piping shaft and piping shaft interior conduit are removed in the lump, thereby realized convenient, the dismounting freely of piping shaft and piping shaft internally-powered pipeline, and employed material can reuse, because the outside plastic-blasting metal sheet that adopts of piping shaft can reach more that factory building is attractive in appearance, the requirement of cleanliness factor.
Certainly, except the foregoing description, can also change the shape of C shaped steel connector, with the C shaped steel connector of supporting shape piping shaft be done triangularity, other shapes such as polygon.Above-mentioned piping shaft can endwaysly be installed in the factory building appropriate location, also can be installed in the appropriate location of factory building sidewards, as long as the whole pipe well can be dismantled.
Claims (7)
1. industrial factory building pipe shaft, comprise entrance, pipe outlet and derrick, it is characterized in that: described derrick is formed by connecting by C shaped steel connector by C shaped steel, described derrick is fixed in outside the service line, described derrick outside is provided with the plastic-blasting metal sheet, and described pipe outlet is arranged on the described plastic-blasting metal sheet.
2. a kind of industrial factory building pipe shaft according to claim 1, it is characterized in that: described C shaped steel connector comprises the L shaped shaped steel connector of level and tee bar connector, vertical L shaped shaped steel connector, the L shaped shaped steel connector of described level, tee bar connector, vertical L shaped shaped steel connector are by bolt, the square nut described C shaped steel that is connected, described vertical L shaped shaped steel connector fitted bolt, square nut are fixed on described derrick on the factory building floor by expansion bolt, and angle aluminium is fixed on described derrick on the factory building ceiling by self-tapping screw.
3. a kind of industrial factory building pipe shaft according to claim 1 and 2 is characterized in that: described plastic-blasting metal sheet is installed on the described derrick by self-tapping screw, and described plastic-blasting metal sheet is provided with access door.
4.
A kind of industrial factory building pipe shaft according to claim 3 is characterized in that: described service line is connected on the described C shaped steel by connector, and described connector is a P shape clip.
5. a kind of industrial factory building pipe shaft according to claim 4 is characterized in that: there is neutral fluid sealant the junction between the junction between the described plastic-blasting metal sheet, described plastic-blasting metal sheet and the described angle aluminium.
6.
A kind of mounting method of industrial factory building pipe shaft is characterized in that: realize by following step: a. connects into a derrick to C shaped steel by C shaped steel connector; B. exterior tubing is introduced described derrick from entrance, forms the service line group in described derrick; C. in described derrick outside dismountable plastic-blasting metal sheet is installed, pipe outlet is arranged on the described plastic-blasting metal sheet; D. described derrick is fixed on the factory building floor and or the factory building ceiling on.
7. according to claim 6
A kind of mounting method of industrial factory building pipe shaft, it is characterized in that: described plastic-blasting metal sheet is installed on the described derrick by self-tapping screw, junction between the described plastic-blasting metal sheet is sealed with neutral fluid sealant, described plastic-blasting metal sheet adopts the plastic-blasting powder that mainly contains acrylic clear powder, polyester powder composition to toast under 180~220 ℃ high temperature through electrostatic spraying again, makes powder smelting be attached on the metal surface and forms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101767703A CN101818558B (en) | 2010-05-19 | 2010-05-19 | Industrial factory building pipe shaft and installing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101767703A CN101818558B (en) | 2010-05-19 | 2010-05-19 | Industrial factory building pipe shaft and installing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101818558A true CN101818558A (en) | 2010-09-01 |
CN101818558B CN101818558B (en) | 2012-03-07 |
Family
ID=42653812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101767703A Expired - Fee Related CN101818558B (en) | 2010-05-19 | 2010-05-19 | Industrial factory building pipe shaft and installing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101818558B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905165A (en) * | 2019-11-04 | 2020-03-24 | 金点石(北京)建筑设计咨询服务有限责任公司 | Piping shaft, building and construction method |
CN114165035A (en) * | 2021-06-30 | 2022-03-11 | 上海宝冶集团有限公司 | Integrated platform for construction in C-shaped steel core barrel |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2098540U (en) * | 1991-08-21 | 1992-03-11 | 刘洪汝 | Anti-theft and fire-proof door |
JPH0762884A (en) * | 1993-08-31 | 1995-03-07 | Mitsui Eng & Shipbuild Co Ltd | Prefabrication shaft unit for building |
CN2479125Y (en) * | 2001-06-13 | 2002-02-27 | 王凤蕊 | Multi-functional integrated air duct |
CN201722900U (en) * | 2010-05-19 | 2011-01-26 | 江苏洪业工业设备安装有限公司 | Industrial factory building piping shaft |
-
2010
- 2010-05-19 CN CN2010101767703A patent/CN101818558B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2098540U (en) * | 1991-08-21 | 1992-03-11 | 刘洪汝 | Anti-theft and fire-proof door |
JPH0762884A (en) * | 1993-08-31 | 1995-03-07 | Mitsui Eng & Shipbuild Co Ltd | Prefabrication shaft unit for building |
CN2479125Y (en) * | 2001-06-13 | 2002-02-27 | 王凤蕊 | Multi-functional integrated air duct |
CN201722900U (en) * | 2010-05-19 | 2011-01-26 | 江苏洪业工业设备安装有限公司 | Industrial factory building piping shaft |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110905165A (en) * | 2019-11-04 | 2020-03-24 | 金点石(北京)建筑设计咨询服务有限责任公司 | Piping shaft, building and construction method |
CN114165035A (en) * | 2021-06-30 | 2022-03-11 | 上海宝冶集团有限公司 | Integrated platform for construction in C-shaped steel core barrel |
Also Published As
Publication number | Publication date |
---|---|
CN101818558B (en) | 2012-03-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202402815U (en) | Split mounting type concrete lined metal corrugated pipe | |
CN202469251U (en) | Combined support hanger | |
CN111400804A (en) | Prefabrication, installation and construction method of large air pipe under BIM model | |
CN101818558B (en) | Industrial factory building pipe shaft and installing method thereof | |
CN201722900U (en) | Industrial factory building piping shaft | |
CN208991117U (en) | A kind of curtain wall rock wool board spray-painting plant | |
CN202402812U (en) | Heat-preserving pipe | |
CN204137656U (en) | A kind of bell reverse buckling type reserve tank | |
CN201943226U (en) | Insertion and hang type pottery tube curtain wall | |
CN203660444U (en) | Lighting wiring system in high-voltage container-type generator set | |
CN107740521B (en) | Arc curtain wall installed indoors | |
CN108167549B (en) | Suspension type comprehensive support and hanger | |
CN202349509U (en) | High-temperature-resistant heat-insulation protective cover for valve | |
CN202349550U (en) | Support of water diversion and collection device | |
CN220303133U (en) | Filter press pipeline anticorrosion threaded flange structure | |
CN205013320U (en) | Immediately, dual -purpose submerged motor pump crouches | |
CN212455850U (en) | Special pipeline fastener for metallurgical equipment | |
CN110360386A (en) | A kind of PPR pipe resistant to high temperature | |
CN210003019U (en) | easy-to-install assembled metal enclosure | |
CN219910277U (en) | Assembled enclosure | |
CN201221638Y (en) | Joint-telescopic valve | |
CN210326980U (en) | Novel explosion-proof junction box | |
CN103938815A (en) | Rapid-installation enclosure system of clean room | |
CN219388821U (en) | Novel assembled building wall pipeline is fixed device | |
CN220538986U (en) | Curtain wall convenient to install |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120307 Termination date: 20140519 |