CN201705374U - 二柱掩护式大采高铺网液压支架 - Google Patents

二柱掩护式大采高铺网液压支架 Download PDF

Info

Publication number
CN201705374U
CN201705374U CN2010202300652U CN201020230065U CN201705374U CN 201705374 U CN201705374 U CN 201705374U CN 2010202300652 U CN2010202300652 U CN 2010202300652U CN 201020230065 U CN201020230065 U CN 201020230065U CN 201705374 U CN201705374 U CN 201705374U
Authority
CN
China
Prior art keywords
hydraulic support
mining height
large mining
support
type large
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202300652U
Other languages
English (en)
Inventor
张守祥
刘国柱
仲丛和
吕金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN2010202300652U priority Critical patent/CN201705374U/zh
Application granted granted Critical
Publication of CN201705374U publication Critical patent/CN201705374U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种二柱掩护式大采高铺网液压支架,包括底座、顶梁、掩护梁,顶梁与底座之间设有两根立柱,该支架的支护高度大于或等于3.8m,该支架的后部设有铺网机构。铺网机构包括铰接于掩护梁后端的尾梁和设于底座后部的至少一个网卷,掩护梁与尾梁之间设有尾梁千斤顶,尾梁内设有插板及插板千斤顶。将大采高技术与铺网技术有机结合,使后部铺网空间加大。既可以可满足产量要求,提高开采效率,又能提高煤炭回收率。

Description

二柱掩护式大采高铺网液压支架
技术领域
本实用新型涉及一种液压支架,尤其涉及一种二柱掩护式大采高铺网液压支架。
背景技术
液压支架是煤炭开采中的必备支护装置,铺网开采和放顶煤开采是现有技术中的两种常用的开采工艺。
现有技术中由于放顶煤开采工效高、开采成本低,应用广泛。但放顶煤回收率低、煤层易燃。
而铺网开采工效低、成本高,所以不及放顶煤推广范围大,但对煤炭的回收率较高。现有技术中的铺网支架一般高度3.5米,使用高度约3~3.3米。
上述现有技术至少存在以下缺点:
开采效率与煤炭回收率不能兼顾。
实用新型内容
本实用新型的目的是提供一种开采效率高、煤炭回收率高的二柱掩护式大采高铺网液压支架。
本实用新型的目的是通过以下技术方案实现的:
本实用新型的二柱掩护式大采高铺网液压支架,包括底座、顶梁、掩护梁,顶梁与底座之间设有两根立柱,该支架的支护高度大于或等于3.8m,该支架的后部设有铺网机构。
由上述本实用新型提供的技术方案可以看出,本实用新型所述的二柱掩护式大采高铺网液压支架,由于该支架的支护高度大于或等于3.8m,该支架的后部设有铺网机构。将大采高技术与铺网技术有机结合,使后部铺网空间加大。既可以可满足产量要求,提高开采效率,又能提高煤炭回收率。
附图说明
图1为本实用新型二柱掩护式大采高铺网液压支架的结构示意图。
具体实施方式
本实用新型的二柱掩护式大采高铺网液压支架,其较佳的具体实施方式如图1所示,包括底座1、顶梁2、掩护梁3,顶梁2与底座1之间设有两根立柱4,该支架的支护高度大于或等于3.8m,该支架的后部设有铺网机构。
铺网机构可以包括铰接于掩护梁3后端的尾梁5和设于底座1后部的至少一个网卷6,掩护梁3与尾梁5之间设有尾梁千斤顶7,形成挡矸机构。尾梁5的上摆角度为10~15°,下摆角度为40~45°。尾梁5内还可以设有插板8及插板千斤顶9。
底座1的中间可以装有推移装置,推移装置的前端连接有前刮板输送机。
标准规定大于3.8米属于大采高液压支架,本实用新型将大采高技术与铺网技术有机结合(支架高度达到7.5m),将厚煤层进行分层开采,而不采用放顶煤开采,可以满足产量要求(如300、500 1000万吨以上),提高了矿山经济效益;采用分层开采技术,又提高煤炭回收率。提高了工作面生产效率和资源回收率,满足安全、高效、高产的需求。
本实用新型中,大采高后部空间较原有铺网支架,后部铺网空间更大,为后部提供更大的操作空间,易于联网。支架高度能应用在支护高度在3.8米以上、适应厚煤层开采需要、提高了工作面生产效率和资源回收率,满足安全、高效、高产的需求。
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。

Claims (5)

1.一种二柱掩护式大采高铺网液压支架,包括底座、顶梁、掩护梁,顶梁与底座之间设有两根立柱,其特征在于,该支架的支护高度大于或等于3.8m,该支架的后部设有铺网机构。
2.根据权利要求1所述的二柱掩护式大采高铺网液压支架,其特征在于,所述的铺网机构包括铰接于所述掩护梁后端的尾梁和设于所述底座后部的至少一个网卷,所述掩护梁与尾梁之间设有尾梁千斤顶。
3.根据权利要求2所述的二柱掩护式大采高铺网液压支架,其特征在于,所述尾梁的上摆角度为10~15°,下摆角度为40~45°。
4.根据权利要求3所述的二柱掩护式大采高铺网液压支架,其特征在于,所述尾梁内设有插板及插板千斤顶。
5.根据权利要求1至4任一项所述的二柱掩护式大采高铺网液压支架,其特征在于,所述底座的中间装有推移装置,所述推移装置的前端连接有前刮板输送机。
CN2010202300652U 2010-06-10 2010-06-10 二柱掩护式大采高铺网液压支架 Expired - Lifetime CN201705374U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202300652U CN201705374U (zh) 2010-06-10 2010-06-10 二柱掩护式大采高铺网液压支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202300652U CN201705374U (zh) 2010-06-10 2010-06-10 二柱掩护式大采高铺网液压支架

Publications (1)

Publication Number Publication Date
CN201705374U true CN201705374U (zh) 2011-01-12

Family

ID=43442528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202300652U Expired - Lifetime CN201705374U (zh) 2010-06-10 2010-06-10 二柱掩护式大采高铺网液压支架

Country Status (1)

Country Link
CN (1) CN201705374U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886547A (zh) * 2010-06-10 2010-11-17 中煤北京煤矿机械有限责任公司 二柱掩护式大采高铺网液压支架

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886547A (zh) * 2010-06-10 2010-11-17 中煤北京煤矿机械有限责任公司 二柱掩护式大采高铺网液压支架

Similar Documents

Publication Publication Date Title
CN101514633B (zh) 无巷旁支护的沿空留巷工艺
CN101871355B (zh) 四柱支撑掩护式大采高铺网液压支架
CN101592035A (zh) 大采高支撑掩护式低位放顶煤液压支架
CN201687497U (zh) 综采工作面末采掩护式支架快速上网装置
CN102383794A (zh) 综放工作面后部输送机交叉侧卸布置配套方式与支架结构
AU2015251283A1 (en) Design process and optimisation method for hydraulic support for solid filling coal mining
CN101886547B (zh) 二柱掩护式大采高铺网液压支架
CN201705375U (zh) 四柱支撑掩护式大采高铺网液压支架
CN201705374U (zh) 二柱掩护式大采高铺网液压支架
CN201391324Y (zh) 轻型薄煤层完整顶板综采液压支架
CN202788899U (zh) 一种大摆梁结构放顶煤液压支架
CN201013399Y (zh) 旋转式两级护帮机构
CN102900450A (zh) 一种大摆梁结构放顶煤液压支架
CN206233944U (zh) 煤矿井下拆除液压支架的掩护架
CN202325609U (zh) 短壁工作面轻型液压支架
CN201363155Y (zh) 一种矿用单摆杆放顶煤液压支架
CN206928968U (zh) 一种刚性骨架耙矸机防护栏
CN201502390U (zh) 机械化采煤顶板破碎工作面液压支架
CN203742630U (zh) 一种液压支架的底座
CN201747391U (zh) 大采高工作面两级侧护过渡支架
CN102080556A (zh) 用于煤炭综采大采高工作面的过渡支架
CN201902220U (zh) 轻型端头支架
CN206997412U (zh) 一种锚杆调直修复机
CN2921287Y (zh) 液压支架新型四连杆装置
CN203271791U (zh) 一种综放液压支架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110112

Effective date of abandoning: 20130306

RGAV Abandon patent right to avoid regrant