CN102900450A - 一种大摆梁结构放顶煤液压支架 - Google Patents

一种大摆梁结构放顶煤液压支架 Download PDF

Info

Publication number
CN102900450A
CN102900450A CN2012103503554A CN201210350355A CN102900450A CN 102900450 A CN102900450 A CN 102900450A CN 2012103503554 A CN2012103503554 A CN 2012103503554A CN 201210350355 A CN201210350355 A CN 201210350355A CN 102900450 A CN102900450 A CN 102900450A
Authority
CN
China
Prior art keywords
coal
swing beam
hinged
hydraulic support
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103503554A
Other languages
English (en)
Inventor
曹连民
肖兴媛
张忠伟
苏国秀
王兴华
赵文明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN2012103503554A priority Critical patent/CN102900450A/zh
Publication of CN102900450A publication Critical patent/CN102900450A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种大摆梁结构放顶煤液压支架,是对现有放顶煤液压支架进行改进,主要由顶梁、伸缩梁、掩护梁、侧护板、连杆、底座、推移机构、立柱、千斤顶及操作阀组成;它还包括一个大摆梁,大摆梁的下面铰接有摆梁千斤顶,大摆梁的前端铰接在顶梁后部上方的铰孔上,摆梁千斤顶的油缸再铰接在顶梁后部下面的铰座上或者铰接在底座上,从而构成一个反四连杆结构;另外大摆梁内设置有插板和插板千斤顶。本发明的有益效果是:该结构放煤窗口大,放煤点高,有利于大块顶煤的放出,有利于提高顶煤回收率。摆梁千斤顶支撑在底座上时,可增大摆梁的驮矸能力,更有利于极近煤层的邻近煤层的下放。

Description

一种大摆梁结构放顶煤液压支架
技术领域
本发明涉及一种煤矿综采工作面支护设备。
背景技术
支护设备是实现综采机械化不可或缺的关键设备,关系到工作面内的人员安全、机器的正常工作和矿工安全生产条件的改善。目前的综采工作面支护设备主要是采用放顶煤液压支架,该支架由顶梁、伸缩梁、掩护梁、侧护板、尾梁、连杆、底座、推移机构、立柱、千斤顶及操作阀组成,顶梁后部通过掩护梁与前、后连杆和底座连接,底座内部设有推移机构,其中,尾梁连接在掩护梁上,尾梁的作用是用于放顶煤。在薄煤层开采中需要下放夹矸,在极近煤层开采中还需要在有限的高度内提高后部放煤空间,以便下放邻近煤层。但现有的放顶煤液压支架由于尾梁连接在掩护梁上,所以放煤高度低,不利于薄煤层大块煤的放出,不利于极近煤层的邻近煤层的下放,影响顶煤的回收率。
发明内容
本发明的目的是为解决薄煤层和极近煤层的顶煤回收率低的问题,对现有放顶煤液压支架进行改进,设计一种大摆梁结构放顶煤液压支架。
本发明采用的技术方案是:一种大摆梁结构放顶煤液压支架,主要由顶梁、伸缩梁、掩护梁、侧护板、连杆、底座、推移机构、立柱、千斤顶及操作阀组成;其特征在于,它还包括一个大摆梁,大摆梁的下面铰接有摆梁千斤顶,大摆梁的前端铰接在顶梁后部上方的铰孔上,摆梁千斤顶的油缸再铰接在顶梁后部下面的铰座上,从而构成一个反四连杆结构;另外大摆梁内设置有插板和插板千斤顶。
上述的摆梁千斤顶的油缸还可以铰接在底座上。
本发明的有益效果是:将现有放顶煤液压支架的尾梁结构改为反四连杆形式的大摆梁结构,该结构放煤窗口大,放煤点高,有利于大块顶煤的放出,过煤高度较高,提高了后部输送机的过煤能力。后连杆与掩护梁铰点提高,后部放煤空间大,有利于提高顶煤的回收率,在低位放顶煤液压支架支护高度受限的情况下可以有效地增大后部的放煤空间,对后部放煤口设备的维护及其它作业提供了较为安全的工作空间,有利于提高顶煤回收率。摆梁千斤顶支撑在底座上时,可增大摆梁的驮矸能力,更有利于极近煤层的邻近煤层的下放。
附图说明
图1是本发明实施例整体结构示意图;
图2是本发明大摆梁结构的另一实施例示意图。
图例说明,1-伸缩梁,2-侧护板,3-顶梁,4-大摆梁,5-插板,6-掩护梁,7-前连杆,8-后连杆,9-底座,10-立柱,11-推移机构,12-推移油缸,13-推杆,14-拉后溜装置,15-起底机构,16-摆梁千斤顶,17-插板千斤顶。
具体实施方式
现结合附图对本发明作进一步详细说明:
实施例一:如图1所示,一种大摆梁结构放顶煤液压支架,主要由顶梁3、伸缩梁1、掩护梁6、侧护板2、前连杆7、后连杆8、底座9、推移机构11、立柱10、千斤顶及操作阀组成;具体结构是,顶梁3和底座9之间通过立柱10相连接,顶梁3的前端设置伸缩梁1,顶梁3的后部设置有掩护梁6,掩护梁6与底座9间通过前连杆7和后连杆8相连接,底座9内设置有推移机构11,推移机构11由推移油缸12和推杆13组成,推移机构11采用倒装结构,推移油缸12与底座9铰接,推杆13的后端与推移油缸12的推杆13铰接,液压支架与后部输送机之间通过拉后溜装置14连接,为适应底板较软情况,底座9的前部设置有起底机构15,以便于移架。它还包括一个大摆梁4,大摆梁4的下面铰接有摆梁千斤顶16,大摆梁4的前端铰接在顶梁3后部上方的铰孔上,摆梁千斤顶16的油缸再铰接在顶梁3后部下面的铰座上,从而构成一个反四连杆结构;另外大摆梁4内设置有插板5和插板千斤顶17。
实施例二:如图2所示,一种大摆梁结构放顶煤液压支架,基本构造与实施例一基本相同,在此不重复描述,其区别在于,摆梁千斤顶16的油缸铰接在底座9上。
上述实施例未具体描述到的其它部分均可采用现有技术。

Claims (1)

1.一种大摆梁结构放顶煤液压支架,主要由顶梁、伸缩梁、掩护梁、侧护板、连杆、底座、推移机构、立柱、千斤顶及操作阀组成;其特征在于,它还包括一个大摆梁,大摆梁的下面铰接有摆梁千斤顶,摆梁的前端铰接在顶梁后部上方的铰孔上,摆梁千斤顶的油缸铰接在底座上或铰接在顶梁后部下面的铰座上,从而构成一个反四连杆结构;另外大摆梁内设置有插板和插板千斤顶。
CN2012103503554A 2012-09-05 2012-09-05 一种大摆梁结构放顶煤液压支架 Pending CN102900450A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103503554A CN102900450A (zh) 2012-09-05 2012-09-05 一种大摆梁结构放顶煤液压支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103503554A CN102900450A (zh) 2012-09-05 2012-09-05 一种大摆梁结构放顶煤液压支架

Publications (1)

Publication Number Publication Date
CN102900450A true CN102900450A (zh) 2013-01-30

Family

ID=47572907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103503554A Pending CN102900450A (zh) 2012-09-05 2012-09-05 一种大摆梁结构放顶煤液压支架

Country Status (1)

Country Link
CN (1) CN102900450A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178999A (zh) * 2015-09-30 2015-12-23 山东能源重装集团鲁南装备制造有限公司 一种液压支架
CN107939434A (zh) * 2017-12-22 2018-04-20 郑州合新科技有限公司 单摆梁放顶煤液压支架
CN108252732A (zh) * 2018-03-26 2018-07-06 中国矿业大学(北京) 一种可以实现放顶煤工作面端部放煤的过渡支架
CN112593989A (zh) * 2020-12-08 2021-04-02 中煤科工开采研究院有限公司 放顶煤液压支架的顶梁长度调节装置、方法和液压支架

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2240607Y (zh) * 1995-11-16 1996-11-20 沈阳煤炭科学研究所 一种放顶煤液压支架
CN2466351Y (zh) * 2000-07-26 2001-12-19 黄尚智 全掩护尾梁高位、中位、低位放顶煤液压支架
AU2003271396A1 (en) * 2003-03-05 2004-09-23 Yankuang Group Corporation A sub-level caving hydraulic support
CN200982201Y (zh) * 2006-12-14 2007-11-28 梁晖勇 自移迈步式轻型液压支架
CN201306178Y (zh) * 2008-12-09 2009-09-09 郑州四维机电设备制造有限公司 带移动托板的填充支护液压支架
CN102562112A (zh) * 2012-03-07 2012-07-11 郑州四维机电设备制造有限公司 四柱悬挂摆梁式矸石填充液压支架
CN202788899U (zh) * 2012-09-05 2013-03-13 山东科技大学 一种大摆梁结构放顶煤液压支架

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2240607Y (zh) * 1995-11-16 1996-11-20 沈阳煤炭科学研究所 一种放顶煤液压支架
CN2466351Y (zh) * 2000-07-26 2001-12-19 黄尚智 全掩护尾梁高位、中位、低位放顶煤液压支架
AU2003271396A1 (en) * 2003-03-05 2004-09-23 Yankuang Group Corporation A sub-level caving hydraulic support
CN200982201Y (zh) * 2006-12-14 2007-11-28 梁晖勇 自移迈步式轻型液压支架
CN201306178Y (zh) * 2008-12-09 2009-09-09 郑州四维机电设备制造有限公司 带移动托板的填充支护液压支架
CN102562112A (zh) * 2012-03-07 2012-07-11 郑州四维机电设备制造有限公司 四柱悬挂摆梁式矸石填充液压支架
CN202788899U (zh) * 2012-09-05 2013-03-13 山东科技大学 一种大摆梁结构放顶煤液压支架

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178999A (zh) * 2015-09-30 2015-12-23 山东能源重装集团鲁南装备制造有限公司 一种液压支架
CN107939434A (zh) * 2017-12-22 2018-04-20 郑州合新科技有限公司 单摆梁放顶煤液压支架
CN108252732A (zh) * 2018-03-26 2018-07-06 中国矿业大学(北京) 一种可以实现放顶煤工作面端部放煤的过渡支架
CN112593989A (zh) * 2020-12-08 2021-04-02 中煤科工开采研究院有限公司 放顶煤液压支架的顶梁长度调节装置、方法和液压支架
CN112593989B (zh) * 2020-12-08 2022-11-25 中煤科工开采研究院有限公司 放顶煤液压支架的顶梁长度调节装置、方法和液压支架

Similar Documents

Publication Publication Date Title
CN103899343B (zh) 三自由度并联液压支架
CN105221177B (zh) 四柱浮摇式液压支架
RU121861U1 (ru) Двухпозиционная двухстоечная гидравлическая крепь для обрушения низкорасположенной верхней пачки угольного пласта
CN102704974B (zh) 一种高位放顶煤充填采煤液压支架及方法
CN103410545A (zh) 可实现放顶煤和充填作业的液压支架
CN202788899U (zh) 一种大摆梁结构放顶煤液压支架
CN102900450A (zh) 一种大摆梁结构放顶煤液压支架
CN201606089U (zh) 支护充填一体化液压支架
CN106968697B (zh) 五自由度并联液压支架
CN203362199U (zh) 综采工作面端头液压支架
CN205101015U (zh) 四柱浮摇式液压支架
CN202832574U (zh) 大采高液压支架
CN102251790A (zh) 双顶梁同轴铰接四连杆采充一体化液压支架
CN101270668A (zh) 综采工作面回撤专用支架
CN101871355B (zh) 四柱支撑掩护式大采高铺网液压支架
CN203383843U (zh) 一种薄煤层充填采煤支架
CN203769820U (zh) 三自由度并联液压支架
CN201502388U (zh) 一种大倾角工作面液压支架机道挡矸装置
CN201310370Y (zh) 大采高掩护式液压支架
CN208280975U (zh) 设有大伸缩比柱形稳定机构的巷道超前支架
CN201568067U (zh) 综采放顶煤工作面端头支架
CN202215273U (zh) 前置单摆杆式端头液压支架
CN201874598U (zh) 用于薄煤层的掩护式液压支架
CN203412607U (zh) 可实现放顶煤和充填作业的液压支架
CN201934115U (zh) 特大采高液压支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130130