The double-deck waterproof double-layer drainage of heat insulation house surface structure
Technical field
The utility model relates to house waterproof, discharge structure and the job practices of building field, the double-deck waterproof double-layer drainage of specifically a kind of heat insulation house surface structure
Background technology
Roof leakage is the generality persistent ailment on puzzlement building circle, it is the problem that the People's Government, industry and broad masses relatively are concerned about, each R﹠D institution and waterproof producer have developed many novel waterproofing materialss, relevant unit, department also sum up many waterproofer's methods, but all fail to stop roof leakage.Existing heat insulation house surface waterproofing system is divided into positively fixed type and two kinds of forms of inversion type, the way of positively fixed type roof waterproof is to do waterproof on insulation layer, form of structure is roof panel basic unit → leveling layer → insulation layer → leveling layer → waterproofing course, the shortcoming that this way exists is if waterproofing course has any one seepage, water will flow directly to insulation layer and scurry other positions to the roof, flow to the floor slit and locate to leak down to cause the roof seepage, not only be difficult to find the definite position of seepage this moment, and insulation layer soaks and can cause insulation failure; The inverted roof waterproofing process is to do waterproof below insulation layer, and its structure is roof panel → leveling layer → waterproofing course → insulation layer → topping successively.In fact the topping on the insulation layer does not have waterproof effect, in case cracking, rainwater will lodge in the insulation layer in a large number, even following waterproofing course is effectively non-leakage, insulation layer also loses heat insulation effect.Roofing in actual construction is at last insulation layer with during smearing leveling layer, in case rain, rainwater enters insulation layer, accumulates in the water in the insulation layer, can not dry up for a long time, and water causes roof leakage in the inlet chamber of roof panel slit.Therefore, usually can occur not raining even strange phenomenon that sunny roofing also leaks.
Chinese patent 200710202498.X discloses " a kind of thermal insulation waterproof roof covering gas-guiding drainage system " its structure and inverted roof waterproof construction basically identical; fundamentally do not solve the problem that the inverted roof topping ftractures and leaks easily; though in insulation layer, added a bleed gutter that communicates with the rainwater pipe; can discharge the big portion ponding that is trapped in the insulation layer; but fail fundamentally to solve roof leakage; also bring simultaneously a problem; that is exactly when roofing runs into big rainwater; because the bleed gutter in the insulation layer communicates with the rainwater pipe; rainwater on the roofing just has the danger of flowing backwards and entering insulation layer by the bleed gutter; this situation appears; one meets heavy rain; insulation layer just may pour in down a chimney into water, causes roof leakage.The heat insulation house surface of this patent is not provided with stack in addition, causes the steam in the roofing heat-insulating layer not discharge.
Summary of the invention
The purpose of this utility model is at the deficiencies in the prior art, provides the double-deck waterproof of a kind of employing to set up defences, the double-deck waterproof double-layer drainage of a kind of heat insulation house surface structure of two cover discharge structures, and this topology layout is reasonable, and anti-drainage effect is remarkable.
Realize above-mentioned purpose by the following technical solutions:
The double-deck waterproof double-layer drainage of a kind of heat insulation house surface structure comprises roof panel, last leveling layer, following leveling layer, waterproofing course and insulation layer,
Described waterproofing course is divided into bottom waterproofing course and surface layer waterproofing course, its arrangement architecture is from the bottom to top successively: reinforced concrete roof board, bottom cement mortar screeding layer, the bottom waterproofing course, insulation layer, surface layer cement mortar screeding layer and surface layer waterproofing course, on heat insulation house surface, be arranged with two cover water-proof drainage systems: a cover is a bottom water-proof drainage system, another set of is surface layer water-proof drainage system, described drainage system mainly is made up of gutter and gutter spout funnel, gutter is arranged on bottom waterproofing course and the surface layer waterproofing course, two gutter left sides of bottom waterproofing course and surface layer waterproofing course, right septum, independent separately, on, under stagger, be set up in parallel, the pipe bottom is inserted in the gutter spout funnel respectively, form the double-deck waterproof double-layer drainage of roofing structure, described gutter spout funnel is positioned at and outdoorly is communicated with main drain;
Described bottom cement mortar screeding layer is provided with many transverse row channelings, several vertical exhaust ditches, many transverse row channelings and several vertical exhaust ditches that vertically is provided with connect, infall at vertical, horizontal exhaust ditch is provided with the roofing air exit that communicates with atmosphere, the roofing stack is arranged on the deck of bottom cement mortar screeding layer, be positioned on the roofing air exit, the tube wall that passes the roofing stack of insulation layer is provided with steam vent, and the water in the insulation layer is discharged through the roofing stack by steam vent.
Compared to existing technology, the utility model adopts the form of structure of two-layer waterproof and two cover drainings at the insulation layer upper and lower surface, has solved many common faults that heat insulation house surface conventional waterproof way occurs.The utility model bottom waterproofing course be waterproofing course also be vapour barrier, it can stop from indoor moisture and enters roofing system by roof panel.The utility model has solved in the rainy season waterproof construction, to run into rainy day roofing heat-insulating layer water inlet, and must to do the difficult problem of waterproofing course in order trying to meet the deadline for the project.The bottom waterproofing course thorough water and the moisture of having blocked from up and down be set.Even roofing heat-insulating layer is met the rain water inlet, the water that enters in the insulation layer can be discharged along the bottom drainage system, along the heat insulation house surface stack, remains in moisture in the insulation layer and can vaporize gradually and drain.For this reason, the long-term building circle heat insulation house surface leakage problems that perplexs is readily solved.The utility model preferably resolves the difficult problem of roof waterproof and insulation, has remedied the deficiency of existing waterproof technique and waterproof effect.
Description of drawings
Fig. 1 is the double-deck waterproof double-layer drainage of a utility model heat insulation house surface structure cut-away view.
Fig. 2 is the double-deck waterproof double-layer drainage of a utility model heat insulation house surface overall structure schematic diagram.
Fig. 3 is the utility model heat insulation house surface roof drainage cut-away view.
Fig. 4 is the utility model heat insulation house surface insulation layer draining cut-away view.
Fig. 5 is the utility model heat insulation house surface gutter schematic diagram.
Among the figure, reinforced concrete roof board 1, bottom cement mortar screeding layer 2, bottom waterproofing course 3, insulation layer 4, surface layer cement mortar screeding layer 5, surface layer waterproofing course 6, roofing stack 7, roof drainage pipe 8, insulation layer gutter 9, gutter spout funnel 10, main drain 11, transverse row channeling 12, vertical exhaust ditch 13, steam vent 14.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail.
Embodiment 1
Present embodiment is the double-deck waterproof double-layer drainage of an a kind of heat insulation house surface structure, see accompanying drawing 1-5, its structure sets gradually reinforced concrete roof board 1, bottom cement mortar screeding layer 2, bottom waterproofing course 3, insulation layer 4, surface layer cement mortar screeding layer 5, surface layer waterproofing course 6 from the bottom to top.Heat insulation house surface upper and lower be provided with two the cover drainage systems: one the cover be bottom water-proof drainage system, another set of is surface layer water-proof drainage system, described drainage system mainly is made up of gutter and gutter spout funnel, sees on Fig. 3 surface layer waterproofing course 6 roof drainage pipe 8 is set.See Fig. 4, insulation layer gutter 9 is set on the bottom waterproofing course 3.
See Fig. 1, Fig. 5, insulation layer gutter 9 one ends that are used to get rid of ponding in the insulation layer stretch into insulation layer 4, and the other end passes parapet and enters and be positioned at outdoor gutter spout funnel 10; After the roof drainage pipe 8 that is used to get rid of rainwater on the roofing passes parapet, also enter and be positioned at outdoor same gutter spout funnel 10, two gutters 8,9 and pass left and right interval behind the parapet, upper and lower staggering, independent separately the setting.The outlet of two gutters, 8,9 bottoms is inserted respectively in the gutter spout funnel 10, gutter spout funnel 10 be positioned at outdoor main drain 11 and be connected, form the double-deck waterproof double-layer drainage of roofing structure thus.
See Fig. 1, be provided with many wide 2~5cm on bottom cement mortar screeding layer 2, spacing is 4~6 meters transverse row channelings 12, vertical exhaust ditch 13 that several vertically are provided with.The bar number of transverse row channeling 12, vertical exhaust ditch 13 is set by designing requirement.Many transverse row channeling 12 connects with several vertical exhaust ditches that vertically are provided with 13, infall at vertical, horizontal exhaust ditch is provided with a plurality of roofing air exits that communicate with atmosphere, roofing stack 7 is arranged on the deck of bottom cement mortar screeding layer 2, is installed on the roofing air exit to communicate with the roofing exhaust opening.The tube wall that roofing stack 7 passes insulation layer 4 parts is provided with a plurality of steam vents 14, and the water of the remnants in the insulation layer 4, vapour are discharged through roofing stack 7 by steam vent 4.The corresponding setting of roofing stack 7 with the roofing exhaust opening.
Embodiment 2
The job practices of the double-deck waterproof double-layer drainage of a kind of heat insulation house surface structure, construction sequence is as follows:
Set gradually following each layer on reinforced concrete roof board 1, at first smear bottom cement mortar screeding layer 2 and look for the slope, the downward-sloping gradient is 3~5 degree.And on bottom cement mortar screeding layer 2, open many wide 2~5cm by designing requirement, and spacing is 4~6 meters transverse row channelings 12, vertical exhaust ditches 13 that several vertically are provided with, laterally, vertically the exhaust ditch connects by designing requirement.A plurality of infall correspondences at vertical, horizontal exhaust ditch are provided with a plurality of roofing air exits that communicate with atmosphere.The bottom waterproofing course 3 that paves stretches out roofing by the construction of Drainage Design in a organized way with the bottom waterproofing course, lays insulation layer 4 then on bottom waterproofing course 3, float coat cement mortar screeding layer 5 and look for the slope on insulation layer 4, and the downward-sloping gradient is 3~5 degree.Surface layer waterproofing course 6 and by the construction of Drainage Design in a organized way paves on surface layer cement mortar screeding layer 5.When doing roofing heat-insulating layer 4, roofing stack 7 and roof drainage pipe 8 are installed.When roof drainage pipe 8 is installed, roof drainage pipe 8 one ends are communicated with the roofing catchment, the position of other end aligning gutter spout funnel 10 is passed parapet and is placed in the gutter spout funnel 10.When insulation layer stack 9 is installed, insulation layer gutter 9 one ends are stretched into the bottom of insulation layer 4, the other end passes parapet and inserts in the gutter spout funnel 10 in the position of corresponding gutter spout funnel 10, and gutter spout funnel 10 is connected with main drain 11.The gutter that is provided with surface layer waterproofing course 6 in the insulation layer 4 has been formed the double-deck waterproof double-layer drainage of roofing structure.
Bottom waterproofing course 3 is stretched out the roofing part bond together, bottom waterproofing course 3 and surface layer waterproofing course 6 are combined between the higher and lower levels form an integral body, form double layer water-proof structure with surface layer waterproofing course 6.
Bottom waterproofing course 3 of the present utility model adopts " elastomer modified asphalt waterproof roll " thickness 4mm, polyester blank, the hot melt construction, or the composite high-molecular waterproofing materials is pressed the Technical code for roof engineering construction.Insulation layer 4 adopts thick 10 centimeters warming plate or ashes.
Surface layer waterproofing course 6 adopts atactic polypropylene (APP) modified bituminous waterproof sheet material, thickness 4.0mm, polyester blank, hot melt construction; Or composite high-molecular waterproof roll and TPO (TPO) waterproof roll and the compound TPO self-adhesion composite of water-proof coiled material of high-polymer modified pitch adhesive waterproof coil, job practices should be used the wet shop of the self-adhesion method construction of hot melt welding or high-polymer modified pitch adhesive waterproof coil according to the material of selecting for use.The drainage system of surface layer waterproofing course 6 is set on the surface layer waterproofing course.
Operating principle of the present utility model
Upper and lower two waterproofing courses that the utility model is provided with, one under insulation layer, one on insulation layer, one expose one built-in; Water in the insulation layer 4 and the water on the roofing all are provided with drainage channel separately, and the water in water on the roofing and the insulation layer 4 is respectively walked the gutter of each, and the water that remains in the insulation layer 4 is discharged by roofing stack 7.The outlet of roof drainage pipe 8 and 9, two gutters of insulation layer gutter is inserted in the same gutter spout funnel 10, and the water that two gutters are discharged is drained by main drain 11 via gutter spout funnel 10.
The function of waterproofing course and effect
1, one of design main points of the present utility model are to have increased bottom waterproofing course 3, utilize bottom waterproofing course 3, solve the positively fixed type roofing when the damage of upper strata waterproofing course, and water leaks to insulation layer and causes a difficult problem of scurrying the difficult searching of water leakage point.
2, utilize bottom waterproofing course 3 to solve the positively fixed type roofings in rainy season construction, in case it is too high and the duration does not allow to delay to meet rain insulation layer moisture content, can there be water seal in waterproof construction again and can't get out in the insulation layer by force, causes the difficult problem of long-term seepage.
3, utilize moisture in the bottom waterproofing course isolating chamber, solve indoor moisture and arrive in the insulation layer, condense into the water reverse osmosis and go into an indoor difficult problem in case run into cold day by the top board slit.
4, utilize the way solution inverted roof rainwater of the double-deck waterproof double-layer drainage of the utility model to be stored in easily in the insulation layer, cause a difficult problem that increases roofing load and insulation layer inefficacy.
More than disclosed only be specific embodiment of the utility model; though the utility model discloses as above with preferred embodiment; but the utility model is not limited thereto; any those skilled in the art can think variation; in not breaking away from design philosophy of the present utility model and scope; the utility model is carried out various changes and retouching, all should drop within the protection domain of the present utility model.