CN201687254U - 一种可升降的通信基站铁塔 - Google Patents
一种可升降的通信基站铁塔 Download PDFInfo
- Publication number
- CN201687254U CN201687254U CN2010202220018U CN201020222001U CN201687254U CN 201687254 U CN201687254 U CN 201687254U CN 2010202220018 U CN2010202220018 U CN 2010202220018U CN 201020222001 U CN201020222001 U CN 201020222001U CN 201687254 U CN201687254 U CN 201687254U
- Authority
- CN
- China
- Prior art keywords
- communication base
- iron tower
- base station
- station iron
- pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型公开一种可升降的通信基站铁塔,包括通信基站铁塔、电动机、绞盘、钢丝绳、滑轮、由通信基站铁塔散件连接制做成的通信基站铁塔节段;电机和绞盘安装在通信基站铁塔底节段上;通信基站铁塔各节段上端固定安装有滑轮;钢丝绳一端固定在绞盘上,另一端依次穿过各滑轮,最后固定在通信基站铁塔顶节段的滑轮上锁死,构成了一整套滑轮系统;通信基站铁塔各节段可叠套在一起,安装时,电机带动绞盘旋转,钢丝绳绕绞盘缠绕,钢丝绳与滑轮组组合逐节带动通信基站铁塔节段升起。优点是:通信基站铁塔节段在运至施工现场前可组装完毕,安装方便快捷,高空作业量少,安全性好,施工占地面积很小,协调容易,可随时安装施工。
Description
技术领域
本实用新型属于通信和工程机械技术领域,涉及一种可升降的通信基站铁塔,特别适用于通信基站的铁塔安装。
背景技术
传统的通信基站铁塔,属于非定型产品,根据不同地域设计制造不同的塔型。通信基站铁塔安装过程是:
准备安装材料:先由工厂加工制造通信基站铁塔的各种工件,然后将通信基站铁塔工件运至施工现场。
安装实施:先打基础,放置预埋件,待混凝土凝固15天——30天后,再利用起吊设备将铁塔各段塔材吊起,人员登高在高空用螺栓分段将塔材进行连接安装。铁塔组立完成后再进行校正调直。
这样的安装方式有很多缺陷:一是从打基础到安装完成,需要很长时间,每个通信基站铁塔施工安装完成约1个月左右;二是安装过程繁杂,安装人员要高空作业,最高时达到百米以上,危险性大;三是施工占地面积大,占地协调难度大,不宜随时安装。
发明内容
本实用新型公开一种可升降的通信基站铁塔,以解决现有技术中安装过程繁杂、高空安装耗时长、危险性大、占地面积大、不宜随时安装等问题。
本实用新型包括通信基站铁塔,通信基站铁塔包括避雷针、天线支架、基站板房;其特征在于还包括:电动机、绞盘、钢丝绳、滑轮、由通信基站铁塔散件连接制做成的通信基站铁塔节段;通信基站铁塔节段至少包括通信基站铁塔顶节段、通信基站铁塔底节段;电机和绞盘安装在通信基站铁塔底节段上;通信基站铁塔各节段上端固定安装有滑轮;钢丝绳一端固定在绞盘上,另一端依次穿过各滑轮,最后固定在通信基站铁塔顶节段的滑轮上锁死,构成了一整套滑轮系统;通信基站铁塔各节段可叠套在一起。
通信基站铁塔底节段上连接安装一个小三角架;电机和绞盘安装在通信基站铁塔底节段上的小三角架上。
通信基站铁塔节段还包括通信基站铁塔中间节段;通信基站铁塔中间段固定安装有滑轮;钢丝绳一端固定在绞盘上,另一端依次穿过通信基站铁塔底节段上滑轮、通信基 站铁塔中间段上滑轮、通信基站铁塔顶节段上滑轮,最后固定在通信基站铁塔顶节段的一个滑轮上锁死,构成了一整套滑轮系统;通信基站铁塔各节段可叠套在一起;安装时,电机带动绞盘旋转,钢丝绳绕绞盘缠绕,钢丝绳与滑轮组组合逐节带动通信基站铁塔节段升起。
通信基站铁塔节段上具有横梁,滑轮由连接板安装在横梁上。
本实用新型通信基站铁塔安装过程如下:
第一步安装前准备:首先将通信基站铁塔散件连接制做成大于2段的节段,钢丝绳一端固定在绞盘上,另一端依次穿过各滑轮,最后固定在通信基站铁塔顶节段的滑轮上锁死;然后将通信基站铁塔各节段叠套在一起。
第二步安装实施:启动电机开关,电机带动绞盘转动,钢丝绳绕绞盘缠绕,钢丝绳开始缩短,钢丝绳与滑轮组组合逐节带动通信基站铁塔节段升起,实现通信基站铁塔安装。
本实用新型的优点是:通信基站铁塔节段在运至施工现场前可组装完毕,施工现场只需接通电源、启动电机、提升通信基站铁塔,实现安装;安装方便快捷,1--3天可完成施工,缩短施工安装时间;大大减少高空作业的工作量,安全性好,施工占地面积很小,协调容易,可随时安装施工。
附图说明
图1为本实用新型结构示意图;
图2为本实用新型沿B-B剖面的滑轮组在塔段下端的连接方式剖视放大图;
图3为本实用新型沿A-A剖面的滑轮在塔段上端连接方式剖视放大图。
图中:1绞盘;2滑轮;3滑轮;4滑轮;5滑轮;6滑轮;7滑轮;8滑轮;9小连接板;10大连接板;11横梁;12连接板;13横梁;101通信基站铁塔顶节段;201通信基站铁塔中间节段;301通信基站铁塔底节段;401小三角架。
具体实施方式
以下是本实用新型的一个实施例。
如图1所示:本实用新型通信基站铁塔包括避雷针、天线支架、基站板房、通信基站铁塔包括通信基站铁塔顶节段101、通信基站铁塔中间节段201、通信基站铁塔底节段301。
如图1、图2、图3所示:本实用新型滑轮升降系统包括电动机、绞盘1、钢丝绳、 滑轮、连接板、小三角架401;通信基站铁塔包括通信基站铁塔顶节段101、通信基站铁塔中间节段201、通信基站铁塔底节段301,通信基站铁塔节段上具有横梁11和横梁13,连接板9、连接板10、连接板12中间具有螺栓安装孔,滑轮2、滑轮5和滑轮8为如图2所示上端固定结构,螺栓穿过两个连接板12安装孔和滑轮轴孔,将滑轮连接安装在两个连接板12之间,两个连接板12焊接在横梁通信基站铁塔中间节段201的上端横梁13上,两个连接板12还焊接在横梁通信基站铁塔底节段301的上端横梁13上;滑轮3、滑轮4、滑轮6和滑轮7为如图3所示的下端固定结构,螺栓穿过连接板9和连接板10安装孔和滑轮轴孔,将滑轮连接安装在连接板9和连接板10之间,连接板9和连接板10焊接在通信基站铁塔中间节段201下端的横梁11上;连接板9和连接板10还焊接在通信基站铁塔顶节段101下端的横梁11上;小三角架401焊接安装连接在通信基站铁塔底节段301下端;电机和绞盘1安装在通信基站铁塔底节段301上的小三角架401上;钢丝绳一端固定在绞盘1上,另一端依次穿过滑轮2、滑轮3、滑轮4、滑轮5、滑轮6,滑轮7,最后固定在滑轮8上锁死。
安装前,通信基站铁塔顶节段101、通信基站铁塔中间节段201、通信基站铁塔底节段301叠套在一起;
安装时,启动电机开关,钢丝绳绕绞盘缠绕,钢丝绳开始缩短,滑轮组带动通信基站铁塔顶节段101升起,当滑轮6、滑轮7与滑轮5和滑轮8高度相同时,通信基站铁塔顶节段101升位停止;然后滑轮3、滑轮4带动通信基站铁塔中间节段201继续向上升起,当滑轮3、滑轮4与滑轮2高度相同时,通信基站铁塔中间节段201升位停止。多个通信基站铁塔中间节段,可如此操作可以安装不同高度的铁塔。
Claims (4)
1.一种可升降的通信基站铁塔,包括通信基站铁塔,通信基站铁塔包括避雷针、天线支架、基站板房;其特征在于还包括:电动机、绞盘、钢丝绳、滑轮、由通信基站铁塔散件连接制做成的通信基站铁塔节段;通信基站铁塔节段至少包括通信基站铁塔顶节段、通信基站铁塔底节段;电机和绞盘安装在通信基站铁塔底节段上;通信基站铁塔各节段上端固定安装有滑轮;钢丝绳一端固定在绞盘上,另一端依次穿过各滑轮,最后固定在通信基站铁塔顶节段的滑轮上锁死,构成了一整套滑轮系统。
2.根据权利要求1所述的通信基站铁塔,其特征在于:通信基站铁塔底节段上连接安装一个小三角架;电机和绞盘安装在通信基站铁塔底节段上的小三角架上。
3.根据权利要求1或2所述的通信基站铁塔,其特征在于:通信基站铁塔节段还包括通信基站铁塔中间节段;通信基站铁塔中间段固定安装有滑轮;钢丝绳一端固定在绞盘上,另一端依次穿过通信基站铁塔底节段上滑轮、通信基站铁塔中间段上滑轮、通信基站铁塔顶节段上滑轮,最后固定在通信基站铁塔顶节段的一个滑轮上锁死,构成了一整套滑轮系统。
4.根据权利要求1所述的通信基站铁塔,其特征在于:通信基站铁塔节段上具有横梁,滑轮由连接板安装在横梁上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202220018U CN201687254U (zh) | 2010-06-11 | 2010-06-11 | 一种可升降的通信基站铁塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202220018U CN201687254U (zh) | 2010-06-11 | 2010-06-11 | 一种可升降的通信基站铁塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201687254U true CN201687254U (zh) | 2010-12-29 |
Family
ID=43375539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202220018U Expired - Fee Related CN201687254U (zh) | 2010-06-11 | 2010-06-11 | 一种可升降的通信基站铁塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201687254U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102373826A (zh) * | 2011-10-26 | 2012-03-14 | 宁波天弘电力器具有限公司 | 抢修塔倒装架 |
CN105552510A (zh) * | 2015-12-15 | 2016-05-04 | 成都迅德科技有限公司 | 一种新型基站天线 |
CN105839979A (zh) * | 2016-04-16 | 2016-08-10 | 无锡南理工科技发展有限公司 | 一种通信铁塔的伸缩塔身 |
CN105888354A (zh) * | 2016-04-16 | 2016-08-24 | 无锡南理工科技发展有限公司 | 伸缩式通信铁塔 |
CN109339554A (zh) * | 2018-10-15 | 2019-02-15 | 合肥鸿坤通信工程有限公司 | 一种自立式通信机架及通信设备 |
-
2010
- 2010-06-11 CN CN2010202220018U patent/CN201687254U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102373826A (zh) * | 2011-10-26 | 2012-03-14 | 宁波天弘电力器具有限公司 | 抢修塔倒装架 |
CN105552510A (zh) * | 2015-12-15 | 2016-05-04 | 成都迅德科技有限公司 | 一种新型基站天线 |
CN105839979A (zh) * | 2016-04-16 | 2016-08-10 | 无锡南理工科技发展有限公司 | 一种通信铁塔的伸缩塔身 |
CN105888354A (zh) * | 2016-04-16 | 2016-08-24 | 无锡南理工科技发展有限公司 | 伸缩式通信铁塔 |
CN109339554A (zh) * | 2018-10-15 | 2019-02-15 | 合肥鸿坤通信工程有限公司 | 一种自立式通信机架及通信设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8584429B2 (en) | Tower erection system and method | |
US8297025B2 (en) | Method of building a hybrid tower for a wind generator | |
US9016029B2 (en) | Method of setting up, maintaining and disassembling a wind turbine | |
CN201687254U (zh) | 一种可升降的通信基站铁塔 | |
US10012005B2 (en) | Crane system incorporated into a tower | |
CN103266779B (zh) | 一种越过水平障碍物的提升滑移施工设备及其方法 | |
CN106996214A (zh) | 一种设有预制桩基础的通信塔 | |
CN206753188U (zh) | 一种设有预制桩基础的通信塔 | |
CN103669956A (zh) | 集中式太阳能塔组件和方法 | |
CN110924738A (zh) | 一种变径拼搭平台及工件搭接方法 | |
CN109653481A (zh) | 一种悬挂导轨式高空操作平台及制作方法 | |
CN101858164A (zh) | 一种可升降的通信基站铁塔 | |
CN202299574U (zh) | 一种插入式通信基站升降塔 | |
CN206336964U (zh) | 一种支顶式管道吊装装置及系统 | |
EP2857615A1 (en) | Mounting method and mounting device of a concrete tower formed with precast pieces | |
KR20130073117A (ko) | 해상 타워구조물 설치방법 | |
CN110593546A (zh) | 一种烟囱保温施工辅助装置 | |
CN103434933A (zh) | 一种大型构件吊装就位装置及就位方法 | |
CN201825635U (zh) | 电站锅炉吊装结构 | |
CN211473325U (zh) | 一种烟囱保温施工辅助装置 | |
CN210918153U (zh) | 一种房建用脚手架 | |
CN208056658U (zh) | 用于工业化建筑的空中造楼机 | |
CN203922508U (zh) | 一种便携式起重装置 | |
EP3670789A1 (en) | Method of installing tall and super-tall towers | |
CN108978926B (zh) | 一种双层压型钢板复合保温墙体内侧压型钢板的安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101229 Termination date: 20120611 |