CN201686735U - Double-suction type waste gas collecting device on batch hot-dip galvanized pools - Google Patents

Double-suction type waste gas collecting device on batch hot-dip galvanized pools Download PDF

Info

Publication number
CN201686735U
CN201686735U CN2009201119328U CN200920111932U CN201686735U CN 201686735 U CN201686735 U CN 201686735U CN 2009201119328 U CN2009201119328 U CN 2009201119328U CN 200920111932 U CN200920111932 U CN 200920111932U CN 201686735 U CN201686735 U CN 201686735U
Authority
CN
China
Prior art keywords
air
suction
air suction
waste gas
pools
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201119328U
Other languages
Chinese (zh)
Inventor
谭蓉
刘克
何明奕
王胜民
赵晓军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN2009201119328U priority Critical patent/CN201686735U/en
Application granted granted Critical
Publication of CN201686735U publication Critical patent/CN201686735U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model discloses a double-suction type waste gas collecting device on batch hot-dip galvanized pools, which belongs to the field of special equipment for controlling waste gas emission and collecting emitted waste gases on batch hot-dip galvanized pools and is applicable to collecting waste gases on hot-dip galvanized pools with the width ranging from 0.6m to 1.2m. The device comprises a low-noise centrifugal fan (1), an adjusting valve (2) and air suction pipelines (3), the two air suction pipelines (3) with the identical rectangular sections are located on two sides of a galvanized pool (4), and waste gases generated on the galvanized pool are sucked by an air suction opening (6), an air suction opening (7), an air suction opening (8), an air suction opening (9) and an air suction opening (10) which are respectively arranged on side walls of the air suction pipelines which face towards the galvanized pool and are emitted to a waste gas treatment device via the low-noise centrifugal fan (1) to be treated finally.

Description

Double-suction type gas sampling device on the batch quantity hot dipping zinc pond
Technical field
The utility model relates to double-suction type gas sampling device on a kind of batch quantity hot dipping zinc pond, belongs to the specific equipment field of the waste gas control of top, batch quantity hot dipping zinc pond, discharging collection.
Background technology
In galvanizing was produced, dust-laden exhaust gas such as a large amount of effusion ammonium chlorides of top, zinc pond meeting, zinc chloride, zinc fume and zinc oxide dust were not as being controlled, will pollute the workshop, influence HUMAN HEALTH, as not handled, will be discharged into atmospheric environment from the workshop, atmosphere is polluted.For preventing the diffusion of dust-laden exhaust gas, will dispose exhaust emission system, these dust-laden exhaust gas are collected, handled.
At present a lot of manufacturing enterprises still do not have effective measure of control and specific equipment to top, galvanizing pond waste gas, and part enterprise adopts import equipment, and effect is also desirable not to the utmost.Import equipment mostly adopts the mode of box-shaped seal closure that waste gas is controlled and collected, because galvanizing zinc pond is longer, part reaches more than the 30m, cabinet space is big, the intake-gas amount is corresponding excessive, moreover most of galvanizing production is the intermittent type input and output material, and the box-shaped seal closure must adopt intermittent type folding gate, this just causes vacuum fan power height, dutycycle height, and the exhaust gas emission effect is subjected to very big restriction.It is big to cause equipment to take up an area of, the cost height.
Summary of the invention
In order to solve the deficiency of now zinc-plated industry to existing on the waste gas pollution control and treatment, double-suction type gas sampling device on the batch quantity hot dipping zinc pond is proposed, can realize collection to top, the galvanizing pond waste gas of medium-width.The utility model provides a kind of device that is used for the wide galvanizing of 0.6~1.2m pond top gas sampling, and this device has adopted double-suction type gas sampling mode, the waste gas that produces on the galvanizing pond is concentrated be discharged into emission-control equipment and handle.
Double-suction type gas sampling device on the batch quantity hot dipping zinc pond, comprise the low-noise centrifugal ventilator, variable valve, air-suction duct, air-suction duct is a uniform cross section rectangle air-suction duct, two uniform cross section rectangle air-suction ducts are positioned at the both sides in zinc pond, it has five air suction inlets respectively on the two side in zinc pond, with top, suction zinc pond dust-laden exhaust gas, five air suction inlets are wide, equidistantly, length is from diminishing successively to blower fan direction one end away from low-noise centrifugal ventilator one end, above uniform cross section rectangle air-suction duct, be provided with windsheild, stop that top, air suction inlet clean air sucks uniform cross section rectangle air-suction duct.The waste gas of top, zinc pond is inhaled into uniform cross section rectangle air-suction duct, finally concentrates through the low-noise centrifugal suction fan to be discharged into emission-control equipment.Wind speed, blast by variable valve equal cross section rectangle air-suction duct are regulated.
Double-suction type gas sampling device on the batch quantity hot dipping zinc pond is compared advantage and the positively effect that is had with conventional art
1) upward double-suction type gas sampling device is littler than box-shaped sealing bell-type gas sampling device intake-gas amount, and input and output material need not intermittent type folding gate and destroys the air-flow environment during production, and influences the exhaust gas emission effect.
2) compare with legacy equipment that to have ventilation little, vacuum fan power height, dutycycle are low, save the advantage of energy consumption.
3) air quantity, wind speed can be regulated, the collection of top, galvanizing pond waste gas under suitable different size and the operating mode, and adaptability is good.
4) the equipment occupation of land is little, and consumptive material is few, and operation site is visual strong, does not influence operation.The device activity member is few, and the life-span is long, keeps in repair easy.
Description of drawings
Fig. 1 is the decomposition texture synoptic diagram of double-suction type gas sampling device on the batch quantity hot dipping zinc pond.
Fig. 2 is uniform cross section rectangle air-suction duct and air suction inlet sketch.
Embodiment
Below by specific embodiment the utility model is described in further detail.
Double-suction type gas sampling device on the batch quantity hot dipping zinc pond, comprise low-noise centrifugal ventilator (1), variable valve (2), air-suction duct (3), air-suction duct (3) is a uniform cross section rectangle air-suction duct, two uniform cross section rectangle air-suction ducts (3) are positioned at the both sides of zinc pond (4), it has five air suction inlets (6~10) respectively on the sidewall in zinc pond, with top, suction zinc pond dust-laden exhaust gas, five air suction inlets (6~10) are wide, equidistantly, length is from diminishing successively to blower fan direction one end away from low-noise centrifugal ventilator (1) one end, above uniform cross section rectangle air-suction duct, be provided with windsheild (5), stop that top, air suction inlet clean air sucks uniform cross section rectangle air-suction duct.
The principle of work of this device is: low-noise centrifugal ventilator (1) is realized even air draught by uniform cross section rectangle air-suction duct (3), and whole process can be controlled flowing of top, zinc pond (4) dust-laden exhaust gas effectively.Be evenly distributed with rectangle air suction inlet (6~10) on the uniform cross section rectangle air-suction duct (3), each rectangle air suction inlet width is identical, length can guarantee that from diminishing by rule successively to blower fan one end away from low-noise centrifugal ventilator (1) one end suction air volume is identical on each air draught cross section.Above uniform cross section rectangle air-suction duct, also be provided with windsheild (5), suck uniform cross section rectangle air-suction duct to stop top, air suction inlet clean air.Top, last zinc pond waste gas is discharged into emission-control equipment through the outlet of low-noise centrifugal ventilator (1) and handles.Wind speed, blast by variable valve (2) equal cross section rectangle air-suction duct are regulated.
Embodiment 1
Double-suction type gas sampling device is made up of uniform cross section rectangle air-suction duct (3), low-noise centrifugal ventilator (1), windsheild (5) and air suction inlet assembly (6~10) on the batch quantity hot dipping zinc pond, double-suction type gas sampling device is installed on 6m * top, 1m galvanizing pond on the batch quantity hot dipping zinc pond, this device can be collected the waste gas of top, galvanizing pond, makes it be discharged into specified device and handles.This device comprises the air intake device that is installed in both sides, zinc pond, and this air intake device comprises uniform cross section rectangle air-suction duct (3), and sectional area is 1000mm * 400mm.Five rectangle air suction inlets (6~10) are arranged on the air-suction duct, the cross section, air suction inlet changes successively, realize even air draught, with top, effective suction zinc pond waste gas, each wide 250mm in rectangle air suction inlet, air suction inlet length is from diminishing by rule successively to blower fan direction one end away from low-noise centrifugal ventilator (1) one end, spacing 1.2m, the long 780mm in air suction inlet (10), the long 760mm in air suction inlet (9), the long 700mm in air suction inlet (8), the long 550mm in air suction inlet (7), the long 520mm in air suction inlet (6), each air suction inlet suction air volume is 1.08m 3/ s.Uniform cross section rectangle air-suction duct top is provided with windsheild (5), length 6.5m, and two uniform cross section air-suction ducts all are equipped with HTFC-III type low-noise centrifugal ventilator (1), total head 350~400Pa, air quantity 20000~30000m 3/ h is equipped with motor 7.5kW.At last top, zinc pond waste gas being discharged into emission-control equipment through low-noise centrifugal ventilator (1) handles.
Embodiment 2
Double-suction type gas sampling device is made up of uniform cross section rectangle air-suction duct (3), low-noise centrifugal ventilator (1), windsheild (5) and air suction inlet assembly (6~10) on the batch quantity hot dipping zinc pond, double-suction type gas sampling device is installed on 8m * top, 1m galvanizing zinc pond on the batch quantity hot dipping zinc pond, this device can be collected the dust-laden exhaust gas of top, galvanizing pond, makes it be discharged into specified device and handles.This device comprises the air intake device that is installed in both sides, zinc pond, and this air intake device comprises two uniform cross section rectangle air-suction ducts (3), and sectional area is 1000mm * 400mm.On these two uniform cross section rectangle air-suction ducts five rectangle air suction inlets (6~10) are arranged respectively, the cross section, air suction inlet changes successively, realize even air draught, with top, effective suction zinc pond waste gas, each wide 250mm in rectangle air suction inlet, air suction inlet length is from diminishing by rule successively to blower fan direction one end away from centrifugal fan (1) one end, spacing 1.6m, the long 1050mm in air suction inlet (10), the long 1000mm in air suction inlet (9), the long 950mm in air suction inlet (8), the long 750mm in air suction inlet (7), the long 700mm in air suction inlet (6), each air suction inlet suction air volume is 1.5m 3/ s.The top, air suction inlet is provided with windsheild (5), length 8.5m, and two uniform cross section air-suction ducts all are equipped with HTFC-III type low-noise centrifugal ventilator (1), total head 350~400Pa, air quantity 20000~30000m 3/ h is equipped with motor 7.5kW.At last top, zinc pond waste gas being discharged into emission-control equipment through low-noise centrifugal ventilator (1) handles.

Claims (1)

1. double-suction type gas sampling device on the batch quantity hot dipping zinc pond, comprise low-noise centrifugal ventilator (1), variable valve (2), air-suction duct (3), it is characterized in that: air-suction duct (3) is a uniform cross section rectangle air-suction duct, two uniform cross section rectangle air-suction ducts (3) are positioned at the both sides of zinc pond (4), it has five air suction inlets (6~10) respectively on the two side in zinc pond, five air suction inlets (6~10) are wide, equidistantly, length is provided with windsheild (5) from diminishing successively to blower fan direction one end away from centrifugal fan (1) one end above uniform cross section rectangle air-suction duct.
CN2009201119328U 2009-09-14 2009-09-14 Double-suction type waste gas collecting device on batch hot-dip galvanized pools Expired - Fee Related CN201686735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201119328U CN201686735U (en) 2009-09-14 2009-09-14 Double-suction type waste gas collecting device on batch hot-dip galvanized pools

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201119328U CN201686735U (en) 2009-09-14 2009-09-14 Double-suction type waste gas collecting device on batch hot-dip galvanized pools

Publications (1)

Publication Number Publication Date
CN201686735U true CN201686735U (en) 2010-12-29

Family

ID=43375021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201119328U Expired - Fee Related CN201686735U (en) 2009-09-14 2009-09-14 Double-suction type waste gas collecting device on batch hot-dip galvanized pools

Country Status (1)

Country Link
CN (1) CN201686735U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111922018A (en) * 2020-07-13 2020-11-13 北京印刷学院 VOCs waste gas roof negative pressure gas collection device of printing and packaging workshop
CN112011751A (en) * 2020-08-18 2020-12-01 安徽徽柏环保科技有限公司 Smoke and dust waste gas collection device of hot galvanizing pot
WO2023227083A1 (en) * 2023-02-10 2023-11-30 徐州瑞马智能技术有限公司 Lifting-type top-suction environmentally-friendly fume exhaust beam for zinc pot cover

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111922018A (en) * 2020-07-13 2020-11-13 北京印刷学院 VOCs waste gas roof negative pressure gas collection device of printing and packaging workshop
CN112011751A (en) * 2020-08-18 2020-12-01 安徽徽柏环保科技有限公司 Smoke and dust waste gas collection device of hot galvanizing pot
CN112011751B (en) * 2020-08-18 2022-08-16 安徽徽柏环保科技有限公司 Smoke and dust waste gas collection device of hot galvanizing pot
WO2023227083A1 (en) * 2023-02-10 2023-11-30 徐州瑞马智能技术有限公司 Lifting-type top-suction environmentally-friendly fume exhaust beam for zinc pot cover

Similar Documents

Publication Publication Date Title
CN201501920U (en) Blowing-sucking waster gas collecting device above batch hot-dip galvanizing bath
CN207035409U (en) It is a kind of can be with the Fresh air handling units of automatic cleaning filter
CN201933171U (en) Chemical tank in electroplating workshop
WO2013029335A1 (en) Bottom aspiration purification system
CN201686735U (en) Double-suction type waste gas collecting device on batch hot-dip galvanized pools
CN105723159A (en) An air conditioning system capable of rapidly exhausting smoke
CN105066201A (en) Pneumatic beam-control lampblack guide method for range hood, and pneumatic beam-control lampblack guide range hood
CN201686736U (en) Single suction waste gas collection device on batch hot-dip galvanizing pool
CN102560607A (en) Chemical tank of electroplating workshop
CN209791110U (en) Central dust removal equipment
CN111013325B (en) Hot dipping zinc pool smoke and dust purifier
CN205299679U (en) High efficiency combination formula smoke ventilator that airs exhaust
CN204543794U (en) Waste-gas burning system plenum chamber
CN211575397U (en) Waste gas collecting and treating system in metal hydrometallurgy electrolysis workshop
CN201569101U (en) Moveable suction system
CN210483783U (en) Tunnel ventilation and smoke exhaust device
CN109812875B (en) Replacement recirculation ventilation method
CN105465861A (en) Combined type smoke exhauster with high air exhausting efficiency
CN202613997U (en) Smoke removal dusting machine of fire curve furnace
CN206556183U (en) A kind of wind pushing mechanism of spray-painting production line
CN213436215U (en) Ammonia mist collecting pipeline device
CN110180276A (en) The dual nested refining glue exhaust gas concentration collection device of one kind and its collection method
CN214307446U (en) Welding shop new trend replacement system
CN204900355U (en) Novel wind -guiding device
CN204830102U (en) Cigarette lampblack absorber is led in pneumatic beam control

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101229

Termination date: 20130914