CN201684906U - Novel process equipment for centrifugal casting furnace tubes - Google Patents

Novel process equipment for centrifugal casting furnace tubes Download PDF

Info

Publication number
CN201684906U
CN201684906U CN2009202115080U CN200920211508U CN201684906U CN 201684906 U CN201684906 U CN 201684906U CN 2009202115080 U CN2009202115080 U CN 2009202115080U CN 200920211508 U CN200920211508 U CN 200920211508U CN 201684906 U CN201684906 U CN 201684906U
Authority
CN
China
Prior art keywords
centrifugal casting
process equipment
furnace tubes
boiler tube
novel process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202115080U
Other languages
Chinese (zh)
Inventor
王承刚
展益彬
吴玉同
高海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai zhuoran engineering Limited by Share Ltd
Original Assignee
Supezet Jingjiang Equipment Manufacturing Co ltd
SHANGHAI ZUORAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Supezet Jingjiang Equipment Manufacturing Co ltd, SHANGHAI ZUORAN ENGINEERING TECHNOLOGY Co Ltd filed Critical Supezet Jingjiang Equipment Manufacturing Co ltd
Priority to CN2009202115080U priority Critical patent/CN201684906U/en
Application granted granted Critical
Publication of CN201684906U publication Critical patent/CN201684906U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The utility model discloses novel process equipment for centrifugal casting furnace tubes, which belongs to the metallurgy centrifugal casting field. The novel process equipment for centrifugal casting furnace tubes aims to overcome shortcomings that alloying elements are broken, moved and the like in metal liquid under the influence of Lorentz force in the electromagnetic field, eliminate alloying element segregation and improve performance of furnace tubes, comprises an electromagnetic generator, centrifugal casting equipment and the like and is characterized in that the a centrifugal machine is additionally provided with the electromagnetic generator. The novel process equipment leads crystallizing mode, crystal types, alloy distribution and the like of the metal liquid to be reasonable and even in a manufacturing process, thereby increasing performance of the furnace tubes and prolonging service lives thereof.

Description

The process equipment of novel centrifugal casting boiler tube
Technical field
The utility model discloses a kind of process equipment of novel centrifugal casting boiler tube, belong to metallurgical centrifugal casting field.
Background technology
At present the spun casting boiler tube of industrial furnace is in its casting process, and its mould need adopt water cooling, molten metal in the mould that enters rotation at a high speed, cooling, moulding under centrifugal action.In process of production, owing to contain different elements in the molten metal, serious gross segregation phenomenon can take place in their density variation in manufacture process.Simultaneously, also be subjected to the restriction of the cooling capacity of mould, can make the crystallization mode of molten metal and kind of crystalline not reach perfect condition, thereby influence the performance of boiler tube.
Summary of the invention
The purpose of this utility model is to propose a kind ofly to overcome above-mentioned defective, eliminates the alloying element segregation phenomena, improves the process equipment of the novel centrifugal casting boiler tube of boiler tube performance.A kind of process equipment of novel centrifugal casting boiler tube is characterized in that having added electromagnetic generator on centrifuge.The process equipment of this novel centrifugal casting boiler tube is the principle that is subjected to the Lorentz active force opposite with direction of rotation according to molten metal in steady magnetic field, by the part column crystal that is generated in the process of setting being smashed by the electromagnetic agitation of current strength control, form the new nuclei of crystallization, generate the equiax crystal of refinement, to improve the performance of boiler tube.Magnetic field generator is installed in the both sides of mould, at the inner horizontal steady magnetic field that forms perpendicular to the mold shaft line of mould.When molten metal injects, just open magnetic field, and keep a period of time, to the molten metal coagulation forming.This technology mainly is made up of electromagnetic generator and spun casting equipment, under the influence of electromagnetic field Lorentz force, motions such as these alloying elements produce in molten metal and fracture, migration, molten metal crystallization mode, kind of crystalline, alloy distribution etc. in mould are tending towards rationally, thereby have improved the performance of boiler tube.Improved the technological level that boiler tube is made, less stock, artificial etc.
The utility model forms the unicity magnetic pole in the mould both sides, through mould, electromagnetic field intensity can decay, and by increasing excitation voltage, the intensity by gaussmeter detection mould internal magnetic field finally forms steady magnetic field.The utility model proposes the making and the installation method of electromagnetic generator for this reason, realized that the process equipment of novel centrifugal casting boiler tube normally moves.Thereby the boiler tube performance is improved, has also reached the purpose that improves the boiler tube manufacturing technology level, reduces production costs simultaneously.
Description of drawings
Fig. 1 is the process schematic representation of novel centrifugal casting boiler tube.
The specific embodiment
Electromagnetic generator is made
According to actual needs, with the mould be the magnetic field that needs to produce the 5m*0.3m*1m size in the space of 1 meter of the left and right sides, center width.Electromagnetic generator adopts magnet exciting coil mode arranged side by side to make the large scale magnetic pole, forms the unicity magnetic pole in the mould both sides, adds heat insulation cooling layer 10 between magnetic pole 40 and the mould 30, and electromagnetism intensity is by excitation voltage regulation.A kind of process equipment of novel centrifugal casting boiler tube is characterized in that the electromagnetic generator that adds adopts thermal insulation layer to regulate distance between two poles in the both sides of mould.
Because the used die wall of spun casting is thick bigger, and be in the condition of high temperature during operation.Therefore the making of electromagnetic generator has taken into full account the operating mode of centrifuge, adopts the mode that increases excitation voltage to improve electromagnetism intensity, and mould is passed in magnetic field still can reach technological requirement after overdamping.The spacing of magnetic pole must satisfy the requirement of magnetic field intensity, and can guarantee magnetic pole not to be subjected to the mould hyperthermia radiation and damage.Therefore, near a side of mould thermal insulation layer is set at magnetic pole, this layer can be ignored to the decay of electromagnetism intensity.Because mould is longer, therefore adopts and make the unicity magnetic pole to mode arranged side by side along mold shaft.Adopt steel plate to isolate between the adjacent windings, prevent that magnetic field from interfering with each other.
Electromagnetic centrifugal casting is installed
Magnetic pole adopts frock to be installed in the mould both sides, and the magnetic pole plane is relative with the mold shaft line, and each magnet exciting coil is in isometry position.Whole device is placed on the shifting sledge, is convenient to the fitting operation of centrifuge.Simultaneously can be by changing distance between two poles fit adjustment magnetic field intensity.Thermal insulation layer and magnet exciting coil division board are installed together, and are convenient to change.Measure the horizontal magnetic field that guarantees to form steady with gaussmeter, the device of control excitation voltage can set the place in addition.
The electromagnetic centrifugal casting process
To the test of comparing of mould cold junction, adopt different magnetic field intensity and rotating speed, the boiler tube cold junction is carried out Metallographic Analysis, the relation of analyzing crystal kind and formation rule and magnetic field intensity, rotating speed etc., thus obtain technological parameters such as reasonable magnetic field intensity, mould rotating speed, duration.
Mould is after preheating, start magnetic field during the molten steel cast, gradually during crystallisation by cooling, metal liquid 20 is subjected to the influence of the Lorentz force opposite with direction of rotation in steady magnetic field, by electromagnetic agitation the part column crystal that generates in the process of setting is smashed, form the new nuclei of crystallization, generate the equiax crystal of refinement.Simultaneously, each alloying element in molten metal is subjected to Lorentz force to influence the generation reverse rotation, can to a certain degree alleviate the gross segregation phenomenon of alloying element.After the moulding of boiler tube crystallisation by cooling, close magnetic field and on slide rail, remove electromagnetic generator.

Claims (4)

1. the process equipment of a novel centrifugal casting boiler tube is characterized in that having added electromagnetic generator on centrifuge.
2. the process equipment of a kind of novel centrifugal casting boiler tube according to claim 1 is characterized in that the electromagnetic generator that adds adopts magnet exciting coil mode arranged side by side.
3. the process equipment of a kind of novel centrifugal casting boiler tube according to claim 1 is characterized in that isolating with steel plate between the adjacent magnet exciting coil of the electromagnetic generator that adds, and makes the unicity magnetic pole that satisfies centrifuge and mould size.
4. the process equipment of a kind of novel centrifugal casting boiler tube according to claim 1 is characterized in that the electromagnetic generator that adds adopts thermal insulation layer to regulate distance between two poles in the both sides of mould.
CN2009202115080U 2009-10-29 2009-10-29 Novel process equipment for centrifugal casting furnace tubes Expired - Lifetime CN201684906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202115080U CN201684906U (en) 2009-10-29 2009-10-29 Novel process equipment for centrifugal casting furnace tubes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202115080U CN201684906U (en) 2009-10-29 2009-10-29 Novel process equipment for centrifugal casting furnace tubes

Publications (1)

Publication Number Publication Date
CN201684906U true CN201684906U (en) 2010-12-29

Family

ID=43373197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202115080U Expired - Lifetime CN201684906U (en) 2009-10-29 2009-10-29 Novel process equipment for centrifugal casting furnace tubes

Country Status (1)

Country Link
CN (1) CN201684906U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103357835A (en) * 2012-03-26 2013-10-23 卓然(靖江)设备制造有限公司 Novel electromagnetic centrifugal furnace tube casting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103357835A (en) * 2012-03-26 2013-10-23 卓然(靖江)设备制造有限公司 Novel electromagnetic centrifugal furnace tube casting device

Similar Documents

Publication Publication Date Title
US4178979A (en) Method of and apparatus for electromagnetic mixing of metal during continuous casting
CN102990027B (en) Low-energy-consumption electromagnetic stirring method for continuous casting and metal continuous casting device
JP5431438B2 (en) Molding device for continuous casting with stirring device
CN102380588B (en) Intermediate-frequency induction and directional solidification ingot casting process and equipment utilizing same
CN203639530U (en) Composite electroslag casting device for optimizing metal solidification structure by using steady-state magnetic field
CN101480715A (en) Electroslag smelting casting device with additional electromagnetic stirring and method
CN105401059A (en) Manufacturing technology and device for improved forged steel roller neck high nickel chrome molybdenum alloy cast composite roller
CN102179505A (en) Method for refining metal solidification structure by using pulsed magnet field and pulse current with same frequency
CN102343424B (en) Horizontal continuous casting device and method for high-conductivity and high-strength copper alloy round bar
CN104827007A (en) Large-scale uniform-structure alloy ingot continuous casting preparation method and magnetic control electroslag continuous casting device
CN105436474A (en) Manufacturing technique and device for improved bainite nodular cast iron composite roller provided with forged steel roller neck
CN105522126A (en) Manufacturing technique and equipment for high-performance composite roller shaft
CN102310174A (en) Method and device for improving metal solidification defects and refining solidification textures
CN105522138A (en) Technique and equipment for forged steel roll neck high-chrome cast iron composite roller
CN102430729A (en) Method for preparing thinned steel continuous casting round billet crystal grains
JP5669509B2 (en) Molding device for continuous casting with stirring device
CN201684906U (en) Novel process equipment for centrifugal casting furnace tubes
CN109261916B (en) Molten pool stirring device and method for metal semi-continuous casting crystallizer
CN103436709A (en) Device and method for preparing electroslag remelting ingot employing tubular electrode additional consumable blender
CN206139818U (en) Immersion electromagnetic pulse grain refinement device
CN102107266A (en) Method for driving unconsolidated molten metal in cast ingot to flow
CN101920324A (en) Novel electromagnetic centrifugal casting process and equipment for furnace tube
CN204912694U (en) Continuous casting chamfer crystallizer casting blank analogue means
CN204413085U (en) Electromagnetism crystallization agitator
CN203390172U (en) Magnetic-stirring circulating cooling tubular crystallizer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200335 Shanghai city Changning District road 268 Lane 3, facing the new

Co-patentee after: Zuoran (Jingjiang) Equipment Manufacture Co., Ltd.

Patentee after: Shanghai zhuoran engineering Limited by Share Ltd

Address before: 200001 Shanghai City, Huangpu District Guangdong Road No. 689 room 1603

Co-patentee before: Zuoran (Jingjiang) Equipment Manufacture Co., Ltd.

Patentee before: Shanghai Zhuoran Engineering Technology Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101229