CN105522138A - Technique and equipment for forged steel roll neck high-chrome cast iron composite roller - Google Patents

Technique and equipment for forged steel roll neck high-chrome cast iron composite roller Download PDF

Info

Publication number
CN105522138A
CN105522138A CN201510764181.XA CN201510764181A CN105522138A CN 105522138 A CN105522138 A CN 105522138A CN 201510764181 A CN201510764181 A CN 201510764181A CN 105522138 A CN105522138 A CN 105522138A
Authority
CN
China
Prior art keywords
roll
water
heating
cast
electromagnetic induction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510764181.XA
Other languages
Chinese (zh)
Other versions
CN105522138B (en
Inventor
丁家伟
丁刚
耿德英
鹿微微
鹿策
施孟达
孔军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Danyang Hengqing Composite Material Science & Technology Co Ltd
Original Assignee
Danyang Hengqing Composite Material Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Danyang Hengqing Composite Material Science & Technology Co Ltd filed Critical Danyang Hengqing Composite Material Science & Technology Co Ltd
Priority to CN201510764181.XA priority Critical patent/CN105522138B/en
Publication of CN105522138A publication Critical patent/CN105522138A/en
Application granted granted Critical
Publication of CN105522138B publication Critical patent/CN105522138B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D19/00Casting in, on, or around objects which form part of the product
    • B22D19/16Casting in, on, or around objects which form part of the product for making compound objects cast of two or more different metals, e.g. for making rolls for rolling mills
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D6/00Heat treatment of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/001Ferrous alloys, e.g. steel alloys containing N
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/005Ferrous alloys, e.g. steel alloys containing rare earths, i.e. Sc, Y, Lanthanides
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/44Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/56Ferrous alloys, e.g. steel alloys containing chromium with nickel with more than 1.7% by weight of carbon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/60Ferrous alloys, e.g. steel alloys containing lead, selenium, tellurium, or antimony, or more than 0.04% by weight of sulfur

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Reduction Rolling/Reduction Stand/Operation Of Reduction Machine (AREA)

Abstract

The invention discloses a technique and equipment for a forged steel roll neck high-chrome cast iron composite roller. Materials comprise, by mass, 2.4-3.3% of C, 0.60-1.0% of Si, 0.50-1.20% of Mn, 0.8-1.2% of Ni, 15-20.0% of Cr, 0.80-2.2% of Mo, 0.5-1% of W, 0-0.05% of P, 0-0.03% of S, 1-3% of Sb, 0.02-0.18% of N, 0.1-0.3% of Y, and the balance Fe and inevitable trace elements. The rare earth Y and silicon iron are adopted for composite inoculation; grain refinement treatment is conducted by adding the Sb and the N, so that the mechanical properties of the roller are improved; the strength of the roller is improved by the adoption of a forged steel roll neck; integral in-mold heating and casting are conducted on a mandril through an induction heater, and a water-cooling crystallizer is used for formation. The interface of a composite layer can be dynamically controlled, the technique is simple, the cost is low, composition segregation is avoided, and the service life of the roller is long.

Description

A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus
Technical field
The invention belongs to metal-pressed machine technical field, particularly a kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus, is applicable to the manufacture of composite roll in Steel-rolling Industry.
Background technology
Roll is described as " mothers of steel ", be steel, the rolling metal such as aluminium, copper makes metal material produce the instrument of plastic deformation in producing, it is the important large component determining milling train production efficiency and mill bar quality and economy, be the indispensable critical piece of mill milling and topmost large consumable part, its consuming cost is about 5% ~ 15% of Rolling production cost.If consider that the production brought because of roll consumption is shut down, fallen the factors such as product and plant maintenance increase, then the proportion of production cost shared by it can be higher.
Milling train is the visual plant during metal-pressed machine is produced, and is the distinctive marks of the national Iron & Steel Development technical merit of measurement one.And roll is the chief component of milling train, it is a large amount of critical component consumed in Rolling production, being the basic guarantee determining a national rolling technique development level, is the embodiment directly perceived of the basic industries comprehensive technical levels such as national metal material design, forming materials technology, processing and manufacturing and a heat treatment.In steel rolling industrial production, each stocking none be not rely on the rolling of roll and be shaped, in other words " good-for-nothing without roller ", so, the quality of roll and act on most important.
Roll quality is not only related to Rolling production cost and milling train production operational availability, also affects mill bar quality to a great extent.Along with the development of steel rolling technology, rolling mill speed and automaticity improve constantly, and the breaker roll quality particularly wearability of roll, intensity and toughness etc. is had higher requirement.Further raising roller performance, to adapt to the needs of milling train, realizes the energy-saving and cost-reducing production of iron and steel material shaped, is the fresh target that roll development person faces.
China's roll manufacturing industry is through the development of decades and growth, and become roll output big country of the world at present, there is very large development roll manufacturing technology and material kind aspect.In roll material, develop into present acicular constituent spheroidal graphite cast-iron, high alloy infinitely chilled ductile cast iron, rich chromium cast iron, carbide alloy, semi-high speed steel and high-speed steel etc. from spheroidal graphite cast-iron, alloy infinitely chilled ductile cast iron.In casting technique also from routine cast single material and press over system casting composite, develop into centrifugal compound casting process.Current domestic roll deliverability has reached more than 1,000,000 tons, manufactures and designs ability and can reach 120 ~ 1,500,000 tons.Along with the transformation of China's rolling equipment with constantly from the external milling train introducing advanced person, milling train is to automation, serialization, heavy-duty future development, and the structure and properties of breaker roll is had higher requirement.
But the metallurgical roller rolled steel mean consumption that China develops voluntarily still has larger gap compared with developed countries.From the recent statistics of China Steel association, within 2014, China's steel output has reached 1,125,570,000 tons, accounts for global output of steel more than 40%, calculates according to loss per ton steel roll 1.0 ~ 1.2kg/t steel, more than 110 ~ 130 ten thousand tons, year consumption roll, year consumes roll fund more than 20,000,000,000 yuan.In order to meet the actual needs of Rolling production, China all needs to spend a large amount of foreign exchange import roll every year, only about more than 3.0 ten thousand ton, import high-quality roll in 2010, consumes foreign exchange about more than 200,000,000 dollar.A large amount of consumption of China's roll, cause the huge waste of resource and the energy.In addition, external roll Year's consumption also more than 1,000,000 tons, the huge market demand.So large learies no matter from the rolling cost of steel rolling mill, or is all a huge waste from the viewpoint of the energy of China and resource consumption, exerts heavy pressures on to environment and resources.Therefore, improve roll quality, extend roll campaign, can not only save a large amount of foreign exchange, but also can save a large amount of roll materials, exploitation high-quality long-life roll material and forming technique thereof, not only can meet domestic demand, but also can realize foreign exchange earning.
For the requirement of satisfied modern steel rolling industry to high-performance roll, in recent years, have developed various new high-performance roll making technology both at home and abroad, wherein mainly contain in the technique of casting manufacture combination process aspect developing: centrifugally cast composite roll, continuous casting (CPC) compound car are shallow, electroslag remelting (ESR) composite roll, combined roll etc.
Centrifugally cast composite roll technique (CF) adopts the method for centrifugal casting to produce bimetallic composite roll.Rotation is mainly used to produce centrifugal force, molten metal is poured in the casting mold rotated, utilize centrifugal force that poured into a mould molten metal is got rid of outer rim to casting mold from pivot, the ecto-entad order of solidifying of molten metal is carried out, is frozen into the outer high abrasion resisting material for dense structure, internal layer is the composite roll of common material.The flowing of molten metal contributes to fragmentation and the refinement of dendritic crystal, and the resistance simultaneously overcoming intercrystalline " tunnel " carries out feeding, and the density of foundry goods is improved.After outer sphere molten metal solidifies, casting mold is sling and to assemble with bottom and top and rising head sand mold, by core and upper lower impressions with gravity-assist pouring filling, realize the compound of bi-material.Centrifugal roller casting manufactures the advantage that composite roll has Castingother technique not possess, specific as follows: (1) some parts do not need dead head, effectively improve the service efficiency of molten metal; (2) do not need to use core just can cast out the foundry goods of annular and empty tubular, can produce the length cast tube different with diameter, have good production efficiency, production cost is not high yet simultaneously yet; (3), under the influence of centrifugal force, after molten metal solidifies, quality is fine and smooth; (4) skin of the roll produced in this way has higher wearability, and the toughness material of internal layer can ensure that again roll has higher toughness, has the application prospect more wide than integral material roll and higher cost performance.
Although it is simple that this technique has equipment, equipment investment is little, and production efficiency is high, and cost is low, is suitable for the feature of production in enormous quantities.But there is following several deficiency in this technique:
1) when roll for the manufacture of high alloy material, owing to often containing the high alloy of large metric density in material, as tungsten, molybdenum, vanadium etc., during centrifugal casting, due to the effect of centrifugal force, the alloy that these density are high understands segregation in roller surface, roll inner alloy constituent content is reduced, make tissue and composition uneven thus worsen roller surface layer toughness, reduce the wearability of skin of the roll, affect the quality of roll.
2) when the fusing point of core material is higher than the fusing point of cladding material, during cast, fused layers is produced in the inner surface of the cladding material solidified.Therefore, when core material selects cast steel, good compound interface can not be obtained.
3) composite roll of forged steel core with high strength, high tenacity cannot be produced.
The outer forming process (CPC method) of continuous pouring, this technique is that Japanese Nippon Steel Corp and late 1980s input in research and development are produced.CPC method is logging material, technique, equipment, be automatically controlled in one new and high technology [10], only have Nippon Steel and Hitachi, Ltd to be used successfully to suitability for industrialized production at present in the world.Its operation principle makes roller core with forged steel, cast steel or waste or old roll, is coated with last layer silicon system glass protection film, prevents roller core surface oxidation on its surface.To the outer sphere molten metal of compound be needed to be poured between vertically arranged roller core and water mold, for the outer high-speed steel and roller core making casting fuses completely, adopt two cover electromagnetic induction heaters to carry out concurrent heating and preheating to molten steel and roller core respectively.Outer sphere molten metal order while fusing with roller core of melting is upwards solidified, and makes the interface of two kinds of materials reach metallurgical binding.By stripping equipment, the roll that compound is good is constantly extracted out from water mold, until composite roll casting complete.In cohesive process, roller core surface occurs micro-molten, makes roller core and outer high-speed steel metal realize firm metallurgical binding, improves bond strength.Tissue and the grain size of the high-speed steel roller stock of this method production are much thinner than centre spinning method, and the distribution of carbide even dispersion, the life-span, comparable centrifugal casting roll was high by 30%.
The formation of binder course affects the decrease speed of roll, also just determines the production efficiency of CPC method.The method has following features: 1. the outer material of roll can select multiple high alloy material, core material can with obdurability and the high steel based material of rigidity, avoids primary carbie segregation and tissue, composition segregation shortcoming that Centrifugal Cast High Speed Steel Roll occurs; 2. molten steel solidifies in water-cooled knot product device, and cooling velocity is fast, the features such as can obtain tiny, fine and close solidified structure, hot-cracking resistance is good, and roller performance is good; 3. consecutive solidification from bottom to top, keeps away the generation of having exerted oneself shrinkage cavity and the casting flaw such as loose; 4. both new roll can be manufactured, also reparation can be manufactured again to old roll.
The shortcoming of CPC is mainly: 1. owing to adopting two cover heating systems, equipment is more complicated, and technical difficulty is large; 2. owing to adopting stripping mode, production efficiency is lower, and the pure brilliant degree of the steel produced is poor; 3. need in production process to be incubated for a long time molten steel, power consumption is large, and require high to tundish refractory material, production cost is high; 4. require high to factory building and operator.Based on above reason, promote the use of scope at present very little, China is not yet invested in plantization production so far.
Liquid pouring of electroslag method (ESSLM), ESSLM invents in E.O. Ba Dun electric welding at beginning of the nineties in last century research institute.Its production technology puts into by the forging of compound in the middle of a copper water mold, casting or the waste and old roller core by mistake, again the slag melted in advance is poured in the gap between roller core and crystallizer, be energized between crystallizer and roller core, electric loop is formed by molten slag, the heat produced in slag is by the surface melting of roller core, melted liquid metal is poured in the gap between roller core and crystallizer with certain technique, slag floats by liquid metal, when passing through slag bath by electroslag refining, simultaneously by coated for roller core and with oneself through preheating roller core surface fuse, solidify under the cooling of crystallizer, form composite bed.In the process, constantly extract out from crystallizer by stripping device roller core, constantly pour into liquid metal, until predetermined length simultaneously.The material covering layer can be cast iron, high-speed steel and other metal, and made composite roll both can be used as cold roll, hot roll or Continuous Casting Rolls, can carry out casting clad again manufacture waste or old roll.But strictly to control melt cinder temperature and the time of roller core in melt cinder, prevent the fusing that core is too much, pollute working lining.
ESSLM technology allows composite diameter from 100mm to 1800mm, even larger diameter billet outer surface.Composite bed thickness 15 ~ 20mm to 100mm is even larger.This technique is compared with electroslag remelting process, and its efficiency is high, and poring rate is 200 ~ 800kg/h, and power consumption is close to 800kWh/t steel [10].
When the shortcoming of this technique is mainly that in recombination process, molten steel injects crystallizer in batches or continuously, due to poring rate slowly, molten steel needs insulation, molten steel storage facility is very complicated and expensive, the refractory material of holding furnace and steel ladle washes away for a long time by high-temperature liquid metal and causes a large amount of losses, and causing nonmetal inclusion to pollute, molten metal is strongly overheated all can cause alloying element and deoxidier oxidation to be accelerated with long-time preservation under high temperature.The energy ezpenditure of this process is larger, and owing to adopting stripping technique, slag temperature is mated and metal liquid level control technology complexity with stripping speed, and roller core surface fusion penetration layer control technology difficulty is large, and production efficiency is low.
Although CPC technique and ESSLM technique can manufacture the composite bed of heavy thickness, the problems referred to above existing for technology and equipment, at present only for the manufacture of high-end composite rolls such as the high-speed steel being less than 10 tons.
Combined roll is that roll is made several parts, mechanically combines.Roll internal layer uses toughness material, outer fieldly mostly makes carbide ring.This roll can save valuable carbide alloy, and cost performance is higher.Outer field carbide ring can ensure that roll has very high wearability.But because carbide ring and internal layer roller core are difficult to accomplish seamless combination, roll unbalance stress can be caused in the operation of rolling and chipping.
Although have developed numerous composite roller manufacturing process both at home and abroad, up to the present, still also there is not a composite roll manufacturing process that technique is simple, production cost is low, performance is good.Therefore, research and development composite roller manufacturing process and equipment, carries out low cost to various material roll and large-scale roller, high efficiency, high-performance manufacture is the current problem being badly in need of solving.It is the new direction of composite roll Manufacturing Technology Development.
Cast iron system roll refers to that phosphorus content is at the roll of 2.50 ~ 3.5%, can be divided into the large class of plain cast iron roll, nickel chromium triangle Infinite chilled complex cast iron roll, high Cr complex cast iron roll and alloy nodular cast iron roll four by main material.Alloy nodular cast iron roll has good heat shock resistance and abrasion resistance properties, is widely used and does large-scale blooming mill, shape rolling mill, bar materials on continuous rolling mill and large-scale seamless-tube rolling mill roller.Current domestic main employing can adopt the manufacture of centrifugal compound pouring technology, and by the restriction of manufacturing process, core adopts spheroidal graphite cast-iron, and because spheroidal graphite cast-iron intensity is low, in Rolling production, easily roll breakage occurs, serious have impact on Rolling production and product quality.
At present in rod product, cutting frame and plate sheet and strip, the centrifugal bainite roll of usual use, this roll has the following disadvantages in Long-Time Service process: 1, hardness drop is large, centrifugal bainite roll first time uses and uses for the last time, material structure changes greatly, hardness wearability declines very fast, and rolling tonnage can decline 50 ~ 70 tons; 2, thermal fatigue resistance is poor, and at high operating temperatures, low thermal fatigue resistance causes roll in use for some time in roll long-term work, easily cracks and the phenomenons such as block are fallen on top layer, has a strong impact on rolled piece quality; 3, the toughness of centrifugal bainite roll is low, fragility large, and roll breakage phenomenon happens occasionally.And this material due to graphite be flat strip shaped, carbide is network structure, so matrix strength is relatively low, therefore its wearability still feels not enough in actual use, and service life does not grow (millimeter amount of rolling is generally 2000 ~ 3000 tons); Secondly, because carbide is network structure, and the boundary effect in graphite hole; make the heat resistanceheat resistant crack performance of this material also not good enough, made roll in plate strip rolling process, along with the increase of amount of rolling can produce fire check; therefore need often to shut down to change roll, removed reparation.Production efficiency when not only affecting the class of milling train, increases replacement operation intensity, and repair amount; But also the surface quality of meeting influence of rolled strip, fire check produces the service life of repairing and also reducing roll, causes production cost higher.The problems referred to above cause centrifugal bainite roll whole service life shorter, can not meet the production requirement of high efficiency milling train.
Rich chromium cast iron is a kind of high-abrasive material of important abrasive wear resistant weld deposit, the performances such as amount of deflection is little when it has higher hardness, good wearability, a fracture, be widely used in production manufacturing the important wear member such as roll, show good combination property compared with other white cast-iron.But it still belongs to fragile material, being hit under larger service condition, often there is the failure phenomenon such as fragmentation, fracture, showing as toughness deficiency, cause its application to be restricted.
The automatic automation of the operation of rolling, serialization, heavy-duty are the developing direction of modern rolling technique.Due to the specific demand to rolled steel, the performance of the size of stocking, surface accuracy, stocking is all had higher requirement.In addition, along with the development of rolling technique, the working environment of roll is also more and more harsher.Therefore, for the problem existing for the roll used at present, the roll material of development of new, improves traditional production technology, makes roll meet milling train production requirement, is the important topic that insider pays close attention to and studies.The new problem that China's roll industry faces is become for present-day mill is equipped with high performance roll.
Summary of the invention
The object of the invention is to the deficiency having technology for oneself, propose that a kind of production technology is simple, equipment investment is little, production efficiency is high, cost is low, heat crack resistance is good, hardness drop is little, good toughness, a kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus that wearability is good, solve centre spinning and easily component segregation occurs, CPC method, ESR method complex manufacturing, power consumption is large, cost is high, inefficient deficiency, adopt forged steel to do roll neck, solve a roll breakage difficult problem.
The equipment scheme solving its technical problem is: this equipment has a planer-type region directional solidification jacking equipment 16, planer-type region directional solidification jacking equipment 6 is provided with lifting platform 17, electromagnetic induction heater 8 is installed on lifting platform 17, rotating lifting screw 15 or hydraulic test by lifting motor 14 drives lifting platform 17 to move up and down with set speed, in the side of planer-type region directional solidification jacking equipment 16, electromagnetic induction electrical power control cabinet 19 is installed, two outputs of electromagnetic induction electrical power control cabinet 19 are connected by the two ends of water-cooled cable 20 with electromagnetic induction heating device 8, a base support is had in the bottom of planer-type region directional solidification jacking equipment 16, base support 13 is provided with support plinth 12, Water-cooled bottom water tank 11 is installed on support plinth 12, the center of end water tank 11 is manhole, the center that is provided with on end water tank 11 is the bottom board 10 of manhole, Combined water cooling crystallizer 7 is installed on bottom board 10, on the top of water mold 7, insulation ring 6 is installed, roll plug 5 is by support plinth 12, the center hole of end water tank 11 and bottom board 12 is fixed on the center of crystallizer 7, casting runner 3 is connected with in the side of bottom board 10, casting runner 3 to be arranged on base support 13 and to sit brick 4 with cast and is connected, cast is sat brick 4 and is provided with feed trumpet 2 above, at the top of feed trumpet, sprue cup 1 is installed, pouring ladle 18 is had on depositing funnel 1.
Water inlet pipe 23 and outlet pipe 24 is had respectively in the side of Water-cooled bottom water tank 11; Water mold 7 is made up of the fourplatemold arc water-cooled box assembly 7 at crystallizer circumferentially equally distributed 2 or 3 integral multiples, water inlet pipe 21 is connected with in the bottom of each arc water-cooled box assembly 7, be connected with outlet pipe 22 on the top of each arc water-cooled box assembly 7, by attachment bolt 9, arc water-cooled box assembly 7 connected into drum-shaped entirety; Insulation ring 6 is manufactured by refractory material or fiber reinforcement refractory material; Electromagnetic induction power supply is line-frequency induction power supply, medium frequency induction power supply, high frequency induction power supply, and frequency is 500Hz ~ 3000Hz.
The process technology scheme solving the employing of its technical problem is:
(1) mandrel preparation and preheating
First the roll mandrel surface of the required size manufactured is carried out oil removing, after processing of rust removing, one deck antioxidizing paint is applied at its surface uniform, put into after heating furnace carries out being preheating to 500 DEG C ~ 700 DEG C, pass through support plinth, the center hole of end water tank and bottom board is fixed on the center of crystallizer, starting region directional solidification lowering or hoisting gear, electromagnetic induction heater is dropped to the bottom of crystallizer, to fetch boiling water the water inlet pipe and water outlet pipe of cooling crystallizer and end water tank, start electromagnetic induction heating power supply, by the induction heater being arranged on water mold outside, surface heating is carried out to plug, to be heated to 840 DEG C ~ 1100 DEG C,
(2) Composition Design
The mass percent of forged steel roll neck rich chromium cast iron composite roller operational layer material composition is: C:2.4 ~ 3.3%, Si:0.60 ~ 1.0%, Mn:0.50 ~ 1.20%, Ni:0.8 ~ 1.2%, Cr:15.0 ~ 20.0%, Mo:0.80 ~ 2.2%, W:0.5 ~ 1.0%, P :≤0.05%, S :≤0.O3%, Sb:1 ~ 3%, N:0.02 ~ 0.18%, Y:0.1 ~ 0.3%, surplus be Fe and inevitably trace element;
(3) molten metal melting
Take base iron, foundry returns, steel scrap, ferrochrome, ferro-molybdenum, ferro-tungsten, nickel ingot by rich chromium cast iron composite roll predetermined material composition, be placed into melting in intermediate frequency furnace, carry out repeatedly slag making in fusion process and skim, ensure hot metal purifying degree; When molten iron temperature is 1450 ~ 1500 DEG C, sampling is chemically examined, and adjusts each constituent content until meet component requirements;
After ladle is toasted, by the Rare Earth Y of weight needed for preheated and Sb, CrN, Si 3n 4alloy grain fining agent and 1/3 needs to add in pit that to imbed together with silicon iron inoculator in roasted ladle, the roll iron filings of covering 0.5 ~ 1% on it compacting, first pour the molten iron of the good qualified composition of the fusing of total amount 2/3, after question response terminates, add remaining 1/3 molten iron, and in iron notch, the ferrosilicon grain (breeding the 75SiFe of in total amount remaining 2/3) of preheating is poured into stream, skim after fully stirring, add coverture preparation cast;
(4) pour into a mould
To breed, the skin of the roll molten metal that micronization processes is good is poured in pouring ladle, molten metal in pouring ladle is passed through depositing funnel according to predetermined cast program, feed trumpet, casting runner pours in the space in crystallizer and between plug, in casting process, pouring temperature should control 1350 ~ 1380 DEG C of scopes, start cast and need large stream, after 40 ~ 60s, start to subtract stream to water slowly, whole casting process must not be greater than 5min, electromagnetic induction heater does not stop heating, after pouring metal melt, induction heater proceeds heating 10 ~ 50 minutes, make poured into a mould molten metal within the regular hour, keep liquid, to increase the liquid-solid time, interface is made to form metallurgical binding, electromagnetic induction heater upwards promotes with certain speed by starting region directional solidification lowering or hoisting gear, the roll shaft composite bed progressively departing from electromagnetic induction heating successively consecutive solidification from bottom to top, and in different regions, control the different rates of climb according to quality requirement, forming region directional solidification, be raised to insulation ring place to stop through 5 ~ 15 minutes, continue to carry out heating 10 ~ 50 minutes to insulation ring, to postpone insulated feeder setting time, feeding is carried out to rising head, gas in composite-layer metal liquid and field trash are fully floated, eliminate composite-layer metal casting flaw, heating is stopped after reaching the scheduled time, continue water flowing and cool 30 minutes ~ 24 hours, the compound roll shaft cast is taken out in crystallizer.
(5) Technology for Heating Processing
Rich chromium cast iron composite roll is directly carried out roughing under as cast condition, then slowly heat up 10 ~ 12h in heating furnace, be incubated after 1h is incubated by the every 30mm of roller diameter at 1070 DEG C and quench, then in heating furnace with heat temperature raising heating rate to 520 ~ 560 DEG C of 15 ~ 25 DEG C/h, air-cooled after insulation 6 ~ l0h, carry out first time tempering, and then be heated to 450 ~ 480 DEG C with the programming rate of 25 ~ 35 DEG C/h, after insulation 12 ~ 15h, stove is chilled to less than 150 DEG C, air cooling, carries out second time tempering.
Described roll mandrel material is forging or cast low alloy steel, medium carbon steel or spheroidal graphite cast-iron.
Described 75SiFe innoculant adding quantity is 0.2 ~ 0.4%.
Described N source material is CrN and Si 3n 4.
Described fourplatemold both can realize the adjustment within the specific limits of fourplatemold inner diameter size by the arc water-cooled box assembly adding or reduce different size, meet the manufacture of different different-diameter size composite roll, thus reduce mould expense.
The composition of described mandrel surface antioxidizing paint is that Na2B407, Si02, Na20, K20, A1203, CaO one or more one-tenth are wherein grouped into.
Beneficial effect
The roll that the methods such as the inventive method and centre spinning, CPC method, ESLLM method are produced is very different, and its main feature is:
1, this invented technology is used to manufacture composite roll, because special casting method makes the metal of melting solidify from bottom to top, be conducive to the feeding of liquid metals, overcome the defect that centre spinning easily produces microstructure segregation, manufactured composite roll material does not have gravity segregation, crystalline structure is excellent, even tissue, and the tiny density of crystal grain is high.The range of choice of plug and composite material is wide, forging varying strength can being selected freely to require according to different instructions for uses or the composite material of rod cast thereby material and different performance, skin of the roll can adopt high alloy material, makes it have good red hardness and high temperature abrasion resistance.
2, electromagnetic induction heater breaker roll mandrel before cast is adopted directly to carry out preheating in crystallizer, after cast, breaker roll mandrel is incubated with the molten metal poured into a mould, decrease the temperature difference between roller core and outer sphere molten metal, be conducive to the good compound of bimetallic material, there is good mechanical performance.On the other hand in order to reduce casting flaw, metallic composite is allowed to realize to lower and upper consecutive solidification, molten metal flowing from top to bottom automatically, be conducive to molten metal feeding from top to bottom, thus shorten the length in feeding district, decrease casting flaw, form the fine and close composite roll without shrinkage cavity; Continue to carry out electromagnetic induction heating to composite in casting process, can reduce by the preheat temperature of composite, reduce the oxidation of composite, the liquid-solid time can be increased, impel the diffusion of two phase material more abundant, function composite by electromagnetic stirring can be utilized simultaneously, increase liquid metals to washing away by mandrel material surface, promote that the matter and energy between two phase material exchanges, composite bed interface is made to be easy to control, thus greatly improve the bond strength at interface, can realize good metallurgical bonding interface, product quality is easy to control.
3, the present invention adopt water mold replace sand mold and metal mold shaping, in roll forming process, because skin of the roll molten metal is cooled and solidified in water mold, cooling velocity is high, nucleation ability is strong, the solidified structure that crystal grain is tiny can be obtained, dense structure's degree is high, hardness is even, mechanical property is good, improve obdurability and the thermal fatigue resistance of roll, there is higher wearability and cold-resistant, the properties possessed needed for thermal fatigue and modern roll working layer, and there is excellent machinability, casting and forging can be realized, improve the service life of roll, thus meet the requirement of modern rolling steel industry to high-performance roll.Adopt water mold to replace sand mold and metal mold shaping, the technique recovery rate of foundry goods is high, and liquid metals consumption reduces, and comparable sand casting saves 15 ~ 30%; Using rate of metal is high.Product size precision, surface light Zhi Dugao, machinery adds remaining minimum, and cast(ing) surface is without viscosity sand layer simultaneously.And quality and dimensionally stable., decreased by very little allowance meanwhile, correspondingly improve using rate of metal, saved material.
4, the present invention adopts water mold to cast, and can not need molding sand completely, so decrease the operation of molding sand process.Again can pour into a mould after foundry goods removing from mould simultaneously, be thus convenient to do mechanization and automated production, and production efficiency be high.
5, owing to adopting water mold shaping, the mold use life-span even several ten thousand times up to several thousand times, save Modeling Material greatly, reduce die cost, due to without sand molding, when having saved a large amount of molding sand and moulder, improve efficiency.Save a large amount of manufacturing expenses, reduced manufacturing cost, decrease the waste of resource and the energy and the pollution of environment.
6, current domestic usual use centrifugal compound manufacture technics roll, this roll has the following disadvantages in Long-Time Service process: 1. hardness drop is large, the roll first time that centrifugal process manufactures uses and uses for the last time, material structure changes greatly, hardness wearability declines very fast, and rolling tonnage can decline 50-70 ton; 2. thermal fatigue resistance is poor, and at high operating temperatures, low thermal fatigue resistance causes roll in use for some time in roll long-term work, easily cracks and the phenomenons such as block are fallen on top layer, has a strong impact on rolled piece quality; 3. the toughness of centrifugal bainite roll is low, fragility large, and roll breakage phenomenon happens occasionally.The present invention adopts imbedding process to manufacture composite roll, in casting process, although mandrel has carried out the preheating of uniform temperature, but for poured into a mould high temperature fluent metal, in casting process, mandrel material is equivalent to chill effect, thus improve roll internal cooling effect, increase the cooling velocity of inside during roll cast, improve and enhance roll dense internal organization, make interface by fused layers, diffusion layer and Quench solidification layer composition, reduce the hardness drop of composite material radial direction, whole composite material hardness drop is minimum, further increase compound roll shaft performance, it is little that service life after manufactured composite roll is repaired in whole life cycle at every turn reduces amplitude.Simultaneously, the present invention adopts water mold shaping, and composite-layer metal liquid is subject to the quick cooling of crystallizer, changes composite bed crystalline structure, improve composite material performance, the composite roll single through this manufacture technics/manufacture again exceedes former material used new roll more than 20 ~ 30% service life.Comprehensive life improves more than 50%.
7, this technology and equipment is used to manufacture composite roll, due to preheating overall in employing type, Quick pouring is shaping, region directional solidification crystallization control tissue, solves CPC method, ESLLM method employing stripping explained hereafter production efficiency is low, power consumption is large, require high to factory building and operator; CPC method adopt two cover heating systems, equipment compared with complicated, technical difficulty is large, the pure brilliant degree of steel is poor; ESLLM method slag temperature is mated and metal liquid level control technology complexity with stripping speed, the drawbacks such as roller core surface fusion penetration layer control technology difficulty is large, there is the production efficiency higher than centrifuging process, and the component segregation overcome existing for Centrifugal compound foundry process and the drawback that cannot manufacture forged steel roll neck roll, controllable process parameters is few, production technology is simply easy to operation, production efficiency is high, power consumption is little, production cost is lower than electroslag remelting process by 1/2, lower than submerged arc bead welding method by 2/3, equipment is simply invested little, is applicable to batch production.Can not by the restriction of equipment and process, realization mini-plant manufactures large-sized multilayer laminar joint product or Gradient Composite Layer product, applied widely.
8, rare-earth yttrium and Sb, CrN, Si is adopted 3n 4, ferrosilicon composite inoculant, improve graphite form, refinement crystal grain, makes carbide morphology in roll obtain remarkable improvement, improves the strength of materials and toughness.By adding antimony, making the network structure of carbide obtain basic elimination, organizing disperse more, reach the metallographic structure and performance that change material, the wearability of material and heat resistanceheat resistant crack performance are effectively combined, improves the amount of rolling of milling train.
9, low-alloy steel, medium carbon steel forged steel or cast steel is adopted to do roll plug, improve roller neck intensity, during Rolling production, core does not have the danger of roll breakage, improve security, fundamentally solve roll breakage accident, improve production efficiency, meet the requirement of modern steel industry to high strength roller core composite roll.May be used for large-scale top load and HI high impact load roll, as Wide and Thick Slab Heat Working Rolls, high roll-force when meeting wide and heavy plate mill rolling and the large requirement of impact load, substantially increase working roll service life.
Accompanying drawing explanation
Fig. 1 is present device installation diagram, wherein 1 is depositing funnel, 2 is feed trumpet, 3 is cast runner, 4 is cast seat brick, 5 is roll plug, 6 is insulation ring, 7 is fourplatemold, 8 is electromagnetic induction heater, 9 is attachment bolt, 10 is bottom board, 11 is end water tank, 12 is support plinth, 13 is base support, 14 is lifting motor, 15 is lifting screw, 16 is planer-type region directional solidification jacking equipment, 17 is lifting platform, 18 is pouring ladle, 19 electromagnetic induction electrical power control cabinets, 20 is water-cooled cable, 23 is end tank inlet pipe, 24 is end radiator drain.
Fig. 2 is fourplatemold structure chart of the present invention, and wherein 7 is fourplatemold.
Fig. 3 is fourplatemold arc water-cooled casing modular construction top view of the present invention, and wherein 21 is fourplatemold water inlet pipe, and 22 is fourplatemold outlet pipe, and 7 is crystallizer arc water-cooled box assembly.
Fig. 4 is end cisten mechanism figure of the present invention, and wherein 11 is end water tank.
Fig. 5 is the end of the present invention cisten mechanism top view, and wherein 11 is end water tank, and 23 is end tank inlet pipe, and 24 is end radiator drain.
Fig. 6 is that the present invention repairs roller structure figure, and wherein 25 is roll working lining, and 26 is roll mandrel.
Detailed description of the invention
By reference to the accompanying drawings, embodiments of the invention are provided as follows:
Embodiment 1: at Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, in Fig. 6, this equipment has a planer-type region directional solidification jacking equipment 16, planer-type region directional solidification jacking equipment 6 is provided with lifting platform 17, electromagnetic induction heater 8 is installed on lifting platform 17, rotating lifting screw 15 or hydraulic test by lifting motor 14 drives lifting platform 17 to move up and down with set speed, in the side of planer-type region directional solidification jacking equipment 16, electromagnetic induction electrical power control cabinet 19 is installed, two outputs of electromagnetic induction electrical power control cabinet 19 are connected by the two ends of water-cooled cable 20 with electromagnetic induction heating device 8, a base support is had in the bottom of planer-type region directional solidification jacking equipment 16, base support 13 is provided with support plinth 12, Water-cooled bottom water tank 11 is installed on support plinth 12, the center of end water tank 11 is manhole, the center that is provided with on end water tank 11 is the bottom board 10 of manhole, Combined water cooling crystallizer 7 is installed on bottom board 10, on the top of water mold 7, insulation ring 6 is installed, roll plug 5 is by support plinth 12, the center hole of end water tank 11 and bottom board 12 is fixed on the center of crystallizer 7, casting runner 3 is connected with in the side of bottom board 10, casting runner 3 to be arranged on base support 13 and to sit brick 4 with cast and is connected, cast is sat brick 4 and is provided with feed trumpet 2 above, at the top of feed trumpet, sprue cup 1 is installed, pouring ladle 18 is had on depositing funnel 1.
Water inlet pipe 23 and outlet pipe 24 is had respectively in the side of Water-cooled bottom water tank 11; Water mold 7 by crystallizer circumferentially equally distributed 2 fourplatemold arc water-cooled box assemblies 7 form, water inlet pipe 21 is connected with in the bottom of each arc water-cooled box assembly 7, be connected with outlet pipe 22 on the top of each arc water-cooled box assembly 7, by attachment bolt 9, arc water-cooled box assembly 7 connected into drum-shaped entirety; Insulation ring 6 is manufactured by refractory material or fiber reinforcement refractory material; Electromagnetic induction power supply is line-frequency induction power supply, medium frequency induction power supply, high frequency induction power supply, and frequency is 1000Hz.
Roll manufacture adopts following processing step:
(1) mandrel preparation and preheating
First the roll mandrel surface of the required size manufactured is carried out oil removing, after processing of rust removing, one deck antioxidizing paint is applied at its surface uniform, put into after heating furnace carries out being preheating to 560 DEG C, pass through support plinth, the center hole of end water tank and bottom board is fixed on the center of crystallizer, starting region directional solidification lowering or hoisting gear, electromagnetic induction heater is dropped to the bottom of crystallizer, to fetch boiling water the water inlet pipe and water outlet pipe of cooling crystallizer and end water tank, start electromagnetic induction heating power supply, by the induction heater being arranged on water mold outside, surface heating is carried out to plug, to be heated to 860 DEG C,
(2) Composition Design
The mass percent of forged steel roll neck rich chromium cast iron composite roller operational layer material composition is: C:2.6%, Si:0.70%, Mn:0.60%, Ni:0.8%, Cr:17%, Mo:0.80%, W:0.5%, P :≤0.05%, S :≤0.O3%, Sb:1%, N:0.05%, Y:0.1%, surplus be Fe and inevitably trace element;
(3) molten metal melting
Take base iron, foundry returns, steel scrap, ferrotungsten, ferro-molybdenum, nickel ingot by rich chromium cast iron composite roll predetermined material composition, be placed into melting in intermediate frequency furnace, carry out repeatedly slag making in fusion process and skim, ensure hot metal purifying degree; When molten iron temperature is 1460 DEG C, sampling is chemically examined, and adjusts each constituent content until meet component requirements;
After ladle is toasted, by the Rare Earth Y of weight needed for preheated and Sb, Si 3n 4alloy grain fining agent is imbedded in the pit in roasted ladle together with 1/3 needs, the roll iron filings of covering 0.5 ~ 1% on it compacting, first pour the molten iron of the good qualified composition of the fusing of total amount 2/3, after spheroidizing reacion terminates, add remaining 1/3 molten iron, and in iron notch, the ferrosilicon grain (breeding the 75SiFe of in total amount remaining 2/3) of preheating is poured into stream, skim after fully stirring, add coverture preparation cast;
(4) pour into a mould
By nodularization, breed, the skin of the roll molten metal that Metamorphism treatment is good is poured in pouring ladle, molten metal in pouring ladle is passed through depositing funnel according to predetermined cast program, feed trumpet, casting runner pours in the space in crystallizer and between plug, in casting process, pouring temperature should control 1370 DEG C of scopes, start cast and need large stream, after 45s, start to subtract stream to water slowly, whole casting process must not be greater than 5min, electromagnetic induction heater does not stop heating, after pouring metal melt, induction heater proceeds heating 15 minutes, make poured into a mould molten metal within the regular hour, keep liquid, to increase the liquid-solid time, interface is made to form metallurgical binding, electromagnetic induction heater upwards promotes with certain speed by starting region directional solidification lowering or hoisting gear, the roll shaft composite bed progressively departing from electromagnetic induction heating successively consecutive solidification from bottom to top, and in different regions, control the different rates of climb according to quality requirement, forming region directional solidification, be raised to insulation ring place to stop through 8 minutes, continue to carry out heating 15 minutes to insulation ring, to postpone insulated feeder setting time, feeding is carried out to rising head, gas in composite-layer metal liquid and field trash are fully floated, eliminate composite-layer metal casting flaw, heating is stopped after reaching the scheduled time, continue water flowing and cool 40 minutes, the compound roll shaft cast is taken out in crystallizer.
(5) Technology for Heating Processing
Rich chromium cast iron composite roll is directly carried out roughing under as cast condition, then slowly heat up 10h in heating furnace, at 1070 DEG C by the every 30mm of roller diameter be incubated 1h be incubated after quenching, then in heating furnace with the heat temperature raising heating rate to 520 DEG C of 15 DEG C/h, air-cooled after insulation 8h, carry out first time tempering, and then being heated to 450 DEG C with the programming rate of 25 DEG C/h, after insulation 12h, stove is chilled to less than 150 DEG C, air cooling, carries out second time tempering.
Described roll mandrel material is forging or cast low alloy steel, medium carbon steel or spheroidal graphite cast-iron.
Described 75SiFe innoculant adding quantity is 0.2%.
Described N source material is Si 3n 4.
The composition of described mandrel surface antioxidizing paint is that Na2B407, Si02, Na20, K20, A1203, CaO one or more one-tenth are wherein grouped into.
Embodiment 2: at Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, in Fig. 6, this equipment has a planer-type region directional solidification jacking equipment 16, planer-type region directional solidification jacking equipment 6 is provided with lifting platform 17, electromagnetic induction heater 8 is installed on lifting platform 17, rotating lifting screw 15 or hydraulic test by lifting motor 14 drives lifting platform 17 to move up and down with set speed, in the side of planer-type region directional solidification jacking equipment 16, electromagnetic induction electrical power control cabinet 19 is installed, two outputs of electromagnetic induction electrical power control cabinet 19 are connected by the two ends of water-cooled cable 20 with electromagnetic induction heating device 8, a base support is had in the bottom of planer-type region directional solidification jacking equipment 16, base support 13 is provided with support plinth 12, Water-cooled bottom water tank 11 is installed on support plinth 12, the center of end water tank 11 is manhole, the center that is provided with on end water tank 11 is the bottom board 10 of manhole, Combined water cooling crystallizer 7 is installed on bottom board 10, on the top of water mold 7, insulation ring 6 is installed, roll shaft plug 5 is by support plinth 12, the center hole of end water tank 11 and bottom board 12 is fixed on the center of crystallizer 7, casting runner 3 is connected with in the side of bottom board 10, casting runner 3 to be arranged on base support 13 and to sit brick 4 with cast and is connected, cast is sat brick 4 and is provided with feed trumpet 2 above, at the top of feed trumpet, sprue cup 1 is installed, pouring ladle 18 is had on depositing funnel 1.
Water inlet pipe 23 and outlet pipe 24 is had respectively in the side of Water-cooled bottom water tank 11; Water mold 7 by crystallizer circumferentially equally distributed 3 fourplatemold arc water-cooled box assemblies 7 form, water inlet pipe 21 is connected with in the bottom of each arc water-cooled box assembly 7, be connected with outlet pipe 22 on the top of each arc water-cooled box assembly 7, by attachment bolt 9, arc water-cooled box assembly 7 connected into drum-shaped entirety; Insulation ring 6 is manufactured by refractory material or fiber reinforcement refractory material; Electromagnetic induction power supply is line-frequency induction power supply, medium frequency induction power supply, high frequency induction power supply, and frequency is 500Hz.
Roll manufacture adopts following processing step:
(1) mandrel preparation and preheating
First the roll mandrel surface of the required size manufactured is carried out oil removing, after processing of rust removing, one deck antioxidizing paint is applied at its surface uniform, put into after heating furnace carries out being preheating to 500 DEG C ~ 700 DEG C, pass through support plinth, the center hole of end water tank and bottom board is fixed on the center of crystallizer, starting region directional solidification lowering or hoisting gear, electromagnetic induction heater is dropped to the bottom of crystallizer, to fetch boiling water the water inlet pipe and water outlet pipe of cooling crystallizer and end water tank, start electromagnetic induction heating power supply, by the induction heater being arranged on water mold outside, surface heating is carried out to plug, to be heated to 890 DEG C,
(2) Composition Design
The mass percent of forged steel roll neck rich chromium cast iron composite roller operational layer material composition is: C:2.9%, Si:0.85%, Mn:0.80%, Ni:1.0%, Cr:18%, Mo:1.2%, W:0.8%, P :≤0.05%, S :≤0.O3%, Sb:2%, N:0.10%, Y:0.2%, surplus be Fe and inevitably trace element;
(3) molten metal melting
Take base iron, foundry returns, steel scrap, ferrotungsten, ferro-molybdenum, nickel ingot by rich chromium cast iron composite roll predetermined material composition, be placed into melting in intermediate frequency furnace, carry out repeatedly slag making in fusion process and skim, ensure hot metal purifying degree; When molten iron temperature is 1490 DEG C, sampling is chemically examined, and adjusts each constituent content until meet component requirements;
After ladle is toasted, by the Rare Earth Y of weight needed for preheated and Sb, Si 3n 4alloy grain fining agent is imbedded in the pit in roasted ladle together with 1/3 needs, the roll iron filings of covering 0.8% on it compacting, first pour the molten iron of the good qualified composition of the fusing of total amount 2/3, after spheroidizing reacion terminates, add remaining 1/3 molten iron, and in iron notch, the ferrosilicon grain (breeding the 75SiFe of in total amount remaining 2/3) of preheating is poured into stream, skim after fully stirring, add coverture preparation cast;
(4) pour into a mould
By nodularization, breed, the skin of the roll molten metal that Metamorphism treatment is good is poured in pouring ladle, molten metal in pouring ladle is passed through depositing funnel according to predetermined cast program, feed trumpet, casting runner pours in the space in crystallizer and between plug, in casting process, pouring temperature should control 1380 DEG C of scopes, start cast and need large stream, after 50s, start to subtract stream to water slowly, whole casting process must not be greater than 5min, electromagnetic induction heater does not stop heating, after pouring metal melt, induction heater proceeds heating 18 minutes, make poured into a mould molten metal within the regular hour, keep liquid, to increase the liquid-solid time, interface is made to form metallurgical binding, electromagnetic induction heater upwards promotes with certain speed by starting region directional solidification lowering or hoisting gear, the roll shaft composite bed progressively departing from electromagnetic induction heating successively consecutive solidification from bottom to top, and in different regions, control the different rates of climb according to quality requirement, forming region directional solidification, be raised to insulation ring place to stop through 10 minutes, continue to carry out heating 10 minutes to insulation ring, to postpone insulated feeder setting time, feeding is carried out to rising head, gas in composite-layer metal liquid and field trash are fully floated, eliminate composite-layer metal casting flaw, heating is stopped after reaching the scheduled time, continue water flowing and cool 60 minutes, the compound roll shaft cast is taken out in crystallizer.
(5) Technology for Heating Processing
Rich chromium cast iron composite roll is directly carried out roughing under as cast condition, then slowly heat up 11h in heating furnace, at 1070 DEG C by the every 30mm of roller diameter be incubated 1h be incubated after quenching, then in heating furnace with the heat temperature raising heating rate to 540 DEG C of 20 DEG C/h, air-cooled after insulation 9h, carry out first time tempering, and then being heated to 470 DEG C with the programming rate of 30 DEG C/h, after insulation 14h, stove is chilled to less than 150 DEG C, air cooling, carries out second time tempering.
Described roll mandrel material is forging or cast low alloy steel, medium carbon steel or spheroidal graphite cast-iron.
Described 75SiFe innoculant adding quantity is 0.3%.
Described N source material is Si 3n 4.
Embodiment 3: at Fig. 1, Fig. 2, Fig. 3, Fig. 4, in Fig. 5, this equipment has a planer-type region directional solidification jacking equipment 16, planer-type region directional solidification jacking equipment 6 is provided with lifting platform 17, electromagnetic induction heater 8 is installed on lifting platform 17, rotating lifting screw 15 or hydraulic test by lifting motor 14 drives lifting platform 17 to move up and down with set speed, in the side of planer-type region directional solidification jacking equipment 16, electromagnetic induction electrical power control cabinet 19 is installed, two outputs of electromagnetic induction electrical power control cabinet 19 are connected by the two ends of water-cooled cable 20 with electromagnetic induction heating device 8, a base support is had in the bottom of planer-type region directional solidification jacking equipment 16, base support 13 is provided with support plinth 12, Water-cooled bottom water tank 11 is installed on support plinth 12, the center of end water tank 11 is manhole, the center that is provided with on end water tank 11 is the bottom board 10 of manhole, Combined water cooling crystallizer 7 is installed on bottom board 10, on the top of water mold 7, insulation ring 6 is installed, roll shaft plug 5 is by support plinth 12, the center hole of end water tank 11 and bottom board 12 is fixed on the center of crystallizer 7, casting runner 3 is connected with in the side of bottom board 10, casting runner 3 to be arranged on base support 13 and to sit brick 4 with cast and is connected, cast is sat brick 4 and is provided with feed trumpet 2 above, at the top of feed trumpet, sprue cup 1 is installed, pouring ladle 18 is had on depositing funnel 1.
Water inlet pipe 23 and outlet pipe 24 is had respectively in the side of Water-cooled bottom water tank 11; Water mold 7 by crystallizer circumferentially equally distributed 6 fourplatemold arc water-cooled box assemblies 7 form, water inlet pipe 21 is connected with in the bottom of each arc water-cooled box assembly 7, be connected with outlet pipe 22 on the top of each arc water-cooled box assembly 7, by attachment bolt 9, arc water-cooled box assembly 7 connected into drum-shaped entirety; Insulation ring 6 is manufactured by refractory material or fiber reinforcement refractory material; Electromagnetic induction power supply is line-frequency induction power supply, medium frequency induction power supply, high frequency induction power supply, and frequency is 2000Hz.
Roll manufacture adopts following processing step:
(1) mandrel preparation and preheating
First the roll mandrel surface of the required size manufactured is carried out oil removing, after processing of rust removing, one deck antioxidizing paint is applied at its surface uniform, put into after heating furnace carries out being preheating to 650 DEG C, pass through support plinth, the center hole of end water tank and bottom board is fixed on the center of crystallizer, starting region directional solidification lowering or hoisting gear, electromagnetic induction heater is dropped to the bottom of crystallizer, to fetch boiling water the water inlet pipe and water outlet pipe of cooling crystallizer and end water tank, start electromagnetic induction heating power supply, by the induction heater being arranged on water mold outside, surface heating is carried out to plug, to be heated to 900 DEG C,
(2) Composition Design
The mass percent of forged steel roll neck rich chromium cast iron composite roller operational layer material composition is: C:3.0%, Si:1.0%, Mn:1.20%, Ni:1.2%, Cr:20.0%, Mo:2.0%, W:1%, P :≤0.05%, S :≤0.O3%, Sb:3%, N:0.18%, Y:0.3%, surplus be Fe and inevitably trace element;
(3) molten metal melting
Take base iron by rich chromium cast iron composite roll predetermined material composition, foundry returns, steel scrap, ferrotungsten, ferro-molybdenum, nickel ingot be placed into melting in intermediate frequency furnace, carry out repeatedly slag making in fusion process and skim, ensure hot metal purifying degree; When molten iron temperature is 1500 DEG C, sampling is chemically examined, and adjusts each constituent content until meet component requirements;
After ladle is toasted, by the Rare Earth Y of weight needed for preheated and Sb, Si 3n 4alloy grain fining agent is imbedded in the pit in roasted ladle together with 1/3 needs, the roll iron filings of covering 1% on it compacting, first pour the molten iron of the good qualified composition of the fusing of total amount 2/3, after spheroidizing reacion terminates, add remaining 1/3 molten iron, and in iron notch, the ferrosilicon grain (breeding the 75SiFe of in total amount remaining 2/3) of preheating is poured into stream, skim after fully stirring, add coverture preparation cast;
(4) pour into a mould
By nodularization, breed, the skin of the roll molten metal that Metamorphism treatment is good is poured in pouring ladle, molten metal in pouring ladle is passed through depositing funnel according to predetermined cast program, feed trumpet, casting runner pours in the space in crystallizer and between plug, in casting process, pouring temperature should control 1360 DEG C of scopes, start cast and need large stream, after 60s, start to subtract stream to water slowly, whole casting process must not be greater than 5min, electromagnetic induction heater does not stop heating, after pouring metal melt, induction heater proceeds heating 30 minutes, make poured into a mould molten metal within the regular hour, keep liquid, to increase the liquid-solid time, interface is made to form metallurgical binding, electromagnetic induction heater upwards promotes with certain speed by starting region directional solidification lowering or hoisting gear, the roll shaft composite bed progressively departing from electromagnetic induction heating successively consecutive solidification from bottom to top, and in different regions, control the different rates of climb according to quality requirement, forming region directional solidification, be raised to insulation ring place to stop through 15 minutes, continue to carry out heating 30 minutes to insulation ring, to postpone insulated feeder setting time, feeding is carried out to rising head, gas in composite-layer metal liquid and field trash are fully floated, eliminate composite-layer metal casting flaw, heating is stopped after reaching the scheduled time, continue water flowing and cool 60 minutes, the compound roll shaft cast is taken out in crystallizer.
(5) Technology for Heating Processing
Rich chromium cast iron composite roll is directly carried out roughing under as cast condition, then slowly heat up 12h in heating furnace, at 1070 DEG C by the every 30mm of roller diameter be incubated 1h be incubated after quenching, then in heating furnace with the heat temperature raising heating rate to 560 DEG C of 25 DEG C/h, air-cooled after insulation 0h, carry out first time tempering, and then being heated to 480 DEG C with the programming rate of 35 DEG C/h, after insulation 15h, stove is chilled to less than 150 DEG C, air cooling, carries out second time tempering.
Described roll mandrel material is forging or cast low alloy steel, medium carbon steel or spheroidal graphite cast-iron.
Described 75SiFe innoculant adding quantity is 0.4%.
Described N source material is Si 3n 4.
The composition of described mandrel surface antioxidizing paint is that Na2B407, Si02, Na20, K20, A1203, CaO one or more one-tenth are wherein grouped into.
More than show and describe general principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand; the present invention is not by the restriction of step embodiment; the just principle of the present invention described in step embodiment and description; without departing from the spirit and scope of the present invention; design of the present invention can be implemented to use by other various forms; also have various changes and modifications, these changes and improvements equally all fall in the claimed scope of the invention.Application claims protection domain is defined by appending claims and equivalent thereof.

Claims (8)

1. a forged steel roll neck rich chromium cast iron composite roll technique, is characterized in that: roll manufacture adopts following processing step:
(1) mandrel preparation and preheating
First the roll mandrel surface of the required size manufactured is carried out oil removing, after processing of rust removing, one deck antioxidizing paint is applied at its surface uniform, put into after heating furnace carries out being preheating to 500 DEG C ~ 700 DEG C, pass through support plinth, the center hole of end water tank and bottom board is fixed on the center of crystallizer, starting region directional solidification lowering or hoisting gear, electromagnetic induction heater is dropped to the bottom of crystallizer, to fetch boiling water the water inlet pipe and water outlet pipe of cooling crystallizer and end water tank, start electromagnetic induction heating power supply, by the induction heater being arranged on water mold outside, surface heating is carried out to plug, to be heated to 840 DEG C ~ 1100 DEG C,
(2) Composition Design
The mass percent of forged steel roll neck rich chromium cast iron composite roller operational layer material composition is: C:2.4 ~ 3.3%, Si:0.60 ~ 1.0%, Mn:0.50 ~ 1.20%, Ni:0.8 ~ 1.2%, Cr:15.0 ~ 20.0%, Mo:0.80 ~ 2.2%, W:0.5 ~ 1.0%, P :≤0.05%, S :≤0.O3%, Sb:1 ~ 3%, N:0.02 ~ 0.18%, Y:0.1 ~ 0.3%, surplus be Fe and inevitably trace element;
(3) molten metal melting
Take base iron, foundry returns, steel scrap, ferrochrome, ferro-molybdenum, ferro-tungsten, nickel ingot by rich chromium cast iron composite roll predetermined material composition, be placed into melting in intermediate frequency furnace, carry out repeatedly slag making in fusion process and skim, ensure hot metal purifying degree; When molten iron temperature is 1450 ~ 1500 DEG C, sampling is chemically examined, and adjusts each constituent content until meet component requirements;
After ladle is toasted, by the Rare Earth Y of weight needed for preheated and Sb, CrN, Si 3n 4alloy grain fining agent and 1/3 needs to add in pit that to imbed together with silicon iron inoculator in roasted ladle, the roll iron filings of covering 0.5 ~ 1% on it compacting, first pour the molten iron of the good qualified composition of the fusing of total amount 2/3, after question response terminates, add remaining 1/3 molten iron, and in iron notch, the ferrosilicon grain (breeding the 75SiFe of in total amount remaining 2/3) of preheating is poured into stream, skim after fully stirring, add coverture preparation cast;
(4) pour into a mould
To breed, the skin of the roll molten metal that micronization processes is good is poured in pouring ladle, molten metal in pouring ladle is passed through depositing funnel according to predetermined cast program, feed trumpet, casting runner pours in the space in crystallizer and between plug, in casting process, pouring temperature should control 1350 ~ 1380 DEG C of scopes, start cast and need large stream, after 40 ~ 60s, start to subtract stream to water slowly, whole casting process must not be greater than 5min, electromagnetic induction heater does not stop heating, after pouring metal melt, induction heater proceeds heating 10 ~ 50 minutes, make poured into a mould molten metal within the regular hour, keep liquid, to increase the liquid-solid time, interface is made to form metallurgical binding, electromagnetic induction heater upwards promotes with certain speed by starting region directional solidification lowering or hoisting gear, the roll shaft composite bed progressively departing from electromagnetic induction heating successively consecutive solidification from bottom to top, and in different regions, control the different rates of climb according to quality requirement, forming region directional solidification, be raised to insulation ring place to stop through 5 ~ 15 minutes, continue to carry out heating 10 ~ 50 minutes to insulation ring, to postpone insulated feeder setting time, feeding is carried out to rising head, gas in composite-layer metal liquid and field trash are fully floated, eliminate composite-layer metal casting flaw, heating is stopped after reaching the scheduled time, continue water flowing and cool 30 minutes ~ 24 hours, the compound roll shaft cast is taken out in crystallizer,
(5) Technology for Heating Processing
Rich chromium cast iron composite roll is directly carried out roughing under as cast condition, then slowly heat up 10 ~ 12h in heating furnace, be incubated after 1h is incubated by the every 30mm of roller diameter at 1070 DEG C and quench, then in heating furnace with heat temperature raising heating rate to 520 ~ 560 DEG C of 15 ~ 25 DEG C/h, air-cooled after insulation 6 ~ l0h, carry out first time tempering, and then be heated to 450 ~ 480 DEG C with the programming rate of 25 ~ 35 DEG C/h, after insulation 12 ~ 15h, stove is chilled to less than 150 DEG C, air cooling, carries out second time tempering;
Described roll mandrel material is forging or cast low alloy steel, medium carbon steel or spheroidal graphite cast-iron;
Described 75SiFe innoculant adding quantity is 0.2%;
Described N source material is Si 3n 4.
2. one kind realizes the equipment of forged steel roll neck rich chromium cast iron composite roll technique, it is characterized in that: this equipment has a planer-type region directional solidification jacking equipment, planer-type region directional solidification jacking equipment is provided with lifting platform, on lifting platform, electromagnetic induction heater is installed, lifting platform is driven to move up and down with set speed by lifting motor rotation lifting screw or hydraulic test, in the side of planer-type region directional solidification jacking equipment, electromagnetic induction electrical power control cabinet is installed, two outputs of electromagnetic induction electrical power control cabinet are connected by the two ends of water-cooled cable with electromagnetic induction heating device, a base support is had in the bottom of planer-type region directional solidification jacking equipment, base support is provided with support plinth, Water-cooled bottom water tank is installed on support plinth, the center of end water tank is manhole, the bottom board that center is manhole is installed on end water tank, Combined water cooling crystallizer is installed on bottom board, on the top of water mold, insulation ring is installed, roll shaft plug passes through support plinth, the center hole of end water tank and bottom board is fixed on the center of crystallizer, casting runner is connected with in the side of bottom board, casting runner 3 to be arranged on base support and to sit brick with cast and is connected, cast is sat above brick and is provided with feed trumpet, at the top of feed trumpet, sprue cup is installed, pouring ladle is had on depositing funnel.
3. the equipment of a kind of forged steel roll neck rich chromium cast iron composite roll technique according to claim 2, it is characterized in that: water mold is made up of the fourplatemold arc water-cooled box assembly at crystallizer circumferentially equally distributed 2 or 3 integral multiples, water inlet pipe is connected with in the bottom of each arc water-cooled box assembly, be connected with outlet pipe on the top of each arc water-cooled box assembly, by attachment bolt, arc water-cooled box assembly connected into drum-shaped entirety.
4. the equipment of a kind of forged steel roll neck rich chromium cast iron composite roll technique according to claim 2, it is characterized in that: electromagnetic induction power supply is line-frequency induction power supply, medium frequency induction power supply, high frequency induction power supply, frequency is 500Hz ~ 3000Hz.
5. the equipment of a kind of forged steel roll neck rich chromium cast iron composite roll technique according to claim 2, is characterized in that: insulation ring is manufactured by refractory material or fiber reinforcement refractory material.
6. the equipment of a kind of forged steel roll neck rich chromium cast iron composite roll technique according to claim 2, is characterized in that: described fourplatemold both can realize the adjustment of fourplatemold inner diameter size by the arc water-cooled box assembly adding or reduce different size.
7. the equipment of a kind of forged steel roll neck rich chromium cast iron composite roll technique according to claim 2, is characterized in that: have water inlet pipe and outlet pipe respectively in the side of Water-cooled bottom water tank.
8. forged steel roll neck rich chromium cast iron composite roll technique according to claim 1, is characterized in that: the composition of described mandrel surface antioxidizing paint is that Na2B407, Si02, Na20, K20, A1203, CaO one or more one-tenth are wherein grouped into.
CN201510764181.XA 2015-11-11 2015-11-11 A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus Active CN105522138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510764181.XA CN105522138B (en) 2015-11-11 2015-11-11 A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510764181.XA CN105522138B (en) 2015-11-11 2015-11-11 A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus

Publications (2)

Publication Number Publication Date
CN105522138A true CN105522138A (en) 2016-04-27
CN105522138B CN105522138B (en) 2018-06-12

Family

ID=55764854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510764181.XA Active CN105522138B (en) 2015-11-11 2015-11-11 A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus

Country Status (1)

Country Link
CN (1) CN105522138B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105522126A (en) * 2015-11-11 2016-04-27 丹阳恒庆复合材料科技有限公司 Manufacturing technique and equipment for high-performance composite roller shaft
CN106825516A (en) * 2017-02-19 2017-06-13 丹阳恒庆复合材料科技有限公司 A kind of composite roll roller covers manufacturing process and equipment
CN109514192A (en) * 2018-11-19 2019-03-26 贵阳华丰航空科技有限公司 A kind of corrosion-resistant screw processing and forming technology of aircraft utilization
CN112846150A (en) * 2020-12-30 2021-05-28 中钢集团邢台机械轧辊有限公司 Multi-element composite manufacturing method for hot-rolled section steel hole type roller
CN113638064A (en) * 2021-09-02 2021-11-12 江苏中杰澳新材料有限公司 Heat pipe assembly, combined heat pipe type hot roller comprising heat pipe assembly and machining method of combined heat pipe type hot roller
CN116060466A (en) * 2023-02-07 2023-05-05 中国第一重型机械股份公司 Roller composite extrusion method and roller
CN116765378A (en) * 2023-08-22 2023-09-19 河北恒兴机械有限公司 Cast iron casting residual liquid collector for electric furnace smelting and process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5050229A (en) * 1973-09-04 1975-05-06
JPH0191902A (en) * 1987-09-30 1989-04-11 Hitachi Metals Ltd Composite cermet roll
CN1077401A (en) * 1993-02-27 1993-10-20 鞍山钢铁公司 Composite cast iron roller and casting method thereof
CN101053899A (en) * 2007-06-07 2007-10-17 中冶京诚工程技术有限公司 Large-scale shaft products vertical casting and repairing device and using method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5050229A (en) * 1973-09-04 1975-05-06
JPH0191902A (en) * 1987-09-30 1989-04-11 Hitachi Metals Ltd Composite cermet roll
CN1077401A (en) * 1993-02-27 1993-10-20 鞍山钢铁公司 Composite cast iron roller and casting method thereof
CN101053899A (en) * 2007-06-07 2007-10-17 中冶京诚工程技术有限公司 Large-scale shaft products vertical casting and repairing device and using method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁家伟等: "高速钢复合轧辊制造工艺研究新进展", 《2008年轧辊制造与应用国际研讨会》 *
徐泽儒: "针状组织球铁轧辊的研制", 《河南冶金》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105522126A (en) * 2015-11-11 2016-04-27 丹阳恒庆复合材料科技有限公司 Manufacturing technique and equipment for high-performance composite roller shaft
CN106825516A (en) * 2017-02-19 2017-06-13 丹阳恒庆复合材料科技有限公司 A kind of composite roll roller covers manufacturing process and equipment
CN109514192A (en) * 2018-11-19 2019-03-26 贵阳华丰航空科技有限公司 A kind of corrosion-resistant screw processing and forming technology of aircraft utilization
CN109514192B (en) * 2018-11-19 2020-06-23 贵阳华丰航空科技有限公司 Machining and forming process for corrosion-resistant screw used for airplane
CN112846150A (en) * 2020-12-30 2021-05-28 中钢集团邢台机械轧辊有限公司 Multi-element composite manufacturing method for hot-rolled section steel hole type roller
CN113638064A (en) * 2021-09-02 2021-11-12 江苏中杰澳新材料有限公司 Heat pipe assembly, combined heat pipe type hot roller comprising heat pipe assembly and machining method of combined heat pipe type hot roller
CN116060466A (en) * 2023-02-07 2023-05-05 中国第一重型机械股份公司 Roller composite extrusion method and roller
CN116060466B (en) * 2023-02-07 2024-01-12 中国第一重型机械股份公司 Roller composite extrusion method and roller
CN116765378A (en) * 2023-08-22 2023-09-19 河北恒兴机械有限公司 Cast iron casting residual liquid collector for electric furnace smelting and process thereof
CN116765378B (en) * 2023-08-22 2023-11-07 河北恒兴机械有限公司 Cast iron casting residual liquid collector for electric furnace smelting and process thereof

Also Published As

Publication number Publication date
CN105522138B (en) 2018-06-12

Similar Documents

Publication Publication Date Title
CN105401059B (en) A kind of modified forged steel roll neck high-nickel-chromium molybdenum alloy cast iron composite roll manufacturing process and equipment
CN105436474B (en) A kind of modified forged steel roll neck bainite ductile iron composite roll manufacturing process and equipment
CN105522126B (en) The compound roll shaft manufacturing process of high-performance and equipment
CN105522138B (en) A kind of forged steel roll neck rich chromium cast iron composite roll Processes and apparatus
CN105312541B (en) Nickel-chrome-molybdenum alloy cast iron composite roll manufacturing process and equipment in a kind of modified forged steel roll neck
CN105436475A (en) Modified manufacturing process for high-chromium cast iron composite roll through forged steel roll neck and equipment
CN105562647B (en) A kind of forged steel roll neck indefinite chill high-nickel-chromium molybdenum composite roll Processes and apparatus
CN105397067B (en) Forged steel roll neck alloy nodular cast iron composite roll manufacturing process and equipment
CN105312540B (en) The composite roll manufacturing process and equipment of a kind of reusable edible roller core
CN105618715B (en) A kind of wear-resistant high speed steel composite roll and preparation method thereof
CN103624084B (en) Resource-saving type high-boron high-speed steel composite roll and manufacturing method thereof
CN100369681C (en) Compound high speed steel roll and its making process
CN102962423B (en) Centrifugal high-carbon, high-boron and high-speed steel composite roller shell and fabrication method of combined roller of composite roller shell
CN103215488B (en) Method for integrally casting large-sized V-shaped diesel engine body by utilizing nodular cast iron
WO2017201729A1 (en) Profiled composite-casted roll and preparation method therefor
CN102851575B (en) Oxidation-resistant alloying grey cast iron and preparation method thereof
CN103526125B (en) A kind of semisteel roll and manufacture method thereof
CN102615108A (en) Centrifugal casting high-speed steel composite roll and manufacture method thereof
CN104404360A (en) Large diameter grey cast iron section bar material and preparation method thereof
CN108705034A (en) A kind of alloy cast iron cylinder sleeve casting method
CN104384193A (en) High speed steel finishing roll of wire bar mill and manufacturing method of high speed steel finishing roll
CN105458227A (en) Centrifugal casting high-boron high-speed steel composite roller and preparing method thereof
CN112695242B (en) Cogging roll and preparation method thereof
CN106222530A (en) A kind of centrifugal casting rich chromium cast iron collars and preparation method
CN106350730A (en) High-wear-resistance alloy tool steel roll and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant