CN201666149U - Walking transfer machine - Google Patents

Walking transfer machine Download PDF

Info

Publication number
CN201666149U
CN201666149U CN2010201584939U CN201020158493U CN201666149U CN 201666149 U CN201666149 U CN 201666149U CN 2010201584939 U CN2010201584939 U CN 2010201584939U CN 201020158493 U CN201020158493 U CN 201020158493U CN 201666149 U CN201666149 U CN 201666149U
Authority
CN
China
Prior art keywords
fortune
chute
machine
fully
walking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201584939U
Other languages
Chinese (zh)
Inventor
孙洪峰
李本学
王德民
石海东
于刚
张国新
刘国锋
李英文
张金玉
马金良
田占东
刘强
邢宝凯
戴洪军
赵明江
于雅文
安忠民
李生
孙涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine
Original Assignee
Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine filed Critical Tiefa Coal Industry (group) Co Ltd Daxing Coal Mine
Priority to CN2010201584939U priority Critical patent/CN201666149U/en
Application granted granted Critical
Publication of CN201666149U publication Critical patent/CN201666149U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a walking transfer machine, which belongs to the transporter transportation technology and is mainly used among a combined mining machine on an underground fully-mechanized mining workface, a fully-mechanized excavation machine on a fully-mechanized excavating workface and a belt conveyor to transport coals and rocks cut by the combined mining machine and the fully-mechanized excavation machine onto the belt conveyor so as to increasing the coal mine production efficiency. The characteristics are that the walking of the walking transfer machine enables a first transporting chute of the walking transfer machine to always follow below a second transporting chute of the combined mining machine or the fully-mechanized excavation machine to transport the coals and rocks cut by the combined mining machine or the fully-mechanized excavation machine to the second transporting chute via a scraper plate of the first transporting chute and then to the belt conveyor via the second transporting chute. The main objective of the utility model is to solve the problem that coals and rocks cut by conventional combined mining machines and fully-mechanized excavation machines can not be transported to the belt conveyor in an rapid and accurate manner.

Description

A kind of walking elevating conveyor
One, technical field: the utility model belongs to transporter transportation technology field, specifically refers to a kind of walking elevating conveyor that transports coal and rock.
Two, background technology: growing along with the colliery, constantly bringing forth new ideas of production technique, and the continual renovation of plant equipment, each colliery coal production constantly increases, especially the exploitation of some girdles need use connection to adopt the machine coal mining, and also need fully-mechanized digging machine constantly to excavate new work plane adapting to the development in each colliery, this just need adopt connection coal that machine, fully-mechanized digging machine cut get off or rock and transport timely and make it not influence connection and adopt machine and fully-mechanized digging machine work.But existing transportation resources can't guarantee to join coal that the machine of adopting and fully-mechanized digging machine cut get off or rock in time, effectively transport, this just need a kind of equipment of design connection can be adopted coal that machine and fully-mechanized digging machine cut get off or rock in time, effectively transport, to guarantee the highly efficient and productive demand in colliery.
Three, summary of the invention:
1, goal of the invention: the utility model provides a kind of walking elevating conveyor, and purpose is that connection is adopted coal or the rock that machine and fully-mechanized digging machine cut get off in time to be transported on the belt conveyer, to improve Coal Production efficient.
2, technical scheme: the utility model is implemented by the following technical programs:
A kind of walking elevating conveyor is characterized in that: this walking elevating conveyor comprises one one fortune chute, and a fortune chute one end connects the running part that has fluid motor-driven reductor, gear wheel, crawler belt; The other end of one fortune chute is equipped with first and regulates the screw mandrel and first hydraulic motor, first hydraulic motor is connected with first scraper chain by the first motor drive sprocket, below this end of fortune chute, also be connected with one two fortune chute, be equipped with second at two fortune chutes away from a fortune chute one end and regulate the screw mandrel and second hydraulic motor, second hydraulic motor is connected with second scraper chain by the second motor drive sprocket.
One fortune chute is the slideway form, can slide front and back.
One fortune chute is equipped with first hoist cylinder near the below of running part one end.
Two fortune chutes are equipped with second hoist cylinder near the below of a fortune chute one end.
Second hoist cylinder is connected with the revolution jack by floating bearing.
Support cylinder is all installed in the front and rear part below walking elevating conveyor fuselage.
3, advantage and effect: this method adopts fuselage mass motion, and connection is adopted machine, fully-mechanized digging machine two fortune chutes ride over and connect on the fortune machine one fortune chute and can move around, and a fortune chute can be realized oscilaltion, makes that to connect goods more accurate.Two fortune chutes, 180 degree that can swing enlarge the unloading scope.Simultaneously chute can oscilaltion, makes unloading more accurate.
This method is specific as follows with the advantage that other method is compared:
(1) connect goods in time, to connect the goods scope big, drive even fortune machine walking of walking reducer drive caterpillar drive realization by even transporting the machine running motor, make a fortune chute below connection is adopted machine or fully-mechanized digging machine two fortune chutes, catch connection all the time at any time and adopt coal or the rock that machine or fully-mechanized digging machine two transport, and can arrive the place that other transporter can't arrive.
(2) it is accurate to connect goods, adopts machine or fully-mechanized digging machine two fortune chutes by connection and rides over and connect on the fortune machine one fortune chute companys of making fortune machine one and transport chute to connect goods more accurate.
(3) cargo transport in time drives scraper plate by the motor drive sprocket rotation that connects fortune machine one fortune chute coal or rock in time is transported in the two fortune chutes of Lian Yunji.
(4) unloading accurately makes two fortune chute unloadings more accurate by the hoist cylinder that connects fortune machine two fortune chute belows.
(5) unloading scope is big, and the floating bearing by connecting fortune machine two fortune chutes belows and the angling cylinder of side make two fortune chutes, 180 degree that can swing, and increase the unloading scope, make goods can be discharged to other transporters unload less than the position.
Four, description of drawings:
Fig. 1 is a structural representation of the present utility model;
Description of reference numerals:
1, a fortune chute 2, first is regulated screw mandrel 3, first hydraulic motor 4, two fortune chutes 5, the second adjusting screw mandrel 6, second hydraulic motor 7, second hoist cylinder 8, floating bearing 9, revolution jack 10, running part 11, first hoist cylinder.
Five, the specific embodiment:
Below in conjunction with accompanying drawing, most preferred embodiment of the present utility model is specifically described:
As shown in Figure 1, a kind of walking elevating conveyor described in the utility model, comprise one one fortune chute 1, this fortune chute 1 is designed to the slideway form, the two fortune chutes that make connection adopt machine or fully-mechanized digging machine ride on the fortune chute 1 of walking elevating conveyor all the time, and a fortune chute 1 can be slided front and back, guarantee to catch at any time connection and adopt coal or the rock that two fortune chutes of machine or fully-mechanized digging machine unload.One fortune chute, 1 one ends connect running part 10, this running part 10 has fluid motor-driven reductor and gear wheel, crawler belt, during work, drive gear wheel, crawler belt rotation by the fluid motor-driven reductor, realize advancing, retreat and turning to of walking elevating conveyor, to adapt to the motion that connection is adopted machine and fully-mechanized digging machine.First hoist cylinder 11 is installed at a fortune chute 1 below near running part 10 1 ends, drives a fortune chute 1 knee-action, adopt the action back and forth of machine and fully-mechanized digging machine two fortune chutes, make that to connect goods more accurate, in time to adapt to connection by 11 actions of first hoist cylinder.The other end at a fortune chute 1 is equipped with the first adjusting screw mandrel 2 and first hydraulic motor 3, first hydraulic motor 3 is connected with first scraper chain by the first motor drive sprocket, the first motor drive sprocket can drive the rotation of first scraper chain, the goods commentaries on classics is discharged to the two fortune chutes 4 that are positioned at a fortune chute 1 below, guarantees that cargo transport is timely.Below two fortune chutes, 4 a close fortune chute 1 one ends, second hoist cylinder 7 is installed, drives two fortune chutes, 4 knee-actions by 7 actions of second hoist cylinder, to adapt to the position of belt conveyer; Away from a fortune chute 1 one ends second hydraulic motor, 6, the second hydraulic motors 6 are installed also at two fortune chutes 4 and drive the second motor drive sprocket, make the rotation of second scraper chain, goods is changeed being discharged on the belt conveyer, make discharging more accurate.Second hoist cylinder, 7 places of continuous transporter two fortune chutes 4 also are equipped with a floating bearing 8 in the down-hole, the side of floating bearing 8 is installed and is established revolution jack 9, make two fortune chutes 4,180 degree that can swing by the action of revolution jack 9, enlarged the unloading scope.
Before and after below the walking elevating conveyor fuselage, two support cylinders are installed respectively also, during the elevating conveyor that do not need to walk walking, support cylinder stretched out make fuselage more steady.
When work, utilize the running part 10 of walking elevating conveyor, make a fortune chute 1 of walking elevating conveyor follow all the time connection adopt machine or fully-mechanized digging machine two fortune chutes below, connection is adopted in the fortune chute 1 that coal that machine, fully-mechanized digging machine cut get off or rock transport to the walking elevating conveyor, one fortune chute 1 drives the first motor drive sprocket by first hydraulic motor 3 again, first scraper chain is moved, and coal or rock are transported in the two fortune chutes 4 of walking elevating conveyor, the second motor drive sprocket by two fortune chutes 4 drives second scraper chain again, and coal or rock are transported on the belt conveyer.
In addition, this walking elevating conveyor in use should be noted that following some requirement:
1, the walking elevating conveyor is installed with running and must be observed the safety regulations in coal mine pertinent regulations;
2, should check the hydraulic operation handle before the start, make it to be in " 0 ';
3, close after the line breaker, rush operation, whether first observation display shows normally see whether power supply indicator is normal again, if overtension, line breaker can auto-action, thereby protects electric-control system;
4, after the Oil pump electrical machinery operation, could be to other mechanism's operation;
5, start the walking elevating conveyor before, check whole machinery, confirm errorless after, can try out;
6, the starting stage of test running, should note air is discharged from hydraulic system, check whether leakage of oil of hydraulic system;
7, in the operating process, take place, note using anxious stopping if any accident;
8, action that note to observe each parts flexibility and reliability whether if any phenomenons such as holdings, answers hard stop to handle;
When 9, shutting down in the operation, killer switch must be cut off the power supply, in order to avoid misoperation;
10, stepped type will carry out maintenance and inspection to the component that may go wrong after continuous transporter work a period of time.
The walking elevating conveyor is adopted the coal that connection can be adopted under the machine cut in the supporting use of machine at my ore deposit SV719 work plane with connection and is transported on the belt conveyer timely and accurately, do not occur once influencing the work plane accident of producing coal because of walking elevating conveyor fault, the approval and the welcome of applying unit have been obtained, for my pit coal carbon yield has been made huge contribution, this shows, the walking elevating conveyor has good development prospect, is worthy to be popularized and uses.
At present, along with science and technology development, the application of new equipment, each Coal Production efficient improves constantly, connection is adopted machine and is used more and morely, and this just need adopt connection coal and the rock that machine and fully-mechanized digging machine cut get off and transport in time, and the elevating conveyor of walking is exactly a kind ofly connection can be adopted the plant equipment that coal that machine and fully-mechanized digging machine cut get off and rock are transported in time, have excellent popularization and be worth, application prospect is good.

Claims (6)

1. walking elevating conveyor is characterized in that: this walking elevating conveyor comprises one one fortune chute (1), and a fortune chute (1) one end connects the running part (10) that has fluid motor-driven reductor, gear wheel, crawler belt; The other end of one fortune chute (1) is equipped with first and regulates screw mandrel (2) and first hydraulic motor (3), first hydraulic motor (3) is connected with first scraper chain by the first motor drive sprocket, also be connected with one two fortune chute (4) in this end below of a fortune chute (1), be equipped with second at two fortune chutes (4) away from a fortune chute (1) one end and regulate screw mandrel (5) and second hydraulic motor (6), second hydraulic motor (6) is connected with second scraper chain by the second motor drive sprocket.
2. according to the described a kind of walking elevating conveyor of claim 1, it is characterized in that: a fortune chute (1) is the slideway form, can slide front and back.
3. according to the described a kind of walking elevating conveyor of claim 1, it is characterized in that: a fortune chute (1) is equipped with first hoist cylinder (11) near the below of running part (10) one ends.
4. according to the described a kind of walking elevating conveyor of claim 1, it is characterized in that: two fortune chutes (4) are equipped with second hoist cylinder (7) near the below of a fortune chute (1) one end.
5. according to the described a kind of walking elevating conveyor of claim 4, it is characterized in that: second hoist cylinder (7) is connected with revolution jack (9) by floating bearing (8).
6. according to the described a kind of walking elevating conveyor of claim 1, it is characterized in that: support cylinder is all installed in the front and rear part below walking elevating conveyor fuselage.
CN2010201584939U 2010-04-14 2010-04-14 Walking transfer machine Expired - Fee Related CN201666149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201584939U CN201666149U (en) 2010-04-14 2010-04-14 Walking transfer machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201584939U CN201666149U (en) 2010-04-14 2010-04-14 Walking transfer machine

Publications (1)

Publication Number Publication Date
CN201666149U true CN201666149U (en) 2010-12-08

Family

ID=43267108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201584939U Expired - Fee Related CN201666149U (en) 2010-04-14 2010-04-14 Walking transfer machine

Country Status (1)

Country Link
CN (1) CN201666149U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425452A (en) * 2011-08-11 2012-04-25 江苏中矿立兴能源科技有限公司 Mining self-shifting belt-type telescopic elevating conveyer
CN104594907A (en) * 2014-12-26 2015-05-06 中国煤炭科工集团太原研究院有限公司 Continuous walking type transport loader of open pit coal mine
CN108005671A (en) * 2017-12-07 2018-05-08 三重型装备有限公司 Drill loader reprints equipment and drill loader group

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425452A (en) * 2011-08-11 2012-04-25 江苏中矿立兴能源科技有限公司 Mining self-shifting belt-type telescopic elevating conveyer
CN104594907A (en) * 2014-12-26 2015-05-06 中国煤炭科工集团太原研究院有限公司 Continuous walking type transport loader of open pit coal mine
CN108005671A (en) * 2017-12-07 2018-05-08 三重型装备有限公司 Drill loader reprints equipment and drill loader group

Similar Documents

Publication Publication Date Title
CN101899976B (en) Continuous coal mining process method of open-pit coal mine
CN201087428Y (en) Bucket type transloader
CN201574753U (en) Cantilever type tunneling machine
CN204152431U (en) A kind of transhipment anchor shaft anchor cable eight arm drill carriage
CN104265167A (en) Transshipment anchor rod and anchor cable drill carriage
CN201502374U (en) Shipping mechanism of tunneling machine
CN201666149U (en) Walking transfer machine
CN107676096B (en) Continuous mining system and mining process for ferrous metallurgy open-pit mine
CN201794610U (en) Drilling, loading, anchoring, supporting and transporting integrated machine in high outburst mine coal drift
CN204152434U (en) A kind of transhipment anchor shaft anchor cable six arm drill carriage
CN201031699Y (en) Circular saw type mechanical boring machine
CN103821530A (en) Continuous excavating equipment and process for roadways
CN201534712U (en) Coal and waste rock separation device
CN101200905B (en) Sump silt cleaner
CN202743922U (en) Self-moving device of loader
CN204152433U (en) A kind of transhipment anchor shaft anchor cable ten arm drill carriage
CN103485787B (en) Opencast mining work plane self-moving reversed loader
CN101929350B (en) Deviated well slag-raking machine
CN201209459Y (en) Abnormal protrusion mine coal road digging anti- protrusion jumbo loader
CN201027540Y (en) Coal-charging, coal-carrying and anchor stock supporting mechanically integrated device
CN201486593U (en) Inclined well slag digging machine
CN103742150B (en) Opencut slusher exploitation continuous processing and equipment
CN201363087Y (en) Gassy outburst mine coal-road tunneling outburst-proof drill loader with dual drilling machine and dual pump station
CN202628170U (en) Movable self-loading type waste rock bin mechanism
CN203476334U (en) Self-moving type transshipping machine for mining working face for open-pit mine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101208

Termination date: 20110414