CN201664887U - Tramcar road bracket mounting clamp - Google Patents
Tramcar road bracket mounting clamp Download PDFInfo
- Publication number
- CN201664887U CN201664887U CN2010201476370U CN201020147637U CN201664887U CN 201664887 U CN201664887 U CN 201664887U CN 2010201476370 U CN2010201476370 U CN 2010201476370U CN 201020147637 U CN201020147637 U CN 201020147637U CN 201664887 U CN201664887 U CN 201664887U
- Authority
- CN
- China
- Prior art keywords
- angle steel
- angle iron
- electric road
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a tramcar road bracket mounting clamp, comprising a second angle iron which is arranged horizontally, a first angle iron is horizontally and fixedly connected below one end of the second angle iron, the other end thereof is vertically and fixedly connected with a fourth angle iron, a horizontal straight scale is arranged above the middle part of the second angle iron, a third angle iron is vertically and fixedly connected below the middle part of the second angle, the bottom end of a fourth angle iron is horizontally and fixedly connected with a fifth angle iron, a regulating bolt and a fixed bolt are respectively and horizontally arranged below the third angle iron and the fifth angle iron; the tramcar road bracket mounting clamp has simple structure, the installation efficiency of the tramcar road bracket is high and the quality is good.
Description
Technical field
The utility model relates to a kind of jig, relates in particular to a kind of electric road support that rubs jig is installed.
Background technology
Many in metallurgical construction installation industry electrical equipment installation middle rolling car project, the installation of the electric road support that rubs is also bigger.The electric road support installation method that rubs in the past is the installation that three people could finish a support substantially: people takes that support, people's water detection are flat, a personal electric welding is fixed, and three people installed the 15-17 assistant support in one day.The quality that not only inefficiency, and support is installed also can not get guaranteeing.
The utility model content
The purpose of this utility model is to address the above problem and provide a kind of simple in structure, the electric road support installation effectiveness height that rubs, and the measured electric road support that rubs of matter is installed jig.
The utility model solves the problems of the technologies described above the technical scheme that is adopted:
It comprises horizontally disposed second angle steel, second angle steel, one end lower horizontal is connected with first angle steel, and the other end vertically is connected with the 4th angle steel, and top, second angle steel middle part is provided with horizontal ruler, the vertical affixed third angle steel in below, described the 4th angle steel bottom level is connected with the 5th angle steel; Described third angle steel and the 5th angle steel below level respectively are provided with adjusting bolt and set bolt.
Compared with prior art, the utility model has been obtained following technique effect:
1, this utility model is simple in structure, this jig and measuring appliance form will rub electric road support and suspension bracket of integral body and tighten up, install and measure and settle at one go, simultaneously, can regulate the support installation site, electric road of rubbing, as long as two people just can finish the installation of a support, installation quality, installation effectiveness and security all are enhanced, and use this to install one day installation of two people at the 40-50 assistant support.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is user mode figure of the present utility model.
Wherein: 1-first angle steel, 2-second angle steel, 3-third angle steel, 4-the 4th angle steel, 5-the 5th angle steel, the horizontal ruler of 6-, 7-are regulated bolt, 8-set bolt 9-rub electric road, 10-crane girder, 11-track, 12-crane girder gusset.
The specific embodiment
Further specify embodiment of the present utility model below in conjunction with accompanying drawing.
Referring to Fig. 1-2, a kind of electric road support that rubs is installed jig, it comprises horizontally disposed second angle steel 2, second angle steel, one end lower horizontal is connected with first angle steel 1, the other end vertically is connected with the 4th angle steel 4, top, second angle steel middle part is provided with horizontal ruler 6, the vertical affixed third angle steel 3 in below, and described the 4th angle steel bottom level is connected with the 5th angle steel 5; Described third angle steel and the 5th angle steel below level respectively are provided with adjusting bolt 7 and set bolt 8.Above-mentioned angle steel can be selected the angle steel of L50*50*5 for use; Bolt can be selected the bolt of φ 12 for use, and the length of horizontal ruler is that 400mm-600mm is long.But also be not limited to above-mentioned size, concrete size can be set according to the needs of field working conditions.Concrete affixed mode can directly adopt the mode of welding.Angle steel can select two block plates in vertical the welding together of edge.
The effect of first angle steel 1 is to determine the centre distance of electric road 9 and track 11 of rubbing, and blocks track, and and parallel track; Second angle steel 2 is effects of playing outrigger, and horizontal ruler 6 tightly is fixed in the above; Third angle steel 3 vertical weldings are played a supporting role in the bottom of second angle steel (its distance should be good at the edge of crane girder), make whole jig level, and vertically act on the orbital plane; The 4th angle steel 4 vertical and second angle steel overlap joints play the distance (deciding apart from designing) of controlling rub electric road and orbital plane; The 5th angle steel is vertical with the 4th angle steel, and parallel with second angle steel, its objective is the horizontal plane of the electric road support that fixedly rubs.Reconcile stud weld in the termination of third angle steel, it is basic point all the time with the orbital plane that the length of adjustment screw rod makes the level of jig; The set bolt electric road support that will rub is fastened on the 5th angle steel, makes the rub electric road support and the second angle steel keeping parallelism.
Using method of the present utility model:, fastening with will rub electric road support and the 5th angle steel of set bolt referring to Fig. 3; Fastening good electric road support and the crane girder gusset 12 of rubbing is close to, and first angle steel blocks track and is put into crane girder 10 belows; Adjustment adjusting bolt makes the horizontal ruler maintenance level on second angle steel, just can install in lap-joint's welding of Mo Diandao support and crane girder gusset.Set bolt is removed in the back of finishing using, and just can carry out the rub installation of electric road support of the next one.
Protection domain of the present utility model is not limited to the above embodiments, and obviously, those skilled in the art can carry out various changes and distortion and not break away from intended scope of the present utility model the utility model.If these changes and distortion belong in the scope of the utility model claim and equivalent technologies thereof, intention then of the present utility model also comprises these changes and is out of shape interior.
Claims (1)
1. the electric road support that rubs is installed jig, it is characterized in that: it comprises horizontally disposed second angle steel (2), second angle steel, one end lower horizontal is connected with first angle steel (1), the other end vertically is connected with the 4th angle steel (4), top, second angle steel middle part is provided with horizontal ruler (6), below vertical affixed third angle steel (3), described the 4th angle steel bottom level is connected with the 5th angle steel (5); Described third angle steel and the 5th angle steel below level respectively are provided with adjusting bolt (7) and set bolt (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201476370U CN201664887U (en) | 2010-03-30 | 2010-03-30 | Tramcar road bracket mounting clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201476370U CN201664887U (en) | 2010-03-30 | 2010-03-30 | Tramcar road bracket mounting clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201664887U true CN201664887U (en) | 2010-12-08 |
Family
ID=43265841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201476370U Expired - Fee Related CN201664887U (en) | 2010-03-30 | 2010-03-30 | Tramcar road bracket mounting clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201664887U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103175462A (en) * | 2011-12-20 | 2013-06-26 | 中冶宝钢技术服务有限公司 | Adjusting and mounting measuring tool for tramway supports |
-
2010
- 2010-03-30 CN CN2010201476370U patent/CN201664887U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103175462A (en) * | 2011-12-20 | 2013-06-26 | 中冶宝钢技术服务有限公司 | Adjusting and mounting measuring tool for tramway supports |
CN103175462B (en) * | 2011-12-20 | 2016-02-03 | 中冶宝钢技术服务有限公司 | The support adjustment of Mo electricity road installs and measures instrument |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103133779A (en) | Adjustable type cable fixed support | |
CN202360896U (en) | Adjustable cable fixing bracket | |
CN201495036U (en) | Device for mounting and adjusting trolley line support of traveling car | |
CN201664887U (en) | Tramcar road bracket mounting clamp | |
CN201610511U (en) | High-speed railway roadbed shoulder concrete construction sliding formwork trolley | |
CN104452581A (en) | Cantilever and base bolt anchoring type comb plate retractor | |
CN207603094U (en) | A kind of dual-purpose pulley block device of novel road bridge | |
CN201567787U (en) | Form-traveler steel formwork | |
CN207155068U (en) | One kind is started to exchange fire basin | |
CN205382222U (en) | Electrophoresis line hanger improves device | |
CN202881854U (en) | Support bracket for bridge construction | |
CN203100878U (en) | Framework for truck scale | |
CN203636302U (en) | Steel pipe flange assembling device | |
CN201195819Y (en) | Subsidence type concrete road vibrating beam | |
CN201850478U (en) | Adjustable template of base plate of ballastless track of special line for passenger traffic | |
CN105297615B (en) | A kind of method of suppression Suo Cheng bridge expanssion joint diseases | |
CN202730638U (en) | Mounting support | |
CN104652271B (en) | A kind of drag-line combination anchor block of Wavelike steel webplate cable-stayed bridge | |
CN210857802U (en) | Novel package post suspended structure | |
CN206219979U (en) | A kind of Double-joint expansion joint device for bridge | |
CN205821976U (en) | A kind of easy-to-mount high intensity overlapping beam slab | |
CN209307867U (en) | Framed bent and bracket | |
CN206827893U (en) | Generating set silencing case mounting tool | |
CN207510682U (en) | A kind of removable and alterable height tower for boarding ship | |
CN206783141U (en) | A kind of windproof stop device of gantry crane trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101208 Termination date: 20170330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |