CN201651576U - Straight bamboo reinforced bamboo compound tube - Google Patents

Straight bamboo reinforced bamboo compound tube Download PDF

Info

Publication number
CN201651576U
CN201651576U CN2010203026852U CN201020302685U CN201651576U CN 201651576 U CN201651576 U CN 201651576U CN 2010203026852 U CN2010203026852 U CN 2010203026852U CN 201020302685 U CN201020302685 U CN 201020302685U CN 201651576 U CN201651576 U CN 201651576U
Authority
CN
China
Prior art keywords
bamboo
straight
enhancement layer
reinforcing layer
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010203026852U
Other languages
Chinese (zh)
Inventor
钟坚瑜
陈文强
叶柃
朱刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Sike Environmental Co., Ltd.
Original Assignee
WUHU SHENGFULAN GLASS STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU SHENGFULAN GLASS STEEL CO Ltd filed Critical WUHU SHENGFULAN GLASS STEEL CO Ltd
Priority to CN2010203026852U priority Critical patent/CN201651576U/en
Application granted granted Critical
Publication of CN201651576U publication Critical patent/CN201651576U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/14Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Laminated Bodies (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a straight bamboo reinforced bamboo compound tube. The existing bamboo-plastic composite tube has the disadvantages of low axial strength, poor bending resistance and poor shear resistance and can not be applied in exposed, overhead or other places. The straight bamboo reinforced bamboo compound tube comprises an inner lining layer, a reinforcing layer and an outer protective layer in sequence from the inner to the outer along the tube diameter direction, and is characterized in that the reinforcing layer comprises an inner annular reinforcing layer, an axial reinforcing layer laid outside the inner annular reinforcing layer and an outer annular reinforcing layer arranged on the outermost part, the inner annular reinforcing layer and the outer annular reinforcing layer are formed by annular winding of more than one layer of continuous bamboo chips, the axial reinforcing layer comprises more than one layer of straight bamboo curtain, and straight bamboos in the straight bamboo curtains are arranged axially. The utility model has excellent axial bending resistance and axial shear resistance, and is particularly suitable for exposed, overhead or other places.

Description

Straight bamboo bar strengthens bamboo and manages again
Technical field
The utility model relates to the pipeline field, and specifically a kind of straight bamboo bar that is applied in the anticorrosion occasion of agricultural irrigation, water supply and sewage work and petrochemical industry strengthens bamboo and manages again.
Background technique
In water supply and sewage work and the anticorrosion occasion of petrochemical industry, used pipeline generally adopts polyvinyl chloride pipe, polyethylene pipe, Glass Steel Tube, glass reinforced plastic sand pipe etc. at present.Polyvinyl chloride pipe and polyethylene pipe light weight, smooth and corrosion-resistant, but deficiency and raw material are the composite of petroleum products to some extent rigidity and intensity aspect; Advantage corrosion-resistant, that intensity is high, fluid resistance is little, rigidity is big that Glass Steel Tube and glass reinforced plastic sand pipe have, but the reinforcing material of product is the glass fibre of high energy consumption, its used resin oil that places one's entire reliance upon, product and waste material are not recyclable, not environmental protection.Therefore use above-mentioned duct products, consumed the petroleum resources of a large amount of preciousnesses and caused environmental pollution.For this reason, a kind of bamboo-plastic combined pipe (be called for short bamboo manage again) occurred, but the multiple tubular axis of existing bamboo is to weak strength, bending resistance, shear behavior are poor, can not be fit to use occasion such as exposing or built on stilts.
The model utility content
Technical problem to be solved in the utility model is to overcome the defective that above-mentioned prior art exists, and provides a kind of straight bamboo bar to strengthen bamboo and manages again, and it makes it have excellent axial strength under the prerequisite of proof strength and rigidity.
For this reason, the utility model adopts following technological scheme: straight bamboo bar strengthens bamboo and manages again, the multiple pipe of bamboo is along the caliber direction, be followed successively by inside liner from inside to outside, enhancement layer and external protection coating, inside liner, enhancement layer and external protection coating are bonded as one by binder, it is characterized in that described enhancement layer comprises interior hoop enhancement layer, the outer axial enhancement layer and the outer hoop enhancement layer that is positioned at outermost of hoop enhancement layer in being laid on, in, outer hoop enhancement layer is entwined by many more than one deck continuous bamboo chip hoops, described axial enhancement layer is the above straight bamboo bar of curtain shape of one deck, and the straight bamboo bar in the straight bamboo bar of curtain shape axially is provided with.
The product that the utility model obtains is compared with polyvinyl chloride pipe, polyethylene pipe, has higher intensity, rigidity, has saved petroleum resources; Compare with Glass Steel Tube and glass reinforced plastic sand pipe, have similar strength and stiffness, it is lighter to compare matter, and cost is lower; Compare to the multiple pipe of the bamboo of twining or spiral twines with simple ring, possess excellent axial strength.
Above-mentioned straight bamboo bar strengthens bamboo and manages again, the length of the straight bamboo bar of curtain shape is at 0.3-3 rice, decide according to the pipeline inner diameter is different, the shortlyest be pipe one times of inner diameter, the outer perimeter of the multiple pipe of the width of the straight bamboo bar of curtain shape and bamboo matches, the straight bamboo bar of curtain shape is managed bamboo fully again coat, make the axial strength of the multiple pipe of bamboo excellent and consistent, according to the different bores of pipeline and the number of plies of usage requirement selection laying.
Above-mentioned straight bamboo bar strengthens bamboo manages again, according to the different pressure rating of pipeline, rigidity requirement, axial strength requirement, can lay the combination layer of a plurality of " axially enhancement layer (being the straight bamboo bar of curtain shape)+interior hoop enhancement layers ".
The utility model adopts continuous bamboo chip and straight bamboo bar as reinforcing material, and non-glass fiber or carbon fiber etc., environmental protection and cost are low; Owing to adopted straight bamboo bar axially to strengthen in the enhancement layer, can make pipeline possess good axial bending resistance, shear behavior, occasion such as be particularly suitable for exposing or built on stilts and use.
Below in conjunction with specification drawings and specific embodiments the utility model is elaborated.
Description of drawings
Fig. 1 makes the structural representation of product for the utility model embodiment 1.
Fig. 2 is the structural representation of the straight bamboo bar of the utility model curtain shape.
Fig. 3 makes the structural representation of product for the utility model embodiment 2.
Embodiment
Embodiment 1
With make diameter be the straight bamboo bar of 200mm axially to strengthen the multiple pipe of bamboo be example, concrete steps are as follows:
A) bamboo chip pretreatment:
Fresh mao bamboon is split into 5 meters long, that 0.7mm is thick, 10mm is wide bamboo chips, soaked 6 hours with 5%NaOH solution, water is rinsed well, after the drying, the mode of many bamboo chips with the front and back overlap joint, bonding with glue, form the above continual continuous bamboo chip that is as long as fifty meters, and be rolled onto on the reel stand-by;
Mao bamboon is split into long 1m is long, the straight bamboo bar of thick 5mm, wide 10mm, 66 straight bamboo bars are laterally closely lined up the bamboo curtain splint that width is 660-670mm, laterally closely join together, become the curtain straight bamboo bar of shape (as shown in Figure 2) with silk thread.
B) preparation of inside liner 1:
At external diameter is the thick polyester film of coating one deck 0.029mm on the steel straight tube mould of polishing of 200mm, with the vinyl ester resin and the fiberglass surfacing mat (30g/m of antiseptic property excellence 2) making thickness reaches the inside liner of 2mm on the straight tube mould;
C) winding working procedure (preparation of enhancement layer):
After treating that inside liner solidifies, 11 bamboos of spooling in advance are wrapped on the Stetch Wrapping Machine, after the debatching of bamboo volume, immerse and to soak into urea formaldehyde resin in the resin storage tank, entirely be wrapped in again on the straight tube mould, twine 1 layer in hoop enhancement layer 2, lay the straight bamboo bar 3 of curtain shape that one deck is made in advance in interior hoop enhancement layer outside, and scrape resin, and twine two outer hoop enhancement layers 4 more outside, reach the design thickness of 8mm; After winding finishes, pipeline is heated to 60 ℃ solidified 20 minutes, after resin crosslinks is solidified, become the same with thermosetting compound material of hard one, the enhancement layer of gained is the combination (as shown in Figure 1) of interior hoop enhancement layer 2, the straight bamboo bar 3 of curtain shape and outer hoop enhancement layer 4.
D) preparation of external protection coating 5:
At pipeline outside brushing one deck water-tight corrosion-proof epoxy resin preferably, thick about 0.5-1mm.
The pipeline that embodiment 1 produces is through hydraulic pressure test, and failure pressure reaches 4.2MPa in short-term, actual measurement total thickness 10.5mm, and rigidity reaches 45200N/m 2, hoop tension brute force reaches 420KN/m, and axially the tension brute force reaches 1180KN/m, is higher than the technical order of fiber reinforced plastic pipe.Real body material proportion is 0.87, is lower than the 1.8-2.1 of Glass Steel Tube.
Embodiment 2:
To make diameter is that the multiple pipe of bamboo of 300mm is an example, and concrete steps are as follows:
A) bamboo chip pretreatment:
Fresh mao bamboon is split into 5 meters long, that 1.3mm is thick, 14mm is wide thin bamboo strips used for weavings, soaked 8 hours for 60 ℃ with 8%NaOH solution, water is rinsed well, after the drying, the mode of many thin bamboo strips used for weavings with the front and back overlap joint, bonding with glue, form the above continual continuous bamboo chip that is as long as fifty meters, and be rolled onto on the reel stand-by;
Mao bamboon is split into long 1.2m is long, the straight bamboo bar of thick 6mm, wide 12mm, 97 straight bamboo bars are laterally closely lined up the bamboo curtain splint that width is 980-990mm, laterally closely join together, become the curtain straight bamboo bar of shape (as shown in Figure 2) with silk thread.
B) preparation of inside liner:
At external diameter is the thick polyester film of coating one deck 0.029mm on the steel straight tube mould of polishing of 300mm, with food level resin and terylene surface felt (30g/m 2) making thickness reaches the inside liner of 2mm on the straight tube mould.
C) winding working procedure:
After treating that inside liner solidifies, the 13 volume bamboos of spooling in advance are wrapped on the Stetch Wrapping Machine, after the debatching of bamboo volume, immerse and soak into unsaturated polyester resin in the resin storage tank, entirely be wrapped on the straight tube mould again, hoop enhancement layer 2 in twining 1 layer, after laying the straight bamboo bar 3 of one deck curtain shape, twine two layers in hoop enhancement layer 2, re-lay the straight bamboo bar 3 of one deck curtain shape, twine two outer hoop enhancement layers 4 again, reach the design thickness (as shown in Figure 3) of 20mm; After winding finished, the thick polyester film of the coated one deck 0.029mm of outermost made the body appearance smooth.Solidifying 60 minutes more than 20 ℃, after resin crosslinks is solidified, becoming the same with thermosetting compound material of hard one.
D) preparation of external protection coating:
At pipeline outside brushing one deck water-tight corrosion-proof vinyl ester resin preferably, thick about 0.5mm.
The pipeline that embodiment 2 produces is through hydraulic pressure test, and failure pressure reaches 6.5MPa in short-term, actual measurement total thickness 23mm, and actual measurement rigidity reaches 103500N/m 2, hoop tension brute force reaches 928KN/m, and axially the tension brute force reaches 1542KN/m, is higher than the technical order of fiber reinforced plastic pipe.Actual measurement body material proportion is 0.84, is lower than the 1.8-2.1 of Glass Steel Tube.
The above only is preferred embodiment of the present utility model, is not the technical solution of the utility model is done any pro forma restriction.Every foundation essence of the present utility model all falls in the protection domain of the present utility model any simple modification, equivalent variations and modification that above embodiment did.

Claims (3)

1. straight bamboo bar strengthens bamboo and manages again, the multiple pipe of bamboo is along the caliber direction, be followed successively by inside liner, enhancement layer and external protection coating from inside to outside, it is characterized in that described enhancement layer comprise in the hoop enhancement layer, be laid in the outer axial enhancement layer of hoop enhancement layer and be positioned at the outer hoop enhancement layer of outermost, inner and outer rings is entwined by many more than one deck continuous bamboo chip hoops to enhancement layer, described axial enhancement layer is the above straight bamboo bar of curtain shape of one deck, and the straight bamboo bar in the straight bamboo bar of curtain shape axially is provided with.
2. straight bamboo bar according to claim 1 strengthens bamboo manages again, and the length that it is characterized in that the straight bamboo bar of described curtain shape is at 0.3-3 rice, and the straight bamboo bar of curtain shape is outside it radially is coated on interior hoop enhancement layer.
3. straight bamboo bar according to claim 1 and 2 strengthens bamboo manages again, and the combination layer of hoop enhancement layer and axially enhancement layer formation is more than one in it is characterized in that.
CN2010203026852U 2010-02-09 2010-02-09 Straight bamboo reinforced bamboo compound tube Expired - Fee Related CN201651576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010203026852U CN201651576U (en) 2010-02-09 2010-02-09 Straight bamboo reinforced bamboo compound tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010203026852U CN201651576U (en) 2010-02-09 2010-02-09 Straight bamboo reinforced bamboo compound tube

Publications (1)

Publication Number Publication Date
CN201651576U true CN201651576U (en) 2010-11-24

Family

ID=43116816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010203026852U Expired - Fee Related CN201651576U (en) 2010-02-09 2010-02-09 Straight bamboo reinforced bamboo compound tube

Country Status (1)

Country Link
CN (1) CN201651576U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103240783A (en) * 2013-05-27 2013-08-14 白建国 Production method of recombined bamboo pipe
CN103448108A (en) * 2013-09-13 2013-12-18 苏州天健竹业科技有限公司 Preparation method for side pressure bamboo pipe of bicycle and bicycle
CN103659989A (en) * 2012-09-26 2014-03-26 苏州天健竹业科技有限公司 Method for manufacturing novel, energy-saving and environmental-friendly bicycle pipe support components through bamboo pressing panels
WO2015067164A1 (en) * 2013-11-07 2015-05-14 浙江鑫宙竹基复合材料科技有限公司 Thermosetting bamboo sand composite pressure pipe
CN104948848A (en) * 2015-05-11 2015-09-30 杭州金培科技有限公司 Energy-saving and environment-friendly composite tube and manufacturing method thereof
CN105371006A (en) * 2015-11-27 2016-03-02 中国海洋石油总公司 Novel pipe section for seawater lifting of offshore oil platform and manufacturing method of novel pipe section
CN105415475A (en) * 2015-12-28 2016-03-23 南京林业大学 Manufacturing method of continuous long bamboo round pipe
CN105715881A (en) * 2016-04-13 2016-06-29 浙江鑫宙竹基复合材料科技有限公司 Ultra-large-diameter bamboo winding composite tube and manufacturing method thereof
CN105715882A (en) * 2016-04-15 2016-06-29 浙江鑫宙竹基复合材料科技有限公司 Small-caliber bamboo winding composite pipe and manufacturing method thereof
WO2016110139A1 (en) * 2015-01-09 2016-07-14 浙江鑫宙竹基复合材料科技有限公司 Thermosetting type bamboo wood composite tube
CN106393828A (en) * 2015-08-06 2017-02-15 苏州可汗极米科技有限公司 Natural fiber composite tube and processing method thereof
CN108131504A (en) * 2018-02-09 2018-06-08 安徽华奇管业有限公司 A kind of superpower measuring body bamboo with bell socket slights spiral composite pipe
CN108278424A (en) * 2018-02-09 2018-07-13 安徽华奇管业有限公司 A kind of resistance to bean curd stick of antibacterial with bell socket winds composite pressure pipe
CN108758104A (en) * 2018-06-14 2018-11-06 江苏环宇建设工程有限公司 Concrete clad structure of natural gas line and preparation method thereof
RU2686966C1 (en) * 2015-09-08 2019-05-06 Чжэцзян Синьчжоу Бамбу-Бэйсд Компосайтс Технолоджи Ко., Лтд Assembly gallery of composite bamboo pipes

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103659989A (en) * 2012-09-26 2014-03-26 苏州天健竹业科技有限公司 Method for manufacturing novel, energy-saving and environmental-friendly bicycle pipe support components through bamboo pressing panels
CN103240783A (en) * 2013-05-27 2013-08-14 白建国 Production method of recombined bamboo pipe
CN103448108A (en) * 2013-09-13 2013-12-18 苏州天健竹业科技有限公司 Preparation method for side pressure bamboo pipe of bicycle and bicycle
WO2015067164A1 (en) * 2013-11-07 2015-05-14 浙江鑫宙竹基复合材料科技有限公司 Thermosetting bamboo sand composite pressure pipe
RU2650008C2 (en) * 2013-11-07 2018-04-06 Чжэцзян Синьчжоу Бамбу-Бэйсд Компосайтс Технолоджи Ко., Лтд Thermo-efficient composite bamboo-sand tube of high pressure
US9903513B2 (en) 2013-11-07 2018-02-27 Zhejiang Xinzhou Bamboo-Based Composites Technology Co., Ltd. Thermosetting bamboo sand composite pressure pipe
JP2016539298A (en) * 2013-11-07 2016-12-15 浙江▲きん▼宙竹基▲複▼合材料科技有限公司 Thermosetting bamboo sand composite pressure tube
WO2016110139A1 (en) * 2015-01-09 2016-07-14 浙江鑫宙竹基复合材料科技有限公司 Thermosetting type bamboo wood composite tube
CN104948848B (en) * 2015-05-11 2017-05-10 安徽蓝通科技股份有限公司 Energy-saving and environment-friendly composite tube and manufacturing method thereof
CN104948848A (en) * 2015-05-11 2015-09-30 杭州金培科技有限公司 Energy-saving and environment-friendly composite tube and manufacturing method thereof
CN106393828A (en) * 2015-08-06 2017-02-15 苏州可汗极米科技有限公司 Natural fiber composite tube and processing method thereof
RU2686966C1 (en) * 2015-09-08 2019-05-06 Чжэцзян Синьчжоу Бамбу-Бэйсд Компосайтс Технолоджи Ко., Лтд Assembly gallery of composite bamboo pipes
CN105371006A (en) * 2015-11-27 2016-03-02 中国海洋石油总公司 Novel pipe section for seawater lifting of offshore oil platform and manufacturing method of novel pipe section
CN105371006B (en) * 2015-11-27 2017-09-22 中海油能源发展股份有限公司 A kind of manufacture method for the new pipeline section of offshore platform seawater lift
CN105415475A (en) * 2015-12-28 2016-03-23 南京林业大学 Manufacturing method of continuous long bamboo round pipe
WO2017177708A1 (en) * 2016-04-13 2017-10-19 浙江鑫宙竹基复合材料科技有限公司 Ultra-large-diameter bamboo-wound composite tube and manufacturing method thereof
CN105715881A (en) * 2016-04-13 2016-06-29 浙江鑫宙竹基复合材料科技有限公司 Ultra-large-diameter bamboo winding composite tube and manufacturing method thereof
WO2017177709A1 (en) * 2016-04-15 2017-10-19 浙江鑫宙竹基复合材料科技有限公司 Small-diameter bamboo-wound composite tube and manufacturing method thereof
CN105715882A (en) * 2016-04-15 2016-06-29 浙江鑫宙竹基复合材料科技有限公司 Small-caliber bamboo winding composite pipe and manufacturing method thereof
CN108131504A (en) * 2018-02-09 2018-06-08 安徽华奇管业有限公司 A kind of superpower measuring body bamboo with bell socket slights spiral composite pipe
CN108278424A (en) * 2018-02-09 2018-07-13 安徽华奇管业有限公司 A kind of resistance to bean curd stick of antibacterial with bell socket winds composite pressure pipe
CN108758104A (en) * 2018-06-14 2018-11-06 江苏环宇建设工程有限公司 Concrete clad structure of natural gas line and preparation method thereof

Similar Documents

Publication Publication Date Title
CN201651576U (en) Straight bamboo reinforced bamboo compound tube
CN101947803A (en) Method for preparing straight bamboo splint reinforced bamboo composite pipe
CN101571213B (en) Preparing method of bamboo fiber winding composite tube
CN101532592B (en) Environmental protection glass-reinforced plastic pipe and production method thereof
CN202327397U (en) Bamboo composite pressure pipe
CN203604828U (en) Thermosetting type bamboo-sand composite pressure tube
CN105546230B (en) A kind of stalk bamboo coiled composite tube and preparation method thereof
CN204493928U (en) A kind of thermosetting bamboo wood composite pipe
CN201434160Y (en) Bamboo fiber winding composite pipe
CN105715881B (en) A kind of the bamboo coiled composite tube and its manufacturing method of super large caliber
CN105715882B (en) A kind of small-bore bamboo coiled composite tube and its manufacturing method
CN205350604U (en) Compound pipe of straw bamboo winding
CN104089105B (en) The preparation method of bamboo sand coiled composite tube
CN104896211B (en) High-performance wood base composite pressure delivery pipe and preparation method
CN105508809A (en) Lining layer of bamboo-wound composite pipe and preparation method thereof
US10215312B2 (en) Hemp-winding composite pipe
CN104260422B (en) Wood base composite pipe and preparation method
CN108749024A (en) A kind of preparation method of bamboo fiber winding composite tube
CN205578941U (en) Small -bore compound pipe of bamboo winding
CN205578938U (en) Compound pipe of bamboo winding of super large bore
CN205578932U (en) Compound pipe of straw winding
CN206112307U (en) A bamboo winding composite pipe for sea water is carried
CN215635483U (en) Bamboo-wood composite winding pipe
CN206154787U (en) Bamboo winding composite product
CN108119719A (en) A kind of preparation method of bamboo winding composite elbow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANGZHOU SIKE ENVIRONMENTAL CO., LTD.

Free format text: FORMER OWNER: WUHU SHENGFULAN GLASS STEEL CO., LTD.

Effective date: 20110427

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 241000 SHENDONG INDUSTRIAL PARK, ZHESHAN EAST ROAD, WUHU CITY, ANHUI PROVINCE TO: 310012 ROOM 1302, NO. 387 (JINGUI BUILDING), GUDUN ROAD, XIHU DISTRICT, HANGZHOU CITY, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110427

Address after: 310012, room 1302, tower 387, ancient Pier Road, Hangzhou, Zhejiang, Xihu District

Patentee after: Hangzhou Sike Environmental Co., Ltd.

Address before: 241000 Anhui Province, Wuhu City Industrial Park zhe Shan Dong Lu Shendong

Patentee before: Wuhu Shengfulan Glass Steel Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101124

Termination date: 20110209