CN201649105U - Slope bracing structure of large-span foundation pit or foundation trench - Google Patents

Slope bracing structure of large-span foundation pit or foundation trench Download PDF

Info

Publication number
CN201649105U
CN201649105U CN2010201843276U CN201020184327U CN201649105U CN 201649105 U CN201649105 U CN 201649105U CN 2010201843276 U CN2010201843276 U CN 2010201843276U CN 201020184327 U CN201020184327 U CN 201020184327U CN 201649105 U CN201649105 U CN 201649105U
Authority
CN
China
Prior art keywords
slope
foundation
anchor pole
foundation trench
retaining structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201843276U
Other languages
Chinese (zh)
Inventor
黄成友
宋明健
黄会军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN2010201843276U priority Critical patent/CN201649105U/en
Application granted granted Critical
Publication of CN201649105U publication Critical patent/CN201649105U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a slope bracing structure of a large-span foundation pit or foundation trench, which can greatly reduce the construction cost of the slope bracing structure of the foundation pit or the foundation trench, and comprises a slope soil body and filling concrete covering on a slope, wherein the filling concrete and the slope soil body are fastened by an anchor rod; an anchor section of the anchor rod is positioned in the slope soil body, and a free section thereof is positioned in the filling concrete; the free section of the anchor rod is provided with a supporting body which comprises a steel bar barricade connected with the anchor rod, and an L-shaped steel bar fixing frame connected with the anchor rod; the free ends of the two adjacent anchor rods are connected by longitudinal connecting steel bars 7 which are two in number; and a concrete anchoring agent of the anchoring section is microdilatancy cement. The slope bracing structure effectively prevents the dip slip of the filling concrete, has high construction efficiency, saves construction cost and is especially applicable to the slope bracing of the large-span foundation pit or foundation trench.

Description

Big span foundation ditch or foundation trench slope retaining structure
Technical field
The utility model relates to building field, relates in particular to a kind of big span foundation ditch or foundation trench slope retaining structure.
Background technology
In industry and civilian construction, often need to lay such as underground structures such as cable tunnel, waste water vestibule, Equipment Foundations, this just needs excavation pit or foundation trench, influence construction speed and personal security for preventing the distortion of foundation ditch or foundation trench slope soil or tumbling, side slope is typically provided with the safe construction that filling concrete sliding masses guarantees structure in foundation ditch or the foundation trench.But in the frictional force of slope soil and concrete sliding masses hour, the concrete sliding masses on the side slope also produces slippage even topples over along side slope easily, has a strong impact on safety of construction in foundation ditch or the foundation trench.At present, in the foundation ditch or the work of foundation trench slope retaining of big span, the reinforcement measure of concrete sliding masses is generally in the concrete sliding masses inboard reinforced bar support frame is set, as shown in Figure 1, need on the filling concrete, built-in fitting be set, squeeze into the bar reinforcement earth anchor in foundation trench bottom, as support, and need according to circumstances the bracing frame that does not highly wait is set in a plurality of positions with shaped steel, these reinforcing bars, shaped steel all can't reclaim after finishing construction, the material cost height of this method, the cycle is longer, and is time-consuming.
The utility model content
The technical problem that the utility model solved is, provides that a kind of cost is low, the big span foundation ditch of easy construction or foundation trench slope retaining structure.
The technical solution adopted in the utility model is, big span foundation ditch or foundation trench slope retaining structure comprise slope soil, are covered in the filling concrete on the side slope, and filling concrete and slope soil are fastening with anchor pole, the anchoring section of anchor pole is arranged in slope soil, and the free section of anchor pole is arranged in fills concrete.
The free section of described anchor pole is provided with supporter.
Described supporter comprises the reinforcing bar split heads that is connected with anchor pole.
Described supporter comprises the L shaped reinforcing bar fixed mount that is connected with anchor pole.
Be connected with vertical connecting reinforcement 7 between the free end of adjacent two anchor poles.
Vertically connecting reinforcement is two,
The cement anchoring agent of described anchoring section is a micro-expansion cement.
The beneficial effects of the utility model are, effectively prevent to fill the cunning of inclining of concrete, and the efficiency of construction height has been saved construction cost.
Description of drawings
Fig. 1 is existing big span foundation ditch or foundation trench slope retaining structure.
Fig. 2 is big span foundation ditch of the present utility model or foundation trench slope retaining structure.
Fig. 3 is an A part enlarged drawing among Fig. 2.
Fig. 4 distributes and the annexation partial schematic diagram for anchor pole.
Be labeled as among the figure: the 1-slope soil, 2-fills concrete, 3-anchor pole, 5-reinforcing bar split heads, 6-reinforcing bar fixed mount, the vertical connecting reinforcement of 7-, 8-cement anchoring agent.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.
Big span foundation ditch of the present utility model or foundation trench slope retaining structure, comprise slope soil 1, be covered in the filling concrete 2 on the side slope, it is fastening with anchor pole 3 with slope soil 1 to fill concrete 2, and the anchoring section of anchor pole 3 is arranged in slope soil 1, and the free section of anchor pole 3 is arranged in fills concrete 2.As shown in Figure 2, anchor pole 3 will be filled concrete 2 and will be connected as a single entity with slope soil 1, effectively prevent to fill the landing of concrete 2 or topple over, and ensure the smooth and safety of construction.
After excavation slope, needs according to field condition are holed on slope soil 1, insert anchor pole 3 then, in the hole, inject cement anchoring agent 8, fixing anchor bar 3 props up the filling concrete form then, builds and fills concrete 2, so just finished the construction of big span foundation ditch or foundation trench slope retaining structure, removed the filling concrete form then and can carry out structure construction in foundation ditch or the foundation trench.Wherein anchor pole 3 insertion depths can calculate as the case may be, are generally about 10 meters, if adopt anchor cable, then to be generally be about 15 meters to insertion depth, and the insertion angle of anchor pole 3 also draws as calculated according to concrete field condition difference.The interval of adjacent anchor pole 3 is generally about 3 meters.The utility model has adopted lower-cost anchor pole 3 or anchor cable to carry out slope retaining, for big span slope retaining structure construction, with respect to the slope retaining structure that needed a large amount of reinforcing bars, earth anchor, shaped steel to support in the past, construction materials cost significantly reduces, and the efficiency of construction height helps advancing the progress of whole engineering.
The free section of described anchor pole 3 is provided with supporter.Finish in the hole of slope soil 1 inject cement anchoring agent 8 after, supporter is installed.As shown in Figure 3, supporter plays support, reinforcement effect to anchor pole 3, builds that the free section to anchor pole supports, protects in the process filling concrete 2, and anchor pole 3 is better combined with filling concrete 2.Simultaneously, fill concrete 2 and build the back supporter that finishes and also be combined as a whole, and supporter also is connected with anchor pole 3, increased anchor pole 3 and filled the steadiness of the combination of concrete 2, make filling concrete 2 be connected more firm with slope soil 1 with filling concrete 2.Described supporter comprises the reinforcing bar split heads 5 that is connected with anchor pole 3.Reinforcing bar split heads 5 can adopt common a few font split heads, and reinforcing bar split heads 5 can also can bundle with rope for welding with the connected mode of anchor pole 3.As another embodiment of the utility model, described supporter comprises the L shaped reinforcing bar fixed mount 6 that is connected with anchor pole 3.Reinforcing bar fixed mount 6 can be weldingly connected with anchor pole 3, also can be by binding.Above-mentioned embodiment can independently separately be implemented also can implement simultaneously, simultaneously the better effects if of Shi Shiing.
Be connected with vertical connecting reinforcement 7 between the free end of adjacent two anchor poles 3.After the installation of the supporter of finishing anchor pole 3, carry out the installation of vertical connecting reinforcement 7, as shown in Figure 4, vertically adjacent anchor pole 3 is welded or is bundled at the two ends of connecting reinforcement 7 respectively, vertical connecting reinforcement 7 between a plurality of anchor poles 3 just constitutes the net structure of a plurality of tie points, after filling concrete 2 was built and finished, netted a plurality of vertical connecting reinforcement 7 and the anchor pole 3 that links to each other thereof just were combined as a whole with filling concrete 2, made 3 pairs of carryings of filling concrete 2 of anchor pole more firm.
The cement anchoring agent 8 of described anchoring section is a micro-expansion cement.Use micro-expansion cement can strengthen the bonding rubbing action of anchor pole 3 and slope soil 1, obtain better anchoring effect.

Claims (7)

1. big span foundation ditch or foundation trench slope retaining structure, comprise slope soil (1), be covered in the filling concrete (2) on the side slope, it is characterized in that: filling concrete (2) is fastening with anchor pole (3) with slope soil (1), the anchoring section of anchor pole (3) is arranged in slope soil (1), and the free section of anchor pole (3) is arranged in fills concrete (2).
2. big span foundation ditch as claimed in claim 1 or foundation trench slope retaining structure is characterized in that: the free section of described anchor pole (3) is provided with supporter.
3. big span foundation ditch as claimed in claim 2 or foundation trench slope retaining structure is characterized in that: described supporter comprises the reinforcing bar split heads (5) that is connected with anchor pole (3).
4. big span foundation ditch as claimed in claim 2 or foundation trench slope retaining structure is characterized in that: described supporter comprises the L shaped reinforcing bar fixed mount (6) that is connected with anchor pole (3).
5. big span foundation ditch as claimed in claim 1 or foundation trench slope retaining structure is characterized in that: be connected with vertical connecting reinforcement (7) between the free end of adjacent two anchor poles (3).
6. big span foundation ditch as claimed in claim 5 or foundation trench slope retaining structure is characterized in that: vertically connecting reinforcement (7) is two.
7. big span foundation ditch as claimed in claim 1 or foundation trench slope retaining structure is characterized in that: the cement anchoring agent of described anchoring section (8) is a micro-expansion cement.
CN2010201843276U 2010-05-10 2010-05-10 Slope bracing structure of large-span foundation pit or foundation trench Expired - Lifetime CN201649105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201843276U CN201649105U (en) 2010-05-10 2010-05-10 Slope bracing structure of large-span foundation pit or foundation trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201843276U CN201649105U (en) 2010-05-10 2010-05-10 Slope bracing structure of large-span foundation pit or foundation trench

Publications (1)

Publication Number Publication Date
CN201649105U true CN201649105U (en) 2010-11-24

Family

ID=43114333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201843276U Expired - Lifetime CN201649105U (en) 2010-05-10 2010-05-10 Slope bracing structure of large-span foundation pit or foundation trench

Country Status (1)

Country Link
CN (1) CN201649105U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425180A (en) * 2011-12-17 2012-04-25 梅东亮 Construction process of gun machine for steel pipes or shaped steel
CN111828087A (en) * 2020-06-15 2020-10-27 安徽马钢矿业资源集团建材科技有限公司 Iron tailing comprehensive treatment method based on mine restoration

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425180A (en) * 2011-12-17 2012-04-25 梅东亮 Construction process of gun machine for steel pipes or shaped steel
CN111828087A (en) * 2020-06-15 2020-10-27 安徽马钢矿业资源集团建材科技有限公司 Iron tailing comprehensive treatment method based on mine restoration
CN111828087B (en) * 2020-06-15 2022-06-07 安徽马钢矿业资源集团建材科技有限公司 Iron tailing comprehensive treatment method based on mine restoration

Similar Documents

Publication Publication Date Title
CN107849917B (en) Tunnel construction method using advance support and lag support and device suitable for same
CN101936170B (en) Cavern arch mould spraying concrete construction structure and process
CN102330432A (en) Panel-type framework prestressed anchor rod flexible support structure and construction method thereof
CN104653198B (en) Method for filling and constructing foam concrete in coal mine soft rock largely-deformed roadway supporter
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN109235490B (en) Retaining wall and construction method thereof
US20150086278A1 (en) Systems and methods to reinforce excavation walls
CN105421468A (en) Basement support without concrete diagonal brace
CN110847195A (en) Construction method for stable treatment of side and upward slope of large-block-diameter loose rock pile body opening
CN102797486A (en) Fabricated grilling anti-invert method for treating pucking
CN107905124A (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN112252342A (en) Steel wire grid net protection and construction method for rock slope broken rock mass
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
CN109914422A (en) A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN201649105U (en) Slope bracing structure of large-span foundation pit or foundation trench
CN106917358B (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN206233249U (en) Complicated precipitous precipice depth side slope comprehensive support structure
CN203741848U (en) Steel tube plate type retaining structure
CN105970992B (en) Large section high inclination-angle tunnel type pile foundation construction process
CN201605588U (en) Structure for reinforcing and fixing slope surface of prestress anchoring frame beam
CN105156111B (en) The method for protecting support of high working face lane formula filling Striping noise
CN203846399U (en) Combined type rock anchor with buckling anchor system
CN105178355A (en) Stratum pre-reinforcement treatment method for underground space construction
CN108755701A (en) The construction method of the support construction of deep basal pit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110318

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617023 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110318

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: China 19th Metallurgical Corporation

Address before: 617023 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC Shijiu Construction Co., Ltd.

Effective date of registration: 20110318

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: China 19th Metallurgical Corporation

Address before: 617023 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC Shijiu Construction Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20101124