Invention content
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that provide a kind of large section
High inclination-angle tunnel type pile foundation construction process, processing step is simple, reasonable design, input cost are low and easy construction, uses effect
Fruit is good, and energy is easy, the work progress of tunnel type pile foundation is rapidly completed, and work progress is easily controllable.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of large section high inclination-angle tunnel type stake
Base construction technology, it is characterised in that:Constructed pile foundation is reinforced concrete pile, and the stake hole of the reinforced concrete pile is broken for super large
Face high inclination-angle Tunnel, the cross sectional area of the large section high inclination-angle Tunnel are more than 100m2And its inclination angle is more than 45 °;
When constructing to constructed pile foundation, include the following steps:
Step 1: stake hole is constructed, process is as follows:
Step 101, barrel vault advanced support construction:To carrying out barrel vault advanced support construction at the top of the stake hole, constructed
Molding barrel vault advanced support structure;
Step 102, hole protection:Entrance construction hole supporting construction in the stake hole;
Step 103, the wide open excavation construction of stake:Using full face tunneling method, from top to bottom divide multiple construction segments to being constructed
The stake hole of pile foundation carries out excavation construction, includes the following steps:
Step 1031, initial construction segment is excavated and supporting construction:Using drilling and blasting method from top to bottom to the first of the stake hole
Begin construction segment progress excavation construction, and carries out supporting using the split molding stake hole segment of digging of tunneling boring supporting construction;
Construction segment of the initial construction segment to be located at topmost in multiple construction segments;
Step 1032, next construction segment is excavated and supporting construction:According to the method described in step 1031, to described
Next construction segment in stake hole is excavated and supporting construction;
Step 1032 is repeated several times in step 1033, until completing the excavation of all construction segments and supporting in the stake hole
Work progress obtains the stake hole that construction is completed;
Step 2: pile body is constructed:It constructs to the pile body of the reinforced concrete pile, process is as follows:
Step 201, steel reinforcement cage binding:In the stake hole that excavation construction is completed in step 1, from the bottom to top to described
Steel reinforcement cage is bound;
Step 202, filling concrete:After the completion for the treatment of the steel reinforcement cage binding, it is perfused from the bottom to top into the stake hole mixed
Solidifying soil;After institute's concrete perfusion final set, the work progress of pile foundation of constructing is completed.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:Construction segment described in step 103
Length is 0.5m~1.5m;
Hole supporting construction described in step 102 is annular shield wall, the annular shield wall for cast-in-place concrete wall and
It is located on the inside of the barrel vault advanced support structure;The depth that the annular shield wall enters the stake hole is 1m~3m.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:Tunneling boring branch described in step 1031
Protection structure is tunneling boring supporting rack and shotcrete combined retaining structure;
The tunneling boring supporting rack includes the tunneling boring branch being supported in the segment of the stake hole with shotcrete combined retaining structure
Support, the anchor pole group reinforced to the inner wall of stake hole segment and injection are sprayed in the concrete on the inner wall of stake hole segment
Layer is penetrated, the inner end of the anchor pole group and the tunneling boring supporting rack are both secured in the concrete ejection layer;
The quantity of the tunneling boring supporting rack is one or more, and multiple tunneling boring supporting racks are along stake hole segment
Length direction from top to bottom lay;An anchor pole group is laid on the outside of each tunneling boring supporting rack;It is described
The quantity of tunneling boring supporting rack is identical with the quantity of the anchor pole group;The ring support of the tunneling boring supporting rack and its shape with
The transverse shape of stake hole segment is identical, and the anchor pole group includes the inside contour line more along the tunneling boring supporting rack
The anchor pole laid from front to back, the more anchor poles are laid on the same cross section of stake hole segment;It is described complete disconnected
Face supporting rack and the perpendicular laying of length direction in the stake hole.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:The tunneling boring supporting rack is with laying
The more anchor poles on the outside of it are laid on same plane;The inner end of the more anchor poles is fixed in the anchor pole group
On the same tunneling boring supporting rack.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:In step 1 in the work progress of stake hole,
Need to also from top to bottom lay anchor cable group in multiple holes in the stake hole, in neighbouring two holes between anchor cable group between
Away from for 3.5m~4.5m;Anchor cable group is in parallel laying with the tunneling boring supporting rack in each hole;
Anchor cable group includes the anchor cable that multiple tracks is laid on the same cross section of stake hole segment in each hole.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:Multiple construction sections in step 103
Duan Juncheng horizontal layouts;
When from top to bottom carrying out excavation construction to the initial construction segment in the stake hole using drilling and blasting method in step 1031, open
It is in horizontal layout to dig section.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:The hole of stake hole described in step 101
In side slope;
The stake hole is from top to bottom divided into top excavation section, middle part excavation section and lower part excavation section;
The top excavation section, middle part excavation section and lower part excavation section be from top to bottom divided into it is multiple it is described construction segments into
Row excavation construction;
The excavated section of the top excavation section from top to bottom gradually increases, and the excavated section of the middle part excavation section is by upper
To lower all same, the excavated section of the lower part excavation section is from top to bottom gradually reduced.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:The hole of stake hole described in step 101
In side slope;The length direction in the barrel vault advanced support structure along the stake hole is laid and its length and the stake hole
Length it is consistent, the barrel vault advanced support structure be located at the stake hole arch carry out supporting supporting construction;
When barrel vault advanced support construction is carried out in step 101, applied according to conventional barrel vault advanced support construction method
Work;
The length direction in barrel vault advanced support structure along the stake hole is laid and its length is consistent with the length in stake hole;
The barrel vault advanced support structure includes the guidings wall being laid on side slope surface, is laid in guiding arch-shaped steel frame within the walls, is more
The pipe canopy pipe and multiple guide pipes that the pipe canopy pipe is oriented to more respectively that root is squeezed into from the front to the back in side slope, it is described to lead
It is located at the top outer in stake hole to wall;Multiple guide pipes are installed on arch-shaped steel frame, and multiple guide pipes are along arch
The center line of steelframe is laid from left to right, and multiple guide pipes are laid on same plane;The arch-shaped steel frame
With the perpendicular laying of length direction in stake hole;The guiding wall is concrete walls;
The length of the more pipe canopy pipes is consistent with the longitudinal length in stake hole;The outer limb of the more pipe canopy pipes is
1 °~3 °, the guide pipe that the every pipe canopy Guan Junyu is oriented to it is laid in coaxial;
The support pier that left and right two supports respectively for two arch springings of arch-shaped steel frame, the support are provided in the side slope
Pier is concrete support pier;
Hole supporting construction described in step 102 is annular shield wall, the annular shield wall for cast-in-place concrete wall and
It is located on the inside of the barrel vault advanced support structure;The depth that the annular shield wall enters the stake hole is 1m~3m, described
Annular shield wall is poured with two support piers and is integrated, and the annular shield wall is divided into top by two support piers
Wall and the lower wall body below the upper wall body.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:The wide open digging of stake is carried out in step 103 to apply
Before work, a hanging apparatus need to be also laid on the outside of the hole in the stake hole;
When from top to bottom carrying out excavation construction to the initial construction segment in the stake hole using drilling and blasting method in step 1031, mistake
Journey is as follows:
Step I, brill are quick-fried:First using drilling device and the excavated section currently constructed on drill through blasthole, then boring
Powder charge in blasthole is taken, detonates after the completion of powder charge and carries out explosion;
Step II, muck removal, include the following steps:
Step II -1, excavator lifting are in place:Excavator is lifted to what is currently constructed using the hanging apparatus and is opened
It digs on section;
Step II -2, hopper lifting muck removal:Hopper is lifted to the excavation currently constructed using the hanging apparatus and is broken
After on face, the quarrel stone generated after explosion is packed into the hopper using excavator described in step II -1, then hangs described in using
The hopper equipped with quarrel stone is hung on the outside of the hole in the stake hole by assembling device;
Step II -2 are repeated several times in step II -3, the muck removal process of produced quarrel stone after completing step I borehole blasting.
Above-mentioned large section high inclination-angle tunnel type pile foundation construction process, it is characterized in that:The hanging apparatus is gantry crane;
The hole of stake hole described in step 101 is located in side slope;
The stake hole is from top to bottom divided into top excavation section, middle part excavation section and lower part excavation section;
The top excavation section, middle part excavation section and lower part excavation section be from top to bottom divided into it is multiple it is described construction segments into
Row excavation construction;
The excavated section of the top excavation section from top to bottom gradually increases, and the excavated section of the middle part excavation section is by upper
To lower all same, the excavated section of the lower part excavation section is from top to bottom gradually reduced;
Multiple construction segments are in horizontal layout in step 103;
When from top to bottom carrying out excavation construction to the initial construction segment in the stake hole using drilling and blasting method in step 1031, open
It is in horizontal layout to dig section;
Step 103 carry out the wide open excavation construction of stake during, need to also the stake hole close to the side of the hanging apparatus by
It is excavated under, and excavates and to form super excavation area;
It is connected inside the super excavation area and the stake hole and its lateral wall is vertical side walls.
Compared with the prior art, the present invention has the following advantages:
1st, processing step is simple, reasonable design and input cost are low.
2nd, used tunneling boring supporting construction is simple, reasonable design and easy construction, using effect are good, while adds hole
Interior anchor cable group, tunneling boring supporting construction form closed strong supporting system with anchor cable group in hole, can effectively solve weak surrounding rock certainly
Body can not form the problem of stable support system, while change conventional tunnel and reach country rock homeostasis again by preliminary bracing
The excavation technology excavated realizes foundation level full face tunneling.
3rd, it is realized by anchor cable group in multiple holes and external support is changed into internal cable support in the form of anchor cable, greatly greatly
The big work surface of excavation construction, rotates muck removal construction for excavator and provides work surface, and it is horizontal to improve mechanized construction, greatly
Big accelerate excavates operation process.Meanwhile using the tunneling boring supporting rack and steel fiber shotcrete of closing cyclization, to improve
The excavation stability of single-pile foundation, greatly reduces construction risk.
4th, used excavation technology step is simple, reasonable design and easy construction, construction efficiency are high, construction effect is good,
Using full face tunneling mode, and excavated section realizes foundation level full face tunneling, it is big to excavate difficulty in horizontal layout
Width reduces.Thus, the present invention summarizes that an excavation method is simple, it is convenient to realize and has with traditional New Austrian Tunneling Method compared with significantly excellent
The horizontal full face tunneling method of gesture is realized easy.
5th, used hanging apparatus is simple in structure, reasonable design and is dismounted easily, is easy to use, using effect
It is good, it can realize the vertical transport of quarrel stone, reinforcing bar etc., propose vertical lifting muck removal mode, can effectively solve super large inclination angle single pile base
Plinth is constructed, and medium-and-large-sized machinery can not be passed in and out normally, working space is narrow, have bad luck the problem of quarrel stone is difficult, breach traditional rail fortune
Output quarrel construction technology, elevating mechanism utilization rate, improves construction efficiency, greatly reduces construction safety risk to greatest extent.Meanwhile
Reinforcing bar is lifted using vertical lifting system, meets the construction demand of live banding steel cage in stake hole.Meanwhile used lifting
Device occupies little space, and can greatly improve the construction efficiency of single-pile foundation.Also, vertical lifting system is located above hole,
Ground place is not take up, does not influence the discrepancy of hole vehicle.Vertical lifting muck removal is carried out using hanging apparatus, is had following excellent
Point:1), using muck removal hopper muck removal, side's amount is greatly;2), hanging apparatus vertical-lift quarrel stone, muck removal speed is fast, greatly improves work
Industry efficiency;3), hanging apparatus is mounted on above hole, does not influence muck removal vehicles while passing construction site, solves narrow field
It is difficult;4) the muck removals equipment such as excavator, are promoted by hanging apparatus and pass in and out chamber, reduce damage of the explosion to construction machinery;Together
When stake hole section up and down can construct simultaneously, it is not necessary to for machinery disengaging chamber set sidewalk, solve blast working to construction machine
The influence that tool and construction machinery construct to tunneling boring;5), hanging apparatus is mounted on above hole, has been detached working face, has been realized out
Quarrel is worked continuously with transport, is improved work efficiency, is shortened the convergence time between process;6), it is not take up construction site
Ground place facilitates construction machinery to pass in and out construction site, is not influenced by bursting work also;7) single-pile foundation, is efficiently solved
Machinery can not directly reach the problem of basic internal when angle of inclination is big, and machinery is made to reach basic internal, mechanization is improved and applies
Work is horizontal.
6th, used steel reinforcement cage binding method step is simple, reasonable design and realization are easy, using effect is good, using vertical
Straight Lift-on/Lift-off System, which lifts the reinforcing bar to complete in advance in processing factory in hole, to be bound, and is realized and is tied up inside stake hole
It wire-ties the purpose to break the whole up into parts, convenient for assembling reinforcement in the chamber that can not manually be reached in mechanical equipment, eliminates place and add
The process of work steel reinforcement cage and handling steel reinforcement cage, while the steel reinforcement cage bound is more in line with the excavation line style of single-pile foundation.
7th, using effect is good and practical value is high, first, using in side slope drilling play anchor cable by the way of to slope surface progress
Pre-pressing is prevented from facing upward slope and be caved in;Barrel vault advanced support construction is carried out before excavating;In digging process, using tunneling boring supporting construction
Carry out supporting;Also, since full face tunneling area is big, pile foundation inclination angle is big, caves in prevent, in stake hole top extent and left and right
Anchor cable is played in side wall, by rock mass by the precompressed anchorage effect raising safety coefficient of anchor cable, thus the present invention realizes that " pipe canopy surpasses
Before, weak blast, short drilling depth (construct segmental length short), tight supporting, early closing " construction principle.The present invention uses tunneling boring
The retaining wall mode of anchor cable group in supporting construction cooperation hole, and strong supporting system is formed, country rock when full face tunneling can be effectively ensured
Stability solves the problems, such as that construction space is narrow;Also, on the outside of hole set vertical lifting system, realize machinery, quarrel stone,
The vertical flexible transport of reinforcing bar etc., and can guarantee freely the transporting in high inclination-angle stake hole such as machinery, quarrel stone, reinforcing bar, very big journey
Raising construction efficiency is spent, work progress is safe and reliable.Meanwhile the present invention is to excavation, muck removal, supporting and steel reinforcement cage binding side
Method is improved respectively, and the construction speed of large section tilting single-pile foundation can be effectively ensured and excavate safety, can effectively carry
High Mechanization Level, expands working face, and machinery disengaging stake hole is convenient;Full face simultaneously to excavate cooperation strengthening supporting, raising is enclosed
Rock stability ensures the Rock Slide Stability in digging process, improves construction safety.
In conclusion present invention process step is simple, reasonable design, input cost is low and easy construction, using effect are good,
Energy is easy, the work progress of tunnel type pile foundation is rapidly completed, and work progress is easily controllable.
Below by drawings and examples, technical scheme of the present invention is described in further detail.
Specific embodiment
A kind of large section high inclination-angle tunnel type pile foundation construction process as shown in Figure 1, pile foundation of constructing are reinforced concrete
Native stake, the stake hole of the reinforced concrete pile are large section high inclination-angle Tunnel 1, the large section high inclination-angle Tunnel 1
Cross sectional area be more than 100m2And its inclination angle is more than 45 °;When constructing to constructed pile foundation, include the following steps:
Step 1: stake hole is constructed, process is as follows:
Step 101, barrel vault advanced support construction:To carrying out barrel vault advanced support construction at the top of the stake hole, constructed
Molding barrel vault advanced support structure, refers to Fig. 2;
Step 102, hole protection:Entrance construction hole supporting construction in the stake hole;
Step 103, the wide open excavation construction of stake:Using full face tunneling method, from top to bottom divide multiple construction segments to being constructed
The stake hole of pile foundation carries out excavation construction, includes the following steps:
Step 1031, initial construction segment is excavated and supporting construction:Using drilling and blasting method from top to bottom to the first of the stake hole
Begin construction segment progress excavation construction, and carries out supporting using the split molding stake hole segment of digging of tunneling boring supporting construction;
Construction segment of the initial construction segment to be located at topmost in multiple construction segments;
Step 1032, next construction segment is excavated and supporting construction:According to the method described in step 1031, to described
Next construction segment in stake hole is excavated and supporting construction;
Step 1032 is repeated several times in step 1033, until completing the excavation of all construction segments and supporting in the stake hole
Work progress obtains the stake hole that construction is completed;
Step 2: pile body is constructed:It constructs to the pile body of the reinforced concrete pile, process is as follows:
Step 201, steel reinforcement cage binding:In the stake hole that excavation construction is completed in step 1, from the bottom to top to described
Steel reinforcement cage is bound;
Step 202, filling concrete:After the completion for the treatment of the steel reinforcement cage binding, it is perfused from the bottom to top into the stake hole mixed
Solidifying soil;After institute's concrete perfusion final set, the work progress of pile foundation of constructing is completed.
Wherein, the inclination angle of the reinforced concrete pile refers to the angle between the longitudinal centre line of this and vertical plane,
Angle between the longitudinal centre line and plumb line of i.e. described reinforced concrete pile.
As shown in figure 5, hole supporting construction described in step 102 is annular shield wall 6, the annular shield wall 6 is existing
Poured concrete wall and its be located on the inside of the barrel vault advanced support structure;The annular shield wall 6 enters the depth in the stake hole
For 1m~3m.
In the present embodiment, the cross-sectional top in the stake hole is arch.
In the present embodiment, the country rock of pile foundation of constructing is the weak weathering country rock of mud stone, the cross section of the reinforced concrete pile
Area is 310m2And its inclination angle between horizontal plane is 55.19 °, longitudinal length (the i.e. oblique length of the reinforced concrete pile
Degree) it is 47 meters.Also, the elliptic cross-section that the cross section of the reinforced concrete pile is 22.5m × 16.4m.
During practice of construction, the length of construction segment described in step 103 is 0.5m~1.5m.In the present embodiment, institute
The length for stating construction segment is 1.2m.
During practice of construction, the length of the construction segment can be adjusted accordingly according to specific needs.
In the present embodiment, the hole of stake hole described in step 101 is located in side slope 2.
In the present embodiment, multiple construction segments are in horizontal layout in step 103;
When from top to bottom carrying out excavation construction to the initial construction segment in the stake hole using drilling and blasting method in step 1031, open
It is in horizontal layout to dig section.
As shown in Fig. 2, the length direction in the barrel vault advanced support structure along the stake hole laid and its length with
The length in the stake hole is consistent, and the barrel vault advanced support structure is located at the supporting construction of the arch progress supporting in the stake hole.
When barrel vault advanced support construction is carried out in step 101, applied according to conventional barrel vault advanced support construction method
Work;
The barrel vault advanced support structure includes the guiding wall 4-4 being laid in 2 slope surface of side slope, is laid in guiding wall 4-4
Interior arch-shaped steel frame 4-1, the more pipe canopy pipe 4-2 squeezed into from the front to the back in side slope 2 and multiple pipe canopy pipes to more respectively
The guide pipe 4-3, the guiding wall 4-4 that 4-2 is oriented to are located at the top outer in the stake hole;Multiple guide pipe 4-3
It being installed on arch-shaped steel frame 4-1, multiple guide pipe 4-3 are laid from left to right along the center line of arch-shaped steel frame 4-1,
And multiple guide pipe 4-3 are laid on same plane;The arch-shaped steel frame 4-1 and the length direction in the stake hole are in hang down
It is straight to lay;The guiding wall 4-4 is concrete walls;
The length of the more pipe canopy pipe 4-2 is consistent with the longitudinal length in the stake hole;More pipe canopy pipe 4-2's
Outer limb is 1 °~3 °, and the every pipe canopy pipe 4-2 is laid with the guide pipe 4-3 being oriented to it in coaxial;
The support pier 5 that left and right two supports respectively for two arch springings of arch-shaped steel frame 4-1, institute are provided in the side slope 2
Support pier 5 is stated as concrete support pier.
During practice of construction, the arch-shaped steel frame 4-1 and multiple guide pipe 4-3 are poured in guiding wall 4-4.
In the present embodiment, the arch-shaped steel frame 4-1 is bent using shaped steel, is specifically bent using 18 hot-rolled steel sections of I
It forms.
In the present embodiment, a diameter of Φ 140mm of the guide pipe 4-3 and its wall thickness are 8mm, the guide pipe 4-3's
Length is 1.5m.
During actual processing, the diameter, wall thickness and length of guide pipe 4-3 accordingly can be adjusted respectively according to specific needs
It is whole.
In the present embodiment, it is welded and fixed between the guide pipe 4-3 and arch-shaped steel frame 4-1 using reinforcing bar.
In the present embodiment, the central angle for being oriented to wall 4-4 is 145 °.
Thus, carry out barrel vault advanced support in the range of 145 ° of the top in the stake hole (also referred to as arch).
In the present embodiment, a diameter of Φ 108mm and its wall thickness of the pipe canopy pipe 4-2 are 6.5mm, the pipe canopy pipe 4-2
Length for 47 meters, the circumferential spacing between adjacent two pipe canopy pipe 4-2 is 40cm.
It, can according to specific needs, to diameter, wall thickness and the length and adjacent two of the pipe canopy pipe 4-2 during practice of construction
Circumferential spacing between pipe canopy pipe 4-2 described in root adjusts accordingly respectively.
In the present embodiment, when carrying out slip casting using pipe canopy pipe 4-2, institute's injection slurry is cement mortar.
As shown in figure 5, in the present embodiment, hole supporting construction described in step 102 is annular shield wall 6, the annular
Protecting wall 6 for cast-in-place concrete wall and its be located at the barrel vault advanced support structure inside;Described in the annular shield wall 6 enters
The depth in stake hole is 1m~3m, and the annular shield wall 6 is poured with two support piers 5 and is integrated, the annular shield wall 6
Divide the lower wall body for upper wall body and below the upper wall body by two support piers 5.
In the present embodiment, the depth that the annular shield wall 6 enters the stake hole is 1m and its thickness of wall body is 1m.
Meanwhile circumferential cracking resistance distributing bar 6-1 is provided in the annular shield wall 6.Also, the circumferential direction cracking resistance construction
Reinforcing bar 6-1 is located at the arch of annular shield wall 6.
In the present embodiment, before carrying out barrel vault advanced support construction in step 101, also need using prestress anchorage cable group opposite side
Two of slope 2 treat that reinforcing area is reinforced respectively;It is respectively to be located on two support piers 5 that reinforcing area is treated described in two
The region of side;The prestress anchorage cable group includes the prestressed anchor that multiple tracks is anchored into respectively in the area inside rock mass to be reinforced
Rope, the multiple rows of multiple row of prestress anchorage cable described in multiple tracks point are laid.
In this way, carry out easy, effective protection by two prestress anchorage cable group side slopes 2.
In the present embodiment, the length of the prestress anchorage cable is 40m and its anchoring depth is 10m, the prestressed anchor
Rope tilts gradually downward from the front to the back and tilt angled down is 20 °, and the design anchor force of the prestress anchorage cable is 700kN.Multiple tracks
The prestress anchorage cable according to 4m × 4m spacing arrange, after the completion of drawing, be perfused M35 cement mortar.
In the present embodiment, before carrying out barrel vault advanced support construction in step 101, specifically to the prestress anchorage cable group
Before being constructed, first the topsoil and country rock of institute's construction stake primitive period side are cleared up, and open up construction channel respectively.
In the present embodiment, as shown in figure 4, the stake hole is from top to bottom divided into top excavation section 1-1, middle part excavation section 1-2
With lower part excavation section 1-3;
The top excavation section 1-1, middle part excavation section 1-2 and lower part excavation section 1-3 are from top to bottom divided into multiple described
Construction segment carries out excavation construction;
The excavated section of the top excavation section 1-1 from top to bottom gradually increases, and the excavation of the middle part excavation section 1-2 breaks
From top to bottom all same, the excavated section of the lower part excavation section 1-3 are from top to bottom gradually reduced in face.
Tunneling boring supporting construction described in step 1031 is tunneling boring supporting rack and shotcrete combined retaining structure;
The tunneling boring supporting rack includes the tunneling boring branch being supported in the segment of the stake hole with shotcrete combined retaining structure
Support, the anchor pole group reinforced to the inner wall of stake hole segment and injection are sprayed in the concrete on the inner wall of stake hole segment
Layer is penetrated, the inner end of the anchor pole group and the tunneling boring supporting rack are both secured in the concrete ejection layer;
The quantity of the tunneling boring supporting rack is one or more, and multiple tunneling boring supporting racks are along stake hole segment
Length direction from top to bottom lay;An anchor pole group is laid on the outside of each tunneling boring supporting rack;It is described
The quantity of tunneling boring supporting rack is identical with the quantity of the anchor pole group;The ring support of the tunneling boring supporting rack and its shape with
The transverse shape of stake hole segment is identical, and the anchor pole group includes the inside contour line more along the tunneling boring supporting rack
The anchor pole laid from front to back, the more anchor poles are laid on the same cross section of stake hole segment;It is described complete disconnected
Face supporting rack and the perpendicular laying of length direction in the stake hole.Wherein, the cross section of stake hole segment refer to it is described
The vertical plane of length direction of stake hole segment.
In the present embodiment, before carrying out the wide open excavation construction of stake in step 103, it need to also be laid on the outside of the hole in the stake hole
One hanging apparatus;
When from top to bottom carrying out excavation construction to the initial construction segment in the stake hole using drilling and blasting method in step 1031, mistake
Journey is as follows:
Step I, brill are quick-fried:First using drilling device and the excavated section currently constructed on drill through blasthole, then boring
Powder charge in blasthole is taken, detonates after the completion of powder charge and carries out explosion;Wherein, longitudinal length of the blasthole along the initial construction segment
It is laid in direction;
Step II, muck removal, include the following steps:
Step II -1, excavator lifting are in place:Excavator is lifted to what is currently constructed using the hanging apparatus and is opened
It digs on section;
Step II -2, hopper lifting muck removal:Hopper is lifted to the excavation currently constructed using the hanging apparatus and is broken
After on face, the quarrel stone generated after explosion is packed into the hopper using excavator described in step II -1, then hangs described in using
The hopper equipped with quarrel stone is hung on the outside of the hole in the stake hole by assembling device;
Step II -2 are repeated several times in step II -3, the muck removal process of produced quarrel stone after completing step I borehole blasting.
In the present embodiment, as shown in figure 3, the hanging apparatus includes vertical lifting system, the vertical lifting system packet
Include longitudinal walking frame 8-1 in left and right two, upper mounted on two longitudinal walking frame 8-1 and can be in two longitudinal direction walking frames
On 8-1 carry out anterior-posterior translation lateral walking frame 8-2 and on lateral walking frame 8-2 and can transversely walking frame 8-2 into
The hanging device 8-3 of row left and right translation;Two longitudinal direction walking frame 8-1 are vertical supporting frame and the two is laid in stake respectively
At left and right sides of the hole in hole 1, the transverse direction walking frame 8-2 is in horizontal layout and itself and longitudinal perpendicular layings of walking frame 8-1;Two
A longitudinal walking frame 8-1 is in parallel laying with stake hole 1 in parallel laying and the two;
Muck removal hopper 8-5 or suspender are lifted with by rope 8-4 below the hanging device 8-3, the rope 8-4 is in perpendicular
Directly to laying;The vertical lifting system, rope 8-4 and muck removal hopper 8-5 composition muck removal equipment, the vertical lifting system,
Rope 8-4 and suspender composition vertical lifting equipment.
In actual use, the hanging apparatus may be gantry crane.
In the present embodiment, the muck removal hopper 8-5 and the suspender are lifted on the underface of hanging device 8-3.
When hopper lifting muck removal is carried out in the present embodiment, in step II -2, include the following steps:
Step II -21, lateral walking frame level Forward and hanging device translation:First by lateral walking frame 8-2 along two institutes
Longitudinal horizontal forward movements of walking frame 8-1 are stated, until lateral walking frame 8-2 is located above the excavated section currently constructed;Again
Hanging device 8-3 is translated to the left on lateral walking frame 8-2 or to right translation, until hanging device 8-3 is located at currently
Above the excavated section constructed;
Step II -22, hopper decentralization:Muck removal hopper 8-5 is lifted and transferred to current using hanging device 8-3 and is constructed
Excavated section on;
Step II -23, quarrel stone bunker:The quarrel stone generated after explosion is packed by muck removal using excavator described in step II -1
In hopper 8-5;
It is carried in step II -24, hopper:Muck removal hopper 8-5 is lifted using hanging device 8-3 and is up-shifted to the stake
Above the hole in hole;
It is moved after step II -25, lateral walking frame level:By lateral walking frame 8-2 along two longitudinal walking frame 8-1 water
It is flat to move backward, until muck removal hopper 8-5 is moved on the outside of the hole in the stake hole;
Step II -26, quarrel stone are toppled over:Quarrel stone will be filled in muck removal hopper 8-5 to be poured on the outside of the hole in the stake hole.
As shown in figure 3, in the present embodiment, the transverse direction walking frame 8-2 is the sub-truss formed by plurality of rods part assembly.
In the present embodiment, the longitudinal direction walking frame 8-1 includes a longitudinal direction that anterior-posterior translation is carried out for lateral walking frame 8-2
Rail 8-11 and Duo Gen are supported in the vertical supporting bar 8-12 below longitudinal rail 8-11 from front to back;
The left and right sides bottom of the transverse direction walking frame 8-2 is mounted on rail 8-11 along longitudinal direction and carries out the vertical of anterior-posterior translation
To travelling wheel, the longitudinal direction travelling wheel is mounted on longitudinal rail 8-11.
In the present embodiment, it is supported in side slope 2 on front side of the longitudinal direction walking frame 8-1 and rear side is supported in 2 outside of side slope
Ground on.
Also, the quantity of included vertical supporting bar 8-12 is four in the longitudinal direction walking frame 8-1, and four described vertical
Supporting rod 8-12 from front to back be respectively first support bar, second support bar, third supporting rod and the 4th supporting rod, described first
Supporting rod and second support bar are supported in side slope 2, and the third supporting rod and the 4th supporting rod are supported in 2 outside of side slope
Ground on.
In the present embodiment, the longitudinal direction walking frame 8-1 further includes two skewed horizontal load bar 8-14, two skewed horizontal loads
Bar 8-14 is between the third supporting rod and the 4th supporting rod;The upper end of two skewed horizontal load bar 8-14 is each attached to
On longitudinal rail 8-11, and the lower end of two skewed horizontal load bar 8-14 is separately fixed at the third supporting rod and the 4th
On strut.
It, can according to specific needs, to the quantity of vertical supporting bar 8-12 included in longitudinal walking frame 8-1 during actual processing
And the installation position of each vertical supporting bar 8-12 adjusts accordingly respectively.
In the present embodiment, the vertical supporting bar 8-12 and skewed horizontal load bar 8-14 are steel pipe, the vertical supporting bar
Between 8-12 and longitudinal direction rail 8-11 and skewed horizontal load bar 8-14 and between skewed horizontal load bar 8-14 and longitudinal rail 8-11
It is fixedly connected with welding manner.
In the present embodiment, the every vertical supporting bar 8-12 bottom is both supported upon an armored concrete buttress 8-13
On, the armored concrete buttress 8-13 is in horizontal layout.
During actual installation, the translation rail that left and right translation is carried out for hanging device 8-3 is provided on the transverse direction walking frame 8-2
Road, the translation track are in parallel laying with lateral walking frame 8-2;The hanging device 8-3 bottoms are equipped in the translation
The lateral walking mechanism of left and right translation is carried out on track, the transverse direction walking mechanism is mounted on the translation track.
In the present embodiment, the rope 8-4 is steel wire rope.
Since the angle of inclination of large section tilting single-pile foundation of the invention of constructing is big, existing muck removal machinery disengaging
Chamber is difficult, in order to allow muck removal machinery disengaging chamber that need to build a more gentle slope in the lower section part in the stake hole,
But the excavation construction of section will be obstructed under the stake hole.Along with construction site is in side slope 2, construction site is narrow, muck removal
Machinery disengaging place is difficult.In order to meet muck removal and do not influence Construction traffic disengaging construction site, need to meet mucker
Tool is not take up a large amount of places, flexiblely can transport the quarrel stone in chamber (i.e. described stake hole) outside the venue.In addition, due to this
It invents large section tilting single-pile foundation (i.e. drilling and blasting method) by the way of blasting rock move of constructing to be excavated, in explosion
All mechanical equipments will interfere construction very big far from construction site, bulky muck removal mechanical equipment in journey.But the present invention
The used muck removal equipment can overcome defect and deficiency existing for above-mentioned existing muck removal machinery.In actual use, it is of the invention
In the muck removal equipment used, by the vertical muck removals of muck removal hopper 8-5, and pass through vertical lifting system by muck removal hopper 8-5
It is transported to outside hole, then quarrel stone is loaded on dump truck by the excavator on the outside of hole and is transported outside the venue.
In the present embodiment, the suspender is for Steel bar hanger or for the horizontal positioned horizontal positioned platform of the excavator, institute
The quantity for stating rope 8-4 is multiple tracks.
In the present embodiment, the length of the longitudinal direction rail 8-11 is 36m, the left and right sides bottom of the transverse direction walking frame 8-2
Longitudinal travelling wheel of portion's installation is driven respectively by two longitudinal translation driving motors.The hanging device 8-3 is electricity
Dynamic hoist engine, is sequentially connected between the electrical hoist and rope 8-4 by transmission mechanism.Meanwhile the rope 8-4
Bottom end is provided with the suspension hook for lifting the suspender or muck removal hopper 8-5.
In the present embodiment, the transverse direction walking mechanism is driven by transverse translation driving motor.
In actual use, the longitudinal translation driving motor, the electrical hoist and the transverse translation driving motor
Remote control is carried out by remote controler, operation is simple.
Excavator is lifted to what is currently constructed using the vertical lifting equipment in the present embodiment, in step II -1 and is opened
When digging on section, after the horizontal positioned platform first is lifted on hanging device 8-3 decentralizations by rope 8-4, then it will need to lift
Excavator be placed horizontally on the horizontal positioned platform.
In this way, after excavator is lifted to the excavated section currently constructed, lifting to the digging in the stake hole is utilized
Pick machine will be cut in stone loading muck removal hopper 8-5;After the completion for the treatment of muck removal, then the vertical lifting equipment is used to hang the excavator
It is filled on the outside of the stake hole.Then, then to next construction segment it excavates, prevents explosion from being damaged to excavator.
It is carried out in the present embodiment, in step 1 in the work progress of stake hole, when the cutting depth in the stake hole is not more than 20m
When, in a manner that 2 excavators coordinate direct muck removal, wherein an excavator moves to the quarrel stone in the stake hole outside hole
On the platform of side, the quarrel stone on platform is fitted into dump truck by another excavator, is transported quarrel stone outside the venue by dump truck
Spoil disposal area.When the cutting depth in the stake hole is more than 20m, excavator passes in and out the stake hole inconvenience, using the muck removal
Equipment carries out muck removal.In the present embodiment, when being excavated to top excavation section 1-1, directly gone out using the cooperation of above-mentioned 2 excavators
The mode of quarrel;When being excavated to middle part excavation section 1-2 and lower part excavation section 1-3, muck removal is carried out using the muck removal equipment.
It, need to also be in the stake hole close to the lifting dress during step 103 carries out the wide open excavation construction of stake in the present embodiment
The side put from top to bottom is excavated, and is excavated and to be formed super excavation area 3;
It is connected inside the super excavation area 3 and the stake hole and its lateral wall is vertical side walls.
It is connected inside the super excavation area 3 and the stake hole and its lateral wall is vertical side walls.
Also, the width of the super excavation area 3 is of same size with the stake hole, and 3 inside of super excavation area and the stake
It is connected inside hole.
For easy construction, quick, in step 1 in the work progress of stake hole, need to also from top to bottom be laid in the stake hole more
Anchor cable group in a hole, the spacing in neighbouring two holes between anchor cable group are 3.5m~4.5m;Anchor in each hole
Suo Zujun is in parallel laying with the tunneling boring supporting rack;
Anchor cable group includes the anchor cable that multiple tracks is laid on the same cross section of stake hole segment in each hole.
In the present embodiment, anchor cable group includes the anchor that M roads are laid in from left to right at the top of the stake hole in each hole
Rope and two side wall anchor cable structures being symmetrically laid in the left and right two side walls in the stake hole, each side wall anchor cable structure
Include the anchor cable that N roads are from top to bottom laid on the left side wall or right side wall in the stake hole;Wherein, M and N is positive integer, M
>=2 and N >=2;
All anchor cables laid in the stake hole are divided into m row and are laid;All anchor cable inner ends laid in the stake hole
It is fastenedly connected and is integrated by the m roads longitudinally connected reinforcing bar of anchor cable, the inner end of anchor cable described in each column is longitudinal with the anchor cable together
Connection reinforcing bar is fixedly connected, and the longitudinally connected reinforcing bar of anchor cable is laid along the length direction in the stake hole;Anchor cable described in m roads
Longitudinally connected reinforcing bar is both secured in the concrete ejection layer;Wherein, m=M+2N.
In the present embodiment, M=6, the length for being laid in the anchor cable at the top of the stake hole is 40m;N=3, the side wall anchor cable
The length of structure stream line is 15m.The quantity of anchor cable group is four in the hole, in the two neighboring hole between anchor cable group
Spacing is 4m.
During practice of construction, can according to specific needs, in the value size and the hole to M and N the quantity of anchor cable group and
Spacing in the two neighboring hole between anchor cable group adjusts accordingly respectively.
Thus, for the safety for ensureing to excavate, the anchor cable group in the multiple holes of stake in-cavity construction.To be fixed, can incite somebody to action
The outer end of the anchor cable or the longitudinally connected Bar Anchorage of the anchor cable are on the tunneling boring supporting rack.
It in actual use, can be by the stake hole by the tunneling boring supporting rack in the preceding section supporting construction
The active force at top is transferred to big ground foundation.
In the present embodiment, the spacing in the stake hole between neighbouring two tunneling boring supporting racks is 0.6m.And
And the length of the construction segment is 1.2m.
In the present embodiment, the tunneling boring supporting rack is laid in same flat with the more anchor poles being laid on the outside of it
On face;The inner end of the more anchor poles is each attached on the same tunneling boring supporting rack in the anchor pole group.It is described complete disconnected
Face supporting rack is to be formed by shaped steel bending and be fastenedly connected the annular support being integrated from beginning to end.
Connected between all tunneling boring supporting racks laid in the stake hole by the longitudinally connected reinforcing bar fastening of multiple tracks frame body
One is connected in, the longitudinally connected reinforcing bar of frame body is laid along the length direction in the stake hole;The each institute laid in the stake hole
It states tunneling boring supporting rack to be fixedly connected with the longitudinally connected reinforcing bar of frame body described in multiple tracks, the longitudinally connected reinforcing bar of frame body described in multiple tracks is equal
It is fixed in the concrete ejection layer.
In the present embodiment, the concrete ejection layer is steel fiber reinforced concrete jetted layers.
Also, the steel fiber reinforced concrete jetted layers are C30 steel fiber reinforced concrete jetted layers.
During practice of construction, the concrete strength of the steel fiber reinforced concrete jetted layers in a construction segment is treated
After reach design strength 70%, then excavated to carrying out next construction segment.
In the present embodiment, it is both provided on the madial wall of each tunneling boring supporting rack multiple for connecting the reinforcing bar
The connection reinforcing bar of cage, multiple connection reinforcing bars are laid on the same cross section of stake hole segment, and multiple described
Connection reinforcing bar is laid from front to back along the inside contour line of the tunneling boring supporting rack;It stretches the inner end of multiple connection reinforcing bars
Go out to the concrete ejection layer.
In the present embodiment, steel reinforcement cage described in step 201 includes multiple tracks main reinforcement and multiple bar-mat reinforcements laid from the bottom to top
Piece, multiple tracks main ribs are laid along the length direction in the stake hole, and multiple reinforced mesh are in main ribs
Vertical runs;
The steel reinforcement cage is formed by multiple steel reinforcement cage section assemblings, length of multiple steel reinforcement cage segments along the stake hole
It is laid from bottom to up in direction;
Before carrying out steel reinforcement cage binding in step 201, first set up to bind tying up for the steel reinforcement cage in the stake hole
Platform is pricked, the binding platform is laid in the tablet on the bottom bracing structure including bottom bracing structure and polylith, described
Bottom bracing structure is that the full hall formula scaffold formed is set up by more steel pipes;
To it is described binding platform set up before, using the hanging device by for set up it is described binding platform institute
It states in tablet and the lifting steel pipes to the stake hole.
In the present embodiment, using manually setting up the full hall formula scaffold, the full hall formula scaffold in the stake hole
The advance of middle upright bar is lm~2m, and the transfer of upright bar is lm~2m meters, and the step pitch of upright bar is 1.40m.The tablet is plank.Institute
Binding platform is stated as one for operation and the platform of interim material stored.
In the present embodiment, the inner hollow of the steel reinforcement cage, the binding platform is located on the inside of the steel reinforcement cage.
Also, the binding platform is the reinforcing bar placement platform for supplying to place for the reinforcing bar for binding the steel reinforcement cage.
When being bound from the bottom to top to the steel reinforcement cage in step 201, the binding platform is connect from the bottom to top
It is high.
As shown in the above, for solve the problems, such as can the assembling reinforcement in the stake hole of tilting, the present invention use institute
Stating vertical lifting equipment will lift to the stake hole, and be positioned over the binding temporarily for binding the reinforcing bar of the steel reinforcement cage
On platform.The binding platform is the construction platform stood for steel flxer people.
In the present embodiment, since the stake hole is inclined to laying, it will be used to bind to solve the vertical lifting equipment
The reinforcing bar of the steel reinforcement cage is lifted to the lifting demand of stake hole inside bottom, and the present invention specifically will using mode of backbreaking
Stake hole lower part is excavated downward vertically, and is excavated and to be formed super excavation area 3, is used in and is bound the reinforcing bar of the steel reinforcement cage and can lift
To the inside bottom in the stake hole.
In the present embodiment, the cross-sectional shape in the stake hole is identical with the cross-sectional shape of Tunnel.
As shown in fig. 6, the reinforced mesh includes stirrup 7-1, the inside reinforcing bar group on the inside of stirrup 7-1 and positioned at hoop
Outside reinforcing bar group on the outside of muscle 7-1, the shape of the stirrup 7-1 are identical with the transverse shape in the stake hole.
The inside reinforcing bar group includes being located at the first arch lengths of rebar 7-2 on the inside of the arch wall in the stake hole together and be located at
It is located at the first bottom reinforcement bars section 7-3, the first arch lengths of rebar 7-2 and stirrup 7-1 of the bottom inside in the stake hole together
Between be attached by multiple first bar connecting section 7-4, multiple first bar connecting section 7-4 are along the first arch reinforcing bar
The length direction of section 7-2 is laid from front to back;Pass through multiple between the first bottom reinforcement bars section 7-3 and stirrup 7-1
Two bar connecting section 7-5 are attached, length sides of multiple second bar connecting section 7-5 along the first bottom reinforcement bars section 7-3
To being laid from front to back.In the present embodiment, multiple first bar connecting section 7-4 are in uniformly distributed and multiple described
Second bar connecting section 7-5 is in uniformly distributed, and adjacent two are smaller than between the two neighboring first bar connecting section 7-4
Spacing between a second bar connecting section 7-5.
The outside reinforcing bar group includes being located at the second arch lengths of rebar 7-6 on the inside of the arch wall in the stake hole together and be located at
It is located at the second bottom reinforcement bars section 7-7, the second arch lengths of rebar 7-6 and stirrup 7-1 of the bottom inside in the stake hole together
Between be attached by multiple third bar connecting section 7-8, multiple third bar connecting section 7-8 are along the second arch reinforcing bar
The length direction of section 7-6 is laid from front to back;Pass through multiple between the second bottom reinforcement bars section 7-7 and stirrup 7-1
Four bar connecting section 7-9 are attached, length sides of multiple 4th bar connecting section 7-9 along the second bottom reinforcement bars section 7-7
To being laid from front to back.In the present embodiment, multiple third bar connecting section 7-8 are in uniformly distributed and multiple described
4th bar connecting section 7-9 is in uniformly distributed, and adjacent two are smaller than between the two neighboring third bar connecting section 7-8
Spacing between a 4th bar connecting section 7-9.
Also, it is smaller than the two neighboring third reinforcing bar between the two neighboring first bar connecting section 7-4
Spacing between linkage section 7-8.In the present embodiment, multiple tracks main ribs in the steel reinforcement cage stirrup 7- along each reinforced mesh
1 length direction is laid from front to back.Also, per pass main ribs are fixed with the stirrup 7-1 in all reinforced mesh
It is connected as one.
When actually being bound, first multiple tracks main ribs are bound from the bottom to top;Multiple tracks main ribs are tied up
During bundle, multiple reinforced mesh are bound respectively from the bottom to top.Reinforced mesh any one described is bound
When, first stirrup 7-1 is bound;The inside reinforcing bar group and the outside reinforcing bar group are bound again.
Nowadays, pile foundation reinforcement cage making and installation be all that merogenesis completes and passes through and put under crane at the scene
In stake holes (the also referred to as stake hole), fixed in time at hole after a section steel reinforcement cage is transferred into stake holes, then by next section steel
Muscle cage is welded as a whole with the section steel reinforcement cage;In this way, steel reinforcement cage is welded and transferred into stake holes by other segments successively, steel is completed
The installation of muscle cage.Also, pile foundation reinforcement cage need to be bound with pile foundation concrete with strong on pile foundation reinforcement cage after installation is complete
The concrete pad of degree, to ensure the thickness of concrete cover of pile foundation reinforcement cage.But above-mentioned existing pile foundation reinforcement cage
Making and installation method, are primarily present following defect:1st, the stake diameter for requiring pile foundation is smaller, and the requirement to place is larger;2nd, field
Ground requires smooth, need to utilize crane auxiliary construction;3rd, pile foundation is necessary for vertically downward, steel reinforcement cage being facilitated to transfer;4th, steel reinforcement cage is every
Saving weight should not be too big, and the high stability of steel reinforcement cage in itself, otherwise cannot lift.
The inclination angle of pile foundation of the invention of constructing is 55.19 °, a length of 47m of stake, stirrup minimum point and peak height difference
12.8m.The weight of used every meter of steel reinforcement cage is 8t and stability is poor, for so big steel reinforcement cage, using precast reinforced cage
Mode can not achieve.Thus, it, can easy, the quick and high quality completion steel using the binding method described in step 501
The process of binding of muscle cage.
Since the inner space that the present invention excavates the stake hole formed is larger, thus the steel reinforcement cage can be accommodated and bound
The bar material of Cheng Suoxu and various welding equipments, but the scrambling of the cross section due to the stake hole, in each reinforced mesh
The bending radius and length of stirrup 7-1 is not quite similar, and more can by the way of assembling reinforcement live in the hole described in step 501
Close to the construction of pile foundation, and the accuracy of thickness of concrete cover and installation site can be effectively ensured.In addition, by being adopted
Longer with the length of main reinforcement, the weight and length of single main reinforcement are larger, using vertical lifting equipment handling reinforcing bar of the present invention
When convenient for construction;It will break the whole up into parts simultaneously for binding the reinforcing bar of the steel reinforcement cage, it is easier for installation using manual site.Its
In, include main reinforcement, stirrup 7-1, the first arch lengths of rebar 7-2, the first bottom reinforcement bars section for binding the reinforcing bar of the steel reinforcement cage
7-3, the first bar connecting section 7-4, the second bar connecting section 7-5, the second arch lengths of rebar 7-6, the second bottom reinforcement bars section 7-7,
Third bar connecting section 7-8 and the 4th bar connecting section 7-9.
When actually being bound, used full hall formula scaffold not only provides operating platform, while to complete for personnel
The binding of steel reinforcement cage and subsequent concrete construction provide safeguard.
In the present embodiment, when being bound to stirrup 7-1, stirrup 7-1 is bent along the tunneling boring supporting rack, this
The line style that construction molding large section tilting single-pile foundation can be effectively ensured in sample is consistent with the line style of stirrup 7-1.
It is security consideration during practical progress steel reinforcement cage binding, the reinforcing bar placed on the binding platform, which indulges weight, to be surpassed
Cross 1t, and with with hanging.The stirrup 7-1 is installed using segmentation, then welds cyclization.3-5 people installs a stirrup 7- simultaneously
1, and it is with welding manner that stirrup 7-1 and tunneling boring supporting rack welding is firm.
In the present embodiment, the length of each steel reinforcement cage segment is 9m.The bottom end of per pass main ribs passes through L-type anchor
Muscle is anchored into the rock mass of stake hole bottom.Also, per pass main ribs are spliced from the bottom to top by multiple main reinforcement segments,
The length of main ribs segment is 9m, is attached between two neighboring main ribs segment using inner thread sleeve.
In conclusion the present invention uses the weak country rock full face tunneling support pattern of large section high inclination-angle.Traditional inclined shaft,
Tunnel excavation construction is roughly divided into following several using New Austrian Tunneling Method:Benching tunnelling method, CD methods, CRD methods etc., the above method apply rock
Physical theory, using safeguard and using country rock self-bearing ability as basic point, use preliminary bracing as main supporting means, in time into
Row supporting controls the deformation and relaxation of country rock, country rock is made to become the component part of support system, and by country rock and supporting
Measure, monitor method and principle constructing tunnel and underground engineering design to be instructed to construct, but the above method be difficult to realize it is complete disconnected
Face entirety excavation construction, work efficiency are extremely low.And the present invention is using tunneling boring supporting construction and the matched strong supporting of anchor cable group in hole
System solves the problems, such as that weak surrounding rock itself can not form stable support system, while realize super large under strong supporting system
The full face tunneling of section.Wherein, tunneling boring supporting construction includes tunneling boring supporting rack, anchor pole and concrete ejection layer.
In addition, when carrying out excavation construction to inclined shaft, tunnel using New Austrian Tunneling Method, used muck removal mode is generally rail fortune
Defeated, big machinery can not be into hole operation, and construction efficiency is extremely low, and security risk is very big, and the present invention passes through full face tunneling side
Formula simultaneously carries out vertical muck removal using the muck removal equipment being set up on the outside of hole, realizes machinery, quarrel stone vertical transport, and solve
Big machinery can not be passed in and out normally, have bad luck the problem of quarrel stone is difficult, maximum limit during high inclination-angle single-pile foundation excavation construction
Elevating mechanism utilization rate is spent, construction efficiency is improved, greatly reduces construction safety risk.
The above is only presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, every according to the present invention
Any simple modification, change and the equivalent structure that technical spirit makees above example change, and still fall within skill of the present invention
In the protection domain of art scheme.