CN201648981U - Bridge deck traction limiting device - Google Patents

Bridge deck traction limiting device Download PDF

Info

Publication number
CN201648981U
CN201648981U CN2010201126875U CN201020112687U CN201648981U CN 201648981 U CN201648981 U CN 201648981U CN 2010201126875 U CN2010201126875 U CN 2010201126875U CN 201020112687 U CN201020112687 U CN 201020112687U CN 201648981 U CN201648981 U CN 201648981U
Authority
CN
China
Prior art keywords
bridge
tractive
bridge floor
angle steel
stopping means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201126875U
Other languages
Chinese (zh)
Inventor
林其荃
顾远生
张志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Original Assignee
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd filed Critical SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority to CN2010201126875U priority Critical patent/CN201648981U/en
Application granted granted Critical
Publication of CN201648981U publication Critical patent/CN201648981U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge deck traction limiting device. The limiting device is fixedly arranged on two sides of a bridge seam of the bridge deck and comprises two locating elements and a traction regulating element, the two locating elements are respectively fixed on the bridge deck of the two sides of the bridge seam, the traction regulating element is arranged between the two locating elements, and the two ends of the traction regulating element are respectively and fixedly connected with the locating elements. The limiting device can effectively play a role of traction and limitation of the bridge decks at two sides of the bridge seam by the two locating elements and the traction regulating element when the bridge lifts up and regulate the distance between the bridge seams by nuts so as to effectively reduce the horizontal projection length of a multi-span bridge under the condition of changeless bridge gradient direction. The utility model further has the advantages of high regulation precision and good safety performance.

Description

Bridge floor tractive stopping means
Technical field
The utility model relates to the spacing technology of bridge jacking, more particularly, relates to a kind of bridge floor tractive stopping means.
Background technology
In the bridge jacking process, when the gradient of whenever striding the beam body changed, this horizontal projection length of striding the beam body will change.If originally the gradient of beam body is a descending, when its gradient diminished after the jacking, this horizontal projection length of striding the beam body will be elongated, otherwise, as the same.If the horizontal projection length of multispan beam body changes, the horizontal projection length that then is superimposed changes will be very big, thereby totally unfavorable to bridge jacking.Therefore must in the jacking process, carry out spacing to bridge floor.At present, it is spacing to adopt the mode of steel strand to carry out tractive usually.It mainly to being fixed in the steel member of Liang Tishang, applies pulling force by steel strand, thereby carries out spacing and adjusting beam seam.Because under the effect of pulling force, steel strand easily produce deformation and fracture, have great potential safety hazard, and the precision of adjusting beam seam is also relatively poor.
The utility model content
At the above-mentioned shortcoming that exists in the prior art, the purpose of this utility model provides a kind of bridge floor tractive stopping means, and this stopping means can effectively play the effect that bridge floor is spacing and the beam seam is regulated when bridge jacking.
For achieving the above object, the utility model adopts following technical scheme:
This bridge floor tractive stopping means is fixed on the beam seam both sides of bridge floor, comprise positioning element and tractive adjusting parts, two positioning elements are separately fixed on the bridge floor of beam seam both sides, tractive is regulated parts and is located between two positioning elements, and the two ends of tractive adjusting parts are connected to a fixed with positioning element respectively.
Described positioning element comprises angle steel and stiffening rib, and the angle steel bottom is fixing with the reinforcing bar welding of mating formation on the bridge floor, and several stiffening ribs are welded on the angle steel respectively.
Described tractive is regulated parts and is comprised double threaded screw and nut, and corresponding angle steel is passed at the double threaded screw two ends respectively, and fastening by nut.
The quantity of described double threaded screw is several, is fixedly arranged on side by side between two angle steel.
In technique scheme, bridge floor tractive stopping means of the present utility model is fixed on the beam seam both sides of bridge floor, comprise positioning element and tractive adjusting parts, two positioning elements are separately fixed on the bridge floor of beam seam both sides, tractive is regulated parts and is located between two positioning elements, and the two ends of tractive adjusting parts are connected to a fixed with positioning element respectively.This stopping means is regulated the fastening of parts by two positioning elements and tractive, when bridge jacking, can effectively play the tractive position-limiting action between the bridge floor of beam seam both sides, and can regulate beam by nut and stitch distance, thereby under the constant condition of beam body gradient direction, effectively reduce the horizontal projection length of multispan beam body.This stopping means also has the precision of conciliation height, the advantage that security performance is good.
Description of drawings
Fig. 1 is the sectional view of the structure and the user mode of stopping means of the present utility model;
Fig. 2 is the vertical view of the user mode of stopping means of the present utility model.
The specific embodiment
Further specify the technical solution of the utility model below in conjunction with drawings and Examples.
Please in conjunction with Fig. 1, shown in Figure 2, the beam that bridge floor tractive stopping means 10 of the present utility model is fixed at bridge floor stitches (3 among Fig. 1 is bent cap) on 1 both sides, comprise positioning element and tractive adjusting parts, two positioning elements are separately fixed at beam and stitch on the bridge floor of 1 both sides, tractive is regulated parts and is located between two positioning elements, and the two ends of tractive adjusting parts are connected to a fixed with positioning element respectively.Wherein, positioning element can adopt angle steel 11 to make, and reinforcing bar 4 welding of mating formation on angle steel 11 bottoms and the bridge floor are fixing, and evenly welds several stiffening ribs 12 in the outside of angle steel 11, is used to strengthen the rigidity of angle steel 11, improves the intensity of whole stopping means 10.Tractive is regulated parts can adopt double threaded screw 13 and nut 14, several double threaded screws 13 are located between two angle steel 11 side by side, and corresponding angle steel 11 is passed at the two ends of each double threaded screw 13 respectively, and be fastened in angle steel 11 by nut 14, be connected and fixed being fixed on two angle steel 11 that beam stitches 1 both sides, thereby in the jacking process, play the spacing effect of bridge floor tractive.The quantity of double threaded screw 13 and rank can adopt corresponding configuration according to calculating the size that the bridge self gravitation produces sliding force.In addition, this stopping means 10 can also play the effect that beam stitches 1 size of regulating in the bridge jacking process, and concrete principle is as follows:
Before jacking, beam between the bridge beam body 2 stitches 1 when smaller, can be by unscrewing the length that nut 14 extends two screw rods between the nut 14, distance between two angle steel 11 is increased, because angle steel 11 welds mutually with deck paving reinforcing bar 4 respectively, thereby promote the displacement that beam body 2 limits bridge, increase the beam crack between the two curb girder bodies 2.
In the jacking process, bridge can shorten the length of screw rod by fastening nut 14 owing to the sliding force that longitudinal gradient produces, and two distances between the angle steel 11 are dwindled, and can spur the displacement that bridge comes restraint beam body 2, thereby dwindles the beam seam 1 between the two curb girder bodies 2.
Those of ordinary skill in the art will be appreciated that, above embodiment is used for illustrating the utility model, and be not to be used as qualification of the present utility model, as long as in connotation scope of the present utility model, all will drop in claims scope of the present utility model variation, the modification of the above embodiment.

Claims (4)

1. a bridge floor tractive stopping means is fixed on the beam seam both sides of bridge floor, it is characterized in that:
This stopping means comprises positioning element and tractive adjusting parts, and two positioning elements are separately fixed on the bridge floor of beam seam both sides, and tractive is regulated parts and is located between two positioning elements, and the two ends of tractive adjusting parts are connected to a fixed with positioning element respectively.
2. bridge floor tractive stopping means as claimed in claim 1 is characterized in that:
Described positioning element includes angle steel and stiffening rib, and the angle steel bottom is fixing with the reinforcing bar welding of mating formation on the bridge floor, and several stiffening ribs are welded on the angle steel respectively.
3. bridge floor tractive stopping means as claimed in claim 2 is characterized in that:
Described tractive is regulated parts and is comprised double threaded screw and nut, and corresponding angle steel is passed at the double threaded screw two ends respectively, and fastening by nut.
4. bridge floor tractive stopping means as claimed in claim 3 is characterized in that:
The quantity of described double threaded screw is several, is fixedly arranged on side by side between two angle steel.
CN2010201126875U 2010-02-11 2010-02-11 Bridge deck traction limiting device Expired - Lifetime CN201648981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201126875U CN201648981U (en) 2010-02-11 2010-02-11 Bridge deck traction limiting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201126875U CN201648981U (en) 2010-02-11 2010-02-11 Bridge deck traction limiting device

Publications (1)

Publication Number Publication Date
CN201648981U true CN201648981U (en) 2010-11-24

Family

ID=43114207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201126875U Expired - Lifetime CN201648981U (en) 2010-02-11 2010-02-11 Bridge deck traction limiting device

Country Status (1)

Country Link
CN (1) CN201648981U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411775A (en) * 2018-04-10 2018-08-17 南京工业职业技术学院 A kind of bridge expanssion joint list seam regulating device
CN114960457A (en) * 2022-06-30 2022-08-30 中国一冶集团有限公司 Split type steel bridge hoisting horizontal interval fine adjustment device and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411775A (en) * 2018-04-10 2018-08-17 南京工业职业技术学院 A kind of bridge expanssion joint list seam regulating device
CN108411775B (en) * 2018-04-10 2023-07-18 南京工业职业技术学院 Bridge expansion joint single-joint adjusting device
CN114960457A (en) * 2022-06-30 2022-08-30 中国一冶集团有限公司 Split type steel bridge hoisting horizontal interval fine adjustment device and construction method

Similar Documents

Publication Publication Date Title
CN201553992U (en) Device for jacking whole body of box girder
CN202779203U (en) Steel belt centering device
CN106758778B (en) The scalable anti-fall beam construction gradually consumed energy
CN204282192U (en) A kind of double deck steel truss girder
CN201648981U (en) Bridge deck traction limiting device
CN210151565U (en) Novel stepless height-adjusting support
CN201728465U (en) Top electrode device for mesh reinforcement rowing welding machine
CN106573568B (en) Truck mounted concrete pump
CN102146661B (en) Traction limiting device used for jacking counter-slope of bridge
CN204644869U (en) Drag-line bridge tower anchoring structure
CN207566810U (en) A kind of column piler
CN206429532U (en) A kind of guide rail section
CN201371139Y (en) Vertical travelling mechanism of air cooling cleaning system
CN206956557U (en) A kind of bridge construction support meanss
CN207483191U (en) Fish-bellied type crane girder
CN202543807U (en) Steel truss girder drag frame constructed by CRM crawler heavy carriers
CN204472598U (en) A kind of foot of ladder retractor device for electrification railway contact net tool car ladder
CN102145873A (en) Oil supplementing device for bellows expander
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN201024360Y (en) Improved damping fish plate
CN203593924U (en) Railway track-laying track-adjusting device
CN203876765U (en) Light-weight high-bearing-capacity internal combustion locomotive body structure
CN203159149U (en) Large-span prestress double-arching-frame hoisting structure
CN209686214U (en) A kind of novel bottom suspension cable bridge
CN201614552U (en) Traction limiting device used for reverse bridge girder lifting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20101124

CX01 Expiry of patent term