CN201635082U - Cofferdam construction device in deep-water pier cushion cap construction - Google Patents
Cofferdam construction device in deep-water pier cushion cap construction Download PDFInfo
- Publication number
- CN201635082U CN201635082U CN2010203021007U CN201020302100U CN201635082U CN 201635082 U CN201635082 U CN 201635082U CN 2010203021007 U CN2010203021007 U CN 2010203021007U CN 201020302100 U CN201020302100 U CN 201020302100U CN 201635082 U CN201635082 U CN 201635082U
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- steel
- steel pipe
- construction
- wallboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Foundations (AREA)
Abstract
The utility model relates to the technical field of large bridge underwater pier cushion cap construction, in particular to a cofferdam construction device in deep-water pier cushion cap construction, which is characterized by at least comprising a cofferdam base board, a pile foundation casing, a cofferdam wallboard, a pier and inner supports, wherein the cofferdam wallboard is a steel tube cofferdam, and the steel tube cofferdam is formed by connecting steel tube wallboard units; the steel tube wallboard units are fixed on the pier one by one and are connected with the cofferdam base board; the inner supports are longitudinally and transversely connected with the pier to form a main support, and the main support is combined with inclined plane couplings; the steel tube bottoms of the steel tube wallboards units are sealed so that the whole cofferdam construction device can be accurately adjusted to a required height by adjusting the water level in steel tubes to carry out the construction of the pile foundation casing. The utility model provides the cofferdam construction device in the deep-water pier cushion cap construction, which is more economic and effective, requires not high on construction machinery and has simple and convenient construction process.
Description
Technical field
The utility model relates to pier bearing platform construction technical field in the large bridge water, is adapted to especially enclose the water-bound design and construction in the long-span bridge beam superelevation Sarasota deep water pier bearing platform construction, and be cofferdam construction device in a kind of deep water pier bearing platform construction exactly.
Background technology
Build a kind of trend that the long-span bridge beam has become bridge construction between great river, straits, bridge type is arranged and is all had main pier in the water usually, and the multi-column pier foundation highrise pile cap is widely used especially in the water.The cofferdam is as the water-bound that encloses of underwater support table, and the pile foundation construction later stage installs, and treats to draw water after the back cover, for bearing platform construction provides " dried environment ".
It is varied that domestic and international large-scale cushion cap encloses the water-bound scheme, having of comparative maturity is following several: steel cofferdam of the no end (as army's mountain bridge etc.), end steel suspended box cofferdam (as white sand continent, Wuhan bridge, the logical bridge of Soviet Union etc.) is arranged, steel sheet-pile cofferdam (as Huangpu bridge) more than encloses water-bound and adopts steel plate as the cofferdam wall panel structure more.The scope of application and the pluses and minuses of several steel cofferdams show: steel suspended box cofferdam of the no end generally is applicable to the phytal zone, the bearing platform construction that the riverbed absolute altitude is higher relatively; Will utilize large-scale floating crane to carry out lifting waterborne, location in construction, construction organization requires high, and later stage back cover, scour protection engineering are bigger; Steel sheet-pile cofferdam can be inserted synchronously in the pile foundation construction later stage and beat, can save the duration, and construction material can have enough to meet the need, equipment is less demanding, but riverbed undulating, the levelling workload is bigger, and because there is inside and outside head difference in the cofferdam, the sealing difficulty is big between the steel sheet pile; Usually need to be provided with the more powerful purlin that encloses and reach interior the support as supporting.End steel suspended box cofferdam is arranged, generally be adapted to the profundal zone bearing platform construction; Do not have scour protection work in the work progress, back cover concrete quality can guarantee, but steel using amount is bigger relatively, and generally needs large-scale floating crane integral hoisting operation waterborne.
In sum, it is commonplace that the large-scale bearing platform construction in profundal zone has end steel cofferdam to use, but traditional have end steel cofferdam to have all generally that construction cost height, machinery have high input, the demanding present situation of construction organization.
Summary of the invention
The purpose of this utility model provides a kind of more economical and effective and, construction technology less demanding to construction machinery cofferdam construction device in the deep water pier bearing platform construction simply and easily.
The purpose of this utility model realizes by following design and technical scheme: cofferdam construction device in a kind of deep water pier bearing platform construction, it is characterized in that: which comprises at least cofferdam base plate, pile foundation casing, cofferdam wallboard, enclose purlin, interior support, the cofferdam wallboard is the steel pipe cofferdam, and the steel pipe cofferdam is connected and composed by steel pipe wallboard unit; Steel pipe wallboard unit is fixed on one by one and encloses on the purlin, and is connected with the cofferdam base plate, and forming by cofferdam base plate floor space and steel pipe wallboard is the space body of spatial altitude; In support with longitudinal and transverse with enclose purlin and be connected to main the support, be linked to be with the inclined-plane and combine, make the common net structure body up and down that forms of steel pipe wallboard unit, cofferdam base plate and interior support one by one, the steel pipe bottom sealing of steel pipe wallboard unit, make integral body accurately be adjusted to required height, carry out the construction of pile foundation casing by the water level of regulating in the steel pipe.
Described steel pipe cofferdam is connected and composed by steel pipe wallboard unit.
Described steel pipe wallboard unit is by angle steel and stiffener and 2 fixing steel pipe row shape bodies that form of steel pipe welding; Two stiffeners are welded to connect two steel pipes respectively up and down, and two stiffener inboards connect an angle steel respectively, and angle steel is welded to connect with two steel pipes again; The outside of two steel pipes is connecting angle more up and down, and outboard angle has fixing bolt.
Described steel pipe wallboard unit is by angle steel and stiffener and 3 fixing steel pipe row shape bodies that form of steel pipe welding; Two stiffeners are welded to connect the position up and down at two steel pipes respectively up and down, and two stiffener inboards connect an angle steel respectively, and angle steel is welded to connect with two steel pipes again; The outside of two steel pipes is connecting angle more up and down, and outboard angle has fixing bolt.
Diameter of steel tube in the described steel pipe wallboard unit is between 1.0~2.0m.
Of the present utility model have a following remarkable advantage:
(1) can make full use of bridge construction project self material stock, reduce the material purchase cost.
(2) the cofferdam wallboard with two, three steel pipes as a unit, process relatively fairly simple, and be convenient to the transportation (need not barge container).
(3) the steel pipe cofferdam can adopt small-sized crane barge or other crane gears to carry out assembly unit by the unit, has saved the construction cost that large-scale floating crane drops into.
(4) the wallboard steel tubular structure that adopts in cofferdam itself has that rigidity is big, advantages of high strength, has increased the security reliability in cofferdam.
(5) wallboard steel pipe in cofferdam adopts the structure of bottom lock, has the advantages that can float certainly after the entry, and the later stage can add heavy under water, is easy to control.
(6) the cofferdam wallboard can carry out assembly unit synchronously in pile foundation construction later stage and pile foundation construction, has the clear superiority of saving the duration.
Description of drawings
The utility model is described in further detail below in conjunction with the embodiment accompanying drawing:
Fig. 1 is the utility model example structure schematic diagram;
Fig. 3 is a steel pipe wallboard unit example structure schematic diagram;
Fig. 2-1 is a job engineering schematic diagram in this embodiment step 1);
Fig. 2-2 is this embodiment step 2) middle job engineering schematic diagram;
Fig. 2-3 is a job engineering schematic diagram in this embodiment step 3);
Fig. 2-4 is a job engineering schematic diagram in this embodiment step 4);
Fig. 2-5 is a job engineering schematic diagram in this embodiment step 5);
Fig. 2-6 is a job engineering schematic diagram in this embodiment step 6).
Among the figure: 1, cofferdam base plate; 2, pile foundation casing; 3, cofferdam wallboard; 4, enclose purlin; 5, interior support; 6, steel pipe; 7, small-sized crane barge; 8, bolt; 9, angle steel; 10, stiffener; 11, construction bridge; 12, construction pier position; 13, transfer water level; 14, drilling platform; 15, cofferdam navigation system; 16, following anchor point.
The specific embodiment
As shown in Figure 1, cofferdam construction device in a kind of deep water pier bearing platform construction which comprises at least cofferdam base plate 1, pile foundation casing 2, cofferdam wallboard 3, encloses purlin 4, interior support 5, and cofferdam wallboard 3 is the steel pipe cofferdam, and the steel pipe cofferdam is connected and composed by steel pipe wallboard unit; Steel pipe wallboard unit is fixed on one by one and encloses on the purlin 4, and be connected with cofferdam base plate 1, formation is the space body of spatial altitude by cofferdam base plate 1 floor space and steel pipe wallboard, in support 5 with longitudinal and transverse with enclose purlin 4 and be connected to main the support, be linked to be with the inclined-plane and combine, make each steel pipe wallboard unit, cofferdam base plate 1 and the interior support 5 common net structure bodies up and down that form, the steel pipe 6 bottoms sealing of tube wall plate unit, make integral body accurately be adjusted to required height, carry out the construction of pile foundation casing 2 by the water level of regulating in the steel pipe.
As shown in Figure 3, steel pipe wallboard unit can be by angle steel 9 and stiffener 10 and 2 fixing steel pipe row shape bodies that form of steel pipe welding.Two stiffeners 10 are welded to connect 6, two stiffener 10 inboards of two steel pipes respectively and connect an angle steel 9 respectively up and down, and angle steel 9 is welded to connect with two steel pipes 6 again.The outside of two steel pipes 6 is connecting angle 9 more up and down, and outboard angle 9 has fixing bolt 8.The A place is the stiffening rib position.
Steel pipe wallboard unit also can be by angle steel 9 and stiffener 10 and 3 fixing steel pipe row shape bodies that form of steel pipe welding.Two stiffeners 10 are welded to connect the position up and down at two steel pipes 6 respectively up and down, and two stiffener 10 inboards connect an angle steel 9 respectively, and angle steel 9 is welded to connect with two steel pipes 6 again.The outside of two steel pipes 6 in the outside is connecting angle 9 more up and down, and outboard angle 9 has fixing bolt 8.Diameter of steel tube in the steel pipe wallboard unit is between 1.0~2.0m.
Its concrete implementation step following (is example with the rectangle cushion cap):
1) see accompanying drawing 2-1, wallboard unit, cofferdam (2 steel pipe wallboard unit or 3 steel pipe wallboard unit that steel pipe constitutes that steel pipe constitutes) after the processing district machines, are transported to construction pier position 12, are undertaken spacing by construction bridge 11; Adopt small-sized crane barge 7 to carry out assembly unit, effectively connect by bolt 8 between each unit, wherein underwater portion connects and can be finished by the dirver.
2) see accompanying drawing 2-2, on the peripheral pile foundation casing 2 place system under the cofferdam is set near the cofferdam at pile foundation construction, making the cofferdam enclose purlin 4 by place system under the cofferdam transfers water level 13 in setting and effectively connects (general fining twisted steel lifting mode more commonly used), whole cofferdam is in from floating state (preparation is transferred).
3) see accompanying drawing 2-3, cofferdam bottom board system and base plate lifting system are installed on the water surface, prepare cofferdam base plate 1 and transfer.
4) see accompanying drawing 2-4, utilize under the cofferdam place system under the place system and base plate, jack is transferred cofferdam and cofferdam base plate 1 synchronously, guarantees each suspension centre synchronism.The cofferdam is transferred in the process and add suitable quantity of water in the steel pipe wallboard, makes that place system is in little stress all the time under the cofferdam.
5) see accompanying drawing 2-5, after cofferdam and bottom board system are transferred and put in place, utilize cofferdam navigation system 15 that it is locked, and send the diver that effective shutoff is carried out in slit between cofferdam base plate and steel casing, cofferdam base plate and the cofferdam wallboard.
6) see accompanying drawing 2-6, after the base plate shutoff is finished, just can carry out bottom concrete and build.
So far, finish cofferdam construction.
Cofferdam bottom board system: adopt shaped steel to add the form of structure of panel (checkered steel plate), handle according to cofferdam inner cavity size size and at pile foundation casing 2 places' preformed holes (can utilize early stage drilling platform 14 change).
Enclose the purlin support system: enclose purlin system and interior support 4 general heavy section steel and the steel pipe processing and fabricatings of adopting, mainly the steel pipe wallboard is effectively supported, make its one-tenth as a whole, more effectively resist the lateral pressure that the cofferdam head difference produces.
The cofferdam navigation system: general using pile foundation casing 2 and peripheral construction bridge 11 steel posts, treat the cofferdam transfer put in place after, positioning beam (heavy section steel) is set is locked.
The cofferdam caging system: generally adopt rubber to protect string, be arranged in around the inboard, cofferdam, corresponding with pile foundation casing 2, big off normal does not take place in the process to guarantee that the cofferdam is transferred.
Place system under the cofferdam: the sharp pile foundation casing 2 of place system is provided with brace summer, diagonal brace, reaction beam, finish rolling deformed bar, following suspension centre etc. under the cofferdam, mainly is responsible for transferring of later stage cofferdam.
Cofferdam base plate lifting system: anchor point 16 was formed under cofferdam base plate lifting system was mainly reached by the anchoring girder that is arranged in the casing end face, cooperated the smart bundle of jack and lifting indented bars to carry out base plate and transferred and bear back cover concrete construction period base plate load.
Because in the utility model, place system and cofferdam base plate lifting system all are methods commonly used in the existing construction under cofferdam navigation system, cofferdam caging system, the cofferdam, why the utility model carries out more explanation, that original construction means can't impact, and is opposite for after being expressed in employing steel pipe wallboard technology, since the cofferdam wallboard with two, three steel pipes as a unit, processing is fairly simple relatively, need not barge container, is convenient to transportation. The steel pipe cofferdam can adopt small-sized crane barge or other crane gears to carry out assembly unit by the unit, has saved the construction cost that large-scale floating crane drops into. And the cofferdam wallboard just the steel-tube construction of usefulness itself have the advantages that rigidity is big, intensity is high, increased the security reliability in cofferdam. Cofferdam wallboard steel pipe adopts the structure of bottom lock, has the advantages that can certainly float after the entry, and the later stage can add heavy under water, is easy to control. The cofferdam wallboard can carry out assembly unit synchronously in pile foundation construction later stage and pile foundation construction, has the clear superiority of saving the duration.
Claims (4)
1. cofferdam construction device in the deep water pier bearing platform construction, it is characterized in that: which comprises at least cofferdam base plate (1), pile foundation casing (2), cofferdam wallboard (3), enclose purlin (4), interior support (5), cofferdam wallboard (3) is the steel pipe cofferdam, and the steel pipe cofferdam is connected and composed by steel pipe wallboard unit; Steel pipe wallboard unit is fixed on one by one and encloses on the purlin (4), and is connected with cofferdam base plate (1), and forming by cofferdam base plate (1) floor space and steel pipe wallboard is the space body of spatial altitude; In support (5) with longitudinal and transverse with enclose purlin (4) and be connected to main the support, be linked to be with the inclined-plane and combine, make the common net structure body up and down that forms of steel pipe wallboard unit, cofferdam base plate (1) and interior support (5) one by one, steel pipe (6) the bottom sealing of steel pipe wallboard unit, make integral body accurately be adjusted to required height, carry out the construction of pile foundation casing (2) by the water level of regulating in the steel pipe (6).
2. cofferdam construction device in a kind of deep water pier bearing platform construction according to claim 1 is characterized in that: described steel pipe wallboard unit is by angle steel (9) and stiffener (10) and the fixing steel pipe row shape body that forms of 2 steel pipes (6) welding; Two stiffeners (10) are welded to connect two steel pipes (6) respectively up and down, and two stiffeners (10) inboard connects an angle steel (9) respectively, and angle steel (9) is welded to connect with two steel pipes (6) again; The outside of two steel pipes (6) is connecting angle (9) more up and down, and outboard angle (9) has fixing bolt (8).
3. cofferdam construction device in a kind of deep water pier bearing platform construction according to claim 1 is characterized in that: described steel pipe wallboard unit is by angle steel (9) and stiffener (10) and 3 fixing steel pipe row shape bodies that form of steel pipe welding; Two stiffeners (10) are welded to connect respectively at the position up and down of two steel pipes (6) up and down, and two stiffeners (10) inboard connects an angle steel (9) respectively, and angle steel (9) is welded to connect with two steel pipes (6) again; The outside of two steel pipes (6) is connecting angle (9) more up and down, and outboard angle (9) has fixing bolt (8).
4. cofferdam construction device in a kind of deep water pier bearing platform construction according to claim 1 is characterized in that: the diameter of steel tube in the described steel pipe wallboard unit is between 1.0~2.0m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010203021007U CN201635082U (en) | 2010-02-02 | 2010-02-02 | Cofferdam construction device in deep-water pier cushion cap construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010203021007U CN201635082U (en) | 2010-02-02 | 2010-02-02 | Cofferdam construction device in deep-water pier cushion cap construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201635082U true CN201635082U (en) | 2010-11-17 |
Family
ID=43079568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010203021007U Expired - Lifetime CN201635082U (en) | 2010-02-02 | 2010-02-02 | Cofferdam construction device in deep-water pier cushion cap construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201635082U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102191777A (en) * | 2011-05-12 | 2011-09-21 | 广州市市政集团有限公司 | Steel sheet pile coefferdam structure and topdown construction method thereof |
CN102493468A (en) * | 2011-12-13 | 2012-06-13 | 中交第二公路工程局有限公司 | Design method for construction cofferdam of bridge deepwater soft soil foundation |
CN107604932A (en) * | 2017-10-16 | 2018-01-19 | 中铁大桥局集团有限公司 | The method, apparatus and totally-enclosed bracket that a kind of high narrow steel cofferdam is integrally gone to river |
CN109371997A (en) * | 2018-12-04 | 2019-02-22 | 中铁六局集团有限公司 | A kind of double-wall cofferdam and pier construction method |
CN109469084A (en) * | 2018-09-21 | 2019-03-15 | 中交武汉港湾工程设计研究院有限公司 | The embedded construction method of deep water hard rock |
-
2010
- 2010-02-02 CN CN2010203021007U patent/CN201635082U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102191777A (en) * | 2011-05-12 | 2011-09-21 | 广州市市政集团有限公司 | Steel sheet pile coefferdam structure and topdown construction method thereof |
CN102191777B (en) * | 2011-05-12 | 2012-12-12 | 广州市市政集团有限公司 | Steel sheet pile coefferdam structure and topdown construction method thereof |
CN102493468A (en) * | 2011-12-13 | 2012-06-13 | 中交第二公路工程局有限公司 | Design method for construction cofferdam of bridge deepwater soft soil foundation |
CN102493468B (en) * | 2011-12-13 | 2014-06-11 | 中交第二公路工程局有限公司 | Design method for construction cofferdam of bridge deepwater soft soil foundation |
CN107604932A (en) * | 2017-10-16 | 2018-01-19 | 中铁大桥局集团有限公司 | The method, apparatus and totally-enclosed bracket that a kind of high narrow steel cofferdam is integrally gone to river |
CN109469084A (en) * | 2018-09-21 | 2019-03-15 | 中交武汉港湾工程设计研究院有限公司 | The embedded construction method of deep water hard rock |
CN109469084B (en) * | 2018-09-21 | 2020-10-16 | 中交武汉港湾工程设计研究院有限公司 | Construction method of deep water hard rock embedded bearing platform |
CN109371997A (en) * | 2018-12-04 | 2019-02-22 | 中铁六局集团有限公司 | A kind of double-wall cofferdam and pier construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102140801A (en) | Cofferdam construction method in construction of deepwater pier bearing platform | |
CN102720140B (en) | Large-span prestress concrete continuous beam deepwater pier construction process | |
CN201635082U (en) | Cofferdam construction device in deep-water pier cushion cap construction | |
CN107653895B (en) | Combined offshore six-buoy buoyancy tank foundation structure and construction method thereof | |
CN201857618U (en) | Floating guide platform and steel casing supported drilling platform deepwater pile foundation | |
CN203200914U (en) | Steel structure socle outward exposed connecting structure | |
CN107630461B (en) | Combined offshore four-buoy buoyancy tank foundation structure and construction method thereof | |
CN103998692A (en) | Foundation structure, which can be installed with a low level of noise, for an offshore plant, in particular an offshore wind energy plant, and assembly method therefor | |
CN102162256A (en) | Maritime foundation base | |
CN107806108A (en) | Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea | |
CN110030014A (en) | A kind of Soft Rock Roadway Floor Heave allows pressure camber shell administering method | |
CN202359566U (en) | Cofferdam for deep-water soft soil foundation construction of bridge | |
CN204551266U (en) | One assembledly can recycle Double-Wall Steel Boxed Cofferdam without inner support | |
CN200992710Y (en) | Steel hanging box for bridge deep-water construction weir | |
CN103572770B (en) | A kind of stake case hydraulic structures and construction method thereof | |
CN102493468A (en) | Design method for construction cofferdam of bridge deepwater soft soil foundation | |
CN207987950U (en) | Four floating drum buoyancy tank foundation structures on a kind of combined type sea | |
CN103031853A (en) | Seabed oil storage system | |
CN208183643U (en) | A kind of dock structure taking into account large ship and heavy mail mast and hanging | |
CN203782670U (en) | Floating box platform for over-water construction | |
CN203238646U (en) | Casing box with built-in bottom board | |
CN101148888A (en) | Compressed-air caisson anchor pile automatic error correcting device | |
CN102433894B (en) | Construction method for station side wall by covered top-down excavation method | |
CN202298649U (en) | Buttress structure with longitudinal beams | |
CN107724414A (en) | Five floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20101117 |
|
CX01 | Expiry of patent term |