CN201635070U - Brick pile structure - Google Patents

Brick pile structure Download PDF

Info

Publication number
CN201635070U
CN201635070U CN2010200497810U CN201020049781U CN201635070U CN 201635070 U CN201635070 U CN 201635070U CN 2010200497810 U CN2010200497810 U CN 2010200497810U CN 201020049781 U CN201020049781 U CN 201020049781U CN 201635070 U CN201635070 U CN 201635070U
Authority
CN
China
Prior art keywords
brick
pile structure
heating conductor
brick pile
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010200497810U
Other languages
Chinese (zh)
Inventor
姚新良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dadongwu Group Construction Co Ltd
Original Assignee
Zhejiang Dadongwu Group Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dadongwu Group Construction Co Ltd filed Critical Zhejiang Dadongwu Group Construction Co Ltd
Priority to CN2010200497810U priority Critical patent/CN201635070U/en
Application granted granted Critical
Publication of CN201635070U publication Critical patent/CN201635070U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Resistance Heating (AREA)

Abstract

The utility model discloses a brick pile structure, which comprises a plurality of heating conductors, both ends of each heating conductor are extended out of a foundation pit, and each heating conductor is wrapped by fired earth bricks. The heating conductors are inserted into the earth and electrified, and the surrounding earth is sintered into bricks when the brick-firing temperature is reached, so that brick piles are formed; when the conventional cement piles are replaced by the brick piles, not only is the firmness enhanced, but also the cost is greatly reduced, moreover, isotropy is achieved, the construction difficulty is low, and therefore the brick pile structure is a novel construction method and a novel structure.

Description

A kind of brick pile structure
[technical field]
The utility model belongs to the realm of building construction, the improvement of the pilework that relates in particular in the building operations to be adopted.
[background technology]
The firmness of present cement earth pile is relatively poor, and very large tracts of land need be set, and cost is very high.And a plurality of cement earth piles are because the difference of constructing operation, and all there is certain difference in its performance, and require to reach isotropism during construction as far as possible, so just improved difficulty of construction.
[summary of the invention]
The purpose of this utility model solves the problems of the prior art exactly, proposes a kind of more firm, brick pile structure that cost is lower.
For achieving the above object, the utility model proposes a kind of brick pile structure, comprise some heating conductors, foundation ditch is stretched out at the both ends of described heating conductor, and the external packets of heating conductor is wrapped with soil and bakes bricks.
As preferably, described heating conductor is the U-shaped syllogic, two sections vertically the bottom of section link to each other by interlude, the top is stretched out foundation ditch and can be connected with power supply.Simple in structure that, easy construction.
As preferably, described soil is baked bricks to cylindrical.It is convenient to realize, the firmness height.
As preferably, the edge that two adjacent soil are baked bricks near or interconnection.Form similar body of wall, further improve whole firmness.
As preferably, also be provided with the temperature controller that is connected with power supply on the described heating conductor.
The beneficial effects of the utility model: the utility model inserts heating conductor under soil, and to its energising, make soil on every side sinter brick into after reaching the temperature of baking bricks, form the brick stake, substitute traditional cement earth pile, not only improved firmness, and greatly reduce cost, and each is to the basic same sex, difficulty of construction is low, is a kind of brand-new form of construction work and structure.
Feature of the present utility model and advantage will be elaborated in conjunction with the accompanying drawings by embodiment.
[description of drawings]
Fig. 1 is the structural representation of a kind of basement uplift pile of the utility model;
Fig. 2 is the structural representation of heating conductor in a kind of basement uplift pile of the utility model.
[specific embodiment]
Consult Fig. 1,2, a kind of brick pile structure comprises some heating conductors 1, and foundation ditch is stretched out at the both ends of described heating conductor 1, and the external packets of heating conductor 1 is wrapped with soil and bakes bricks 2.Described heating conductor 1 is the U-shaped syllogic, and the bottom of two sections vertical sections links to each other by interlude, and the top is stretched out foundation ditch and can be connected with power supply.Described soil bakes bricks 2 for cylindrical.Two adjacent soil bake bricks 2 edge near or interconnection.Also be provided with the temperature controller that is connected with power supply on the described heating conductor 1.
Heating conductor 1 can be whole syllogic, also can be syllogic independently.If all-in-one-piece, pass soil layer when then constructing, implant in the soil layer, connect power supply then at two ends, make the conductor heating up, with native burnt brick, use as the stake of ground, after soil change brick is finished power supply is disconnected, heating conductor 1 is stayed in the brick body.If syllogic independently, be welded to connect after then can inserting soil layer respectively, connect power supply then at two ends, make the conductor heating up, with native burnt brick, use as the stake of ground, soil becomes and after brick is finished power supply is disconnected, and heating conductor 1 is stayed in the brick body.Soil forms the brick stake after sintering brick into, substitutes traditional cement earth pile, not only improved firmness, and greatly reduced cost, and each is to the basic same sex, and difficulty of construction is low, is a kind of brand-new form of construction work and structure.
Certainly; the utility model also can have other various embodiments; under the situation that does not deviate from the utility model spirit and essence thereof; those of ordinary skill in the art works as can make various corresponding changes and distortion according to the utility model, but these corresponding changes and distortion all should belong to the protection domain of the appended claim of the utility model.

Claims (5)

1. brick pile structure, it is characterized in that: comprise some heating conductors, foundation ditch is stretched out at the both ends of described heating conductor, and the external packets of heating conductor is wrapped with soil and bakes bricks.
2. a kind of brick pile structure as claimed in claim 1 is characterized in that: described heating conductor is the U-shaped syllogic, and the bottom of two sections vertical sections links to each other by interlude, and the top is stretched out foundation ditch and can be connected with power supply.
3. a kind of brick pile structure as claimed in claim 1 or 2 is characterized in that: described soil is baked bricks to cylindrical.
4. a kind of brick pile structure as claimed in claim 3 is characterized in that: the edge that two adjacent soil are baked bricks near or interconnection.
5. a kind of brick pile structure as claimed in claim 2 is characterized in that: also be provided with the temperature controller that is connected with power supply on the described heating conductor.
CN2010200497810U 2010-01-13 2010-01-13 Brick pile structure Expired - Lifetime CN201635070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200497810U CN201635070U (en) 2010-01-13 2010-01-13 Brick pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200497810U CN201635070U (en) 2010-01-13 2010-01-13 Brick pile structure

Publications (1)

Publication Number Publication Date
CN201635070U true CN201635070U (en) 2010-11-17

Family

ID=43079556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200497810U Expired - Lifetime CN201635070U (en) 2010-01-13 2010-01-13 Brick pile structure

Country Status (1)

Country Link
CN (1) CN201635070U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761070B (en) * 2010-01-13 2012-10-17 浙江大东吴集团建设有限公司 Brick pile structure
CN103306274A (en) * 2013-07-04 2013-09-18 宁夏回族自治区电力设计院 Sintering pile and method for manufacturing sintering pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761070B (en) * 2010-01-13 2012-10-17 浙江大东吴集团建设有限公司 Brick pile structure
CN103306274A (en) * 2013-07-04 2013-09-18 宁夏回族自治区电力设计院 Sintering pile and method for manufacturing sintering pile

Similar Documents

Publication Publication Date Title
CN105908862B (en) A kind of production method of masonry shell in 3D printing reinforced masonry shear wall
CN102071761B (en) Built-in rope net rammed earth wall body and construction method thereof
CN101761070B (en) Brick pile structure
CN202689252U (en) Reinforced rammed earth wall applicable to rural house
CN104912101A (en) Tunneling and assembling structure and construction method of comprehensive pipe gallery
CN101806100A (en) Horizontal joint waterproofing node of exterior wall
CN201635070U (en) Brick pile structure
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN102644408A (en) Assembly type reinforced concrete prefabricated wall
CN204645058U (en) A kind ofly be provided with the H type Double-row-piles Structure adding core rotary churning pile
CN107447776A (en) The pull-type vertical retaining wall structure structure of anchor and construction method
CN205242858U (en) Dysmorphism curved surface roofing screed -coat structure
CN203080540U (en) Iron tower foundation of power transmission line
CN204112340U (en) A kind of ecological slope protection structure
CN208777497U (en) A kind of one off houses that cob brick is built
CN208455660U (en) A kind of welding with filler wire Retaining Wall
CN206887978U (en) A kind of thermal insulation environment protection architecture foundation structure
CN204982910U (en) Foundation ditch arch supporting construction
CN205976361U (en) Prefabricated type elevartor shaft
CN206233398U (en) The agricultural greenhouse that a kind of use building heat preservation module is built
CN212176163U (en) Sunlight greenhouse wall structure
CN208633128U (en) A kind of cofferdam floor tile
CN201943217U (en) Rammed earth wall with build-in rope net
CN103758223A (en) Energy-saving and structure integration environment-friendly building external wall of external foundation wall and steel mesh heat-preservation boards
CN212506877U (en) Archaizing building with black brick wall surface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20101117

CX01 Expiry of patent term