CN201634981U - Complete interchange - Google Patents

Complete interchange Download PDF

Info

Publication number
CN201634981U
CN201634981U CN2010200101298U CN201020010129U CN201634981U CN 201634981 U CN201634981 U CN 201634981U CN 2010200101298 U CN2010200101298 U CN 2010200101298U CN 201020010129 U CN201020010129 U CN 201020010129U CN 201634981 U CN201634981 U CN 201634981U
Authority
CN
China
Prior art keywords
south
east
north
bend
runway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200101298U
Other languages
Chinese (zh)
Inventor
孙宗光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Maritime University
Original Assignee
Dalian Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Maritime University filed Critical Dalian Maritime University
Priority to CN2010200101298U priority Critical patent/CN201634981U/en
Application granted granted Critical
Publication of CN201634981U publication Critical patent/CN201634981U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a complete interchange, which comprises an east west ground artery, a south north elevated artery and four intersections. Each intersection has five traffic lanes and a left right change overpass. A west south curve, an east south curve and a south east curve are ground roads. A north south straightway is connected with the east traffic lane of the south north elevated artery through an approach bridge. A south north straightway spans the north south straightway through the left right change overpass and then is connected with the west traffic lane of the south north elevated artery and is connected with a south west curve through the south north elevated artery. A north intersection traffic lane is antisymmetrical to a south intersection traffic lane. An east intersection traffic lane is similar to the south intersection traffic lane but the straightway is connected with the east west ground artery. A west intersection traffic lane is antisymmetrical to the east intersection traffic lane. The utility model realizes that the drivers drive on the right when turning right and drive on the left when turning left. The vehicles turning left are as natural, smooth and quick as the vehicles turning right. The area of occupied floor is small and the building is low.

Description

A kind of complete interchange viaduct
Technical field
The utility model relates to a kind of highway interchange viaduct, particularly a kind of complete interchange viaduct.
Background technology
Complete interchange viaduct is the overpass bridge of instigating all roads of intersecting at the crossing to communicate with each other.All roads that need intersect are all realized the three-dimensional intersection by different elevations.Communication between the different elevation roads realizes by ad hoc ring road, makes any vehicle that enters the intersection can realize, turn right and keep straight on, and each is unblocked to wagon flow, does not disturb mutually, has eliminated the plane conflict point fully.Therefore, complete interchange viaduct is the most perfect up to now a kind of overpass bridge form.Illustrated in figures 1 and 2 is two kinds of canonical forms of complete interchange viaduct.Wherein first kind is the individual layer intersection.The overpass bridge of these forms has all solved the collision problem between the different directions vehicle of intersection preferably.But the major defect of overpass bridge shown in Figure 1 is: (1) floor space is big, under land resources situation in short supply day by day, has strengthened construction cost, has also limited the employing at most of crossings in the city simultaneously; (2) turn left to detour 270 °, running distance is long, has increased energy consumption, has reduced efficient.The major defect of overpass bridge shown in Figure 2 is: the number of plies of intersecting is too much, and it is long to cause building height to increase with access bridge, and this has not only strengthened construction cost and operation maintenance cost, also makes structural performance, and especially anti-seismic performance descends greatly.
Summary of the invention
For solving the problems referred to above that prior art exists, the utility model will design a kind of complete interchange viaduct that floor space is little, building height is low, left turning vehicle no longer detours that possesses simultaneously.
To achieve these goals, the technical solution of the utility model is as follows: a kind of complete interchange viaduct comprises the overhead arterial highway in arterial highway, thing ground and north and south, have four crossings of East, West, South, North, there are five kinds of runways and a left and right sides lane change overpass bridge in each crossing; The runway of South Road mouth is by being followed successively by southwest from left to right towards the crossing to bend, the southeast is to bend, north south orientation straight way, north-south straight way and east southeast are to bend, described southwest is to bend, the southeast all is ground level roads to bend and east southeast to bend, described northern south orientation straight way links to each other with the east side runway of overhead arterial highway, north and south by access bridge, described north-south straight way links to each other with the west side runway of overhead arterial highway, north and south after crossing over northern south orientation straight way by left and right sides lane change overpass bridge, and link to each other North Road mouth runway and South Road mouth runway antisymmetry to bend with Nan Xi by overhead arterial highway, north and south; The runway of East Road mouth is by being followed successively by east southeast from left to right towards the crossing to bend, east northeast is to bend, west east orientation straight way, East and West direction straight way and North-East Bound bend, described east northeast links to each other with the east side runway of overhead arterial highway, north and south by access bridge to bend, described western east orientation straight way links to each other with the north side runway of arterial highway, thing ground by the ground bend, described East and West direction straight way is crossed over western east orientation straight way by left and right sides lane change overpass bridge and is linked to each other with the southern side runway of arterial highway, thing ground, and be connected West Road mouth runway and East Road mouth runway antisymmetry to bend with the southeast by arterial highway, thing ground.
Northern south orientation straight way described in the utility model links to each other with the east side runway of overhead arterial highway, north and south after crossing over the north-south straight way by left and right sides lane change overpass bridge; Described western east orientation straight way is crossed over the East and West direction straight way by left and right sides lane change overpass bridge and is linked to each other with the north side runway of arterial highway, thing ground.
The four corners of the world described in the utility model direction can be rotated arbitrarily under the certain intersecting angle situation in overhead arterial highway and arterial highway, ground guaranteeing.
Runway described in the utility model can be arranged to single road or arrange the road more according to the size of vehicle flowrate.
Compared with prior art, the utlity model has following beneficial effect:
1, because the utility model makes vehicle from either direction before entering the intersection, at first shunt the right-hand rotation vehicle to right-turn lane, then, craspedodrome and left lateral vehicle become by left and right sides lane change overpass bridge temporarily and keep left; After realization kept left, left turning vehicle can directly turn left to sail into left turn lane, and through vehicles recovers to keep to the right by the left and right sides lane change overpass bridge at crossing, opposite once more.Thereby realized " keep to the right during right-hand rotation, keep left during left-hand rotation ", made the vehicle of left-hand rotation under the rule of keeping to the right, realize the same natural, smooth and easy, quick with right-hand rotation.
2, because the utility model has realized that vehicle directly turns left, do not need the long radius bend that detours, reduced floor space greatly, be particularly suitable for narrow and small crossing, city.Compare with overpass bridge floor space shown in Figure 1, suppose that the left-hand rotation turning radius is 40m, so, total can reduce takes up an area of about 20,000 square metres.
3, because all fly-over junctions of the utility model all are the individual layer intersections, and building height is low, and access bridge is short, and cost is low, anti-seismic performance is good; Compare with the overall height of overpass bridge shown in Figure 2, building height can be reduced to 1/3rd.
4, because the utility model has realized that left turning vehicle need not cross over, no longer detour, shortened running distance, compare with the distance of overpass bridge shown in Figure 1, suppose left-hand rotation turning radius 40m, so, the left-hand rotation of four direction can reduce 1000m at least apart from amounting to, and each left turning vehicle lacks to walk the distance of 250m approximately.
Description of drawings
5 in the total accompanying drawing of the utility model, wherein:
Fig. 1 is a kind of complete interchange viaduct structural representation.
Fig. 2 is a kind of multilayer complete interchange viaduct structural representation.
Fig. 3 is a single-layer full interchange viaduct structural representation of the present utility model.
Fig. 4 is a single-layer full interchange viaduct perspective view of the present utility model.
Fig. 5 is a single-layer full interchange viaduct passing method schematic diagram of the present utility model.
Among the figure: 1, arterial highway, thing ground, 2, overhead arterial highway, north and south, 3, southwest is to bend, 4, the southeast is to bend, 5, northern south orientation straight way, 6, north-south straight way, 7, east southeast is to bend, 8, Nan Xi is to bend, 9, east northeast is to bend, 10, western east orientation straight way, 11, the East and West direction straight way, 12, the North-East Bound bend.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further.Shown in Fig. 3-5, a kind of complete interchange viaduct comprises the overhead arterial highway 2 in arterial highway 1, thing ground and north and south, has four crossings of East, West, South, North, and there are five kinds of runways and a left and right sides lane change overpass bridge in each crossing; The runway of South Road mouth is by being followed successively by southwest from left to right towards the crossing to bend 3, the southeast is to bend 4, north south orientation straight way 5, north-south straight way 6 and east southeast are to bend 7, described southwest is to bend 3, the southeast all is ground level roads to bend 4 and east southeast to bend 7, described northern south orientation straight way 5 links to each other by the east side runway of the overhead arterial highway 2 in access bridge and north and south, described north-south straight way 6 is crossed over northern south orientation straight way 5 backs by left and right sides lane change overpass bridge and is linked to each other with the west side runway of overhead arterial highway 2, north and south, and link to each other North Road mouth runway and South Road mouth runway antisymmetry to bend 8 with Nan Xi by overhead arterial highway 2, north and south; The runway of East Road mouth is by being followed successively by east southeast from left to right towards the crossing to bend 7, east northeast is to bend 9, west east orientation straight way 10, East and West direction straight way 11 and North-East Bound bend 12, described east northeast links to each other to the east side runway of bend 9 by the overhead arterial highway 2 in access bridge and north and south, described western east orientation straight way 10 links to each other with the north side runway of arterial highway, thing ground 1 by the ground bend, described East and West direction straight way 11 is crossed over western east orientation straight way 10 by left and right sides lane change overpass bridge and is linked to each other with the southern side runway of arterial highway, thing ground 1, and be connected West Road mouth runway and East Road mouth runway antisymmetry to bend 4 with the southeast by arterial highway 1, thing ground.
Northern south orientation straight way 5 described in the utility model is crossed over north-south straight way 6 backs by left and right sides lane change overpass bridge and is linked to each other with the east side runway of overhead arterial highway 2, north and south; Described western east orientation straight way 10 is crossed over East and West direction straight way 11 by left and right sides lane change overpass bridge and is linked to each other with the north side runway of arterial highway, thing ground 1.Described four corners of the world direction can be rotated arbitrarily under the certain intersecting angle situation in overhead arterial highway and arterial highway, ground guaranteeing.Described runway can be arranged to single road or arrange the road more according to the size of vehicle flowrate.
Passing rules of the present utility model is as follows: before entering the intersection, at first shunt the right-hand rotation vehicle to right-turn lane from the vehicle of either direction, then, keep straight on and the left lateral vehicle becomes by left and right sides lane change overpass bridge temporarily and keeps left; After realization kept left, left turning vehicle can directly turn left to sail into left turn lane, and through vehicles recovers to keep to the right by the left and right sides lane change overpass bridge at crossing, opposite once more.

Claims (4)

1. a complete interchange viaduct comprises the overhead arterial highway in arterial highway, thing ground (1) and north and south (2), has four crossings of East, West, South, North, it is characterized in that: there are five kinds of runways and a left and right sides lane change overpass bridge in each crossing; The runway of South Road mouth is by being followed successively by southwest from left to right towards the crossing to bend (3), the southeast is to bend (4), north south orientation straight way (5), north-south straight way (6) and east southeast are to bend (7), described southwest is to bend (3), the southeast all is ground level roads to bend (4) and east southeast to bend (7), described northern south orientation straight way (5) links to each other by the east side runway of the overhead arterial highway in access bridge and north and south (2), described north-south straight way (6) is crossed over northern south orientation straight way (5) back by left and right sides lane change overpass bridge and is linked to each other with the west side runway of overhead arterial highway, north and south (2), and link to each other North Road mouth runway and South Road mouth runway antisymmetry to bend (8) with Nan Xi by overhead arterial highway, north and south (2); The runway of East Road mouth is by being followed successively by east southeast from left to right towards the crossing to bend (7), east northeast is to bend (9), west east orientation straight way (10), East and West direction straight way (11) and North-East Bound bend (12), described east northeast links to each other to the east side runway of bend (9) by the overhead arterial highway in access bridge and north and south (2), described western east orientation straight way (10) links to each other with the north side runway of arterial highway, thing ground (1) by the ground bend, described East and West direction straight way (11) is crossed over western east orientation straight way (10) by left and right sides lane change overpass bridge and is linked to each other with the southern side runway of arterial highway, thing ground (1), and be connected West Road mouth runway and East Road mouth runway antisymmetry to bend (4) with the southeast by arterial highway, thing ground (1).
2. a kind of complete interchange viaduct according to claim 1 is characterized in that: described northern south orientation straight way (5) is crossed over north-south straight way (6) back by left and right sides lane change overpass bridge and is linked to each other with the east side runway of overhead arterial highway, north and south (2); Described western east orientation straight way (10) is crossed over East and West direction straight way (11) by left and right sides lane change overpass bridge and is linked to each other with the north side runway of arterial highway, thing ground (1).
3. a kind of complete interchange viaduct according to claim 1 is characterized in that: described four corners of the world direction can be rotated arbitrarily under the certain intersecting angle situation in overhead arterial highway and arterial highway, ground guaranteeing.
4. a kind of complete interchange viaduct according to claim 1 is characterized in that: described runway can be arranged to single road or arrange the road more according to the size of vehicle flowrate.
CN2010200101298U 2010-01-07 2010-01-07 Complete interchange Expired - Fee Related CN201634981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200101298U CN201634981U (en) 2010-01-07 2010-01-07 Complete interchange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200101298U CN201634981U (en) 2010-01-07 2010-01-07 Complete interchange

Publications (1)

Publication Number Publication Date
CN201634981U true CN201634981U (en) 2010-11-17

Family

ID=43079467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200101298U Expired - Fee Related CN201634981U (en) 2010-01-07 2010-01-07 Complete interchange

Country Status (1)

Country Link
CN (1) CN201634981U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261026A (en) * 2011-06-16 2011-11-30 白羽 Distributed two-layer oriented viaduct

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261026A (en) * 2011-06-16 2011-11-30 白羽 Distributed two-layer oriented viaduct
CN102261026B (en) * 2011-06-16 2013-04-17 白羽 Distributed two-layer oriented viaduct

Similar Documents

Publication Publication Date Title
US20150117947A1 (en) Traffic-light-free overpass at intersection
CN203487426U (en) Crisscross urban overpass
CN101725100A (en) Single-layer full interchange viaduct
CN103498394B (en) A kind of automobile-use planar road net system
CN103161108B (en) A kind of intersection bridge
CN202323599U (en) Full-through flyover
CN113338094A (en) Urban interchange with double-layer structure for up-down lines and left-turn ramps
WO2017167138A1 (en) Interchange and traffic routing method
CN203200625U (en) Bridge on junction of three roads
WO2013007100A4 (en) Interchange
CN201634981U (en) Complete interchange
CN1966859A (en) Tower type rotary whole-interchange fly-over bridge
CN202030999U (en) Urban road network
CN208830073U (en) A kind of dislocation cross junction overpass structure
CN1752347A (en) Crossroads fly-over crossing without red and green lamps
CN202705840U (en) Improved clover-leaf interchange overpass
CN202055131U (en) City center overpass
CN202390735U (en) U-shaped turning bridge for realizing continuous passing of vehicles at level crossing
CN101949118A (en) Omnibearing full double-deck overpass bridge at intersection
CN202000233U (en) Road network system
CN201459557U (en) Completely interchanging flyover
CN202023130U (en) Elevated overpass shaped like a Chinese character `Ri`
CN203160082U (en) Intersection bridge
CN200946229Y (en) Super minisize crossroads
CN205501746U (en) Light automobile steel of highway T crossing constructs overpass structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20140107