CN201620360U CN2010201739130U CN201020173913U CN201620360U CN 201620360 U CN201620360 U CN 201620360U CN 2010201739130 U CN2010201739130 U CN 2010201739130U CN 201020173913 U CN201020173913 U CN 201020173913U CN 201620360 U CN201620360 U CN 201620360U
Authority
CN
China
Prior art keywords
pedestal
arch rib
moulding
arch
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201739130U
Other languages
Chinese (zh)
Inventor
张广义
刘强华
杜越
罗万录
王永丽
张清臣
刘锋
尹刚练
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Original Assignee
China Railway 20th Bureau Group Corp
First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp, First Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd filed Critical China Railway 20th Bureau Group Corp
Priority to CN2010201739130U priority Critical patent/CN201620360U/en
Application granted granted Critical
Publication of CN201620360U publication Critical patent/CN201620360U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a vertical precasting pedestal for an arch rib of a bowstring arch bridge. The vertical precasting pedestal comprises a base plate, a pedestal and a forming board, wherein the pedestal is arranged on the base plate; the forming board is laid on the pedestal; the forming board, the pedestal and the base plate are combined into a whole body from top to bottom and form a bottom die used for precasting an arch rib needing to be molded; the structures and the sizes of the forming board, the pedestal and the base plate are matched with the structure and the size of the arch rib needing to be molded; the pre-camber at the upper part of the forming board is identical to the pre-camber of the arch rib needing to be molded; the upper surface of the forming board is a forming curved surface used for molding the bottom surface of the arch rib needing to be molded; and the curvilinear equation of a center line of the forming curved surface is identical to the curvilinear equation of a medial axis of the arch rib needing to be molded. The vertical precasting pedestal has the advantages of simple structure, reasonable design, simple and convenient use and operation, high construction efficiency and low construction difficulty, does not need to adopt integral templating in construction templating, does not need overturn during hoisting, does not need to have a try in joint before installation, achieves simple and convenient construction and is easy to ensure the quality, and overcomes the a plurality of defects and shortages existing in the flat precasting method of the arch rib.

Description

Bowstring arch bridge arch rib vertical precast pedestal
Technical field
The utility model belongs to bowstring arch bridge arch rib prefabricating technique field, especially relates to a kind of bowstring arch bridge arch rib vertical precast pedestal.
Background technology
Along with the fast development of transport development, bowstring arch bridge has won increasing favor with its rational stress performance, bigger span ability and pretty moulding, and being applied in of this bridge type is general day by day both at home and abroad.At present, the full framing job practices is generally adopted in the construction of rigid arch rigid tie bar bridge, and the technical comparative maturity of this job practices is operated easylier, but hinders the current of navigation channel in a long time, should not adopt the method for the navigation channel that the traffic volume is bigger.Non-support construction process has obtained attempting using in the bowstring arch bridge construction in heavy traffic navigation channel in recent years, and this technology is less to the navigation ability influence in navigation channel, but cost is higher.In addition, nowadays arch rib generally adopts the method for prefabricating that lies low, and this method for prefabricating is comparative maturity technically, but needs whole setting-out, need stand up during lifting, need try to piece together before installing, and difficulty of construction is bigger, and quality should not guarantee, and construction plant that need be bigger.
The utility model content
Technical problem to be solved in the utility model is at above-mentioned deficiency of the prior art, a kind of bowstring arch bridge arch rib vertical precast pedestal is provided, it is simple in structure, reasonable in design, use is easy and simple to handle and efficiency of construction is high, difficulty of construction is low, needn't adopt whole setting-out during construction lofting, need not stand up during lifting, need not try assembly before installing, easy construction and quality guarantee easily, overcome arch rib lie low existing many defectives of method for prefabricating and deficiency.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of bowstring arch bridge arch rib vertical precast pedestal, it is characterized in that: comprise bed plate, be laid in the pedestal on the described bed plate and be laid on profiled sheeting on the described pedestal, described profiled sheeting, pedestal and bed plate from top to bottom are combined into one and three's composition is used for the prefabricated bed die that needs the moulding arch rib, the structure of described profiled sheeting, pedestal and bed plate is all corresponding with structure that needs the moulding arch rib and size with size, and the camber on described profiled sheeting top is identical with the camber that needs the moulding arch rib; The upper surface of described profiled sheeting is to be used for the moulding curved surface that moulding needs moulding arch rib bottom surface, and the curvilinear equation of described moulding center of surface line is identical with the curvilinear equation that needs moulding arch rib axis.
The upper surface of described pedestal is a curved surface, and the surface structure of described pedestal is identical with the structure of described moulding curved surface.
Described bed plate is for to build the base concrete basis that forms in advance, and described pedestal is for to build the concrete base that forms on base concrete basis, and described bed plate is a steel plate.
The thickness of described steel plate is 2mm.
Be provided with many prefabricated pull bars used when needing the moulding arch rib in the described concrete base, and many pull bars are even laying.
The utility model compared with prior art has the following advantages:
1, simple in structure, processing and fabricating is easy and the processing and fabricating cost is low, uses easy and simple to handle.
2, rationally novel in design, prefabricated profiled arch rib qualification rate height of institute and efficiency of construction height, difficulty of construction is low, labour intensity significantly reduces, and needs the vertical coordinate of moulding arch rib to draw by computer simulation in advance, and needn't adopt whole setting-out during construction lofting, need not stand up during lifting, need not try assembly before installing, easy construction and quality guarantee easily, overcome the arch rib prefabricated many shortcomings that lie low.
3, with prefabricated the comparing that lie low, the used prefabricated place of the utility model is little, has saved the construction plant.
4, practical value height, the extent of spreading amd application is big, can effectively promote the pre-formed process that is suitable for to relevant arch rib.
In sum, the utility model is simple in structure, reasonable in design, use is easy and simple to handle and efficiency of construction is high, difficulty of construction is low, needn't adopt whole setting-out during construction lofting, need not stand up during lifting, need not try before installing to piece together, easy construction and quality guarantee easily, overcome arch rib lie low existing many defectives of method for prefabricating and deficiency.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is the user mode reference diagram of the utility model embodiment 1.
Fig. 2 is the structural representation of the utility model embodiment 1.
Fig. 3 is the cross-sectional structure schematic diagram of the pre-formed arch rib of the utility model.
Fig. 4 is the structural representation of the utility model embodiment 2.
Description of reference numerals:
1-needs the moulding arch rib; 2-base concrete basis; 3-concrete base;
The 4-steel plate; The 5-pull bar.
The specific embodiment
Embodiment 1
As shown in Figure 1 and Figure 2, the utility model comprises bed plate, be laid in the pedestal on the described bed plate and be laid on profiled sheeting on the described pedestal, described profiled sheeting, pedestal and bed plate from top to bottom are combined into one and three's composition is used for the prefabricated bed die that needs moulding arch rib 1, the structure of described profiled sheeting, pedestal and bed plate is all corresponding with structure that needs moulding arch rib 1 and size with size, and the camber on described profiled sheeting top is identical with the camber that needs moulding arch rib 1.The upper surface of described profiled sheeting is to be used for the moulding curved surface that moulding needs moulding arch rib 1 bottom surface, and the curvilinear equation of described moulding center of surface line is identical with the curvilinear equation that needs moulding arch rib 1 axis.
In the present embodiment, the upper surface of described pedestal is a curved surface, and the surface structure of described pedestal is identical with the structure of described moulding curved surface.Described bed plate is for to build the base concrete basis 2 that forms in advance, and described pedestal is for to build the concrete base 3 that forms on base concrete basis 2, and described bed plate is a steel plate 4.The thickness of described steel plate 4 is 2mm.In conjunction with Fig. 3, the cross-sectional structure of described need moulding arch rib 1 is a dumbbell shaped.
In the actual use, carry out whole setting-out for the bow member of whole bowstring arch bridge, the equal segmentation of arch rib and tie-rod is prefabricated, and wherein arch rib adopts the utility model to carry out vertically prefabricated.Before prefabricated,, needing moulding arch rib 1, all going out the coordinate figure of vertical each point earlier with computer simulation for each for need guaranteeing the accuracy of moulding arch rib 1 coordinate, and the corresponding curvilinear equation of extrapolating the axis that needs moulding arch rib 1; Afterwards, the curvilinear equation processing and fabricating that draws according to reckoning goes out to be used for the forming panel of moulding concrete base 3, and builds out the satisfactory concrete base 3 of structure on base concrete basis 2; Subsequently, lay steel plate 4 at concrete base 3 again, promptly finish prefabricated preparation before.In the prefabricated process, adopting the utility model as bed die, is the plastic-coated plate according to designing requirement processing and fabricating arch rib side form and the arch rib side form that adopted again, and arch rib side form arranged outside has multiple tracks folder a tree, used in making timber for boats, guarantees that template is firm.For preventing spillage, guarantee presentation quality, form joint place all accompanies a bed thickness sponge and beats glass cement and handle.
Embodiment 2
As shown in Figure 4, in the present embodiment, as different from Example 1: be provided with many prefabricated pull bars 5 used when needing moulding arch rib 1 in the described concrete base 3, and many pull bars 5 are even laying, prefabricated when needing moulding arch rib 1, the side form pull bar of corresponding setting on described pull bar 5 and the arch rib side form is used, and the remainder 26S Proteasome Structure and Function is all identical with embodiment 1.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; everyly any simple modification that above embodiment did, change and equivalent structure are changed, all still belong in the protection domain of technical solutions of the utility model according to the utility model technical spirit.

Claims (5)

1. bowstring arch bridge arch rib vertical precast pedestal, it is characterized in that: comprise bed plate, be laid in the pedestal on the described bed plate and be laid on profiled sheeting on the described pedestal, described profiled sheeting, pedestal and bed plate from top to bottom are combined into one and three's composition is used for the prefabricated bed die that needs moulding arch rib (1), the structure of described profiled sheeting, pedestal and bed plate is all corresponding with structure that needs moulding arch rib (1) and size with size, and the camber on described profiled sheeting top is identical with the camber that needs moulding arch rib (1); The upper surface of described profiled sheeting needs the moulding curved surface of moulding arch rib (1) bottom surface for being used for moulding, and the curvilinear equation of described moulding center of surface line is identical with the curvilinear equation that needs moulding arch rib (1) axis.
2. according to the described bowstring arch bridge arch rib vertical of claim 1 precast pedestal, it is characterized in that: the upper surface of described pedestal is a curved surface, and the surface structure of described pedestal is identical with the structure of described moulding curved surface.
3. according to claim 1 or 2 described bowstring arch bridge arch rib vertical precast pedestals, it is characterized in that: described bed plate is for building the base concrete basis (2) that forms in advance, described pedestal is for to build the concrete base (3) that forms on base concrete basis (2), described bed plate is steel plate (4).
4. according to the described bowstring arch bridge arch rib vertical of claim 3 precast pedestal, it is characterized in that: the thickness of described steel plate (4) is 2mm.
5. according to the described bowstring arch bridge arch rib vertical of claim 3 precast pedestal, it is characterized in that: be provided with many prefabricated pull bars (5) used when needing moulding arch ribs (1) in the described concrete base (3), and many pull bars (5) are even laying.
CN2010201739130U 2010-04-28 2010-04-28 Vertical precasting pedestal for arch rib of bowstring arch bridge Expired - Fee Related CN201620360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201739130U CN201620360U (en) 2010-04-28 2010-04-28 Vertical precasting pedestal for arch rib of bowstring arch bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201739130U CN201620360U (en) 2010-04-28 2010-04-28 Vertical precasting pedestal for arch rib of bowstring arch bridge

Publications (1)

Publication Number Publication Date
CN201620360U true CN201620360U (en) 2010-11-03

Family

ID=43023816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201739130U Expired - Fee Related CN201620360U (en) 2010-04-28 2010-04-28 Vertical precasting pedestal for arch rib of bowstring arch bridge

Country Status (1)

Country Link
CN (1) CN201620360U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284102A (en) * 2016-08-22 2017-01-04 中国铁建大桥工程局集团有限公司 The double rib lifting of the calm cable in mountain area is big across tubular arch segmental construction engineering method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284102A (en) * 2016-08-22 2017-01-04 中国铁建大桥工程局集团有限公司 The double rib lifting of the calm cable in mountain area is big across tubular arch segmental construction engineering method

Similar Documents

Publication Publication Date Title
CN201943347U (en) Mounting structure for plastic formwork of frame column
CN104831852A (en) Original version concrete bracket system construction method
CN202100001U (en) Independent column system with aluminum alloy templates
CN103722613A (en) Construction method for vertically casting and mounting four-foot hollow block in seawall wave resistance engineering
CN201620360U (en) Vertical precasting pedestal for arch rib of bowstring arch bridge
CN201972715U (en) Integrated ditch cable trough mould frame
CN204691228U (en) One-shot forming hollow construction formwork
CN109773946A (en) A kind of multiple layer combination platform mold of prefabricated large-scale plate-type component
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN201826539U (en) Reusable support frame for steel bar construction
CN103878868A (en) Application of novel vertical pouring construction process to prefabricated concrete block with four hollow corners
CN210263116U (en) Rapid mounting and dismounting shaping template for concrete reverse filling of lower independent foundation
CN206477356U (en) Mounting structure of the steel bar truss floor support plate in underground pipe gallery construction
CN205399830U (en) Easy plane is plastics split heads for reinforcing bar
CN202530756U (en) Early-removed template support structure
CN202247722U (en) Ditch cable trench formwork
CN205399454U (en) Separate house L shape concrete foundation who pours with concrete trough
CN206123902U (en) A light -duty side form system for precast concrete wall panel production
CN202324371U (en) Locating cushion block with multiple locating distances for poured board type concrete
CN219993148U (en) Auxiliary tool for pouring high and large outer wall constructional column
CN205777582U (en) A kind of concrete pier base moulding bed assembled for large-scale steel structure body
CN204040461U (en) A kind of MST wall construction part
CN202826020U (en) Steel molding plate of novel special road surface precasting plate
CN202324356U (en) Reinforcing-steel-bar locating pad for pouring plate concrete
CN201574582U (en) Hollow box for cast-in-site floor slab

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103