CN201619965U - 爬升式吊装 - Google Patents

爬升式吊装 Download PDF

Info

Publication number
CN201619965U
CN201619965U CN2010200042285U CN201020004228U CN201619965U CN 201619965 U CN201619965 U CN 201619965U CN 2010200042285 U CN2010200042285 U CN 2010200042285U CN 201020004228 U CN201020004228 U CN 201020004228U CN 201619965 U CN201619965 U CN 201619965U
Authority
CN
China
Prior art keywords
frock
tower tube
embracing
arm
annulus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010200042285U
Other languages
English (en)
Inventor
陈杰
康周俊
彭根运
李飞
姚强
张俊蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Shengdong Marine Engnieering Co., Ltd.
Original Assignee
Jiangsu Shengyu Windpower Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shengyu Windpower Equipment Co Ltd filed Critical Jiangsu Shengyu Windpower Equipment Co Ltd
Priority to CN2010200042285U priority Critical patent/CN201619965U/zh
Application granted granted Critical
Publication of CN201619965U publication Critical patent/CN201619965U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

本实用新型的目的是解决现有技术在风电安装中的复杂、繁琐及安装不便的情况,提供一种爬升式吊装,为了解决以上技术问题,本实用新型所采用的技术方案是,此种吊装包括圆环抱装置、锁紧装置和十字移动装置,圆环抱装置包括抱臂、摩擦片、摆杆、铰链、圆环抱液压缸,锁紧装置包括锁紧液压缸、刹车臂、刹车片、摆块和托板,内工装和外工装采用导轨和齿条的连接方式。本实用新型施工容易,适用于海上、近海滩涂、陆地和高山的风力发电安装,无需大型的起重机和吊装设备,节省大量的费用,安装方便、安全、可靠。

Description

爬升式吊装
技术领域
本实用新型涉及一种爬升式吊装,属于机电一体化的吊装设备领域。
背景技术
目前,我国的风电安装一般是采用履带式起重机充当吊装设备主角,汽车起重机充当配角。
大型履带式起重机的不足之处是,在拼装吊臂时所需场地较大,比如吊臂有100米,所需场地就在100米以上,在山上或海边很难找到合适的场所拼接,且履带式起重机前期组装非常繁琐,不适合在矿山、林区等野外地形复杂情况下使用。而我国的风电安装一般都在复杂的环境下,大型履带式起重机每完成一个场地的吊装都需要分体运输到下一个工作地点,再次进行组装,因而效率很低。在风力安装上,塔筒的中心需要保持不变,而吊装时微小的晃动是在所难免的,塔筒内的法兰孔需要相互连接,而法兰孔却很小,如此精确的安装对大型履带式起重机是需要用人工更好的去控制,效率受到一定影响。
所以大型履带式起重机不仅成本高,运输效率低而且在风电安装上对吊装的要求很高。汽车起重机的缺点是吊前准备工作复杂,需要用液压脚将车支起,对地面的要求和工作环境的要求更高。
实用新型内容
本实用新型的目的是解决上述技术问题的不足之处,提供一种爬升式吊装,运输和组装都比较方便,无论是海上、近海滩涂、陆地还是山地、都可以进行风电设备的安装,而且本实用新型本身重量轻,成本低。
为了解决以上技术问题,本实用新型所采用的技术方案是:除包括内工装和外工装外还包括圆环抱装置、锁紧装置和十字移动装置,圆环抱装置包括抱臂、摩擦片、摆杆、铰链、圆环抱液压缸,锁紧装置包括锁紧液压缸、刹车臂、刹车片、摆块和托板,内工装和外工装采用导轨和齿条的连接方式。
抱臂与抱臂的连接采用搭扣的连接方式,十字移动装置分上下两层,并且可以纵向和横向移动。
本实用新型施工容易,适用于海上、近海滩涂、陆地和高山的风力发电安装,无需大型的起重机和吊装设备,节省大量的费用,安装方便、安全、可靠。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步的说明。
图1是本新型的内工装与第一节塔筒的组装及第一节塔筒安装示意图。
图2是外工装与内工装的组合及外工装与第二节塔筒的组合示意图,也是
本实用新型的结构示意图。
图3是外工装上升安装第二节塔筒的示意图。
图4是第二节塔筒与第一节塔筒对接完毕的示意图。
图5是外工装下降,第二节塔筒的内工装与外工装的组合示意图。
图6是三节塔筒对接完毕后安装风机时的示意图。
图7是风机随外工装上升到第二节塔筒顶部时的示意图。
图8是风机与第三节塔筒对接时的示意图。
图9是圆环抱与内工装的结合及内工装的局部结构示意图。
图10是外工装与内工装组合后外工装的爬升时的示意图
图11是十字装置与外工装的组合结构示意图。
具体实施方式
如图2、图9、图10所示,本实用新型主要由内工装1、外工装2、十字装置3、齿轮箱4、圆环抱5组成,圆环抱5与内工装1相结合,结合方式可以采用焊接等常规连接方式。圆环抱5包括抱臂12、摆杆13、铰链14、搭扣15、圆环抱液压缸19、摩擦块18。摩擦片16通过螺栓17与摩擦块18相结合。抱臂12通过其上的圆环抱液压缸19的伸缩实现抱臂12与塔筒20进行抱紧及松开。内工装1上设置有齿条6、导轨7和锁紧装置。锁紧装置包括刹车片8、摆块9、刹车臂10和刹车液压缸11。外工装2上设置有与内工装1的导轨7相匹配的卡子23,卡子可以拆卸,外工装2与内工装1组配时关键是卡子23与导轨7相组配,同时使齿轮箱4中的齿轮21与齿条6相吻合,滑轮21沿着齿条6爬升时带动外工装2沿着内工装1上的导轨7上升。托板22与外工装2上的框架30相连接,托板22托住刹车臂10,刹车臂10通过其上的刹车液压缸11的收缩作用于其上的两块摆块9,摆块9向刹车片8靠拢压紧进而实现外工装2不再沿内工装1的导轨7移动实现刹车的目的。
圆环抱的层数及大小可以根据不同的塔筒的直径及所安装的风机的高度的不同设置不同的圆环抱。
如图2、图11所示,在外工装2的上面设置有一十字装置3,十字装置3分上下两层,上层通过设置在一旁的十字装置液压缸25可以竖向移动,下层通过设置在一端的两个液压缸收缩时的牵拉,其底部的轮子可以沿着十字装置导轨31横向移动,十字装置的轮子位于十字装置导轨31的里面,以实现十字装置运行的稳定及安全。十字装置的下层设置有挂钩24用于挂提塔筒。进行风电安装时把塔筒挂在24上并利用外工装2的升降实现塔筒及风机的安装及拆卸。本实用新型在风电安装中的使用方法可分为如下具体操作步骤:
1、平台上的安装
(1)在桩基相邻处建两个平台,一个是辅助吊平台,另一个是配件平台;
(2)通过履带运输平板车把塔筒、机舱、风叶和工装运输到平台上;
(3)如图1所示,在第一节塔筒20上装上带有圆环抱5的内工装1;
(4)检查所有的安装设备,确认是否一切正常;
2、第一节塔筒的安装
(1)通过辅助吊起吊带有内工装1的第一节塔筒20;
(2)对准好基桩,安装塔筒到基桩上,连接法兰;
3、外工装的安装
(1)在辅助平台上连接好外工装;
(2)如图2、图10所示,通过辅助吊起吊外工装2并安装到第一节塔筒上内工装1的齿条6、导轨7上;
4、第二节塔筒的安装
(1)如图2所示,通过辅助吊把第二节塔筒26吊进外工装2挂在挂钩上;
(2)如图3所示,利用第一节塔筒20上的导轨和齿条上升第二节塔筒26;
(3)如图4所示,外工装2和第二节塔筒26上升到第一节塔筒20的顶端,利用外工装2上的十字移动装置推进第二节塔筒26至第一节塔筒20的上方,使第二节塔筒26的下方对准第一节塔筒20的上方,下降第二节塔筒26并用螺栓通过法兰使第一节塔筒和第二节塔筒相连接;
(5)如图5所示,脱离挂钩,下降工装到底端,利用辅助吊吊起内工装1上升到第一节塔筒20的顶端,利用外工装上端的十字移动装置推进内工装1至第二节塔筒的边缘,缩进塔筒,使内工装1和和第二节塔筒连为一体;
5、第三节塔筒的安装顺序及方法同4中第二节塔筒的安装;
6、机舱和风叶的安装如图6、图7、图8所示
(1)通过辅助吊把机舱27、风叶28安放在外工装2的上方;
(2)上升外工装2至第二节塔筒26的顶端,利用外工装2上的十字移动机构使机舱下方对准第三节塔筒29的上端;
(3)下降外工装2,使机舱27的内法兰与第三节塔筒29的内法兰相连接;
(4)下降外工装。
至此,全部安装完毕,顺序拆卸外工装和内工装。

Claims (3)

1.一种爬升式吊装,包括内工装和外工装,其特征在于:它还包括圆环抱装置、锁紧装置和十字移动装置,圆环抱装置包括抱臂、摩擦片、摆杆、铰链、圆环抱液压缸,锁紧装置包括锁紧液压缸、刹车臂、刹车片、摆块和托板,内工装和外工装采用导轨和齿条的连接方式。
2.根据权利要求1所述的爬升式吊装,其特征在于:所述的抱臂与抱臂的连接采用搭扣的连接方式。
3.根据权利要求1所述的爬升式吊装,其特征在于:所述的十字移动装置分上下两层,并且可以纵向和横向移动。
CN2010200042285U 2010-01-21 2010-01-21 爬升式吊装 Expired - Fee Related CN201619965U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200042285U CN201619965U (zh) 2010-01-21 2010-01-21 爬升式吊装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200042285U CN201619965U (zh) 2010-01-21 2010-01-21 爬升式吊装

Publications (1)

Publication Number Publication Date
CN201619965U true CN201619965U (zh) 2010-11-03

Family

ID=43023421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200042285U Expired - Fee Related CN201619965U (zh) 2010-01-21 2010-01-21 爬升式吊装

Country Status (1)

Country Link
CN (1) CN201619965U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101774511B (zh) * 2010-01-21 2012-03-07 南通市盛东航道工程有限公司 爬升式吊装及其使用方法
CN105439005A (zh) * 2014-08-28 2016-03-30 三一汽车起重机械有限公司 起重机

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101774511B (zh) * 2010-01-21 2012-03-07 南通市盛东航道工程有限公司 爬升式吊装及其使用方法
CN105439005A (zh) * 2014-08-28 2016-03-30 三一汽车起重机械有限公司 起重机

Similar Documents

Publication Publication Date Title
CN101774511B (zh) 爬升式吊装及其使用方法
CN101196177B (zh) 海上风力发电机组安装施工方法
CN203359842U (zh) 一种顶升套架自升式的内爬起重机
CN112938774B (zh) 一种装配式构件的整体吊装系统及吊装方法
CN111029968B (zh) 一种适用于密集封网施工的多层模块化不停电跨越架
CN101537976B (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN202415019U (zh) 快架轮胎式起重机
CN201376848Y (zh) 双塔桅巨型自升降起重设备
CN101708812B (zh) 自升式吊装及其使用方法
CN202557745U (zh) 海上高空重载起升安装作业多功能双体风电工程船
CN104192735A (zh) 一种小型起重机
CN110606438A (zh) 一种可拆卸旋转吊
CN108946509A (zh) 一种大型风力发电机自升塔吊施工方法
CN201292776Y (zh) 一种海洋石油钻井平台井架
CN102582786A (zh) 深海浮式平台的建造工艺
CN201619965U (zh) 爬升式吊装
CN202785387U (zh) 一种室内悬臂起重机
CN104495653A (zh) 一种多功能大吨位架梁起重机及架梁方法
CN204752010U (zh) 风力发电塔自顶升平移吊吊装系统
CN106703031A (zh) 一种建筑工程用压桩机
CN201530696U (zh) 自升式吊装
CN214497512U (zh) 一种静压桩机用提升牵引塔架
CN210457249U (zh) 机身自顶升的电力抱杆结构
CN201694361U (zh) 一种海上风机整体运输与安装的专用工程船
CN211198404U (zh) 一种可拆卸旋转吊

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANTONG SHENGDONG NAVIGATION ENGINEERING CO., LTD.

Free format text: FORMER OWNER: JIANGSU SHENGYU WIND POWER EQUIPMENT CO., LTD.

Effective date: 20110504

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226000 23/F, BUILDING 17, ZHONGNAN CENTURY CITY, NO. 8, TAOYUAN ROAD, CHENGNAN DISTRICT, NANTONG CITY, JIANGSU PROVINCE TO: 226000 23/F, BUILDING 17, ZHONGNAN CENTURY CITY, CHONGCHUAN DISTRICT, NANTONG CITY, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110504

Address after: 226000 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Patentee after: Nantong Shengdong Waterway Engineering Co., Ltd.

Address before: 226000, 17, South China Century City, 8 Taoyuan Road, Chengnan District, Jiangsu City, Nantong Province, China. 23

Patentee before: Jiangsu Shengyu Windpower Equipment Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: NANTONG SHENGDONG OFFSHORE ENGINEERING CO., LTD.

Free format text: FORMER NAME: NANTONG SHENGDONG NAVIGATION ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: 226018 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Patentee after: Nantong Shengdong Marine Engnieering Co., Ltd.

Address before: 226000 Jiangsu province Nantong City Chongchuan District South Century City 17 building 23 layer

Patentee before: Nantong Shengdong Waterway Engineering Co., Ltd.

DD01 Delivery of document by public notice

Addressee: Nantong Shengdong Marine Engnieering Co., Ltd.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Nantong Shengdong Marine Engnieering Co., Ltd.

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103

Termination date: 20150121

EXPY Termination of patent right or utility model