CN201605868U - 通讯塔 - Google Patents
通讯塔 Download PDFInfo
- Publication number
- CN201605868U CN201605868U CN2010201266118U CN201020126611U CN201605868U CN 201605868 U CN201605868 U CN 201605868U CN 2010201266118 U CN2010201266118 U CN 2010201266118U CN 201020126611 U CN201020126611 U CN 201020126611U CN 201605868 U CN201605868 U CN 201605868U
- Authority
- CN
- China
- Prior art keywords
- tower
- joint
- hypomere
- master
- epimere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本实用新型提供了一种结构合理、施工方便、节约钢材的新型通讯塔。所述的通讯塔包括地脚、上段主材、下段主材、横材、斜材、拉杆、连板、主材接头、螺栓、天线支架、避雷针,其特征在于:整个通讯塔由若干个塔段组成,上段主材管径按受力要求小于下段主材管径,自下而上的横材、斜材的长度和截面按受力要求逐渐变小,在外型尺寸上,整基塔形成一正三棱台型,满足塔体受力条件的要求。
Description
技术领域
本实用新型属于通讯设备领域,具体涉及一种塔的水平截面为正三角形的通讯塔。
背景技术
目前,通讯塔一般采用的是单管塔、四角角钢塔、多管塔。四角角钢塔和多管塔占地面积大、加工复杂;单管塔钢材用量大,浪费钢材;塔段之间一般采用包铁或法兰连接,施工复杂。专利号为200620102069的实用新型专利公布了一种“通信用三管塔”,但塔柱套接装置采用的是等径管,对于整基塔而言,自下而上受力越来越小,显然结构不够合理。
发明内容
为了解决上述问题,本实用新型提供了一种结构合理、施工方便、节约钢材的新型通讯塔。
本实用新型的技术方案为:所述的通讯塔包括地脚、上段主材、下段主材、横材、斜材、拉杆、连板、主材接头、螺栓、天线支架、避雷针,其特征在于:整个通讯塔自下而上由若干个塔段连接而成,塔段横截面呈正三角型,正三角型顶点位置设置塔段主材,塔段主材采用等径钢管,上段主材管径按受力要求小于下段主材管径,上段主材与下段主材之间采用主材接头连接,然后再通过横材、斜材、拉杆、连板由螺栓连接在一起,地脚连接在最下部塔段的下部,天线支架连接在最上部塔段的主材外侧,避雷针设置在整基塔的最上端,自下而上的横材、斜材的长度和截面按受力要求逐渐变小,在外型尺寸上,整基塔呈正三棱台型,满足塔体受力条件的要求。
本实用新型所述的主材接头采用变径管,它由上、中、下三部分组成:下部为接头下段,中部为接头中段,上部为接头上段;接头上段采用钢管,外径与上段主材内径相等;接头中段采用钢板,外径与下段主材外径相等;接头下段采用钢管,外径与下段主材内径相等。主材接头连接后由螺栓固定,再由拉杆连接上段主材和下段主材,约束上段主材和下段主材的横向、纵向位移,使塔体受力稳定。
本实用新型所述的拉杆可采用角钢,也可采用圆钢。
本实用新型所述的通讯塔,结构合理,节约钢材,受力稳定,安全可靠,外形美观,经济效益好。
附图说明
图1是本实用新型的结构示意图;
图2是主材接头结构示意图;
图3是图1的A-A方向剖面示意图。
具体实施方式
结合附图对本实用新型进一步详细描述,以便公众更好地掌握本实用新型的实施方法。
通讯塔包括地脚1、下段主材2、上段主材8、横材3、斜材4、拉杆7、连板5、主材接头6、螺栓11、天线支架9、避雷针10;其特征是:整基通讯塔自下而上由若干个塔段连接而成,塔段横截面呈正三角型,正三角型顶点位置设置塔段主材,塔段主材采用等径钢管,上段主材8和下段主材2通过主材接头6连接后,再与横材3、斜材4通过连板5用螺栓11连接,地脚1连接在最下部塔段的下部,天线支架9连接在最上部塔段的主材外侧,避雷针10设置在整基塔的最上端,自下而上的横材3、斜材4的长度和横截面积逐渐变小,在外型尺寸上,整基塔正三棱台型。
所述的上段主材8的管径小于下段主材2的管径。
所述的连板5分别焊接在上段主材8和下段主材2上。
所述的主材接头6采用变径管,由三部分组成:接头下段12、接头中段13、接头上段14。接头下段12采用钢管,其外径与下段主材2的内径相等;接头中段13采用钢板,其外径与下段主材2的外径相等;接头上段14采用钢管,其外径与上段主材8的内径相等;主材接头6连接后由螺栓11固定。
所述的拉杆7可采用角钢,也可采用圆钢,拉杆7通过连板5连接上段主材8和下段主材2。
本实用新型所述的通讯塔结构合理、节约钢材,受力稳定、外形美观。
Claims (3)
1.通讯塔,它由地脚(1)、下段主材(2)、上段主材(8)、横材(3)、斜材(4)、拉杆(7)、连板(5)、主材接头(6)、螺栓(11)、天线支架(9)、避雷针(10)组成,其技术特征是:整基通讯塔自下而上由若干个塔段连接而成,塔段横截面呈正三角型,正三角型顶点位置设置塔段主材,上段主材(8)和下段主材(2)通过主材接头(6)连接后,再与横材(3)、斜材(4)通过连板(5)用螺栓(11)连接,地脚(1)连接在最下部塔段的下端,天线支架(9)连接在最上部塔段的主材外侧,避雷针(10)设置在整基塔的最上端,整基塔呈正三棱台型。
2.根据权利要求1所述的通讯塔,其特征在于所述的主材接头(6)采用变径管,它由上、中、下三部分组成:下部为接头下段(12),中部为接头中段(13),上部为接头上段(14);接头下段(12)采用钢管,其外径与下段主材(2)的内径相等;接头中段(13)采用钢板,其外径与下段主材(2)的外径相等;接头上段(14)采用钢管,其外径与上段主材(8)的内径相等。
3.根据权利要求1所述的通讯塔,其特征在于所述的拉杆(7)可采用角钢,也可采用圆钢,拉杆(7)通过连板(5)用螺栓(11)连接上段主材(8)和下段主材(2)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201266118U CN201605868U (zh) | 2010-03-06 | 2010-03-06 | 通讯塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201266118U CN201605868U (zh) | 2010-03-06 | 2010-03-06 | 通讯塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201605868U true CN201605868U (zh) | 2010-10-13 |
Family
ID=42950577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201266118U Expired - Fee Related CN201605868U (zh) | 2010-03-06 | 2010-03-06 | 通讯塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201605868U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104405167A (zh) * | 2014-12-01 | 2015-03-11 | 国家电网公司 | 一种混压多回路十字交跨高压电线塔 |
CN107386436A (zh) * | 2017-06-14 | 2017-11-24 | 中国科学院宁波材料技术与工程研究所 | 一种正四面体型杆状结构 |
CN110924732A (zh) * | 2019-12-09 | 2020-03-27 | 广州增立钢管结构股份有限公司 | 一种多主材铁塔的主材与十字连板装配方法 |
CN112392321A (zh) * | 2019-08-19 | 2021-02-23 | 成都华网电力工程咨询有限公司 | 输电铁塔 |
CN115258041A (zh) * | 2022-07-08 | 2022-11-01 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | 用于lng双燃料船的lng透气桅架 |
-
2010
- 2010-03-06 CN CN2010201266118U patent/CN201605868U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104405167A (zh) * | 2014-12-01 | 2015-03-11 | 国家电网公司 | 一种混压多回路十字交跨高压电线塔 |
CN107386436A (zh) * | 2017-06-14 | 2017-11-24 | 中国科学院宁波材料技术与工程研究所 | 一种正四面体型杆状结构 |
CN112392321A (zh) * | 2019-08-19 | 2021-02-23 | 成都华网电力工程咨询有限公司 | 输电铁塔 |
CN110924732A (zh) * | 2019-12-09 | 2020-03-27 | 广州增立钢管结构股份有限公司 | 一种多主材铁塔的主材与十字连板装配方法 |
CN115258041A (zh) * | 2022-07-08 | 2022-11-01 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | 用于lng双燃料船的lng透气桅架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201605868U (zh) | 通讯塔 | |
CN202577934U (zh) | 一种脚手架与建筑物的丝扣连墙件 | |
CN201546435U (zh) | 螺栓固定式斜拉悬挑脚手架 | |
CN204225906U (zh) | 大变形中空钢管混凝土支架 | |
CN204187120U (zh) | 支撑顶杆 | |
CN101806107A (zh) | 一种薄钢板剪力墙的边柱连接节点 | |
CN103993730B (zh) | 钢煤斗对接安装施工操作台 | |
CN201649770U (zh) | 三管通讯塔 | |
CN203487548U (zh) | 变电站钢构支架与混凝土基础节点连接结构 | |
CN201165766Y (zh) | 三管通讯塔 | |
CN203514337U (zh) | 一种大型钢管插入式基础 | |
CN204437497U (zh) | 预埋式地下管道用提升装置 | |
CN204435546U (zh) | 一种仿莲蓬杆的大直径格构式钢管结构 | |
CN203412194U (zh) | 一种复式钢管混凝土柱 | |
CN201661106U (zh) | 一种多棱型筒节式钢管杆 | |
CN201605865U (zh) | 多棱钢管塔 | |
CN202082910U (zh) | 塔式超临界锅炉主钢架节点装置 | |
CN205161337U (zh) | 便于拆卸的温室大棚骨架 | |
CN204326658U (zh) | Lng储罐钢筋网片抗风柱加固装置 | |
CN204112524U (zh) | 一种新型建筑剪力墙结构 | |
CN204282920U (zh) | 一种配有拼接式基座的通信塔 | |
CN204456164U (zh) | 一种通信塔的拼接式基座 | |
CN203654849U (zh) | 一种钢管混凝土主材的耐张型铁塔 | |
CN203855330U (zh) | 一种异型结构的组合式塔吊附墙装置 | |
CN203531487U (zh) | 一种无放张部分预应力电杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101013 Termination date: 20110306 |