CN201605564U - Structure of building - Google Patents
Structure of building Download PDFInfo
- Publication number
- CN201605564U CN201605564U CN2009202215981U CN200920221598U CN201605564U CN 201605564 U CN201605564 U CN 201605564U CN 2009202215981 U CN2009202215981 U CN 2009202215981U CN 200920221598 U CN200920221598 U CN 200920221598U CN 201605564 U CN201605564 U CN 201605564U
- Authority
- CN
- China
- Prior art keywords
- plate body
- constracture unit
- building
- decoration plate
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Retaining Walls (AREA)
Abstract
A structure of a building comprises a concrete building element and two decorative plate bodies, wherein the decorative plate bodies are directly plastered onto the building element which is not dry, so that the decorative plate bodies can be fixed on the dry building element later; no additional bonding layers are arranged between the dry decorative plate bodies and the building element respectively; and the decorative plate bodies are arranged opposite at intervals and are respectively fixed on two sides of the building element. The utility model greatly reduces building time, cost, and labor.
Description
Technical field
The utility model relates to a kind of structure of building body.
Background technology
Be applied to the building body of riverbed, retaining wall, irrigation canals and ditches etc. at present, the overwhelming majority is directly to build in the construction site.Because this mode must be set up complicated engineerings such as template, nail pallet, grouting in the building site, and also must be waited for hardening of concrete, therefore the engineering time of engineering drags extremely longly, efficiency of construction is poor, and very labor intensive and material resources cause building costs to improve relatively.
Another construction method, be in factory in advance with model pre-cast building element, carrying is to building site assembly group, fixing again.This mode owing to not be used in the scene and carry out large-scale civil engineering, therefore has quick, the clean and tidy advantage of engineering, and is the guiding of engineering now.The structure of this kind pre-cast building element, as shown in Figure 6, after being first moulding one Constracture unit 21, both sides at this Constracture unit 21, smear last layer adhesive agent or concrete with instrument 24 and form the following layer 22 of one deck, on this following layer 22, stick a slice and decorate plate body 23, again as Fig. 7, shown in Figure 8.
Above-mentioned pre-cast building element, though solve in the scene the directly shortcoming of construction, it decorates the structure of multilayer sandwich-types such as plate body 23, following layer 22, Constracture unit 21, goes up very labor intensive in making, and its manufacturing cost is increased, and show improved necessity is arranged.
The utility model content
Technical problem underlying to be solved in the utility model is, overcomes the above-mentioned defective that prior art exists, and a kind of structure of building body is provided, and shortens manufacturing time widely, reduces cost and the use of manpower.
The structure of the utility model building body, comprising: Constracture unit is concrete; Decorating plate body, is directly to stick in not dried Constracture unit when solid, makes to decorate the plate body one and be bonded to the Constracture unit of doing after solid, and does between the decoration plate body and Constracture unit after solid, does not have any extra following layer.
Above-mentioned decoration plate body is two, and these two decorated plate body setting spaced relative to each other, makes this two decorate the both sides that plate body is anchored on this Constracture unit respectively, and this two decorates plate body separately and between the Constracture unit, does not all have any extra following layer.
The utility model discloses the structure of building body, and wherein this Constracture unit forms a hollow form, contains a chamber, and wears hole on this Constracture unit, decoration plate body, is communicated with the chamber with this Constracture unit inside.When the utility model was installed in riverbed, seashore or hillside, fish, shrimp, crab class, reptile class etc. can enter breeding in the chamber, perch, to serve as ecological habitat from hole.In addition, the chamber of hollow and hole also can alleviate Constracture unit and decorate the weight and the materials of plate body, reduce the cost made from transportation.
The structure of the utility model building body makes two building bodies be connected mutually or when piling up, and the chamber of two adjacent Constracture units is that the hole by correspondence is interconnected.
The structure of the utility model building body, the relative both sides of this Constracture unit wherein form the docking section of a correspondence respectively, are recess as a side, opposite side be a protuberance then, make two build bodies can be firmly, dock exactly or pile up.The section of above-mentioned docking section is trapezoidal, make two building bodies can be accurately, fast, firmly dock or pile up.
The utility model building body structure, because this Constracture unit and two is decorated between the plate body, do not need extra following layer, can make this Constracture unit and two decorate plate body engages tightly, therefore can shorten manufacturing time widely, reducing cost and the use of manpower, and show its novelty and tool industry applications.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the schematic perspective view of the utility model before moulding.
Fig. 2 is the schematic perspective view of the utility model after moulding.
Fig. 3 is the sectional drawing of 3-3 direction shown in Figure 2.
Fig. 4 is the schematic perspective view of the utility model second embodiment.
Fig. 5 is the sectional drawing shown in the 5-5 direction shown in Figure 4.
Fig. 6 is the manufacture process schematic diagram of existing building body.
Fig. 7 is the schematic perspective view of existing building body.
Fig. 8 is the sectional drawing shown in the 8-8 direction shown in Figure 7.
The number in the figure explanation:
11 decorate plate body 112 holes 12 Constracture units
12b docking section, 12a docking section 121 chambers
122 holes
The specific embodiment
See also Fig. 1, Fig. 2, shown in Figure 3, the utility model relates to a kind of structure of building body, comprising: Constracture unit 12 and decoration plate body 11.Wherein Constracture unit 12 is a concrete.And decoration plate body 11 is the Constracture units 12 when directly sticking in not dried consolidating, make the Constracture unit of decorating after plate body 11 one are bonded to dried consolidating 12, and between the decoration plate body 11 and Constracture unit 12 after doing admittedly, there is not any extra following layer (for example: concrete is layer or other any adhesive agent following layer then).
Above-mentioned decoration plate body 11 is two, and decorating plate body 11,11 for these two is spaced apart relatively, make this two decorate the both sides that plate body 11,11 is anchored on this Constracture unit 12 respectively, and this two decorates plate body 11,11 separately and between the Constracture unit 12, all do not have any extra following layer.
The utility model is decorated plate body 11, can take from natural stone slab, artificial board etc., and the utility model is not limited form, the material of this decoration plate body 11.
As Fig. 4, shown in Figure 5, the structure of the utility model building body, wherein this Constracture unit 12 forms a hollow form, contains a chamber 121, and on this Constracture unit 12, decoration plate body 11, wear hole 122,112 respectively, be communicated with chamber 121 with these Constracture unit 12 inside, when the utility model is installed in riverbed, hillside, irrigation canals and ditches, seashore etc., fish, shrimp, crab class, reptile class etc., can enter breeding in the chamber 121, perch, from hole 112 to serve as ecological habitat.In addition, chamber of hollow 121 and hole 122,112 also can alleviate Constracture unit 12 and decorate the weight and the materials of plate body 11, reduce the cost made from transportation.
The structure of the utility model building body makes two building bodies be connected mutually or when piling up, and the chamber 121 of two adjacent Constracture units 12 is interconnected by the hole 112 of correspondence.
As Fig. 3, shown in Figure 5, the structure of the utility model building body, the wherein relative both sides of this Constracture unit 12, form docking section 12a, the 12b of a correspondence respectively, as a side is recess, and opposite side is a protuberance then, make two building bodies can be firmly, dock exactly or pile up.The section of above-mentioned docking section 12a, 12b is trapezoidal, make two building bodies can be accurately, fast, firmly dock or pile up.
The structure of the utility model building body, because this Constracture unit 12 and two is decorated between the plate body 11,11, and need not extra following layer, can make this Constracture unit 12 and two decorate plate body 11,11 engages tightly, therefore can shorten manufacturing time widely, reducing cost and the use of manpower, and show its novelty and tool industry applications.
The above, it only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment did.
Claims (7)
1. a structure of building body is characterized in that, comprising:
Constracture unit is concrete;
Decorating plate body, is directly to stick in not dried Constracture unit when solid, make to decorate the plate body one and be bonded to the Constracture unit of doing after solid, and do between the decoration plate body and Constracture unit after solid, and be no extra following layer.
2. according to the structure of the described building body of claim 1, it is characterized in that: described decoration plate body is two, and these two decoration plate bodys are spaced apart relatively.
3. according to the structure of the described building body of claim 1, it is characterized in that: described Constracture unit forms a hollow form, contains a chamber, and on this Constracture unit, decoration plate body, wears hole respectively, is communicated with the chamber with this Constracture unit inside.
4. according to the structure of the described building body of claim 1, it is characterized in that: the relative both sides of described Constracture unit form the docking section of a correspondence respectively.
5. according to the structure of the described building body of claim 4, it is characterized in that: the section of described docking section is trapezoidal.
6. according to the structure of claim 1 or 2 described building bodies, it is characterized in that: described decoration plate body is a natural stone slab.
7. according to the structure of claim 1 or 2 described building bodies, it is characterized in that: described decoration plate body is behaved and is made sheet material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202215981U CN201605564U (en) | 2009-10-27 | 2009-10-27 | Structure of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202215981U CN201605564U (en) | 2009-10-27 | 2009-10-27 | Structure of building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201605564U true CN201605564U (en) | 2010-10-13 |
Family
ID=42950272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202215981U Expired - Fee Related CN201605564U (en) | 2009-10-27 | 2009-10-27 | Structure of building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201605564U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104805863A (en) * | 2015-04-24 | 2015-07-29 | 东北大学 | Novel combinable assembly type slope retaining wall structure and construction method thereof |
CN105804002A (en) * | 2016-03-16 | 2016-07-27 | 中国水电建设集团十五工程局有限公司 | Wave protection wall structure with granite plates replacing formwork and construction method |
-
2009
- 2009-10-27 CN CN2009202215981U patent/CN201605564U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104805863A (en) * | 2015-04-24 | 2015-07-29 | 东北大学 | Novel combinable assembly type slope retaining wall structure and construction method thereof |
CN105804002A (en) * | 2016-03-16 | 2016-07-27 | 中国水电建设集团十五工程局有限公司 | Wave protection wall structure with granite plates replacing formwork and construction method |
CN105804002B (en) * | 2016-03-16 | 2018-02-23 | 中国水电建设集团十五工程局有限公司 | Granite slab replaces the wave resistance wall construction and construction method of template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1070711A (en) | Anti-seismic heat-preservation building blocks and manufacturing thereof | |
CN201605564U (en) | Structure of building | |
CN106121035A (en) | A kind of overlapping assembled integral basement of flat slab system | |
CN101906900A (en) | Fence structure | |
CN201103175Y (en) | Novel house wall structure | |
CN209277383U (en) | A kind of precast concrete rock wool combined wall board | |
CN2937291Y (en) | Composite wall brick | |
CN201206323Y (en) | Mold special for pasting small face brick on wall surface | |
CN106088319A (en) | A kind of overlapping assembled integral basement of the system of hollow building cover without beam | |
CN203716343U (en) | Plastic sheet internal mold cement mortar wall body | |
CN206616725U (en) | A kind of assembled decorative heat preservation partition plate | |
CN109469334A (en) | A kind of construction method of the mosaic surface of odd-shaped substrates | |
CN201169843Y (en) | Cast-in-situ light inner partition | |
CN201818107U (en) | Enclosing wall structure | |
CN202755532U (en) | Pull-lay combination building fabricated wall plate | |
CN207088623U (en) | Strong plastic structure | |
CN211396406U (en) | Cement-based ceramic tile | |
CN2383649Y (en) | Mould for cement and concrete construction | |
CN219108490U (en) | Hollow prefabricated artificial fish reef | |
CN211229151U (en) | Concrete masonry module | |
CN204690690U (en) | The vertical chain revetment building block of a kind of I shape perforate half | |
CN212200891U (en) | High-strength anti-seismic wall anti-cracking hollow brick | |
CN215563786U (en) | Module brick prefabricated building | |
CN200985581Y (en) | Special-shaped hollow brick for building frame style wall | |
CN104018614B (en) | The preparation of precast concrete assembled plate and monolithic architecture constructive method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101013 Termination date: 20141027 |
|
EXPY | Termination of patent right or utility model |