CN201581381U - Dredging sediment diversion dam - Google Patents
Dredging sediment diversion dam Download PDFInfo
- Publication number
- CN201581381U CN201581381U CN2010201147763U CN201020114776U CN201581381U CN 201581381 U CN201581381 U CN 201581381U CN 2010201147763 U CN2010201147763 U CN 2010201147763U CN 201020114776 U CN201020114776 U CN 201020114776U CN 201581381 U CN201581381 U CN 201581381U
- Authority
- CN
- China
- Prior art keywords
- dam
- water
- sediment
- river
- water inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a dredging sediment diversion dam which is a river dam and has the functions of depositing the sediment of the river in a water storage sediment diversion area, supplying the river water to the artificial sightseeing lake as the landscape belt through a water inlet and ensuring the water flowing in the artificial sightseeing lake to be clear. A dam body of the dredging sediment diversion dam is connected with a segregation dam, the dam body extends and closes to one side of an upstream retaining dam firstly in a linear shape and then in an S-shape against the water flow direction till the dam body is connected with a river embankment; the dam body is provided with a water inlet close to the retaining dam; and the upper edge of the water inlet is parallel and level to that of a waster storage dam. The dredging sediment diversion dam is built at the upstream of the water storage dam and the first-class retaining dam and is connected with the segregation dam. The dam has the functions of accumulating the river water with the sediment in the water storage sediment diversion area, depositing the sediment in the water storage sediment diversion area, supplying the deposited clear water to the artificial sightseeing lake and ensuring the lake water to be clear without large quantity of sediment deposition.
Description
Technical field
The utility model relates to the river dykes and dams, specifically is that required desilting divides sand bar when building rubber dam landscape band on the river course.
Background technology
At present, urban construction is maked rapid progress, and in order to create a good days environment to the common people, much has the city of river process and area to build rubber dam landscape band.The river that silt is less seals whole riverbed with rubber dam, form artificial lake landscape band; The river that silt is more is divided into two the riverbed, and small part is artificial lake for the canal that drains off floodwaters is most of, and artificial lake is gone sightseeing for the visitor.But this rubber dam landscape band that the riverbed is divided into two is arranged in desilting at present and is had more problem aspect husky: mainly be that storage dam and one-level, the sedimentation of secondary check dam are too many, neither attractive in appearancely also be not easy to desilting and maintenance.
The utility model is that a kind of desilting divides sand bar, can effectively overcome too many drawback and the defective of existing rubber dam landscape band silt alluvial.
The utility model content
Rubber dam landscape band for the more area build of river silt, be provided with one or more levels check dam, built isolation dam in the riverbed, the riverbed is divided into two parts: manually the go sightseeing lake and the canal that drains off floodwaters, isolation dam, check dam and river levee form artificial sightseeing lake together, isolation dam and opposite side river levee form the canal that drains off floodwaters, drain off floodwaters the width of canal much smaller than the width in artificial sightseeing lake, built storage dam with one-level check dam corresponding position, the build desilting that links to each other with isolation dam divides sand bar, described desilting divides sand bar to be made of dam body and water inlet, its dam body flow path direction against the current earlier upstream extends to the position, riverbed that one-level check dam top water level can reach with linear, afterwards with the S type upstream check dam one side draw close, end is connected with check dam one side river levee, and dam body and river levee join to holding and be abutment, and the end that links to each other with isolation dam is the dam tail, dam body is provided with water inlet in one-level check dam upstream, and the upper edge of water inlet is concordant with the storage dam upper edge.
The beneficial effects of the utility model are as follows: 1, desilting divides sand bar with the poly-retaining Fen Sha district that stays of upland water, make the sediment deposition of being with in the river, treat that water level rises when reaching the water inlet, water has been clarified and has been begun to flow into artificial sightseeing lake, realized that desilting divides husky purpose, the river that guarantees to enter artificial sightseeing lake is as clear as crystal; 2, put things right once and for all, the long-term assurance do not have a large amount of silts to enter artificial sightseeing lake, do not need frequent desilting row husky, saves human and material resources, reduced maintenance cost.
Description of drawings
Fig. 1--rubber dam landscape band and desilting divide the sand bar floor map
Fig. 2--rubber dam landscape band cross sectional representation
The drawing explanation:
Among Fig. 1: position, the riverbed 8-one-level check dam 9--that 1-water (flow) direction 2-river levee 3-storage dam 4-retaining Fen Sha district 5-dam body 6-riverbed 7-one-level check dam top water level can the reach lake 10-isolation dam 11-water inlet of manually going sightseeing
Among Fig. 2: the 2-river levee 9-lake 10-isolation dam 12-canal that drains off floodwaters of manually going sightseeing
The specific embodiment
Below in conjunction with description of drawings the utility model specific embodiment:
Shown in Figure 2 as Fig. 1, rubber dam landscape band comprises river levee 2, storage dam 3, one-level check dam 8, manually go sightseeing lake 9, isolation dam 10, the canal 12 that drains off floodwaters, water (flow) direction 1 indicates the flow direction of river.Desilting divides sand bar to be made of dam body 5 and water inlet 11, dam body 5 links to each other against the current, and flow path direction upstream extends to the position, riverbed 7 that one-level check dam top water level can reach with linear earlier with isolation dam 10, afterwards with S shape upstream check dam one side draw close, end is connected with check dam one side river levee, this end is abutment, the end that links to each other with isolation dam 10 is the dam tail, and abutment exceeds riverbed 6 and is 100-200CM, and the dam tail exceeds storage dam 3 upper edge 50-100CM.Dam body 5 is provided with water inlet 11 in one-level check dam 8 upstreams, the upper edge of water inlet 11 is concordant with storage dam 3 upper edges, the distance of water inlet 11 and one-level check dam 8 is 1/3 place of distance between one-level check dam 8 and the one-level check dam top water level position, riverbed 7 that can reach, and the aspect ratio of water inlet 11 is 5: 1.The straight line portion of dam body 5 is the reinforced concrete structure, and width is identical with isolation dam; Sweep is for being the trapezoidal cement structure of gravel and sand.
Claims (3)
1. a desilting divides sand bar, comprise dam body, it is characterized in that desilting divides sand bar to be made of dam body (5) and water inlet (11), dam body (5) links to each other with isolation dam (10), described dam body (5) flow path direction against the current earlier upstream extends to the position, riverbed (7) that one-level check dam top water level can reach with linear, afterwards with the S type upstream check dam one side draw close, terminal be connected with check dam one side river levee (2); Dam body (5) is provided with water inlet (11) in the upstream of one-level check dam (8), and the upper edge of water inlet (11) is concordant with storage dam (3) upper edge.
2. desilting according to claim 1 divides sand bar, it is characterized in that abutment exceeds riverbed (6) and is 100-200CM, and the dam tail exceeds storage dam (3) upper edge 50-100CM.
3. desilting according to claim 2 divides sand bar, and the aspect ratio that it is characterized in that water inlet (11) is 5: 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201147763U CN201581381U (en) | 2010-01-21 | 2010-01-21 | Dredging sediment diversion dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201147763U CN201581381U (en) | 2010-01-21 | 2010-01-21 | Dredging sediment diversion dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201581381U true CN201581381U (en) | 2010-09-15 |
Family
ID=42723378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201147763U Expired - Fee Related CN201581381U (en) | 2010-01-21 | 2010-01-21 | Dredging sediment diversion dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201581381U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103306241A (en) * | 2013-06-21 | 2013-09-18 | 清华大学 | Watercourse and rubber dam water storage system |
CN103938591A (en) * | 2014-02-27 | 2014-07-23 | 黄河水利委员会河南黄河河务局 | Method for reducing heavily silt-carrying river reservoir deposition |
CN103953003A (en) * | 2014-05-16 | 2014-07-30 | 国家海洋局第二海洋研究所 | Deposition promotion dyke and deposition promotion method for reclaiming land from sea by building dykes |
CN104389296A (en) * | 2014-11-14 | 2015-03-04 | 长江三峡通航管理局 | Automatic force application device for adjusting back pulling rod of miter gate |
CN104389300A (en) * | 2014-11-17 | 2015-03-04 | 项方岩 | River flood-fighting control structure |
CN113684784A (en) * | 2020-05-18 | 2021-11-23 | 吴彦民 | Multifunctional hardened riverbed canal network vein with one main river and multiple alternate flow stopping and sand cleaning functions |
-
2010
- 2010-01-21 CN CN2010201147763U patent/CN201581381U/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103306241A (en) * | 2013-06-21 | 2013-09-18 | 清华大学 | Watercourse and rubber dam water storage system |
CN103938591A (en) * | 2014-02-27 | 2014-07-23 | 黄河水利委员会河南黄河河务局 | Method for reducing heavily silt-carrying river reservoir deposition |
CN103938591B (en) * | 2014-02-27 | 2015-12-02 | 黄河水利委员会河南黄河河务局 | A kind of method reducing reservoir on hyperconcentration river alluvial |
CN103953003A (en) * | 2014-05-16 | 2014-07-30 | 国家海洋局第二海洋研究所 | Deposition promotion dyke and deposition promotion method for reclaiming land from sea by building dykes |
CN103953003B (en) * | 2014-05-16 | 2015-09-30 | 国家海洋局第二海洋研究所 | A kind of short silt dykes and dams for reclaiming fields from the sea and short silt method |
CN104389296A (en) * | 2014-11-14 | 2015-03-04 | 长江三峡通航管理局 | Automatic force application device for adjusting back pulling rod of miter gate |
CN104389296B (en) * | 2014-11-14 | 2016-08-17 | 长江三峡通航管理局 | The automatic boosting device adjusted for miter gate back rod |
CN104389300A (en) * | 2014-11-17 | 2015-03-04 | 项方岩 | River flood-fighting control structure |
CN104389300B (en) * | 2014-11-17 | 2016-05-11 | 项方岩 | A kind of rivers flood fighting administration structure |
CN113684784A (en) * | 2020-05-18 | 2021-11-23 | 吴彦民 | Multifunctional hardened riverbed canal network vein with one main river and multiple alternate flow stopping and sand cleaning functions |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201581381U (en) | Dredging sediment diversion dam | |
CN102061677B (en) | Full-section water wetland purification system suitable for normal water level of river | |
CN102219304B (en) | Method for ecologically improving water quality of water delivery type lake | |
CN101003969A (en) | Method for harnessing pollution by supplying water to rivers in city | |
CN103011497B (en) | Backwash combination type farmland non-point source pollution cut-off purification system | |
CN100347377C (en) | Mould bag line curtain and method for preventing falldown of river bank | |
CN102134844B (en) | Automatic dredging and desilting system for rubber dam | |
CN202787190U (en) | Frame used in riprap closure method for high flow rate closure gap | |
CN204728261U (en) | For the combining structure of blocking that ditch water treatment and mud-rock flow are protected | |
CN105064291A (en) | Step sand-blocking dam ecosystem for reservoir desilting and sand prevention | |
CN205205916U (en) | System is reformed transform to reservoir deposits crystallizing field river system | |
CN209555882U (en) | A kind of hydraulic engineering ecological protection slope | |
CN104831689B (en) | A kind of automatic flood control, the water intake facilities of anti-alluvial of blowdown | |
CN204491509U (en) | A kind of tidal river auto purification type ecology is T-shaped draws/water fetching device | |
CN108729407A (en) | Clear husky device is arrheaed in river double flute hardening riverbed exchange | |
CN103614986A (en) | Free surface flow water inflow method suitable for draining off floodwaters of tailing pond | |
CN2869121Y (en) | Flood control-discharge dyke-dam | |
CN2856164Y (en) | Sand blocking net | |
CN108658208B (en) | In-situ purification treatment device for tailing water riverway | |
CN207331601U (en) | A kind of ecological, environmental protective permeable spur structure | |
CN203474550U (en) | Circular breathing filtrate-type riverway permanent cleaning system | |
CN204825801U (en) | Automatic flood control, blowdown prevent siltation water intaking facility | |
CN215714991U (en) | Ecological percolation dam module and system | |
CN215715005U (en) | Bank protection river levee | |
CN218813466U (en) | Ecological wetland structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100915 Termination date: 20110121 |