CN201556885U - Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement - Google Patents

Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement Download PDF

Info

Publication number
CN201556885U
CN201556885U CN2009202415687U CN200920241568U CN201556885U CN 201556885 U CN201556885 U CN 201556885U CN 2009202415687 U CN2009202415687 U CN 2009202415687U CN 200920241568 U CN200920241568 U CN 200920241568U CN 201556885 U CN201556885 U CN 201556885U
Authority
CN
China
Prior art keywords
transmission line
tool
suspension insulator
earth potential
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202415687U
Other languages
Chinese (zh)
Inventor
糜哲
陈保华
王云飞
易剑波
易良
林谋强
徐斌
李璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI YICHUN POWER SUPPLY CO Ltd
Original Assignee
JIANGXI YICHUN POWER SUPPLY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI YICHUN POWER SUPPLY CO Ltd filed Critical JIANGXI YICHUN POWER SUPPLY CO Ltd
Priority to CN2009202415687U priority Critical patent/CN201556885U/en
Application granted granted Critical
Publication of CN201556885U publication Critical patent/CN201556885U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)

Abstract

The utility model discloses a tool for a single hanging and twin suspension insulator string capable of solving the problem of earth potential electrified transmission line replacement. The tool comprises two support arms; an obtuse angle is formed between the two support arms; and a mounting hole is formed at the outer end of one support arm, and a clamping groove with an opening is formed at the outer end of the other support arm. The two support arms are jointlessly formed and made of high-strength aluminium alloy. The utility model can perform operation to the overhaul and replacement of a single hanging and twin suspension insulator, avoid the economic loss caused by power failure or the problem of low equipment operation level caused by the short-time live working during replacement, and can solve the problems of air clearance of short-circuit between the tool and the insulator string, and labor intensity of operation personnel, thereby greatly reducing power failure frequency and power failure time of the transmission line, reducing non-planning outage rate of the transmission line, and improving the power supply reliability of the transmission line. Moreover, the utility model has the advantages of simple structure, safety, practicality, and low cost.

Description

Solve earth potential live replacing transmission line list and hang the instrument of duplex suspension insulator
Technical field
The utility model relates to a kind of electric power facility maintenance tool, relates in particular to a kind of instrument that earth potential live replacing transmission line list is hung the duplex suspension insulator that solves.
Background technology
At present, each electric company mostly adopts the compound mode of bent plate card and thread gripping-board that " single duplex of hanging " insulator string is carried out hotline maintenance, to reduce the transmission line frequency of power cut.In the case, at first because the screw mandrel length of bent plate card has 250mm, short circuit the air gap of insulator string, reduced insulativity; Secondly operating personnel wants the whole body both hands operation of popping one's head in of leaning to one side of lying prone on the lead cross-arm downwards, and not only labour intensity is very big, and the operating personnel has certain unsafe factor.
Summary of the invention
The purpose of this utility model is: a kind of instrument that solves earth potential live replacing transmission line list extension duplex suspension insulator that a kind of new structure above-mentioned defective of solved prior art simple, safe and practical, with low cost is provided.
The purpose of this utility model realizes by following scheme: be made of two support arms, two arm rooms form the obtuse angle, and wherein a support arm outer end is provided with installing hole, and another support arm outer end is provided with the opening draw-in groove.
Two support arms described in the utility model are one-body molded.
The utility model is made by high strength alumin ium alloy.
The utility model can be changed at single maintenance of hanging the duplex insulator carry out operation, avoids economic loss brought by power failure or problem that the operation level of changing the equipment that influences of not having a power failure in short-term reduces.Possess following characteristics: 1, can be convenient, fast, be installed on the transmission line L1040-L2040 type yoke plate effectively.2, can carry the load of lead porcelain vase string carrying, and be not less than 30KN.3, can be used with other instruments effectively, the electrician all can conveniently use on ground electrician and the bar.4, can solve the problem of instrument short circuit insulator string air gap and operating personnel's labour intensity, and significantly reduce the frequency of power cut and the interruption duration of transmission line, reduce the unplanned outage rate of transmission line, improve the power supply reliability of transmission line.5, simple in structure, safe and practical, with low cost.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model user mode figure.
Embodiment
Below in conjunction with accompanying drawing the utility model is elaborated.
The utility model is made of two support arms 1,2 of being made by high strength alumin ium alloy, and 1,2 of two support arms form the obtuse angle, and support arm 1 outer end is provided with opening draw-in groove 3, and support arm 2 outer ends are provided with and install and fix hole 4.
By installing and fixing hole 4 the utility model is fixed on three yoke plates of transmission line cross-arm below during use, cooperates pulley, insulation ropes that single duplex insulator of hanging is carried out various operations by opening draw-in groove 3.

Claims (3)

1. one kind solves the instrument that earth potential live replacing transmission line list is hung the duplex suspension insulator, it is characterized in that: be made of two support arms, two arm rooms form the obtuse angle, and wherein a support arm outer end is provided with installing hole, and another support arm outer end is provided with the opening draw-in groove.
2. solution earth potential live replacing transmission line list according to claim 1 is hung the instrument of duplex suspension insulator, and it is characterized in that: two support arms are one-body molded.
3. solution earth potential live replacing transmission line list according to claim 1 and 2 is hung the instrument of duplex suspension insulator, it is characterized in that: made by high strength alumin ium alloy.
CN2009202415687U 2009-12-01 2009-12-01 Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement Expired - Fee Related CN201556885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202415687U CN201556885U (en) 2009-12-01 2009-12-01 Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202415687U CN201556885U (en) 2009-12-01 2009-12-01 Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement

Publications (1)

Publication Number Publication Date
CN201556885U true CN201556885U (en) 2010-08-18

Family

ID=42616575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202415687U Expired - Fee Related CN201556885U (en) 2009-12-01 2009-12-01 Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement

Country Status (1)

Country Link
CN (1) CN201556885U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069562A (en) * 2017-06-28 2017-08-18 云南电网有限责任公司曲靖供电局 Replacing insulator under electrified method and load transfer device
CN107086495A (en) * 2017-06-28 2017-08-22 云南电网有限责任公司曲靖供电局 Load transfer instrument and electric power maintenance equipment
CN107086499A (en) * 2017-06-28 2017-08-22 云南电网有限责任公司曲靖供电局 Conductor load transfer tool and replacing insulator string device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069562A (en) * 2017-06-28 2017-08-18 云南电网有限责任公司曲靖供电局 Replacing insulator under electrified method and load transfer device
CN107086495A (en) * 2017-06-28 2017-08-22 云南电网有限责任公司曲靖供电局 Load transfer instrument and electric power maintenance equipment
CN107086499A (en) * 2017-06-28 2017-08-22 云南电网有限责任公司曲靖供电局 Conductor load transfer tool and replacing insulator string device
CN107086499B (en) * 2017-06-28 2019-03-08 云南电网有限责任公司曲靖供电局 Conductor load transfer tool and replacing insulator string device
CN107086495B (en) * 2017-06-28 2019-05-31 云南电网有限责任公司曲靖供电局 Load transfer tool and electric power maintenance equipment

Similar Documents

Publication Publication Date Title
CN201181826Y (en) 10KV overhead conductor insulation support fixer
CN201601455U (en) Insulation crossarm
CN105514877B (en) Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture
CN102420401A (en) Triangular insulating hanging fulcrum bar
CN204835359U (en) Drive electrified installation device of bird ware
CN201556885U (en) Tool for single hanging and twin suspension insulator string capable of solving problem of earth potential electrified transmission line replacement
CN204885990U (en) Transmission line yoke plate hoisting device
CN103594968A (en) Lifting device of multiple divided conductors of transmission tower
CN201904593U (en) Pre-stranded two-bundle spacer
CN101814707A (en) Tool for live replacement of 220kV line 'V' string insulator and method
CN202126896U (en) Pin type ceramic insulator
CN201933831U (en) Power transmission iron tower shared by +/-800 kV direct-current line and grounding electrode line
CN201438617U (en) Electric lifting tool for linear insulator string on ZM tower
CN103683107B (en) Front clamp for LF type insulator string live replacement
CN201490625U (en) Special fixture for replacing linear insulator string under electrification
CN203367861U (en) Simple ground-wire lifter
CN201742027U (en) Special tool for replacing insulators in electriferous state for 110kV single tower double circuit
CN203536736U (en) Novel miniature-bus connecting structure in switch cabinet
CN206211407U (en) The fixture of charged for replacement double bundle conductor strain list insulator string
CN202678834U (en) Apparatus and back card used for replacing insulator
CN201584701U (en) Tool for replacing 'V' string insulator of 220kV line in live state
CN207150030U (en) Fixture for the only cross-arm shaft tower replacing insulator under electrified of 110kV straight lines
CN103606849A (en) Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device
CN204258228U (en) For the fixing gold utensil of line terminal and lead-in wire
CN202550391U (en) High-voltage power maintenance implement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20101201