CN201555934U - Three-color indicator light device for automatic relay testing platform - Google Patents

Three-color indicator light device for automatic relay testing platform Download PDF

Info

Publication number
CN201555934U
CN201555934U CN2010201510865U CN201020151086U CN201555934U CN 201555934 U CN201555934 U CN 201555934U CN 2010201510865 U CN2010201510865 U CN 2010201510865U CN 201020151086 U CN201020151086 U CN 201020151086U CN 201555934 U CN201555934 U CN 201555934U
Authority
CN
China
Prior art keywords
indicator light
testing platform
automatically testing
relay
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201510865U
Other languages
Chinese (zh)
Inventor
赵坚
周智奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Schneider Electric Power Automation Co., Ltd.
Original Assignee
AREVA T&D SHANGHAI POWER AUTOMATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AREVA T&D SHANGHAI POWER AUTOMATION Co Ltd filed Critical AREVA T&D SHANGHAI POWER AUTOMATION Co Ltd
Priority to CN2010201510865U priority Critical patent/CN201555934U/en
Application granted granted Critical
Publication of CN201555934U publication Critical patent/CN201555934U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Audible And Visible Signals (AREA)

Abstract

The utility model discloses a three-color indicator light device for an automatic relay testing platform. The three-color indicator light device comprises a red indicator light, an amber indicator light, a green indicator light and a sleeve, wherein the sleeve is divided into three parts; and the red indicator light, the amber indicator light and the green indicator light are respectively positioned in one of the three parts of the sleeve from the top down. In the utility model, the testing states of the relay are presented through the three-color indicator light, which completely meets the visual management requirement of the product line, and at the same time, the working efficiency of testing staff can be improved.

Description

The tri-colour LED device of relay automatically testing platform
Technical field
The utility model relates to a kind of relay automatically testing platform, particularly a kind of tri-colour LED device of relay automatically testing platform.
Background technology
Existing relay automatically testing platform can be realized the test automation of relay, only need relevant informations such as the model of tester's input relay when beginning to test and sequence number, in case but find mistake in the test process, the relay automatically testing platform just can be ended, and the report that needs this moment the tester to point out and print according to display screen comes the reason of failure judgement and carries out corresponding corrective action.Existing relay automatically testing platform has following defective: one, the tester is not easy to know current relay test mode, sees unless stare at display screen always; Two, the tester can not leave the relay automatically testing platform and do maintenance job or carry out voltage-withstand test or go up operations such as electric test; Three, only be confined to the visualized management requirement that test mode on the display screen does not meet production line yet.
The utility model content
Technical problem to be solved in the utility model provides a kind of tri-colour LED device of relay automatically testing platform, and it allows the tester know current relay test mode easily, and meets the visualized management requirement of production line.
For solveing the technical problem, the utility model provides a kind of tri-colour LED device of relay automatically testing platform, the tri-colour LED device of relay automatically testing platform comprises red led, amber pilot lamp, green indicating lamp and sleeve pipe, sleeve pipe is divided into three parts, and red led, amber pilot lamp, green indicating lamp lay respectively in the part of sleeve pipe from top to bottom.
Preferably, the tri-colour LED device of described relay automatically testing platform is fixed on the relay automatically testing platform.
Positive progressive effect of the present utility model is: the utility model is expressed out with the relay test mode by the pilot lamp of three kinds of colors, even the tester goes to other positions of production line and also can come into plain view to the relay test mode, in time the return relay automatically testing platform is operated, so also meet the visualized management requirement of production line fully, can improve tester's work efficiency simultaneously.
Description of drawings
Fig. 1 is the structural representation of the tri-colour LED device of the utility model relay automatically testing platform.
Fig. 2 is the circuit diagram that the pilot lamp in the tri-colour LED device of the utility model relay automatically testing platform connects.
Embodiment
Lift a preferred embodiment below, and come the clearer the utility model that intactly illustrates in conjunction with the accompanying drawings.
As shown in Figure 1, the tri-colour LED device 1 of the utility model relay automatically testing platform is fixed on the relay automatically testing platform 2, the tri-colour LED device 1 of relay automatically testing platform comprises red led 11, amber pilot lamp 12, green indicating lamp 13 and sleeve pipe 14, sleeve pipe 14 is divided into three parts, and red led 11, amber pilot lamp 12, green indicating lamp 13 lay respectively in the part of sleeve pipe 14 from top to bottom.
As shown in Figure 2, red led 11, amber pilot lamp 12, green indicating lamp 13 parallel connections, red led 11 is connected with first switch 31, amber pilot lamp 12 is connected with second switch 32, green indicating lamp 13 is connected with the 3rd switch 33, control module 21 is connected with first switch 31, second switch 32, the 3rd switch 33, the opening and closing of control module 21 controls first switch 31, second switch 32, the 3rd switch 33, control module 21 and power supply 22 series connection, control module 21 and power supply 22 can be located in the relay automatically testing platform 2.If after first switch 31 was opened, then red led 11 was lighted, when lighting, red led 11 represents relay automatically testing platform test termination.After if second switch 32 is opened, then amber pilot lamp 12 is lighted, and represents relay automatically testing platform wait operation when amber pilot lamp 12 is lighted.If after the 3rd switch 33 was opened, then green indicating lamp 13 was lighted, when lighting, green indicating lamp 13 represents that the relay automatically testing platform normally moves.
To sum up, the utility model is expressed out with the relay test mode by the pilot lamp of three kinds of colors, even the tester goes to other positions of production line and also can come into plain view to the relay test mode, in time the return relay automatically testing platform is operated, so also meet the visualized management requirement of production line fully, can improve tester's work efficiency simultaneously.
Though more than described embodiment of the present utility model, but those skilled in the art is to be understood that, these only illustrate, and under the prerequisite that does not deviate from principle of the present utility model and essence, can make numerous variations or modification to these embodiments.Therefore, protection domain of the present utility model is limited by appended claims.

Claims (2)

1. the tri-colour LED device of a relay automatically testing platform, it is characterized in that, the tri-colour LED device of relay automatically testing platform comprises red led, amber pilot lamp, green indicating lamp and sleeve pipe, sleeve pipe is divided into three parts, and red led, amber pilot lamp, green indicating lamp lay respectively in the part of sleeve pipe from top to bottom.
2. the tri-colour LED device of relay automatically testing platform as claimed in claim 1 is characterized in that, the tri-colour LED device of described relay automatically testing platform is fixed on the relay automatically testing platform.
CN2010201510865U 2010-04-06 2010-04-06 Three-color indicator light device for automatic relay testing platform Expired - Fee Related CN201555934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201510865U CN201555934U (en) 2010-04-06 2010-04-06 Three-color indicator light device for automatic relay testing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201510865U CN201555934U (en) 2010-04-06 2010-04-06 Three-color indicator light device for automatic relay testing platform

Publications (1)

Publication Number Publication Date
CN201555934U true CN201555934U (en) 2010-08-18

Family

ID=42615622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201510865U Expired - Fee Related CN201555934U (en) 2010-04-06 2010-04-06 Three-color indicator light device for automatic relay testing platform

Country Status (1)

Country Link
CN (1) CN201555934U (en)

Similar Documents

Publication Publication Date Title
CN102253300B (en) Electric cabinet detector of numerical control machine
CN204719167U (en) A kind of pcb board automated intelligent detects frock
CN103093714A (en) Detecting device and detecting method of light emitting diode (LED) display screen driving board
CN102929248A (en) Monitoring system used for blast furnace winding engine system and monitoring method thereof
CN204332199U (en) A kind of electrotechnical, electronic chamber of replaceable different chip
CN201555934U (en) Three-color indicator light device for automatic relay testing platform
CN202339692U (en) Detection device for light emitting diode (LED) display screen driving plate
CN101833889B (en) Digital display twisted-pair termination detecting device
CN207473055U (en) A kind of relay intelligent test device
CN203689125U (en) LED display screen multichannel automatic aging control device
CN101763743A (en) Intelligent practicing device for an electrical towage control circuit
CN202008517U (en) Electric cabinet test instrument for numerical control machine tool
CN202306323U (en) Intelligent electrical detection system in driver cab
CN204462322U (en) A kind of warning system for chip testing
CN209215937U (en) Automobile shift sensor control panel test fixture
CN203759489U (en) Lamp belt type numerical control system state display device
CN207458376U (en) A kind of multifunctional electric automates training platform
CN204310621U (en) Cage top overhauling wiring integral box detecting device
CN203616396U (en) Signal line tester
CN205920218U (en) Electric energy meter carrier channel online test appearance
CN205003543U (en) Terminal control module testing device is gathered to special change
CN104880993A (en) Board for fault diagnosis of torsion-synchronization intelligent numerical control bending machine
CN201897720U (en) Operation system of field bridge crane with test lamp button
CN203812034U (en) Comprehensive training device for ship/vessel-used lighting system
CN210199246U (en) Comprehensive intelligent measurement and control communication system tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI SCHNEIDER ELECTRIC + POWER AUTOMATION CO.

Free format text: FORMER NAME: AREVA T + D SHANGHAI POWER AUTOMATION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 201315, building 499, No. 1, Yi Yi Road, Cambridge Industrial Area, Shanghai, Pudong

Patentee after: Shanghai Schneider Electric Power Automation Co., Ltd.

Address before: 201315, building 499, No. 1, Yi Yi Road, Cambridge Industrial Area, Shanghai, Pudong

Patentee before: AREVA T&D Shanghai Power Automation Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20130406