CN201553564U - Straight arm frame assembling and disassembling gantry crane - Google Patents
Straight arm frame assembling and disassembling gantry crane Download PDFInfo
- Publication number
- CN201553564U CN201553564U CN 200920211770 CN200920211770U CN201553564U CN 201553564 U CN201553564 U CN 201553564U CN 200920211770 CN200920211770 CN 200920211770 CN 200920211770 U CN200920211770 U CN 200920211770U CN 201553564 U CN201553564 U CN 201553564U
- Authority
- CN
- China
- Prior art keywords
- arm frame
- strut member
- straight
- girders
- web
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a straight arm frame assembling and disassembling a gantry crane, which is provided with an amplitude pulley block and is characterized by comprising two I-shaped beams, a plurality of pairs of first strut members and a plurality of second strut members, wherein the two I-shaped beams are parallelly arranged; the plurality of pairs of first strut members and the plurality of second strut members are arranged between the two I-shaped beams; each pair of first strut members are arranged crosswise; and two ends of each first strut member and each second strut member are connected with the webs of the two I-shaped beams. The straight arm frame has simple structure and light self weight, and does not need an additional balance device.
Description
Technical field
The utility model relates to the handling door machine, relates in particular to the straight-arm shelf structure of handling door machine.
Background technology
Present domestic stevedoring door machine all adopts four traditional connecting rod forms, the Four-link door facility have the luffing performance good, can bear bigger advantages such as goods beat, but the boom system of Four-link door machine structurally has following defective: from great, need extra balanced system to come balance jib weight, complex structure, accuracy of manufacture requires high.
Summary of the invention
Technical problem to be solved in the utility model be to provide a kind of simple in structure, from the straight-arm frame of the handling door machine of heavy and light.
The technical scheme that the utility model adopted is: a kind of straight-arm frame of handling door machine, on this straight-arm frame, be provided with the luffing assembly pulley, be characterized in, this straight-arm frame comprises two H-girders, many to first strut member and Duo Gen second strut member, two H-girders be arranged in parallel, many first strut member and Duo Gen second strut member are arranged between these two H-girders, each is arranged in a crossed manner to first strut member, and the two ends of each first strut member and each second strut member are connected with the web of two H-girders respectively.
Above-mentioned straight-arm frame, wherein, the length of this straight-arm frame is L, free-ended at distance straight-arm frame
The place is provided with a crossbeam, and the luffing assembly pulley is arranged on this crossbeam.
Above-mentioned straight-arm frame, wherein, the web inboard of each described H-girder is provided with polylith joint backing plate and many reinforced ribs, and described polylith joint backing plate and described many reinforced ribs are along vertical arrangement of web, and are located on the same line; The two ends of each described first strut member respectively with two H-girders on the joint welding with backing connect.
The utlity model has following advantage:
1. simple in structure.
2. from heavy and light, balanced system that need not be extra.
3. the luffing assembly pulley is arranged in apart from straight-arm frame free end approximately
The position of straight-arm frame length overall utilizes the rear portion deadweight of the dead-weight balanced straight-arm frame of free end of straight-arm frame, reduces the weight stress of straight-arm frame.
4. the straight-arm frame adopts the twin I-beam main structure, the longitudinal rib of the second strut member arrangement utilizing web, and both convenient the manufacturing processed, and improved the anti-fatigue performance of straight-arm shelf structure again.
Description of drawings
Fig. 1 is that master of the present utility model looks scheme drawing.
Fig. 2 is a schematic top plan view of the present utility model.
Fig. 3 is the cross sectional representation of Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is made and to be further specified.
As illustrated in fig. 1 and 2, the straight-arm frame of handling door machine of the present utility model comprises two H-girders 1, many to first strut member 2 and Duo Gen second strut member 3.Two H-girders 1 be arranged in parallel, many first strut member 2 and Duo Gen second strut member 3 are arranged between these two H-girders 1, each is arranged in a crossed manner to first strut member 2, and the two ends of each first strut member 2 and each second strut member 3 are welded to connect with the web of two H-girders 1 respectively.Preferably, first strut member 2 and second strut member 3 are pipe fitting.
Also be provided with several crossbeams between these two H-girders 1, wherein crossbeam 41 is arranged on the free-ended end of this straight-arm frame, is provided with compensation pulley group 5 on crossbeam 41.The length of this straight-arm frame is L, and another crossbeam 42 is arranged on apart from straight-arm frame free end
The place is provided with luffing assembly pulley 6 on crossbeam 42.
In conjunction with shown in Figure 3, preferably, the web inboard of each H-girder is provided with polylith joint backing plate 11 and many reinforced rib (not shown)s, this polylith joint backing plate and many reinforced ribs are along vertical arrangement of web, and be located on the same line, the two ends of each first strut member 2 respectively with two H-girders on 11 welderings of joint backing plate connect.Joint backing plate 11 had herein both played the effect that connects first strut member, can play the effect of serving as the web waling again, and joint backing plate and reinforced rib are arranged in sustained height, can guarantee that reinforced rib is in web continuity longitudinally.
Claims (4)
1. the straight-arm frame of a handling door machine, on this straight-arm frame, be provided with the luffing assembly pulley, it is characterized in that, this straight-arm frame comprises two H-girders, many to first strut member and Duo Gen second strut member, described two H-girders be arranged in parallel, described many first strut member and Duo Gen second strut member are arranged between these two H-girders, each is arranged in a crossed manner to first strut member, and the two ends of each first strut member and each second strut member are connected with the web of two H-girders respectively.
2. straight-arm frame as claimed in claim 1 is characterized in that, described first strut member and described second strut member are pipe fitting.
3. straight-arm frame as claimed in claim 1 is characterized in that, the length of this straight-arm frame is L, free-ended at distance straight-arm frame
The place is provided with a crossbeam, and described luffing assembly pulley is arranged on this crossbeam.
4. straight-arm frame as claimed in claim 1 is characterized in that, the web inboard of each described H-girder is provided with polylith joint backing plate and many reinforced ribs, and described polylith joint backing plate and described many reinforced ribs are along vertical arrangement of web, and is located on the same line; The two ends of each described first strut member respectively with two H-girders on the joint welding with backing connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920211770 CN201553564U (en) | 2009-11-03 | 2009-11-03 | Straight arm frame assembling and disassembling gantry crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200920211770 CN201553564U (en) | 2009-11-03 | 2009-11-03 | Straight arm frame assembling and disassembling gantry crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201553564U true CN201553564U (en) | 2010-08-18 |
Family
ID=42613237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200920211770 Expired - Lifetime CN201553564U (en) | 2009-11-03 | 2009-11-03 | Straight arm frame assembling and disassembling gantry crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201553564U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104988898A (en) * | 2015-07-10 | 2015-10-21 | 杨崇庆 | Cantilever crane device for track type dynamic compactor |
-
2009
- 2009-11-03 CN CN 200920211770 patent/CN201553564U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104988898A (en) * | 2015-07-10 | 2015-10-21 | 杨崇庆 | Cantilever crane device for track type dynamic compactor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201850085U (en) | Primary truss arm and crawler crane with the same | |
CN110005059A (en) | A kind of quick-installed building connection steel construction | |
CN201553564U (en) | Straight arm frame assembling and disassembling gantry crane | |
CN201031113Y (en) | Column crane type mast section | |
CN201634994U (en) | Bolting-welding combined member | |
CN103979429A (en) | Cantilever type portal crane | |
CN201288031Y (en) | Luffing jib stacker crane slewing platform | |
CN201386252Y (en) | Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge | |
CN204398084U (en) | A kind of novel press | |
CN203653074U (en) | Quick-assembled combined cross beam for portal crane | |
CN202559814U (en) | Iron tower | |
CN201082850Y (en) | Crawler crane main boom head | |
CN201386253Y (en) | Temporary connecting device of girder section top plates of steel box girders of suspension bridge | |
CN207904766U (en) | A kind of prestressing force triangle hanging basket of light weight high bearing capacity | |
CN201770432U (en) | A-Bracket for electric tire crane | |
CN202082910U (en) | Main steel frame node device for tower type supercritical boiler | |
CN201105946Y (en) | Main girder of single-beam crane | |
CN201952103U (en) | Steel-bar lifting frame | |
CN105060087A (en) | Rectangular tube truss without support | |
CN206375570U (en) | Crane and its leg structure | |
CN206856433U (en) | A kind of cavity type abdomen wing connects balance suspension support | |
CN206219084U (en) | The main string standard knot of double angle | |
CN103422421A (en) | Corrugated steel web steel structure simply-supported box beam | |
CN201012879Y (en) | Single-beam crane | |
CN204778259U (en) | Rectangular pipe does not have bracing truss |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20100818 |
|
CX01 | Expiry of patent term |