CN201553075U - Putting machine for putting cones quickly in highway - Google Patents

Putting machine for putting cones quickly in highway Download PDF

Info

Publication number
CN201553075U
CN201553075U CN2009202273332U CN200920227333U CN201553075U CN 201553075 U CN201553075 U CN 201553075U CN 2009202273332 U CN2009202273332 U CN 2009202273332U CN 200920227333 U CN200920227333 U CN 200920227333U CN 201553075 U CN201553075 U CN 201553075U
Authority
CN
China
Prior art keywords
chute board
turning cylinder
trailer
express highway
ordering machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202273332U
Other languages
Chinese (zh)
Inventor
刘庆亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009202273332U priority Critical patent/CN201553075U/en
Application granted granted Critical
Publication of CN201553075U publication Critical patent/CN201553075U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a putting machine for putting cones quickly in a highway, which comprises a trailer, wherein the tail part of the trailer is provided with a chute board, the chute board is connected with the trailer in a hanging way and comprises a plate with a smooth surface and a support frame, wherein the support frame is arranged at one end of the bottom surface of the plate, close to the ground, and provided with a travelling wheel, the bottom surface of one end part of the plate close to the trailer is provided with a trailing stop block, the support frame of the chute board is provided with a transmission mechanism and a shifting fork, the shifting fork penetrates through the chute board and extends out of the outside, and the plate of the chute board is provided with a barrier strip. In the putting machine, only one of workers in the trailer is needed to place the cones in the chute board, the cones slide down along a chute under the action of gravity and then slide off through the action of the shifting fork, and are put in proper positions, and the transmission ratio of rotation and the speed of an automobile are controlled to be fixed, thus ensuring the distances between every two cones to be the same, and shortening the time of implementation for emergency and smoothness.

Description

A kind of express highway that is used for is put taper target ordering machine fast
Technical field
The utility model relates to a kind of express highway that is used for and puts taper target ordering machine fast, and what the control of traffic state was travelled in the lane change of a kind of specifically special solution express highway puts taper target ordering machine fast.
Background technology
When occurring major traffic accidents on the express highway and cause obstruction to traffic, for guaranteeing to recover the current quick lane change that needs, carry out the single width two-way road, put taper in the offside track of accident point and mark vehicular traffic channeling conduct and caution.Generally can be by putting of driver's channeling conduct of several taper marks to vehicular traffic, need the staff to drive to fill the Working vehicle of sign, driving to the position that need put road sign stops, adopt the mode of manually putting to put sign, need repetitive operation repeatedly put road sign, waste time and energy and dangerous.
The utility model content
Technical problem to be solved in the utility model provides a kind of express highway that is used for and puts taper target ordering machine fast.
A kind of express highway that is used for is put taper target ordering machine fast, comprise trailer, the afterbody of described trailer is provided with chute board, described chute board and trailer hitch, it is characterized in that: described chute board comprises ganoid plate and bracing frame, bracing frame is arranged on the plate bottom surface near a ground-surface end, bracing frame is provided with road wheel, the bottom surface of one end of the close trailer of plate is provided with pulls block, the bracing frame of described chute board is provided with transmission device and shift fork, described shift fork passes chute board and reaches the outside, and the plate of described chute board is provided with barrier rib.
Below be further improvement of these options:
Described transmission device comprises first turning cylinder, arm revolving gear, transmission gear, second turning cylinder, minor sprocket, hinge wheel, the 3rd turning cylinder and chain.
The described first turning cylinder captive joint road wheel,, described arm revolving gear is fixedly installed on first turning cylinder, described transmission gear is fixedly installed on second turning cylinder, described arm revolving gear and transmission gear are meshing with each other, be set with minor sprocket on described second turning cylinder, described hinge wheel is fixedly installed on the 3rd turning cylinder, and described minor sprocket and hinge wheel are by chain gear.
The two ends of described second turning cylinder and the 3rd turning cylinder are respectively equipped with bearing and bearing seat, and described bearing seat is fixedly installed on the bracing frame of chute board.
The transmitting ratio of described arm revolving gear and transmission gear is 1: 2, and the transmitting ratio of described minor sprocket and hinge wheel is 1: 2.
Described shift fork is fixedly installed on the 3rd turning cylinder, stretches out rotation the hole slot of described shift fork from chute board.
The end of described shift fork is provided with bearing.
Described barrier rib is separately positioned on chute board near on the dual-side of hole slot, and described barrier rib is to the inboard inclination of chute board, and described barrier rib is captiveed joint with chute board.
The top of described barrier rib is provided with bearing.
The utility model compared with prior art, have following characteristics: only need wherein a staff is placing the taper mark in the trailer on chute board, the effect lower edge slideway that taper is marked on gravity slides, the place is stopped by barrier rib at shift fork, make taper mark landing in effect by shift fork, put voluntarily in position, shift fork and barrier rib bearing at end, can rotate, when stopping that effectively the taper mark hurtles down, not hinder stirring of shift fork, the transmitting ratio and the speed of a motor vehicle that the control shift fork rotates are fixed, guaranteed that the distance between each taper mark is identical, can put 400 taper marks, protect unimpeded enforcement for speedily carrying out rescue work and shorten the time for 2 kilometers.
The utility model is described in further detail below in conjunction with drawings and Examples:
Description of drawings
Accompanying drawing 1 is the structural representation of the utility model embodiment;
Accompanying drawing 2 is the scheme drawing of transmission device among the utility model embodiment;
Accompanying drawing 3 is the birds-eye view of the utility model middle slideway plate.
Among the figure: 1-chute board, 2-trailer, 3-pull block, 4-road wheel, 5-road wheel, 6-first turning cylinder, 7-arm revolving gear, 8-transmission gear, 9-second turning cylinder, 10-minor sprocket, 11-hinge wheel, 12-the 3rd turning cylinder, 13-chain, 14-shift fork, 15-bearing, 16-barrier rib, 17-bearing, 18-hole slot.
The specific embodiment
Embodiment, as Fig. 1, shown in Figure 3, a kind of express highway that is used for is put taper target ordering machine fast, comprise trailer 2, the afterbody of trailer 2 is provided with chute board 1, chute board 1 comprises ganoid plate and leg-of-mutton bracing frame, bracing frame is arranged on the plate bottom surface near a ground-surface end, bracing frame is provided with road wheel 4, road wheel 5, the bottom surface of one end of the close trailer of plate is provided with pulls block 3, chute board 1 is articulated in the afterbody of trailer 2 by pulling block 3, and the bracing frame of chute board 1 is provided with transmission device and shift fork 14, the hole slot 18 that is provided with on the plate of chute board 1, shift fork 14 can pass hole slot 18 and reach the outside, the end of shift fork 14 is provided with bearing 15, and the plate of chute board 1 is provided with barrier rib 16, and barrier rib 16 is separately positioned on chute board 1 near on the dual-side of hole slot 18, barrier rib 16 is to chute board 1 inboard inclination, barrier rib 16 is captiveed joint with chute board 1, and barrier rib 16 is for having certain elastomeric sheetmetal, and the top of barrier rib 16 is provided with bearing 17.
As shown in Figure 2, transmission device comprises first turning cylinder 6, arm revolving gear 7, transmission gear 8, second turning cylinder 9, minor sprocket 10, hinge wheel 11, the 3rd turning cylinder 12 and chain 13.The both ends captive joint road wheel 4 and the road wheel 5 of first turning cylinder 6, arm revolving gear 7 is fixedly installed on first turning cylinder 6, transmission gear 8 is fixedly installed on second turning cylinder 9, arm revolving gear 7 is meshing with each other with transmission gear 8, be set with minor sprocket 10 on second turning cylinder 9, hinge wheel 11 is fixedly installed on the 3rd turning cylinder 12, and minor sprocket 10 passes through chain 13 transmissions with hinge wheel 11.The two ends of second turning cylinder 9 and the 3rd turning cylinder 12 are respectively equipped with bearing and bearing seat, and bearing seat is fixedly installed on the bracing frame of chute board 1.When road wheel 4 and road wheel 5 motions, drive first turning cylinder 6, the arm revolving gear 7 that is fixedly installed on first turning cylinder 6 drives the rotation that is fixedly installed on second turning cylinder, 9 upper transfer gear 8 by gear meshing, thereby drive and be set with minor sprocket 10 rotations on second turning cylinder 9, minor sprocket 10 drives by chain 13 and is fixedly installed on hinge wheel 11 on the 3rd turning cylinder 12, thereby drives the shift fork 14 on the 3rd turning cylinder 12.
Arm revolving gear 7 is 1: 2 with the transmitting ratio of transmission gear 8, and minor sprocket 10 is 1: 2 with the transmitting ratio of hinge wheel 11.
During use, the staff is on trailer 2, chute board 1 is put, the taper mark is placed on the chute board 1, starts trailer 2, keep the speed of a motor vehicle at 15~18 kilometers/hour, make the taper mark be slipped on the ground, the setting of the transmitting ratio by transmission device, the utility model can be put 400 tapers marks uniformly in 2 kilometers distance, saved staff's labour intensity greatly.Break away for preventing that taper is marked in the process of downslide, also the smooth plate on the chute board can be designed to U-shaped.

Claims (9)

1. one kind is used for express highway and puts taper target ordering machine fast, comprise trailer (2), the afterbody of described trailer (2) is provided with chute board (1), described chute board (1) articulates with trailer (2), it is characterized in that: described chute board (1) comprises ganoid plate and bracing frame, bracing frame is arranged on the plate bottom surface near a ground-surface end, bracing frame is provided with road wheel (4,5), the bottom surface of one end of the close trailer of plate is provided with pulls block (3), the bracing frame of described chute board (1) is provided with transmission device and shift fork (14), described shift fork (14) passes chute board (1) and reaches the outside, and the plate of described chute board (1) is provided with barrier rib (16).
2. a kind of express highway that is used for according to claim 1 is put taper target ordering machine fast, and it is characterized in that: described transmission device comprises first turning cylinder (6), arm revolving gear (7), transmission gear (8), second turning cylinder (9), minor sprocket (10), hinge wheel (11), the 3rd turning cylinder (12) and chain (13).
3. a kind of express highway that is used for according to claim 2 is put taper target ordering machine fast, it is characterized in that: described first turning cylinder (6) captive joint road wheel (4,5), described arm revolving gear (7) is fixedly installed on first turning cylinder (6), described transmission gear (8) is fixedly installed on second turning cylinder (9), described arm revolving gear (7) is meshing with each other with transmission gear (8), be set with minor sprocket (10) on described second turning cylinder (9), described hinge wheel (11) is fixedly installed on the 3rd turning cylinder (12), and described minor sprocket (10) passes through chain (13) transmission with hinge wheel (11).
4. a kind of express highway that is used for according to claim 3 is put taper target ordering machine fast, it is characterized in that: the two ends of described second turning cylinder (9) and the 3rd turning cylinder (12) are respectively equipped with bearing and bearing seat, and described bearing seat is fixedly installed on the bracing frame of chute board (1).
5. a kind of express highway that is used for according to claim 4 is put taper target ordering machine fast, it is characterized in that: described arm revolving gear (7) is 1: 2 with the transmitting ratio of transmission gear (8), and described minor sprocket (10) is 1: 2 with the transmitting ratio of hinge wheel (11).
6. a kind of express highway that is used for according to claim 5 is put taper target ordering machine fast, and it is characterized in that: described shift fork (14) is fixedly installed on the 3rd turning cylinder (12), stretches out rotation the hole slot (18) of described shift fork (14) from chute board (1).
7. a kind of express highway that is used for according to claim 6 is put taper target ordering machine fast, and it is characterized in that: the end of described shift fork (14) is provided with bearing (15).
8. a kind of express highway that is used for according to claim 7 is put taper target ordering machine fast, it is characterized in that: described barrier rib (16) is separately positioned on chute board (1) near on the dual-side of hole slot (18), described barrier rib (16) is to the inboard inclination of chute board (1), and described barrier rib (16) is captiveed joint with chute board (1).
9. a kind of express highway that is used for according to claim 8 is put taper target ordering machine fast, and it is characterized in that: the top of described barrier rib (16) is provided with bearing (17).
CN2009202273332U 2009-09-25 2009-09-25 Putting machine for putting cones quickly in highway Expired - Fee Related CN201553075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202273332U CN201553075U (en) 2009-09-25 2009-09-25 Putting machine for putting cones quickly in highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202273332U CN201553075U (en) 2009-09-25 2009-09-25 Putting machine for putting cones quickly in highway

Publications (1)

Publication Number Publication Date
CN201553075U true CN201553075U (en) 2010-08-18

Family

ID=42612751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202273332U Expired - Fee Related CN201553075U (en) 2009-09-25 2009-09-25 Putting machine for putting cones quickly in highway

Country Status (1)

Country Link
CN (1) CN201553075U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644246A (en) * 2012-05-09 2012-08-22 中信机电制造公司科研设计院 Casting device of marking device
CN102660928A (en) * 2012-06-08 2012-09-12 北京工商大学 Stacking device for traffic cones
CN102776848A (en) * 2012-07-19 2012-11-14 上海电控研究所 Automatic recovery and placing vehicle for traffic road cones
CN103911962A (en) * 2014-04-28 2014-07-09 上海市政养护管理有限公司 Mechanical traffic road cone placing device
CN106320213A (en) * 2016-10-18 2017-01-11 北京泽通科技开发有限公司 Multi-layer automatic storage stacking rack for traffic cones
CN108330856A (en) * 2015-09-07 2018-07-27 陈国栋 The working method of road surface deceleration strip automatic mounting machine

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644246A (en) * 2012-05-09 2012-08-22 中信机电制造公司科研设计院 Casting device of marking device
CN102660928A (en) * 2012-06-08 2012-09-12 北京工商大学 Stacking device for traffic cones
CN102776848A (en) * 2012-07-19 2012-11-14 上海电控研究所 Automatic recovery and placing vehicle for traffic road cones
CN102776848B (en) * 2012-07-19 2015-05-20 上海电控研究所 Automatic recovery and placing vehicle for traffic road cones
CN103911962A (en) * 2014-04-28 2014-07-09 上海市政养护管理有限公司 Mechanical traffic road cone placing device
CN103911962B (en) * 2014-04-28 2015-11-18 上海市政养护管理有限公司 A kind of traffic conic road-sign machinery applicator
CN108330856A (en) * 2015-09-07 2018-07-27 陈国栋 The working method of road surface deceleration strip automatic mounting machine
CN106320213A (en) * 2016-10-18 2017-01-11 北京泽通科技开发有限公司 Multi-layer automatic storage stacking rack for traffic cones
CN106320213B (en) * 2016-10-18 2018-05-15 北京泽通科技开发有限公司 Cone stores multilayer racking automatically

Similar Documents

Publication Publication Date Title
CN201553075U (en) Putting machine for putting cones quickly in highway
CN206308655U (en) A kind of intelligent automatic control moves guardrail
CN102425136B (en) Preposed snow removing machine capable of controlling roller brush automatically and using method for preposed snow removing machine
CN110835892B (en) Automatic retracting device for traffic cones
CN210975628U (en) Highway traffic awl winding and unwinding devices
CN109159770A (en) A kind of highway automobile turns around auxiliary device and its control method
KR102101572B1 (en) Trailer equipped with a indicating apparatus of sign-car for the direction
CN110847078A (en) Traffic cone recovery device
CN204674694U (en) Railway T-shaped beam special transportation device
CA2839221C (en) Snow removal apparatus and system
CN216515063U (en) Road surface hot melting marking device for traffic engineering
CN206172491U (en) A skip positioning element for on automotive production line
CN104802878A (en) Transportation equipment special for railway T-shaped girders
CN202227315U (en) Superposed automatic control roller brush snow remover
CN109435918A (en) A kind of highway automobile turns around auxiliary device and its control method
CN211773060U (en) Automatic vehicle-mounted deceleration strip winding and unwinding device
CN108999072A (en) Pavement of road lineation device and its construction method
CN201329832Y (en) Multi-functional wrecker
CN102126457A (en) Vehicle for setting road surface traffic sign
CN214734041U (en) Traction device for roadway and roadway thereof
CN110593156A (en) Retracting and releasing device of rubber cone
CN211904371U (en) Dynamic automobile weighing scale body with antiskid structure
CN205524236U (en) Automatic transmission light rail public traffic system
CN211621326U (en) Retraction device of rubber cone
CN217479959U (en) Bridge construction operation platform truck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20100925