CN201549854U - Insulation support device between conductors - Google Patents
Insulation support device between conductors Download PDFInfo
- Publication number
- CN201549854U CN201549854U CN2009202579278U CN200920257927U CN201549854U CN 201549854 U CN201549854 U CN 201549854U CN 2009202579278 U CN2009202579278 U CN 2009202579278U CN 200920257927 U CN200920257927 U CN 200920257927U CN 201549854 U CN201549854 U CN 201549854U
- Authority
- CN
- China
- Prior art keywords
- insulator
- support device
- insulation support
- lead
- wire clips
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Insulators (AREA)
Abstract
Description
技术领域:Technical field:
本实用新型涉及电力输送电领域,特别涉及10KV农村线路中同杆双回架设的绝缘装置。The utility model relates to the field of electric power transmission, in particular to an insulation device erected on the same pole with double circuits in 10KV rural lines.
背景技术:Background technique:
目前我国电力10KV线路架设方式复杂,网架结构多样性。面对城市发展不断向周围扩张,存在10KV配网线路架设路径短缺的情况。所以经常不得不采用同杆架设形式。但存在的实际情况是早期架设的农网线路挡距较大,导线垂弧也较大,即使是两条线路都采用JKLY-185的绝缘导线,在风力达到4级及以上的天气情况下,极易发生相间短路,导致整条线路跳闸,甚至发生故障。且在处理线路故障时,因为是同杆架设,所以两条线路任意一条停电另一条也要陪停,这样极大影响了供电可靠性指标,损失了大量电量,造成了资源的浪费,影响了人民群众的正常生活和供电企业的经济效益。At present, the erection methods of 10KV electric power lines in my country are complicated, and the grid structures are diverse. Facing the continuous expansion of urban development, there is a shortage of 10KV distribution network lines. Therefore, it is often necessary to adopt the same pole erection form. However, the actual situation is that the rural grid line erected in the early days has a large distance and a large vertical arc of the conductor. Even if the two lines use JKLY-185 insulated conductors, when the wind force reaches
实用新型内容:Utility model content:
本实用新型所要解决的技术问题就是针对以上不足而提供一种导线间绝缘支撑装置,该装置采用绝缘子和带电设备线夹巧妙结合,避免了电力资源的浪费,挽回不必要的电量损失,保障了10KV配网安全、稳定、可靠运行,具有体积小、成本低、重量轻、选材容易等优点。The technical problem to be solved by the utility model is to provide an insulating support device between conductors for the above deficiencies. The 10KV distribution network is safe, stable, and reliable, and has the advantages of small size, low cost, light weight, and easy material selection.
本实用新型采用的技术方案是:The technical scheme that the utility model adopts is:
一种导线间绝缘支撑装置,由绝缘体及绝缘体两端连接的设备线夹构成,绝缘体两端与设备线夹的连接为弧形万向连接,已解决对装置对导线的重力影响,设备线夹上具有吊装孔和螺旋杆。An insulating support device between conductors, which is composed of an insulator and equipment clamps connected at both ends of the insulator. The connection between the two ends of the insulator and the equipment clamps is an arc-shaped universal connection, which has solved the gravity effect on the device on the conductors. The equipment clamps There are hoisting holes and screw rods on it.
为保证绝缘体两端与设备线夹的弧形万向连接,绝缘体两端部的挂口具有弧形接头,设备线夹的连接位置具有相适应的弧形槽。In order to ensure the arc-shaped universal connection between the two ends of the insulator and the equipment clamp, the hanging openings at the two ends of the insulator have arc-shaped joints, and the connection position of the equipment clamp has a corresponding arc-shaped groove.
为保证绝缘质量,绝缘体采用适用的复合绝缘子。In order to ensure the insulation quality, the insulator adopts the applicable composite insulator.
为保证连接强度,绝缘体两端与设备线夹之间设有连接螺丝。In order to ensure the connection strength, there are connecting screws between the two ends of the insulator and the equipment clamps.
绝缘体两端部设有金属垫片,金属垫片穿接在连接螺丝上。The two ends of the insulator are provided with metal washers, and the metal washers are pierced and connected on the connecting screws.
本装置全长50CM,安装后符合同杆双回导线间距离长度和重量要求。The total length of this device is 50CM, and after installation, it meets the requirements for distance length and weight between double-circuit wires on the same pole.
本实用新型能够达到的有益效果是:The beneficial effect that the utility model can reach is:
1、本实用新型结构设计巧妙、具有体积小、成本低、重量轻、选材容易,具有安装简易、携带和更换方便等特点。1. The utility model has the advantages of ingenious structural design, small size, low cost, light weight, easy material selection, easy installation, convenient carrying and replacement, etc.
2、本实用新型采用绝缘子和带电设备线夹巧妙结合,避免了电力资源的浪费,挽回不必要的电量损失,保障了10KV配网安全、稳定、可靠运行,在对郑州供电公司环城分局管辖范围内10KV配网中试用,百天线进行试用是效果显著,自使用段以来百11板百新线与百30板百水线没有再出现因导线碰撞引起的相间短路停电或故障发生,成功率达100%。2. The utility model adopts ingenious combination of insulators and live equipment clamps, which avoids the waste of power resources, saves unnecessary power loss, and ensures the safe, stable and reliable operation of the 10KV distribution network. In the 10KV distribution network within the scope of the trial, the trial effect of the 100-antenna is remarkable. Since the use of the 11-board 100-new line and the 30-board 100-water line, there has been no interphase short-circuit power failure or failure caused by wire collision. The success rate up to 100%.
3、本实用新型整体尺寸和重量满足于挡距大且同杆架设的两条10KV线路导线间,应用范围广泛。3. The overall size and weight of the utility model are satisfied between two 10KV line conductors with a large distance and erected on the same pole, and have a wide range of applications.
附图说明:Description of drawings:
图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.
图2为本实用新型使用状态示意图。Fig. 2 is a schematic view of the utility model in use.
具体实施方案:Specific implementation plan:
下面结合附图对本实用新型作进一步的描述:Below in conjunction with accompanying drawing, the utility model is further described:
如图1、图2所示,该导线间绝缘支撑装置,由绝缘体1及绝缘体1两端连接的设备线夹2构成,绝缘体1两端部的挂口具有弧形接头3,设备线夹2的连接位置具有相适应的弧形槽4,保证了绝缘体1两端与设备线夹2的弧形万向连接,绝缘体1两端与设备线夹2之间设有连接螺丝8,金属垫片5穿接在连接螺丝8上,设备线夹2上具有吊装孔6和螺旋杆7,绝缘体1采用适用的复合绝缘子,本装置整体全长50CM,安装后符合同杆双回导线间距离长度和重量要求。As shown in Figure 1 and Figure 2, the insulating support device between the wires is composed of an insulator 1 and an
该装置适合安装的位置位于同杆双回的两条线路中,某个挡距较大的导线垂弧中间或垂弧靠上的某点。现场安装此设备存在两种情况:一、线路两端同时带电操作。首先,需要两个操作人员同时位于需安装设备的线路两侧,使用带电梯登上合适的位置;然后同时使用令克棒从吊装孔6挑起本装置,将其两端同时、分别挂在两条线路的相应位置;两个操作人员同时旋动螺旋杆7固定好导线即可。二、使用带电操作绝缘斗臂车。操作人员登上带电车后,可以先用令克棒插入吊装孔6将设备一端固定到对象线路中其中一条线路相应的位置上,然后再在另一条线路的相应位置上固定设备的另一端。The suitable installation position of the device is located in the middle of the vertical arc of a conductor with a relatively large distance or at a certain point above the vertical arc of the two double-circuit lines on the same pole. There are two situations in the field installation of this equipment: 1. Both ends of the line are live and operated at the same time. First of all, two operators are required to be on both sides of the line where the equipment needs to be installed at the same time, and use the elevator to climb to the appropriate position; then use the gram stick to lift the device from the hoisting hole 6 at the same time, and hang the two ends of the device at the same time and respectively. The corresponding positions of the two lines; two operators rotate the
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009202579278U CN201549854U (en) | 2009-11-06 | 2009-11-06 | Insulation support device between conductors |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009202579278U CN201549854U (en) | 2009-11-06 | 2009-11-06 | Insulation support device between conductors |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201549854U true CN201549854U (en) | 2010-08-11 |
Family
ID=42605035
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009202579278U Expired - Fee Related CN201549854U (en) | 2009-11-06 | 2009-11-06 | Insulation support device between conductors |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201549854U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102403671A (en) * | 2011-07-27 | 2012-04-04 | 东阳市供电局 | Tool for replacing rod type porcelain insulator through live-wire work |
| CN103746325A (en) * | 2014-01-16 | 2014-04-23 | 江苏省电力公司东台市供电公司 | High-voltage power line connecting method |
-
2009
- 2009-11-06 CN CN2009202579278U patent/CN201549854U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102403671A (en) * | 2011-07-27 | 2012-04-04 | 东阳市供电局 | Tool for replacing rod type porcelain insulator through live-wire work |
| CN103746325A (en) * | 2014-01-16 | 2014-04-23 | 江苏省电力公司东台市供电公司 | High-voltage power line connecting method |
| CN103746325B (en) * | 2014-01-16 | 2016-03-02 | 国家电网公司 | A kind of power high-voltage line method of attachment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
| CN103066526B (en) | A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line | |
| CN204645808U (en) | Bar stepped on by cement pole cable | |
| CN201549854U (en) | Insulation support device between conductors | |
| CN102966257B (en) | 750kV composite material cross arm | |
| CN208078602U (en) | A kind of high-tension cable upper boom bottom protection pipe | |
| CN206931928U (en) | A kind of 10kV distributions uninterrupted operation fixed power source lead wire insulation cross-arm | |
| CN201438617U (en) | Electric lifting tool for linear insulator string on ZM tower | |
| CN201742027U (en) | Special tool for replacing insulators in electriferous state for 110kV single tower double circuit | |
| CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
| CN202422954U (en) | 10KV incoming bridge grounding conductor terminal for transformer | |
| CN205544113U (en) | Cross arm for transmission tower | |
| CN203352055U (en) | Electric pole grounding downlead lifting apparatus | |
| CN209193357U (en) | Pre- arch tube type bus hanging apparatus | |
| CN203367935U (en) | Phase distance optimization structure for strain tower of compact transmission line | |
| CN210693413U (en) | High-strength core rod type lightning arrester with visible fracture | |
| CN203589662U (en) | Sectional ground wire connection structure | |
| CN209434747U (en) | The combination tool of horizontal rotation method replacement direct current grounding pole line tension string | |
| CN209822060U (en) | Multifunctional combined training facility for simulation low-voltage distribution line | |
| CN207490436U (en) | The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex | |
| CN206340886U (en) | The lossless ground connection distribution of bilateral becomes platform | |
| CN204407828U (en) | A kind of power distribution station cross-arm | |
| CN204885498U (en) | Earthing device is arranged to generating line | |
| CN204663115U (en) | 10kV multiloop switch steel pipe pole | |
| CN204886008U (en) | Wire lifting device for replacing insulator strings of large-tonnage wires with power on |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100811 Termination date: 20111106 |