CN202094322U - Multipurpose lead wiring device of large-scale transformer test - Google Patents
Multipurpose lead wiring device of large-scale transformer test Download PDFInfo
- Publication number
- CN202094322U CN202094322U CN2011201516758U CN201120151675U CN202094322U CN 202094322 U CN202094322 U CN 202094322U CN 2011201516758 U CN2011201516758 U CN 2011201516758U CN 201120151675 U CN201120151675 U CN 201120151675U CN 202094322 U CN202094322 U CN 202094322U
- Authority
- CN
- China
- Prior art keywords
- test
- wire
- plug
- terminal
- test equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Measuring Leads Or Probes (AREA)
Abstract
本实用新型涉及电力系统导线的技术领域,尤其涉及一种大型变压器试验多用途导线接线装置。是将连接板的一端的两个面分别与两个接线夹导电接触板连接,两个接线夹导电接触板之间连接有收缩弹簧;连接板的另一端与连接倒杆连接,连接倒杆的另一端与拉杆相连。本实用新型可以大大缩短因电力设备维修、改造而造成的停电时间,使停电线路能够尽快的恢复供电,保证企业生产和生活用电的可靠性。本实用新型同时还具有体积小,质量轻,可靠性高,携带方便的特点,满足电气高压试验灵活机动特性的要求,可以应用于电力系统66kV及以上电压等级大型变压器交接及预防性试验工作中。
The utility model relates to the technical field of electric power system wires, in particular to a large-scale transformer test multipurpose wire connection device. It is to connect the two surfaces of one end of the connecting plate with the two conductive contact plates of the connecting clip respectively, and the contraction spring is connected between the conductive contact plates of the two connecting clips; the other end of the connecting plate is connected with the connecting inverted rod, and the connecting rod The other end is connected with pull rod. The utility model can greatly shorten the power outage time caused by the maintenance and transformation of electric equipment, enable the power outage circuit to recover power supply as soon as possible, and ensure the reliability of electricity used in production and life in enterprises. The utility model also has the characteristics of small size, light weight, high reliability, and convenient portability, which meets the requirements of flexible and maneuverable electrical high-voltage tests, and can be applied to the handover and preventive tests of large transformers with a voltage level of 66kV and above in the power system .
Description
技术领域 technical field
本实用新型涉及电力系统导线的技术领域,尤其涉及一种大型变压器试验多用途导线接线装置。 The utility model relates to the technical field of wires in electric power systems, in particular to a large-scale transformer test multipurpose wire connection device.
背景技术 Background technique
变压器作为电力系统中的重要组成部分,其作用是变换电压,以利于功率的传输。电压经升压变压器升压后,可以减少线路损耗,提高送电的经济性,达到远距离送电的目的。而降压变压器则能把高电压变为用户所需要的各级使用电压,满足用户需要。为了保证变压器可靠稳定的运行,在变压器出厂、安装后及运行中均需要做出厂、交接及预防性试验,提供试验数据、以检验变压器的健康状况,从而保证电力系统的安全可靠的运行。 As an important part of the power system, the transformer is used to transform voltage to facilitate power transmission. After the voltage is boosted by the step-up transformer, the line loss can be reduced, the economy of power transmission can be improved, and the purpose of long-distance power transmission can be achieved. The step-down transformer can change the high voltage into the various levels of voltage required by the user to meet the needs of the user. In order to ensure the reliable and stable operation of the transformer, it is necessary to make factory, handover and preventive tests after the transformer leaves the factory, after installation and during operation, and provide test data to check the health of the transformer, so as to ensure the safe and reliable operation of the power system.
沈阳供电公司公司现有66kV及以上电压等级大型变压200多台,而随着全运会的到来及市内不断增加的用电需求,又有大量在建和将建的变电站。每年有大量的变压器交接及预防性试验任务,而每台变压器在交接及预防性试验中,攀爬套管更改接线成为一项工作量巨大的操作项目,由于不同的设备专门配有不用的接线,这个问题的出现使得工作效率大大降低,而且反复更改接线无形中也耗费了大量的作业时间,同时在作业中试验人员反复多次攀爬套管又存在着极大的安全隐患,这也加大了劳动力投入。 Shenyang Power Supply Company currently has more than 200 large-scale transformers with a voltage level of 66kV and above. With the arrival of the National Games and the increasing demand for electricity in the city, there are a large number of substations under construction or to be built. There are a large number of transformer handover and preventive test tasks every year, and during the handover and preventive test of each transformer, climbing the bushing to change the wiring becomes a huge workload, because different equipment is specially equipped with unused wiring , the emergence of this problem greatly reduces the work efficiency, and it takes a lot of work time to change the wiring repeatedly. increased labor input.
实用新型内容 Utility model content
本实用新型针对上述现有技术中存在的问题,提供了一种大型变压器试验多用途导线接线装置。目的是为了提供一种安全性能高,体积小,质量轻,携带方便的大型变压器试验多用途导线装置。 The utility model aims at the problems existing in the above-mentioned prior art, and provides a large-scale transformer test multi-purpose wire connection device. The purpose of the utility model is to provide a large-scale transformer test multipurpose lead device with high safety performance, small size, light weight and convenient portability.
本实用新型解决其技术问题所采用的技术方案是: The technical scheme that the utility model solves its technical problem adopts is:
大型变压器试验多用途导线接线装置是将连接板的一端的两个面分别与两个接线夹导电接触板连接,两个接线夹导电接触板之间连接有收缩弹簧,接线夹导电接触板上设有收缩弹簧固定螺栓旋钮和接线夹上端收缩弹簧固定螺栓旋钮; The large-scale transformer test multi-purpose wire wiring device is to connect the two surfaces of one end of the connecting plate with the two conductive contact plates of the terminal clip respectively. A contraction spring is connected between the conductive contact plates of the two terminal clamps. There is a retractable spring fixing bolt knob and a retractable spring fixing bolt knob at the upper end of the terminal clip;
连接板的另一端与连接倒杆连接,连接倒杆的另一端插入在拉杆首段卡槽内,拉杆首段卡槽的另一端与拉杆相连; The other end of the connecting plate is connected with the connecting inverted rod, the other end of the connecting inverted rod is inserted into the draw-in groove of the first section of the tie rod, and the other end of the draw-in groove of the first section of the tie rod is connected with the pull rod;
连接板上的导电短线与接线夹导电接触板相连;连接板上设有试验导线固定螺栓,试验导线固定螺栓与多用途试验导线的一端相连,多用途试验导线的另一端与试验设备端相连。 The conductive short wire on the connecting plate is connected to the conductive contact plate of the terminal clamp; the connecting plate is provided with a test lead fixing bolt, which is connected to one end of the multi-purpose test lead, and the other end of the multi-purpose test lead is connected to the test equipment end.
所述的多用途试验导线的一端分别通过导线连接有连接接线夹端电压线叉形插头和连接接线夹端电流线叉形插头,连接接线夹端电压线叉形插头和连接接线夹端电流线叉形插头分别与试验导线固定螺栓相连; One end of the multi-purpose test lead is respectively connected with a fork-shaped plug for connecting the voltage line at the terminal of the terminal clamp and a fork-shaped plug for the current line at the terminal of the terminal clamp through a wire, and a fork-shaped plug for the voltage line at the terminal of the connecting terminal and a fork-shaped plug for connecting the voltage line at the terminal of the terminal clamp and the current line at the terminal for connecting the terminal clamp. The fork-shaped plugs are respectively connected to the fixing bolts of the test leads;
多用途试验导线的另一端分别连接有连接试验设备端电压导线和连接试验设备端电流导线; The other end of the multi-purpose test lead is respectively connected to the voltage lead connected to the test equipment end and the current lead connected to the test equipment end;
连接试验设备端电压导线的另一端连接连接试验设备端电压柱形线插头,试验设备端电压柱形线插头上通过绝缘橡胶绳连接有连接试验设备端电压线备用叉形插头; The other end of the voltage wire connected to the test equipment terminal is connected to the voltage column plug of the test equipment terminal, and the voltage column plug of the test equipment terminal is connected to a spare fork plug connected to the voltage line of the test equipment terminal through an insulating rubber rope;
连接试验设备端电流导线的另一端连接连接试验设备端电流线柱形插头,连接试验设备端电流线柱形插头上通过绝缘橡胶绳连接有连接试验设备端电流线备用叉形插头; The other end of the current wire connected to the test equipment end is connected to the cylindrical plug of the current wire connected to the test equipment end, and the cylindrical plug connected to the current wire of the test equipment end is connected to a spare fork-shaped plug connected to the current wire of the test equipment end through an insulating rubber rope;
连接试验设备端电压柱形线插头、连接试验设备端电压线备用叉形插头、连接试验设备端电流线柱形插头、连接试验设备端电流线备用叉形插头均与试验设备端相连。 The plug for connecting the voltage cylindrical line of the test equipment end, the spare fork plug for connecting the voltage line of the test equipment end, the cylindrical plug for connecting the current line of the test equipment end, and the spare fork plug for connecting the current line of the test equipment end are all connected to the test equipment end.
所述的多用途试验导线是在线芯的外部依次设有:绝缘层、屏蔽层及外层绝缘层。 The multi-purpose test lead is sequentially provided outside the wire core: an insulating layer, a shielding layer and an outer insulating layer.
所述的接线夹导电接触板为平板结构,两个接触板开口为V字行开口;接线夹下端收缩弹簧固定螺栓旋钮和接线夹上端收缩弹簧固定螺栓旋钮均固定连接收缩弹簧,4根收缩弹簧均由螺杆固定在两个接触板之间。 The conductive contact plate of the connecting clip is a flat plate structure, and the openings of the two contact plates are V-shaped openings; the lower end of the connecting clip shrinks the spring fixing bolt knob and the connecting clip upper end shrinks the spring fixing bolt knob and is fixedly connected to the shrinking spring, and the four shrinking springs Both are fixed between two contact plates by screws.
所述的连接倒杆上设有卡销,卡销为柱形结构。 A bayonet pin is provided on the connecting inverted rod, and the bayonet pin is a cylindrical structure.
所述的导电短线为两根,分别设在连接板的两侧,并分别与两块接线夹导电接触板相连。 There are two conductive short wires, which are respectively arranged on both sides of the connection plate, and are respectively connected with the two conductive contact plates of the connecting clip.
所述的接线夹导电接触板为铜质材料构成,连接板与连接倒杆为铝合金材料构成。 The conductive contact plate of the terminal clip is made of copper material, and the connecting plate and connecting bar are made of aluminum alloy material.
本发明的有益效果是: The beneficial effects of the present invention are:
由于本发明大型变压器试验多用途导线接线装置的开发及使用,使在66kV及以上电压等级大型变压器交接试验时间由原来的4小时减少到现在的2.5小时,平均攀爬套管打滑次数由原来的0.35次降至0次,作业人员则由4人减少至3人,平均每次作业时间缩短超过了1.5小时。这样也就大大缩短了因电力设备维修、改造而造成的停电时间,使停电线路能够尽快的恢复供电,保证了企业生产和人民生活用电的可靠性。本发明同时还具有体积小,质量轻,可靠性高,携带方便的特点,满足电气高压试验灵活机动特性的要求,可以应用于电力系统66kV及以上电压等级大型变压器交接及预防性试验工作中。 Due to the development and use of the multi-purpose wire connection device for large-scale transformer testing of the present invention, the time for the large-scale transformer handover test at a voltage level of 66kV and above is reduced from the original 4 hours to the current 2.5 hours, and the average number of climbing bushing slips is reduced from the original From 0.35 times to 0 times, the number of operators was reduced from 4 to 3, and the average operation time was shortened by more than 1.5 hours. This also greatly shortens the power outage time caused by the maintenance and transformation of power equipment, enables the power outage line to resume power supply as soon as possible, and ensures the reliability of power consumption for enterprise production and people's daily life. The present invention also has the characteristics of small size, light weight, high reliability, and portability, meets the requirements of flexible and maneuverable electrical high-voltage tests, and can be applied to the handover and preventive tests of large-scale transformers with a voltage level of 66kV and above in the power system.
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图2是图1的侧视图。 FIG. 2 is a side view of FIG. 1 .
图3是本实用新型中接线夹导电接触板结构示意图。 Fig. 3 is a structural schematic diagram of the conductive contact plate of the wiring clip in the utility model.
图4是本实用新型中连接板结构示意图。 Fig. 4 is a schematic diagram of the structure of the connecting plate in the utility model.
图5是本实用新型中连接倒杆结构示意图。 Fig. 5 is a schematic diagram of the structure of the connecting inverted rod in the utility model.
图6是图5的俯视图; Figure 6 is a top view of Figure 5;
图7是图5的侧视图; Fig. 7 is a side view of Fig. 5;
图8是本实用新型中导线结构示意图。 Fig. 8 is a schematic diagram of the wire structure in the present invention.
图9是本实用新型中多用途试验导线连接试验仪器设备端插头结构示意图; Fig. 9 is a schematic diagram of the structure of the multi-purpose test wire connected to the test instrument equipment end plug in the utility model;
图10是本实用新型中多用途试验导线连接连接板端插头结构示意图。 Fig. 10 is a schematic diagram of the structure of the multi-purpose test lead connected to the plug at the end of the connecting plate in the utility model.
图11是拉杆首段卡槽结构示意图; Fig. 11 is a schematic diagram of the structure of the first section of the draw bar;
图12是本实用新型实施状态结构示意图。 Fig. 12 is a structural schematic diagram of the implementation state of the utility model.
图中:接线夹导电接触板1,连接板2,连接倒杆3,卡销4,导电短线5,试验导线固定螺栓6,接线夹下端收缩弹簧固定螺栓旋钮7,连接板固定螺栓8,接线夹上端收缩弹簧固定螺栓旋钮9,导电短线固定螺栓10,连接倒杆与连接板固定螺栓11,连接试验设备端电压柱形线插头12,连接试验设备端电压线备用叉形插头13,连接试验设备端电流线柱形插头14,连接试验设备端电流线备用叉形插头15,连接试验设备端电压导线16,连接试验设备端电流导线17,多用途试验导线18,线芯19,绝缘层20,屏蔽层21,外层绝缘层22,连接接线夹端电压线叉形插头23,连接接线夹端电流线叉形插头24,拉杆25,拉杆首段卡槽26,收缩弹簧27,高压试验仪器28,被试设备的套管首段接线板29。
In the figure: the
下面结合本实用新型的具体实施例和附图,对本实用新型加以详细描述。 Below in conjunction with the specific embodiment of the utility model and accompanying drawing, the utility model is described in detail.
具体实施方式 Detailed ways
实施例1: Example 1:
如图1-图3所示,本实用新型是大型变压器试验多用途导线接线装置,它包括接线夹、连接板、连接倒杆及多用途试验导线四大部分。 As shown in Figures 1-3, the utility model is a large-scale transformer test multi-purpose wire connection device, which includes four parts of a connection clip, a connecting plate, a connection inverted bar and a multi-purpose test wire.
接线夹部分:是由连接板2的一端的两个面分别与两个由铜质材料构成的接线夹导电接触板1连接,接线夹的连接板2与接线夹导电接触板1是通过接线夹的连接板固定螺栓8相连接,接线夹的连接板2与接线夹与拉杆连接处连接倒杆3通过接线夹的连接倒杆与连接板固定螺栓11相连接。两个接线夹导电接触板1之间连接设有收缩弹簧27,接线夹导电接触板1上设有收缩弹簧固定螺栓旋钮7和接线夹上端收缩弹簧固定螺栓旋钮9。所述的接线夹导电接触板1为平板结构,两个接触板开口为V字行开口;接线夹下端收缩弹簧固定螺栓旋钮7和接线夹上端收缩弹簧固定螺栓旋钮9均分别与4根收缩弹簧27相连, 4根收缩弹簧27均分别由螺杆固定在两个接触板之间。
Connection clip part: the two surfaces of one end of the
连接倒杆部分:如图5-图7所示,是由铝合金材料构成的连接板2的另一端与由铝合金材料构成的连接倒杆3连接,连接倒杆3的另一端插入在拉杆首段卡槽26内,拉杆首段卡槽26的另一端与拉杆25相连,如图11所示。所述的连接倒杆3上设有卡销4,卡销4为柱形结构。
Connecting inverted rod part: as shown in Figure 5-Figure 7, the other end of the connecting
连接板部分:如图4所示,是由连接板2两侧的两根导电短线5分别通过导电短线固定螺栓10与两个接线夹导电接触板1相连。连接板2上设有试验导线固定螺栓6,试验导线固定螺栓6与多用途试验导线18的一端相连,多用途试验导线18的另一端与高压试验仪器28相连。
The connecting plate part: as shown in FIG. 4 , it is connected to the two
多用途试验导线部分:如图8-图10所示,所述的多用途试验导线18是在线芯19的外部依次设有:绝缘层20、屏蔽层21及外层绝缘层22。多用途试验导线18的一端分别通过导线连接有连接接线夹端电压线叉形插头23和连接接线夹端电流线叉形插头24,连接接线夹端电压线叉形插头23和连接接线夹端电流线叉形插头24分别与试验导线固定螺栓6相连。多用途试验导线18的另一端分别连接有连接试验设备端电压导线16和连接试验设备端电流导线17。连接试验设备端电压导线16的另一端连接连接试验设备端电压柱形线插头12,试验设备端电压柱形线插头12上通过绝缘橡胶绳连接有连接试验设备端电压线备用叉形插头13。连接试验设备端电流导线17的另一端连接连接试验设备端电流线柱形插头14,连接试验设备端电流线柱形插头14上通过绝缘橡胶绳连接有连接试验设备端电流线备用叉形插头15。连接试验设备端电压柱形线插头12、连接试验设备端电压线备用叉形插头13、连接试验设备端电流线柱形插头14、连接试验设备端电流线备用叉形插头15均与试验设备端相连。
Multi-purpose test wire part: as shown in Figures 8-10, the
使用时,如图12所示,图12是本实用新型实施状态结构示意图,是将本实用新型所述的大型变压器试验多用途导线接线装置在高压试验时的接线图。首先是接线夹部分,如果面对220kV变压器一次套管过高,反复攀爬套管更改试验接线即浪费大量时间,同时也带来了巨大的安全隐患。此时使用本实用新型所述的大型变压器试验多用途导线接线装置就不需要再攀爬变压器一次套管就可以更改试验接线了。 When in use, as shown in Figure 12, Figure 12 is a schematic diagram of the utility model's implementation state structure, which is a wiring diagram of the large-scale transformer test multi-purpose wire connection device described in the utility model during the high-voltage test. The first is the connection clip part. If the primary bushing of a 220kV transformer is too high, it will waste a lot of time to repeatedly climb the bushing to change the test wiring, and it will also bring a huge safety hazard. Now use the large-scale transformer test multi-purpose wire wiring device described in the utility model and just can change test wiring without climbing the transformer once bushing again.
首先将多用途试验导线18上的连接试验设备端电压柱形线插头12插入在连接试验设备端电压线备用叉形插头13上,将连接试验设备端电流线柱形插头14插入在连接试验设备端电流线备用叉形插头15上,再将连接试验设备端电压线备用叉形插头13和连接试验设备端电流线备用叉形插头15连接在高压试验仪器28的导线固定螺栓上。
First, insert the connection test equipment end voltage cylindrical line plug 12 on the
再将多用途试验导线18上的连接接线夹端电压线叉形插头23和连接接线夹端电流线叉形插头24端固定到本实用新型所述的大型变压器试验多用途导线接线装置的连接板2上的试验导线固定螺栓6上,然后将连接倒杆3插入拉杆首段卡槽26内通过连接倒杆卡销4旋转锁死,然后试验人员将本实用新型所述的大型变压器试验多用途导线接线装置通过拉杆25举至大型设备变压器被试相套管首段,在接线夹导电接触板1开口处与大型设备接线处的套管接线板对接上以后,试验人员用力下拉拉杆25,利用套管接线板将接线夹导电接触板1的V型开口打开,在本实用新型接线装置下端收缩弹簧固定螺栓旋钮7和接线夹上端收缩弹簧固定螺栓旋钮9的作用下,两块接线夹导电接触板1将紧紧夹住被试设备的套管首段接线板29,然后转动拉杆25,将连接倒杆卡销4旋出拉杆首段卡槽26,收回拉杆25,即完成接线。
Then the connection clamp end voltage
本实用新型所述的多用途试验导线18部分的设计,充分考虑了大型变压器交接、预防性试验涵盖绝缘试验项目所需最大电压及电流峰值,导线的绝缘等级完全能满足电压及电流峰值的要求。同时导线的机械强度、抗拉伸能力也能充分满足户外试验要求,在温度为-30℃—40℃之间能保持很好的机械强度及绝缘效果。 The design of the 18 parts of the multi-purpose test wire described in the utility model has fully considered the large-scale transformer handover, and the preventive test covers the maximum voltage and current peak value required by the insulation test item, and the insulation level of the wire can fully meet the requirements of the voltage and current peak value. . At the same time, the mechanical strength and tensile strength of the wire can also fully meet the requirements of outdoor tests, and can maintain good mechanical strength and insulation effect at temperatures between -30°C and 40°C.
本实用新型所述还考虑到不同型号试验设备接口多样化,将多用途试验导线18与设备的连接端设计为连接试验设备端电压线柱形插头12,连接试验设备端电压线备用叉形插头13,连接试验设备端电流线柱形插头14,连接试验设备端电流线备用叉形插头15。完全满足目前所使用的全部设备接口需求。同时连接试验设备端电压线备用叉形插头13、连接试验设备端电流线备用叉形插头15叉形接口设计为由绝缘橡胶绳与连接试验设备端电压导线16、连接试验设备端电流导线17母线相连,在闲置时可以保持良好绝缘,使用时只需将连接试验设备端电压柱形线插头12、连接试验设备端电流线柱形插头14的柱形插头插入连接试验设备端电压线备用叉形插头13、连接试验设备端电流线备用叉形插头15叉形端子尾端即可使用。
The utility model also considers the diversification of different types of test equipment interfaces, and the connection end of the
本实用新型所述的多用途试验导线18可以连接多种试验仪器设备。多用途试验导线18连接试验设备端的插头分别为柱形和叉形两种结构,不工作时彼此绝缘不能导电,只有需要时,可将对应插头连接,方可导电。
The
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011201516758U CN202094322U (en) | 2011-05-13 | 2011-05-13 | Multipurpose lead wiring device of large-scale transformer test |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011201516758U CN202094322U (en) | 2011-05-13 | 2011-05-13 | Multipurpose lead wiring device of large-scale transformer test |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202094322U true CN202094322U (en) | 2011-12-28 |
Family
ID=45369370
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011201516758U Expired - Lifetime CN202094322U (en) | 2011-05-13 | 2011-05-13 | Multipurpose lead wiring device of large-scale transformer test |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202094322U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103293413A (en) * | 2013-05-19 | 2013-09-11 | 国家电网公司 | Special high-voltage testing device for transformers |
| CN104977475A (en) * | 2015-07-17 | 2015-10-14 | 国家电网公司 | Test clip for transformer dielectric loss angle and deformation test |
| CN105790022A (en) * | 2016-04-28 | 2016-07-20 | 赵士立 | Climbing belt conveyor light current line adapter |
| CN107871939A (en) * | 2016-09-24 | 2018-04-03 | 国网辽宁省电力有限公司丹东供电公司 | Downlead device for transformer fast-wiring |
| CN110618362A (en) * | 2019-10-15 | 2019-12-27 | 国网天津市电力公司 | High-voltage test device for lightning arrester of power transmission line |
-
2011
- 2011-05-13 CN CN2011201516758U patent/CN202094322U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103293413A (en) * | 2013-05-19 | 2013-09-11 | 国家电网公司 | Special high-voltage testing device for transformers |
| CN104977475A (en) * | 2015-07-17 | 2015-10-14 | 国家电网公司 | Test clip for transformer dielectric loss angle and deformation test |
| CN105790022A (en) * | 2016-04-28 | 2016-07-20 | 赵士立 | Climbing belt conveyor light current line adapter |
| CN107871939A (en) * | 2016-09-24 | 2018-04-03 | 国网辽宁省电力有限公司丹东供电公司 | Downlead device for transformer fast-wiring |
| CN110618362A (en) * | 2019-10-15 | 2019-12-27 | 国网天津市电力公司 | High-voltage test device for lightning arrester of power transmission line |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202094322U (en) | Multipurpose lead wiring device of large-scale transformer test | |
| CN203491485U (en) | Secondary circuit wiring terminal strip short-circuiting plug for power plant or transformer station | |
| CN202930802U (en) | Movable type distribution transformer allowing uninterruptible power supply mounting and dismounting | |
| CN202330562U (en) | Ground resistance test wire clamp | |
| CN201413360Y (en) | 110kV and above circuit breaker loop resistance test tool | |
| CN202384516U (en) | Secondary voltage drop live-line wiring device | |
| CN203849288U (en) | Wiring conversion device for electrical routine tests of transformer | |
| CN202929093U (en) | A multi-functional high-voltage electrical testing device | |
| CN204331009U (en) | Electric power mutual-inductor calibration equipment | |
| CN210690637U (en) | A special short-circuit device for electrical testing of high-voltage transformers | |
| CN205450042U (en) | Experimental switching operation platform of power transformer | |
| CN205157597U (en) | Power transformer's experimental pencil | |
| CN202977026U (en) | Insulation wire clamp | |
| CN206057549U (en) | A kind of reference test bar | |
| CN206573673U (en) | Investigate the specific purpose tool of secondary circuit failure | |
| CN205389012U (en) | Intelligent power distribution coils earthing device | |
| CN202711944U (en) | 35 kV and below plug-in current transformer | |
| CN209215494U (en) | A kind of movable fixture for the test of multicolumn lightning arrester connected in parallel current distribution | |
| CN109524809A (en) | The fast wiring clip and insulation gripper clamp and operating method of low-voltage live line work | |
| CN209590077U (en) | Power transformer high-potting multifunctional access wire clamp | |
| CN107797087A (en) | A kind of Portable mutual inductor reference test bar | |
| CN207020217U (en) | Cable testing aid containing T-shaped terminal | |
| CN108092167B (en) | Special tool for testing oil-gas casing pipe transformer | |
| CN106932613A (en) | A 35kV and 110kV transformer routine test wiring conversion box | |
| CN201425773Y (en) | Line disconnection power failure alarm |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121224 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20121224 Address after: 110811 eight Heping Street, 94 Heping Street, Liaoning, Shenyang Patentee after: Liaoning Shenyang Electric Power Supply Co., Ltd. Patentee after: State Grid Corporation of China Address before: 110811 eight Heping Street, 94 Heping Street, Liaoning, Shenyang Patentee before: Liaoning Shenyang Electric Power Supply Co., Ltd. |
|
| CX01 | Expiry of patent term |
Granted publication date: 20111228 |
|
| CX01 | Expiry of patent term |