CN201548986U - Test and alarm electronic device for communication network maintenance - Google Patents

Test and alarm electronic device for communication network maintenance Download PDF

Info

Publication number
CN201548986U
CN201548986U CN2009201088724U CN200920108872U CN201548986U CN 201548986 U CN201548986 U CN 201548986U CN 2009201088724 U CN2009201088724 U CN 2009201088724U CN 200920108872 U CN200920108872 U CN 200920108872U CN 201548986 U CN201548986 U CN 201548986U
Authority
CN
China
Prior art keywords
module
information
accessory
logging modle
information logging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201088724U
Other languages
Chinese (zh)
Inventor
班黎明
任海蛟
仇序
武彦君
关囡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Millennium Vision Technologies Co Ltd
Original Assignee
Beijing Millennium Vision Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Millennium Vision Technologies Co Ltd filed Critical Beijing Millennium Vision Technologies Co Ltd
Priority to CN2009201088724U priority Critical patent/CN201548986U/en
Application granted granted Critical
Publication of CN201548986U publication Critical patent/CN201548986U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a test and alarm electronic device for communication network maintenance. The device effectively controls interactive processes and helps enterprises track and control interactive processes. The system has strong early warning functions through controlling every process step and acquiring and analyzing messages. Business process time and inventory information can be accurately recorded, and manual operation error frequency can be reduced. Meanwhile, the device has perfect early warning message prompt functions. The emergency degree of prompt messages can be automatically judged according to preset values so as to send prompt messages to different management layers. The device not only enhances the level sense of enterprise management, but also well helps enterprise managers enhance the management of business weak links and promotes enterprises to have higher benefit.

Description

The electronic installation that is used for the test and the early warning of communication network maintenance
Technical field
The utility model relates to a kind of network operation controlled electron device, relates in particular to a kind of electronic installation that is used for communication network maintenance, belongs to electronic information field.
Background technology
At present, develop on a large scale period at network, the strength of application network is called or balanced spare part resource, increases work efficiency, the way that reduces cost, popular day by day, particularly suitable be main company in service, therefore, in the middle of each main transregional company of the world, this method of use is arranged all.Yet, because the social background difference, the difference of culture background, the difference of customers, also each has something to recommend him to the requirement of the electronic installation of network operation.
On Chinese market, the more standardized management of customer requirement requires to have the more service network of precise and high efficiency.Yet because the Chinese communication wide network coverage, the service request grade is numerous, requirement as China Telecom is standardized large-scale standards service, the communication company of local level then requires personalized Communications service, requires cheaply the Communications service of reflection fast again for small-sized telecom operators.Therefore, just need the multi-level service of multi-angle.The communication product of communication companies at different levels in addition buying has very big gap, famous transnational product is arranged, the product that autonomous property right is also arranged, device type is of a great variety, the situation of mixing the work of taking mutually is very general, and this just requires a unified network operation electronic installation to come real-time operation to the Communications service network that service is provided.Yet, go back the network operation electronic installation that neither one is served at the communication network of Chinese market at present, make Chinese communications industry need waste great amount of manpower and material resources safeguard that communication network normally moves.
Summary of the invention
The purpose of this utility model provides the test that is used for communication network maintenance and the electronic installation of early warning, be mainly used in accessory warehouse-in, keep in repair, receive, lease, make an inventory, flow operations such as test, can simplify the manually-operated flow process.The prompt facility of prior-warning device can help enterprise to cut operating costs greatly, increases work efficiency.
Go into the general designation that storehouse in library module, stock model, the inventory archiving module is meant client's own storehouse, the own storehouse of service provider and the public storehouse that service provider provides etc. in this device.This unique distinction of the present utility model just is exactly a notion of having set up a big storehouse.
This device comprises: go into library module, stock model, maintenance modules, receive module, the module of making an inventory, software upgrading module, lease module, test module, scrap module, lend module, give back module, give back the back archive module, go out library module, whole world buying module, allot module, information logging modle (setting up in the middle of each link), information and study and judge module (judgement after gathering, a module), early warning information analysis module, information indicating module and operation rank module;
Wherein, the information logging modle also has difference according to the information flow of the position different acquisition of placing, and the variation of running time, flow state, operation-roles, early warning feedback information, man of maintenance factory information, maintenance total quantity, accessory maintenance frequency, accessory keep in repair defective quantity, stock's archive information, Data Update information etc.; The information flow here includes but not limited to that information source, information studies and judges module and be divided into information source and whereabouts and follow the tracks of submodule, judge early warning information submodule, information indicating submodule, information source and whereabouts are followed the tracks of submodule and are linked to each other with the information indicating submodule with judging the early warning information submodule respectively, and the early warning information submodule also links to each other with the information indicating submodule; Therefore, information logging modle, information are studied and judged the prior-warning device in the utility model application that module and operation rank module form.
Wherein, the information logging modle of prior-warning device gathers whole operation informations and archive information, and the information information of being sent to is studied and judged module carry out information analysis;
After information was studied and judged information analysis submodule in the flow process and received various information, the early warning information that is sent to that belongs to early warning information was analyzed submodule, and what belong to information is sent to the information indicating submodule;
Early warning information is analyzed submodule and is included but not limited to carry out early warning analysis from time, quality, quantity, four aspects of management respectively according to preset threshold, judges advanced warning grade, sends early warning and reports to the information indicating module;
The information that the information indicating module sends according to information analysis module and early warning information analysis module sends information, the operations flow process of complete monitoring accessory to other operating personnel of level of correspondence;
Issue the information of judging the early warning information submodule when the information indicating submodule and surpassed predefined administration and supervision authorities rank threshold value, to promote the operation rank automatically and relevant information will be sent to corresponding management layer Permission Levels, so that more higher leveled administration and supervision authorities are in time pinpointed the problems; Operation rank module is carried out Permission Levels according to the requirement of actual management layer and is set; Therefore, each operation layer can be by the information of receiving, complete monitoring is also held the operating process of accessory, in time early warning information is handled, and submits the result report to upper level simultaneously.
Wherein, going into library module passes through the judgement of accessory and the requirement after the judgement, link to each other with maintenance modules with stock model, software upgrading module respectively through the information logging modle, stock model passes through the information logging modle by the demand of alloting, the demand of making an inventory, outbound demand, lease demand, upgrade requirement, testing requirement, the analysis of receiving demand and maintenance requirements etc. and receives module, the module of making an inventory, test module, software upgrading module, leases module, goes out library module and allot module and link to each other; The lease module links to each other with software upgrading module, test module through the information logging modle again, test module is through information logging modle and maintenance modules, scrap module, lend module and link to each other with stock model, lend module through the information logging modle with give back module and link to each other, giving back module links to each other with stock model through the information logging modle, maintenance modules through the information logging modle with scrap module and link to each other, scrap module and pass through the information logging modle and link to each other with stock model; Receiving module links to each other with test module with maintenance modules through the information logging modle respectively, the module of making an inventory judge coupling or do not match after respectively through the information logging modle with test module, stock model with allot module and link to each other, go out library module and pass through the information logging modle and link to each other with the software upgrading module; The software upgrading module links to each other with test module through the information logging modle, alloting module judges whether to link to each other with the software upgrading module with whole world buying module through the information logging modle respectively after the short supply by alloting, lend module by outbound judge through the information logging modle with give back module and go out library module and link to each other, after no matter any below demand flow process finish, all passing through the information logging modle links to each other with stock model, and in each link the information logging modle is is all studied and judged module with information respectively and is linked to each other, information is studied and judged module and is operated the rank module and link to each other.
This device may further comprise the steps:
The first step: by warehouse-in application module typing new storage accessory information and submission warehouse-in application information, enter the putaway verification stage, prior-warning device transmit operation simultaneously information is to the operator, and by running time early warning, performance management early warning, the efficient of library module is gone in strict control;
The operator carries out putaway verification according to the warehouse-in application information of submitting to accessory, upgrades inventory information, and information was sent to for second step to the accessory judge module;
Second step: the accessory judge module is received the information that the first step sends, status attribute to accessory is artificially judged, produce three kinds of results, one, judges when accessory is new part, upgrade inventory information, accessory information is sent to the 17 step stock model through the information logging modle, enters the 3rd step demand analysis module when user demand is arranged; Judge when goods is old that two, process information logging modle is sent to the 3rd step demand analysis module with the testing requirement information of accessory; Judge when accessory is the fault part that three, process information logging modle is sent to the 3rd step demand analysis module with the maintenance requirements information of fault accessory;
In whole process, prior-warning device simultaneously the transmit operation information to the operator, and by running time early warning, performance management early warning, strict control operation efficient;
The 3rd step: demand analysis module, according to the actual requirements the inventory archiving accessory information is sent to through the information logging modle and receives module, software upgrading module, lease module, go out library module, the module of making an inventory, allot module, test module, maintenance modules, start corresponding module;
The 4th step: receive the information that module received for the 3rd step, operating personnel select to receive accessory according to demand and send to affirmation after accessory are sent to fault in-situ, simultaneously, accessory information is received in selection issued the information logging modle, and judge artificially whether on-the-spot accessory breaks down, on-the-spot accessory has fault, and the field failure accessory information is sent to the 11 step maintenance modules through the information logging modle; On-the-spot accessory can not confirm whether fault is arranged, and on-the-spot accessory information is sent to the tenth pacing die trial piece through the information logging modle;
Receive the end module and receive the accessory information of the tenth pacing test result, accessory is received end operation, and information is sent to the 17 step stock model through the information logging modle for " normally "; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
In this process, prior-warning device is received the running time by running time early warning, performance management early warning monitoring, strict control operation efficient, and guarantee to receive that accessory is consistent with fault part model, software version conforms to;
The 5th step: the module of making an inventory connects the information in the 3rd step, the boot disk point module, and making an inventory is divided into dual mode: a kind of is the default time limit of making an inventory of device basis to carry out device through the automatic boot disk point module of information logging modle to make an inventory; Another kind is made an inventory for the Warehouse Keeper manually starts manually through the information logging modle;
The content of making an inventory is stock-taking, statistics tank farm stock, analysis inventory information, prior-warning device judges according to the result that makes an inventory whether each storehouse number of fitting parts is complementary with quantity required, when not matching, quantity to accessory is redistributed, and allocation result being sent to the module of alloting in the 6th step through the information logging modle, prior-warning device sends through the information logging modle simultaneously and allots operation prompt information, and carries out strictness by running time early warning, performance management early warning and control; When quantity Matching, prior-warning device judges according to inventory time stock's accessory whether test by needs, and the accessory that the resting period surpasses stock's test duration need enter the tenth pacing die trial piece through the information logging modle; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
The accessory information that will not have testing requirement, and test result is sent to the end module of making an inventory in the flow process of making an inventory for the accessory information of " normally ", lastest imformation also is sent to the 17 and goes on foot stock model and early warning information logging modle;
The 6th step: allot module and connect the information that the 3rd, five steps sent, module is alloted in startup through the information logging modle, between storehouse, carry out alloting of accessory, upgrade each warehouse inventory information, prior-warning device judges according to preset value whether each accessory tank farm stock is sufficient, when the accessory tank farm stock is all sufficient, judge according to the actual requirements whether the accessory of being alloted needs to adjust software version, need adjustment that information via information logging modle is sent to the 9th step software upgrading module; Do not need to adjust process information logging modle information is sent to the tenth pacing die trial piece, after the test, if normally returned for the 6th step; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
When tank farm stock is inadequate, prior-warning device sends accessory low stock early warning information through the information logging modle to the associative operation personnel, can select to lease the accessory mode or buy the accessory mode number of fitting parts of replenishing the stock, if select the lease mode, send the demand information of renting through three step of information logging modle to the demand module; If the accessory of purchase demand is arranged, send purchasing demand information to whole world buying through the information logging modle, enter the first step through the information logging modle after parts procurement finishes and go into library module;
Allot and finish module acceptance test result for after the accessory information of " normally ", finish to allot flow process, process information logging modle lastest imformation also is sent to the 17 step stock model and early warning information logging modle;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning to flow process;
The 7th step: the lease module connects the 3rd, the information in six steps, operating personnel select to lease accessory according to demand, judge whether this accessory needs to carry out the adjustment of software version, do not need to adjust, through the information logging modle accessory information is sent to the tenth pacing die trial piece, test finishes, test result is lent operation for the accessory of " normally " through the information logging modle, information logging modle record is lent the time, time limit and accessory information are by the running time early warning, the performance management early warning is returned situation to accessory and is carried out strictness control, and testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle; If need to adjust software version, then accessory information is sent to the 9th step software upgrading module through the information logging modle, after finishing, the software version adjustment enters the tenth pacing die trial piece, after finishing, test test result is lent operation for the accessory of " normally " through the information logging modle, send the lease accessory with charge free, accessory is sent to affirmation, simultaneously, send to confirmation and send to the information logging modle, through the information logging modle, information is studied and judged the prior-warning device of module and operation rank module composition, by the work of giving back of lease time forewarning management monitoring accessory;
The accessory of giving back during the leasing period, enter the tenth pacing die trial piece through the information logging modle, test is normal, through the information logging modle information is sent to lease and finishes module, finish Rental Procedure, process information logging modle lastest imformation also is sent to the 17 step stock model, and testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle; Before lease expired, the client proposed purchase intention, finished Rental Procedure, and through the information logging modle accessory information was sent to the 8th and walks out of library module;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning and stock's early warning to operating process;
The 8th step: go out library module and receive the 3rd, the information in seven steps is confirmed the outbound accessory, judges whether to carry out the adjustment of software version, need adjustment then information to be sent to the 9th software upgrading module that goes on foot, after the upgrading information is sent to test module through the information logging modle; Do not need to adjust then and information is sent to test module through the information logging modle, test result will be sent with charge free for the accessory of " normally ", confirm the accessory outbound, finish the outbound flow process, through 17 step of information logging modle to the stock model, it is undesired to test, and through the information logging modle information is sent to the 11 step maintenance modules;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning and stock's early warning to operating process;
The 9th step: the software upgrading module connects the 3rd, six, the information in eight steps, start the software upgrading module through the information logging modle, accessory is carried out the promotion and demotion of software, the software version information of information logging modle recording means and upgrading personal information after the software version adjustment finishes, are sent to the tenth pacing die trial piece through the information logging modle with accessory information;
It is the accessory information of " normally " that software upgrading finishes module acceptance test result, finishes the software upgrading flow process, is sent to the 17 step stock model through the information logging modle; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning to the running time;
The tenth step: test module receives the 3rd, four, five, six, seven, test application information in eight, nine steps is confirmed test fittings through the information logging modle, accessory is tested, whether the every index that detects accessory is normal, according to the data of test report, testing result passed through the information logging modle for the accessory information of " undesired " be sent to the 11 step maintenance modules; Test result is sent to the end module that proposes in the corresponding flow process that test applies for for the accessory information of " normally " through the information logging modle; Be sent to the 12 step stock model from the accessory information in the 3rd step through the information logging modle because of warehouse-in decision operation proposition testing requirement;
Simultaneously all accessories and operation information are sent to the information logging modle; And study and judge module and operation rank module in information and gather and judge;
In this process, prior-warning device writes down tester's information, content measurement and monitors the test duration of accessory; Prior-warning device comes strict Control work efficiency by running time early warning, performance management early warning;
The 11 step: maintenance modules receives the three, four, five, and the information in six, seven, eight, nine, ten steps will be from the three, four through the information logging modle, and five, six, seven, eight, nine step accessories send producer to keep in repair;
Test fittings information from the tenth step is scrapped judgement according to test report, the accessory that does not reach the condition of scrapping send producer's maintenance through the information logging modle, wherein, prior-warning device recorded key time point, maintenance factory's man's information and maintenance content information and monitored maintenance time, guarantee fittings quality by the early warning of accessory maintenance rate;
Test result reaches the accessory of the condition of scrapping, the accessory state is updated to scraps, be sent to the 17 step stock model through the information logging modle, prior-warning device is by the scrap situation of scrappage early warning monitoring with a collection of accessory simultaneously, surpass predetermined value, prior-warning device sends the scrappage early warning to the associative operation personnel;
The accessory maintenance is sent to the tenth pacing die trial piece with accessory information through the information logging modle after finishing to return; Maintenance finishes module and receives the accessory information of the tenth pacing test result for " normally ", through the information logging modle accessory is keeped in repair return, finish maintenance flow, through the information logging modle information is sent to the 17 stepping and goes into stock model, file;
Prior-warning device starts stock's early warning constantly, guarantees that the quantity of stock's accessory can both satisfy emergency condition, and whole repair messages of accessory all can be sent to the information logging modle of prior-warning device, are used to start corresponding early warning;
The 17 step: stock model receives the information that above step sends, and through the information logging modle above-mentioned information is filed preservation, is the making of various forms, and prior-warning device provides effective information.
Wherein, storehouse under each can be provided with the keeper of oneself, also can entrust service provider to manage, but, the management of demand module is provided with limit grade, open to service provider in trust (operator) in principle, also can be as required, the part is that the inside and outside client of other service providers or device is open.
Beneficial effect:
1, the advantage in the five, six step is can be the client provides two kinds of modes of making an inventory, and the function of making an inventory automatically of device can be removed manually-operated from, automatically make an inventory, the keeper can also can adjust the storehouse accessory configuring condition of self by the function of alloting of this software according to the result, adapts to his demand.Simultaneously, this information and this device of alloting module is shared, can directly procurement demand be proposed by device to the supplier of other communication companies, or the user demand that the lease demand satisfies accessory is proposed to service provider, strengthened the contact between client, supplier and the three of service provider, simplified operating process, made the information transmission between the three more convenient.
2, through the unified management of this device, make the information of all communication companies in this device, all have versatility.The sharing functionality of accessory inventory information can be with all accessory resource unified managements of all communication companies, satisfy communication company and can both obtain rationally and fast distributing to the demand of different accessories, improve accessory resources effective utilization rate.
3, the 7th step advantage is that the client can buy the accessory of leasing, and when whether the client meets oneself demand because of bankroll problem or to the performance of uncertain accessory, can select to lease accessory earlier, after use a period of time, buys again.
4, this patent has been strengthened the effect of software upgrading module and test module, and the operation of other each modules all is associated with software upgrading and accessory test, has improved the reliability of accessory performance, has also improved service quality simultaneously.
5, the most outstanding characteristics of this patent are to be furnished with a perfect prior-warning device, powerful warning function, can comprehensively manage all modules, carry out early warning analysis from time, quality, quantity, four aspects of management respectively according to preset threshold, improved work efficiency and service quality when having guaranteed the quality of accessory greatly.Prior-warning device can also be according to presupposed information, judge the grade of early warning information, and to different administration and supervision authorities, early warning information by the corresponding grade that sends, the different operating level others can complete monitoring and hold the operating process of accessory, help enterprise and improve weak link in the flow process, help enterprise and obtain more benefits.
6, stock model is to above-mentioned inventory archiving information, and Data Update information is filed preservation, and the data of these filings are mainly used in the inquiry of accessory information and the making of various forms, and handled easily personnel and client check.Archive information also can be sent to the information of these filings the information logging modle of prior-warning device, for prior-warning device provides data timely and effectively.
Description of drawings:
Fig. 1: the synoptic diagram of the electronic installation embodiment of a kind of test that is used for communication network maintenance and early warning.
Embodiment
The first step: by warehouse-in application module typing new storage accessory information and submission warehouse-in application information, enter the putaway verification stage, prior-warning device transmit operation simultaneously information is to the operator, and by running time early warning, performance management early warning, the efficient of library module is gone in strict control;
The operator carries out putaway verification according to the warehouse-in application information of submitting to accessory, upgrades inventory information, and information was sent to for second step to the accessory judge module;
The first step: as three accessories of needs warehouse-in, first is the new accessory LOC that buys, and unit type is SLM-2000, and second is the old accessory OTU1 by reclaiming, and unit type is OLS400G, and the 3rd is fault accessory PIDS3, and unit type is AMD16/1.
The information of these three accessories of storekeeper's typing, comprise the spare part type, manufacturer, affiliated specialty, hard piece number, device type, integrated circuit board numberings etc. are after typing is finished, select to store storehouse, prior-warning device can be recommended the target storehouse to the keeper according to default tank farm stock optimum value, generates warehouse-in request slip and accessory identification bar code, is sent to the storehouse operator, prior-warning device sends the warehouse-in information simultaneously, the prompting operation person of running time early warning meeting simultaneously finishes the warehouse-in work of accessory at the appointed time, if repeatedly postpone operation, prior-warning device can be judged advanced warning grade and send the performance management early warning information to corresponding administration and supervision authorities according to preset value.The storehouse operator receives after the warehouse-in early warning information, put beamhouse operation in storage, whether the information of checking on accessory and the warehouse-in request slip by the bar code that scans on the accessory is identical, after operator's confirmation is checked, click " putaway verification " button, the information of 3 accessories is saved in the information bank, and prior-warning device sends the putaway verification feedback information simultaneously to warehouse operator, informs that 3 accessories put in storage.If when the accessory information in warehouse-in accessory and the request slip was inequality, the storehouse operator can click " postponing warehouse-in " button, explains the reason, and information is sent to the storekeeper, coordinates.
Second step: the accessory judge module is received the information that the first step sends, status attribute to accessory is artificially judged, produce three kinds of results, one, judges when accessory is new part, upgrade inventory information, accessory information is sent to the 17 step stock model, enters the 3rd step demand analysis module when user demand is arranged; Two, judge when goods is old, the testing requirement information of accessory is sent to the 3rd step demand analysis module; Three, judge when accessory is the fault part, the maintenance requirements information of fault accessory is sent to the 3rd step demand analysis module;
In whole process, prior-warning device simultaneously the transmit operation information to the operator, and by running time early warning, performance management early warning, strict control operation efficient;
Second step: for the LOC accessory, belong to new accessory, because producer has guaranteed fittings quality, directly warehouse-in is preserved, and waits to be used; Belong to the old accessory of recovery for the OTU1 accessory, can not guarantee that whether accessory exists fault, then enters test module; The PIDS3 accessory belongs to the fault accessory, then enters maintenance modules.The keeper is according to the whereabouts of accessory, generate request slip and send the demand application to the demand analysis module, the early warning decorum sends the demand information, running time early warning meeting prompting operation person complete operation work at the appointed time, if repeatedly postpone operation, prior-warning device can be judged advanced warning grade and send the performance management early warning information to corresponding administration and supervision authorities according to preset value.
The 3rd step: the demand analysis module, the inventory archiving accessory information is sent to receives module, software upgrading module according to the actual requirements, lease module, go out library module, the module of making an inventory, allot module, test module, maintenance modules, start corresponding module;
The 3rd step: the user selects the accessory to having put in storage according to user demand, and accessory is carried out the demand application, starts respective modules.As receive module, software upgrading module, lease module, go out library module, the module of making an inventory, arbitrary module of alloting in module, test module, the maintenance modules operate;
The demand of receiving comprises:
Customer requirement is tested a LOC accessory, sends testing requirement process information logging modle to test module;
Customer requirement is keeped in repair an OTU1 accessory, sends testing requirement process information logging modle to maintenance modules;
Customer requirement is received a LOC accessory, sends testing requirement process information logging modle to receiving module;
Customer requirement is carried out software upgrading to a LOC accessory, sends testing requirement process information logging modle to the software upgrading module;
Customer requirement is leased an OTU1 accessory, sends testing requirement process information logging modle to leasing module;
Customer requirement is carried out outbound to an OTU1 accessory, sends testing requirement process information logging modle to going out library module.
The operator of corresponding module will receive above demand information.
The 4th step: receive the information that module received for the 3rd step, operating personnel select to receive accessory according to demand, accessory is sent to affirmation after sending to fault in-situ, and send relevant information to the information logging modle, and judge artificially whether on-the-spot accessory breaks down, on-the-spot accessory has fault, and the field failure accessory information is sent to the 11 step maintenance modules through the information logging modle; On-the-spot accessory can not confirm whether fault is arranged, and on-the-spot accessory information is sent to the tenth pacing die trial piece through the information logging modle;
Receive the end module and receive the accessory information of the tenth pacing test result, accessory is received end operation, again information via information logging modle is sent to the 17 step stock model through the information logging modle for " normally "; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
In this process, prior-warning device is received the running time by running time early warning, performance management early warning monitoring, strict control operation efficient, and guarantee to receive that accessory is consistent with fault part model, software version conforms to;
The 4th step: when client's LOC accessory breaks down, can start and receive module, the device meeting is according to the accessory type of client's needs, find the LOC accessory, and send fault in-situ with charge free, replace the accessory of fault, in this process, prior-warning device guarantees to receive the model of accessory and the needs of software version and reality coincide, running time early warning meeting prompting operation person finishes operations work at the appointed time, if repeatedly postpone operation, prior-warning device can be judged advanced warning grade and send the performance management early warning information to corresponding administration and supervision authorities according to preset value.Phenomenon of the failure is removed after the LOC accessory is replaced, there is fault really in the accessory that the client has been described, and the fault accessory of replacing is delivered to maintenance modules keep in repair, and repeats maintenance and testing process, prior-warning device record maintenance and detecting information are studied and judged data are provided for carrying out early warning.If after the LOC accessory has been replaced the fault accessory, still break down, illustrate that failure cause not exclusively on the LOC accessory, delivers to test module with the doubtful fault accessory of replacing, the record detecting information, prior-warning device is monitored operating process.
After the maintenance of LOC accessory, test result is " normally ", puts filing in storage; If testing result is sent to maintenance modules for the accessory information of " undesired ".
The 5th step: the module of making an inventory connects the information in the 3rd step, the boot disk point module, and making an inventory is divided into dual mode: a kind of is the default time limit of making an inventory of device basis to carry out device through the automatic boot disk point module of information logging modle to make an inventory; Another kind is made an inventory for the Warehouse Keeper manually starts manually through the information logging modle;
The content of making an inventory is stock-taking, statistics tank farm stock, analysis inventory information, prior-warning device judges according to the result that makes an inventory whether each storehouse number of fitting parts is complementary with quantity required, when not matching, quantity to accessory is redistributed, and allot module with what allocation result was sent to for the 6th step, prior-warning device sends simultaneously allots operation prompt information, and carries out strictness by running time early warning, performance management early warning and control; When quantity Matching, prior-warning device judges according to inventory time stock's accessory whether test by needs, and the accessory that the resting period surpasses stock's test duration need enter the tenth pacing die trial piece through the information logging modle; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
The accessory information that will not have testing requirement, and test result is sent to the end module of making an inventory in the flow process of making an inventory for the accessory information of " normally " through the information logging modle, and lastest imformation also is sent to the 17 through the information logging modle and goes on foot stock model and early warning information logging modle;
The 5th step: the accessory in the storehouse is after after a while demand is used, or inventory information can start the flow process of making an inventory through the information logging modle and understand current inventories, as the result that makes an inventory is when variation has taken place:
A1 storehouse: LOC accessory 5 A2 storehouses: LOC accessory 3
OTU1 accessory 0 OTU1 accessory 0
PIDS3 accessory 3 PIDS3 accessories 1
For guaranteeing normally carrying out of work, preset accessory stockpile number optimum value at prior-warning device, the LOC number of fitting parts is 3, and the OTU1 number of fitting parts is 1, and the PIDS3 number of fitting parts is 2.
The tank farm stock and the actual demand of LOC accessory are complementary, directly its inventory information is filed, the operator has preset in prior-warning device when the static storage time of accessory in the warehouse and has surpassed in 6 months simultaneously, points out this accessory to test, and confirms whether performance is normal.There is the static storage time of 2 LOC accessories to surpass 6 months in the A1 storehouse, need enters test module;
The tank farm stock of OTU1 accessory and PIDS3 accessory and actual not matching need be alloted, and start to allot module;
The 6th step: allot module and connect the information that the 3rd, five steps sent, start and allot module, between storehouse, carry out alloting of accessory through the information logging modle, upgrade each warehouse inventory information, prior-warning device judges according to preset value whether each accessory tank farm stock is sufficient, when the accessory tank farm stock is all sufficient, judge according to the actual requirements whether the accessory of being alloted needs to adjust software version, need to adjust process information logging modle information is sent to the 9th step software upgrading module; Do not need to adjust process information logging modle information is sent to the tenth pacing die trial piece, after the test, if normally returned for the 6th step; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
When tank farm stock is inadequate, prior-warning device sends accessory low stock early warning information to the associative operation personnel, can select to lease the accessory mode or buy the accessory mode number of fitting parts of replenishing the stock, if select the lease mode, send the demand information of renting through three step of information logging modle to the demand module; If the accessory of purchase demand is arranged, send purchasing demand information via information logging modle to whole world buying module, enter the first step after parts procurement finishes and go into library module;
Allot and finish module acceptance test result for after the accessory information of " normally ", finish to allot flow process, lastest imformation and process information logging modle are sent to the 17 step stock model and early warning information logging modle;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning to flow process;
The 6th step: start and allot module, device distributes number of fitting parts automatically according to optimum value default in actual store quantity and the prior-warning device, and the generation requisition slip is alloted the result and is: the A1 storehouse need access 1 PIDS3 accessory to the A2 storehouse
In the process of alloting, the running time early warning meeting prompting operation person of the early warning decorum finishes accessory at the appointed time and allots work, if repeatedly postpone operation, prior-warning device can be judged advanced warning grade and send the performance management early warning information to corresponding administration and supervision authorities according to preset value.Accessory is alloted when finishing, and upgrades the inventory information data, and the inventories of this moment are:
A1 storehouse: LOC accessory 5 A2 storehouses: LOC accessory 3
OTU1 accessory 0 OTU1 accessory 0
PIDS3 accessory 2 PIDS3 accessories 2
Prior-warning device is according to default accessory tank farm stock optimum value and tank farm stock bound, send OTU1 accessory low stock information to the storekeeper, and point out A1 storehouse and A2 storehouse to need to increase by 1 respectively, the operator can send lease or purchasing demand by software service, need lease, enter the lease module, need carry out whole world buying, prior-warning device monitoring buying hour.The number of fitting parts that the operator selects procurement method to replenish the stock, 2 OUT1 accessories that buying is returned carry out in-stockroom operation, and information is filed.
The stockpile number of this moment is:
A1 storehouse: LOC accessory 5 A2 storehouses: LOC accessory 3
OTU1 accessory 1 OTU1 accessory 1
PIDS3 accessory 2 PIDS3 accessories 2
The PIDS3 accessory of being alloted need carry out the adjustment of software version, need send into the software upgrading module
The 7th step: the lease module connects the 3rd, the information in six steps, operating personnel select to lease accessory according to demand, judge whether this accessory needs to carry out the adjustment of software version, do not need to adjust, accessory information is sent through information logging modle to the ten pacing die trial pieces, test finishes, test result is lent operation for the accessory of " normally ", the prior-warning device record is lent the time, time limit and accessory information are by the running time early warning, the performance management early warning is returned situation to accessory and is carried out strictness control, and testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle; If need to adjust software version, then accessory information is sent through information logging modle to the nine step software upgrading modules, after finishing, the software version adjustment enters the tenth pacing die trial piece through the information logging modle, after test finishes test result is lent operation for the accessory of " normally ", send the lease accessory with charge free, accessory is sent to affirmation, and the information that will send to affirmation simultaneously issues the information logging modle, and prior-warning device is by the work of giving back of lease time forewarning management monitoring accessory;
The accessory of giving back during the leasing period, enter the tenth pacing die trial piece, test is normal, information via information logging modle is sent to lease finishes module, finish Rental Procedure, lastest imformation also is sent to the 17 step stock model and early warning information logging modle, and testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle; Before lease expired, the client proposed purchase intention, finished Rental Procedure, and accessory information is sent to the 8th through the information logging modle walked out of library module;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning and stock's early warning to operating process;
The 7th step: the client proposes the lease demand to the OTU1 accessory, the operator in the storehouse, search for and confirm the lease accessory, whether needs carry out the adjustment of software version to judge accessory according to client's demand, the software version of the OTU1 accessory in the storehouse is identical with customer demand, do not need to enter the software upgrading module, directly test, test result is " normally ", accessory and test report are delivered to the client jointly, and the operator confirms term of a lease, the prior-warning device monitoring accessory lease time, begin transmission in first three sky that finishes lease term and give back information, when lease expired, the client gave back OTU1 accessory, and prior-warning device stops to send gives back information, the accessory of giving back at first enters test module, test result is normal, warehouse-in filing, lastest imformation.If the client has the tendency of buying this lease accessory when lease, can carry out purchasing demand, enter out library module through information logging modle accessory.
The 8th step: go out library module and receive the 3rd, the information in seven steps is confirmed the outbound accessory, judges whether to carry out the adjustment of software version, need to adjust the software upgrading module that then information transmission process information logging modle to the nine is gone on foot, after the upgrading information is sent to test module; Do not need to adjust then and information is sent to test module through the information logging modle, test result will be sent with charge free for the accessory of " normally ", confirm the accessory outbound, finish the outbound flow process, lastest imformation and process information logging modle send information to the 17 step stock model, it is undesired to test, and is sent to the 11 step maintenance modules through information logging modle information;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning and stock's early warning to operating process;
The 8th step: the client need buy the OTU1 accessory, the operator searches in the storehouse and confirms accessory, whether needs carry out the adjustment of software version to judge accessory according to client's demand, the software version of the OTU1 accessory in the storehouse is identical with customer demand, do not need to enter the software upgrading module, directly test, test result is " normally ", the operator is dispatched into the client jointly with accessory and test report, when accessory is sent to, the client sends to affirmation, in this operating process, running time early warning meeting prompting operation person complete operation work at the appointed time, if repeatedly postpone operation, prior-warning device can be judged advanced warning grade and send the performance management early warning information to corresponding administration and supervision authorities according to preset value.
The 9th step: the software upgrading module connects the three, six, the information in eight steps, start the software upgrading module, accessory is carried out the promotion and demotion of software, the software version information of prior-warning device recording means and upgrading personal information, after the software version adjustment finishes, accessory information is sent to the tenth pacing die trial piece;
It is the accessory information of " normally " that software upgrading finishes module acceptance test result, finishes the software upgrading flow process, and more new data and process information logging modle are sent to the 17 step stock model; Testing result is sent to the 11 step maintenance modules for the accessory information of " undesired " through the information logging modle;
In the whole operation process, prior-warning device carries out strictness control by running time early warning, performance management early warning to the running time;
The 9th the step: allot the LOC accessory that has the PIDS3 of software upgrade requirement accessory and client to propose software upgrade requirement in the process and enter the software upgrading module, the operator with software release upgrade to the software version that requires.After the promotion and demotion of accessory software finish, enter the software test module through the information logging modle, the accessory after the software release upgrade is tested, the test result of 2 accessories is normally, through information logging modle inventory archiving, waits for user demand; If the test back finds that there are fault in PIDS3 accessory or LOC accessory, then report and submit maintenance through the information logging modle, enter test once more through the information logging modle after the maintenance, this process that circulates is till accessory is repaired, and prior-warning device is by the problem of running time early warning, performance management early warning, the early warning of accessory maintenance rate, the next strict Control work efficiency of accessory scrappage early warning and fittings quality.Accessory is through after testing successfully, and inventory archiving is waited for user demand.
The tenth step: test module receives the 3rd, four, five, six, seven, test application information in eight, nine steps is confirmed test fittings, accessory is tested, whether the every index that detects accessory is normal, according to the data of test report, testing result passed through the information logging modle for the accessory information of " undesired " be sent to the 11 step maintenance modules; Test result is sent to the end module that proposes in the corresponding flow process that test applies for for the accessory information of " normally " through the information logging modle; Be sent to the 12 step stock model from the accessory information in the 3rd step through the information logging modle because of warehouse-in decision operation proposition testing requirement;
Simultaneously all accessories and operation information are sent to the early warning information logging modle;
In this process, prior-warning device writes down tester's information, content measurement and monitors the test duration of accessory; Prior-warning device comes strict Control work efficiency by running time early warning, performance management early warning;
The tenth step: after the client proposes the LOC accessory of testing requirement and PIDS3 accessory that warehouse-in is judged as old accessory and enters test module, running time early warning meeting prompting operation person finishes test operation work at the appointed time, if repeatedly postpone operation, prior-warning device can be judged advanced warning grade and send the performance management early warning information to corresponding administration and supervision authorities according to preset value.After through test, the operator fills in the detecting information of 2 accessories respectively in device, the test-types that comprises accessory, failure-description, content measurement, other alarm record, test result, information such as test man, it is single to generate test report, finds that finally all there is fault in 2 accessories, and judge that further the PIDS3 accessory has reached the condition of scrapping, the sign of record PIDS3 accessory is scrapped reason, file finish and and with the information filing and be sent to the early warning information logging modle, provide data for carrying out early warning analysis.Scrap condition and the LOC accessory is satisfied, then enter maintenance modules, keep in repair, simultaneously information is sent to the early warning information logging modle, provide data for carrying out early warning analysis.If there is not fault in accessory, will join information and be sent to the inventory archiving module, filing preservation information is also waited for user demand.
The 11 step: maintenance modules receives the three, four, five, and the information in six, seven, eight, nine, ten steps will send producer to keep in repair after five, six, seven, eight, the nine step accessories process information logging modles from the three, four;
Test fittings information from the tenth step is scrapped judgement according to test report, the accessory that does not reach the condition of scrapping send producer's maintenance, prior-warning device recorded key time point, maintenance factory's man's information and maintenance content information and monitored maintenance time, guarantee fittings quality by the early warning of accessory maintenance rate;
Test result reaches the accessory of the condition of scrapping, the accessory state is updated to scraps, be sent to the 17 step stock model, prior-warning device is by the scrap situation of scrappage early warning monitoring with a collection of accessory simultaneously, surpass predetermined value, prior-warning device sends the scrappage early warning to the associative operation personnel;
The accessory maintenance is sent to the tenth pacing die trial piece with accessory information after finishing to return; Maintenance finishes module and receives the accessory information of the tenth pacing test result for " normally ", and accessory is keeped in repair return, finishes maintenance flow, information is sent to the 17 stepping goes into stock model, files;
Prior-warning device starts stock's early warning constantly, guarantees that the quantity of stock's accessory can both satisfy emergency condition, and whole repair messages of accessory all can be sent to the information logging modle of prior-warning device, are used to start corresponding early warning;
The 11 step: the client proposes the OTU1 accessory of maintenance requirements, test result is undesired and does not satisfy the LOC accessory of the condition of scrapping and warehouse-in is that the PIDS3 accessory of fault part belongs to the accessory that needs repairing when judging, after maintenance modules is received the maintenance requirements information of transmission, prior-warning device sends accessory repair prompt information simultaneously to the operator, prompting is carried out maintenance and is prepared, maintenance operation person is typing maintenance producer in device, servicing time, repair location, the maintenance amount of money, report explanation etc. for repairment, the accessory information table is reported in generation for repairment, send with charge free and send to affirmation when accessory arrives maintenance producer, and in device the recording means service mode, time and service interval sent in the prior-warning device record, and the monitored maintenance time, point out when exceeding the time limit, maintenance finishes, LOC all returns after OTU1 and the maintenance of PIDS3 accessory on time, and accessory together enters test module with the maintenance report, OTU1 accessory test result has reached the condition of scrapping, the sign of recording means is scrapped reason, and file finishes and information is sent to inventory archiving and early warning information logging modle, provides data for carrying out early warning analysis.PIDS3 accessory test result will enter maintenance modules once more for " undesired " but do not satisfy and scrap condition, keep in repair, and simultaneously information will be sent to the early warning information logging modle, provide data for carrying out early warning analysis.LOC accessory test result is normal, will join information and be sent to the inventory archiving module, and filing preservation information is also waited for user demand.
The 12 step: stock model receives the information that above step sends, and above-mentioned information is filed preservation, is the making of various forms, and prior-warning device provides effective information.
So far, the EO of this device.
Wherein, stock model is to above-mentioned inventory archiving information, and Data Update information is filed preservation, and the data of these filings are mainly used in the inquiry of accessory information and the making of various forms, and handled easily personnel and client check.Archive information also can be sent to the information of these filings the information logging modle of prior-warning device, for prior-warning device provides data timely and effectively.
The information logging modle of prior-warning device gathers whole operation informations and archive information, and the information information of being sent to is studied and judged module carry out information analysis;
Various operation informations, inventory archiving information, Data Update information all are summarised in the information logging modle of prior-warning device, for example: operation-roles, accessory maintenance frequency, accessory flow state etc.The information analysis module that the information logging modle is studied and judged the information information of being sent in the flow process is carried out information analysis.
Information is studied and judged the information analysis module in the flow process, and with the information processing of classifying, what belong to early warning information is sent to early warning information analysis module (as: maintenance frequency), and what belong to information is sent to information indicating module (as: warehouse-in application information).
The early warning information analysis module carries out early warning analysis from time, quality, quantity, four aspects of management respectively, and the time early warning mainly comprises running time, the time of making an inventory, servicing time, lease time etc.; Quality pre-alert mainly comprises: repair rate, failed part rate, scrappage etc.; The quantity early warning mainly is the stockpile number early warning; The management early warning mainly is at the work performance management early warning of effect of staff.The early warning information analysis module is judged advanced warning grade according to preset threshold, sends early warning and reports to the information indicating module.
The information indicating module is according to the information of information analysis module and the transmission of early warning information analysis module, with one-level red early warning (very urgent), the orange early warning of secondary (promptly), three grades of yellow early warning (generally urgent), green early warning (normally) early warning information of level Four is sent to corresponding administration and supervision authorities.
One-level red early warning information is sent to the senior management staff, middle management, operator; The orange early warning of secondary is sent to the middle management, the operator; Three grades of yellow, the green early warning information of level Four and operation prompt information are sent to the operator, after each operation layer is received information, in time information is handled, submitted to the result report to upper level simultaneously, the mabage report of one-level red early warning is committed to middle management person and operator.
The utility model includes but not limited to above embodiment, and is every in any local improvement of carrying out under spirit of the present utility model and the principle or be equal to replacement and all will be considered as within protection domain of the present utility model.

Claims (1)

1. be used for the electronic installation of the test and the early warning of communication network maintenance, comprise: go into library module, stock model, maintenance modules, receive module, the module of making an inventory, software upgrading module, lease module, test module, scrap module, lend module, give back module, give back the back archive module, go out library module, whole world buying module, allot module, a plurality of information logging modle, an information and study and judge module, early warning information analysis module, information indicating module and operation rank module; It is characterized in that: go into library module and pass through the judgement of accessory and the requirement after the judgement, link to each other with maintenance modules with stock model, software upgrading module respectively through the information logging modle, stock model passes through the information logging modle by the demand of alloting, the demand of making an inventory, outbound demand, lease demand, upgrade requirement, testing requirement, the analysis of receiving demand and maintenance requirements etc. and receives module, the module of making an inventory, test module, software upgrading module, leases module, goes out library module and allot module and link to each other; The lease module links to each other with software upgrading module, test module through the information logging modle again, test module is through information logging modle and maintenance modules, scrap module, lend module and link to each other with stock model, lend module through the information logging modle with give back module and link to each other, giving back module links to each other with stock model through the information logging modle, maintenance modules through the information logging modle with scrap module and link to each other, scrap module and pass through the information logging modle and link to each other with stock model; Receiving module links to each other with test module with maintenance modules through the information logging modle respectively, the module of making an inventory judge coupling or do not match after respectively through the information logging modle with test module, stock model with allot module and link to each other, go out library module and pass through the information logging modle and link to each other with the software upgrading module; The software upgrading module links to each other with test module through the information logging modle, alloting module judges whether to link to each other with the software upgrading module with whole world buying module through the information logging modle respectively after the short supply by alloting, lend module by outbound judge through the information logging modle with give back module and go out library module and link to each other, after no matter any below demand flow process finish, all passing through the information logging modle links to each other with stock model, and in each link the information logging modle is is all studied and judged module with information respectively and is linked to each other, information is studied and judged module and is operated the rank module and link to each other.
CN2009201088724U 2009-06-09 2009-06-09 Test and alarm electronic device for communication network maintenance Expired - Lifetime CN201548986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201088724U CN201548986U (en) 2009-06-09 2009-06-09 Test and alarm electronic device for communication network maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201088724U CN201548986U (en) 2009-06-09 2009-06-09 Test and alarm electronic device for communication network maintenance

Publications (1)

Publication Number Publication Date
CN201548986U true CN201548986U (en) 2010-08-11

Family

ID=42604163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201088724U Expired - Lifetime CN201548986U (en) 2009-06-09 2009-06-09 Test and alarm electronic device for communication network maintenance

Country Status (1)

Country Link
CN (1) CN201548986U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105939946A (en) * 2014-01-29 2016-09-14 日本托盘租赁株式会社 Distribution container management system, distribution container management method, and distribution container management program
CN106779513A (en) * 2017-04-07 2017-05-31 北京燃气绿源达清洁燃料有限公司 Special equipment dynamic information management system
CN111191862A (en) * 2018-11-15 2020-05-22 鸿富锦精密电子(成都)有限公司 Material scrapping cost management method, computer device and readable storage medium

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105939946A (en) * 2014-01-29 2016-09-14 日本托盘租赁株式会社 Distribution container management system, distribution container management method, and distribution container management program
CN105939946B (en) * 2014-01-29 2017-12-12 日本托盘租赁株式会社 Physical distribution container management system, platform management method and platform management program
CN106779513A (en) * 2017-04-07 2017-05-31 北京燃气绿源达清洁燃料有限公司 Special equipment dynamic information management system
CN111191862A (en) * 2018-11-15 2020-05-22 鸿富锦精密电子(成都)有限公司 Material scrapping cost management method, computer device and readable storage medium

Similar Documents

Publication Publication Date Title
CN107831750B (en) IMES intelligent manufacturing execution system
CN110599103B (en) Production management subsystem based on intelligent manufacturing MES system
CN110580026A (en) intelligent manufacturing MES system
CN113780990A (en) Cloud intelligence manufacturing platform based on artificial intelligence production management mode and processing method
CN110580572B (en) Product life-span traceability system
CN101655933A (en) Warehouse network electronic checking and dispatching method
CN105160467A (en) Engineering change control management system and method therefor
CN101639908A (en) Testing and early warning electronic system for maintaining communication network
CN104700229A (en) Product recall warning system and method based on two-dimension codes
CN101655956A (en) Remote controllable network rent method
CN103390218A (en) Three-chain coupling integrated emergency security system and method for emergencies
CN201548986U (en) Test and alarm electronic device for communication network maintenance
CN201548988U (en) Warehouse network electronic checking scheduling device
CN101655936A (en) Network monitoring method for maintaining telecommunication equipment
CN113673835A (en) Third generation semiconductor supply chain management system
CN112967155A (en) Intelligent self-service catering service system architecture and device
CN114897472A (en) Digital logistics center system based on internet
Hribernik et al. Intelligent products to support closed-loop reverse logistics
CN101655935A (en) Telecommunication equipment network interaction processing method
CN102663539A (en) Operation cost management system based on platform of internet of things
CN112907183A (en) Small and micro enterprise platform management system based on cloud computing
CN112269357A (en) Intelligent management system of mill
CN201548985U (en) Telecommunication equipment network interactive processing device
CN201548989U (en) Test electronic device for communication network maintenance
CN201548996U (en) Remote controlled network lease device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20100811

CX01 Expiry of patent term