CN201521032U - Full-extension roofing tour building - Google Patents

Full-extension roofing tour building Download PDF

Info

Publication number
CN201521032U
CN201521032U CN2009200642099U CN200920064209U CN201521032U CN 201521032 U CN201521032 U CN 201521032U CN 2009200642099 U CN2009200642099 U CN 2009200642099U CN 200920064209 U CN200920064209 U CN 200920064209U CN 201521032 U CN201521032 U CN 201521032U
Authority
CN
China
Prior art keywords
roofing
upset
transmission shaft
roof
metope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200642099U
Other languages
Chinese (zh)
Inventor
周普森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009200642099U priority Critical patent/CN201521032U/en
Application granted granted Critical
Publication of CN201521032U publication Critical patent/CN201521032U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

A full-extension roofing tour building consists of a frame assembly, a wall assembly and a roof assembly, wherein the frame assembly includes a square longitudinal pipe, a square transverse pipe, and a square vertical pipe, which are connected with each other and are fixed by angle connecting plates; the roof assembly includes a reversible roof cover; and the reversible roof cover is movably connected with a reversible wall surface through transmission shaft B and is supported on the slope surface of a triangular wall plate to form a divided roof. The full-extension roofing tour building adopts frame structure with a rectangular roof truss consisting of square pipes in connection with each other, the reversible roof cover is movably connected with the reversible wall surface through the transmission shaft B, the reversible wall surface is connected with the joint of the rear wall plate and the square vertical pie through a transmission shaft A, and the reversible roof cover is movably connected with the reversible wall surface through the transmission shaft B and is supported on the slope surface of the triangular wall plate so as to form the divided roof. According to the technical scheme, the full-extension tour building overcomes the disadvantages of present tour buildings, such as high cost, high energy consumption, difficult assembly and disassembly, integral sealing, poor lighting, and bad influence on the using environment and the life quality of user, and suits temporary buildings in scenic spots, disaster relief places, construction places, and so on.

Description

Full expand formula roofing travelling house
Technical field
The utility model relates to a kind of full expand formula roofing travelling house.
Background technology
Existing for the traveller tourist site stay or the equipment of rest usefulness have multiple, as simple and easy travelling house, tent etc.The defective that they exist is: 1. overall structure is insecure, causes security incident easily as strong wind; 2. equipment is closed, and inner daylighting is not good enough, has reduced the quality of life of equipment service property (quality) with the person of residence.
Summary of the invention
At above-mentioned situation, the purpose of this utility model is to provide a kind of and can Fast Installation dismantles, and is not subjected to field of employment restriction and safe in utilization, reliable, comfortable, natural full expand formula roofing travelling house again.
To achieve these goals, a kind of full expand formula roofing travelling house, it is by the roof truss assembly, metope assembly and roof assembly are formed, described roof truss assembly comprises square longitudinal tubule (L tubule), square transverse tube overlaps mutually with square standpipe and is fixed with being connected gusset, described metope assembly comprises wallboard and embeds opening the door greatly of wallboard, described roof assembly comprises that the upset roofing is movably connected on the upset metope and is supported on the domatic opposite opened roof of go up forming of triangle wallboard through power transmission shaft B, the upset metope vertically is connected in the lap-joint of rear wall plate and square standpipe through power transmission shaft A, described power transmission shaft A lower end is through the bevel gear engaged transmission of bevel gear and drive motors A, and the front end of power transmission shaft B is established drive motors B.
For implementation structure optimization, its further step is: power transmission shaft A is arranged in order coating by rear wall plate fixed cover and upset metope fixed cover.Power transmission shaft B is arranged in order coating by upset metope fixed cover and upset roofing fixed cover.Upset roofing fixed cover is the shell-like cylindrical shell that is fixed in the upset roofing.Upset metope fixed cover is the shell-like cylindrical shell that is fixed in the upset metope.The rear wall plate fixed cover is the shell-like cylindrical shell that is fixed in rear wall plate.The area that opens the door greatly account for wallboard the gross area 2/3rds.
The utility model adopts establishes the frame construction that is formed the rectangle roof truss by the square pipe overlap joint, the upset roofing is movably connected on the upset metope through power transmission shaft B, the upset metope is connected in the lap-joint of rear wall plate and square standpipe through power transmission shaft A, the upset roofing is movably connected on the upset metope and is supported on the domatic technical scheme that go up to form the opposite opened roof of triangle wallboard through power transmission shaft B, it is expensive to have overcome existing travelling house, highly energy-consuming, not quick detachable and assembly unit is used again, integrally closed daylighting is not good enough, influences the environment for use and the person's of residence defectives such as quality of life.
The beneficial effect that the utility model is produced compared to existing technology: (I) adopt production, technical maturity, steady quality, resourceful constructional materials is drawn materials conveniently buying, and cheap, safety is good; (II) the whole heat insulating material parcel that adopts in house, outer rainproof, dustproof, wind resistance, anti-ice climate, the internal layer insulation, winter protection, heatstroke prevention, and control roofing assembly for automatic control circuit, easy to use, safe and reliable; (III) adopt the rubber strip sealing at the place, mating face of the upset roofing of correspondence, both rainwater leakage preventions, can also limit roofing digs, when roof assembly is opened or is closed, can select whole metope and roof to open simultaneously, also can only open the roof, make the mode of occupation of whole travelling house have more selectivity and versatility, satisfy the demand of more people floor space size and daylighting etc.; The ponding on roof when (IV) the domatic roof of triangle is avoided raining heavily, and can the thick crushing by snow of anti-300mm, the roof assembly after the unlatching overturns to rear wall plate, and is simple and compact for structure, invests little, safe and reliable; (V) the size setting of adopting the area open the door greatly to account for the gross area 2/3rds of wall, make whole floor space and surrounding environment visually seem very open, reduced the sense of depression that travelling house brings because of the space is little, brought loosening on vision and the health, felt very comfortable to the user; (VI) roof truss adopts the framework connected mode of square pipe, make installation technology simple, both light, dismounting, assembly unit easily is solid and reliable again, and movable roof assembly makes building structure novelty, attractive in appearance, practical, metope opening mechanism reliable operation, penetration and promotion is convenient in the little and environmental protection of noise, and market prospects are wide.
The utility model is suitable for tourist attraction, the disaster relief, construction site etc. and uses the room temporarily.
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Description of drawings
The stereogram that Fig. 1 closes for the utility model roof assembly.
The stereogram that Fig. 2 opens for the utility model upset roofing.
Fig. 3 is the stereogram of the utility model roof assembly complete opening.
Fig. 4 is the stereogram of roof truss assembly of the present utility model.
Fig. 5 goes up the schematic diagram that each fixed cover is arranged in order coating for power transmission shaft B.
Fig. 6 goes up the schematic diagram that each fixed cover is arranged in order coating and transmission of power for power transmission shaft A.
Among the figure 1, drive motors A, 2, drive motors B, 3, the upset metope, 4, upset roofing, 5, power transmission shaft A, 6, power transmission shaft B, 7, rear wall plate, 8, the triangle wallboard, 9, square standpipe, 10, square transverse tube, 11, square longitudinal tubule (L tubule), 12, connect gusset, 13, upset roofing fixed cover, 14, upset metope fixed cover, 15, the rear wall plate fixed cover, 16, gearbox, 17, wallboard, 18, open the door greatly.
The specific embodiment
Referring to accompanying drawing, a kind of full expand formula roofing travelling house, it is by the roof truss assembly, metope assembly and roof assembly are formed, the roof truss assembly comprises square longitudinal tubule (L tubule) 11, square transverse tube 10 overlaps mutually and is fixed with being connected gusset 12 with square standpipe 9, what the metope assembly comprised wallboard 17 and embedded wallboard 17 opens the door 18 greatly, roof assembly comprises that upset roofing 4 is movably connected on the upset metope 3 and is supported on the domatic opposite opened roof of go up forming of triangle wallboard 8 through power transmission shaft B6, upset metope 3 vertically is connected in the lap-joint of rear wall plate 7 and square standpipe 9 through power transmission shaft A5, power transmission shaft A5 lower end is through the bevel gear engaged transmission of bevel gear and drive motors A1, and the front end of power transmission shaft B is established drive motors B.Power transmission shaft A5 is arranged in order coating by rear wall plate fixed cover 15 and upset metope fixed cover 14.Power transmission shaft B6 is arranged in order coating by upset metope fixed cover 14 and upset roofing fixed cover 13.Upset roofing fixed cover 13 is for being fixed in upset roofing 4 shell-like cylindrical shells.Upset metope fixed cover 14 is for being fixed in upset metope 3 shell-like cylindrical shells.Rear wall plate fixed cover 15 is for being fixed in the shell-like cylindrical shell of rear wall plate 7.18 the area of opening the door greatly account for wallboard 17 the gross area 2/3rds.
Normal use of the present utility model is: when opening roofing, drive motors B2 drives upset roofing 4 through gearbox 16 by power transmission shaft B6 and outwards is flipped open, driving power transmission shaft A5 by drive motors A1 through bevel gear again makes upset roofing 4 vertical with upset metope 3, turn over simultaneously by power transmission shaft A5 drive upset roofing 4 and upset metope 3, drive motors A1 and drive motors B2 are along with turning over, and fit on the rear wall plate 7, this moment, the skylight and the metope in whole house were opening; When closing roofing, drive motors A1 drives upset roofing 4 by power transmission shaft A5 and upset metope 3 overturns simultaneously, keep with ground vertically and fit on the roof truss, drive power transmission shaft B6 by drive motors B2 again, drive 4 upsets of upset roofing by power transmission shaft B6, fit on the triangle wallboard 8, and establish self-locking device, but natural calamities such as anti-strong wind.The place, mating face of corresponding upset roofing 4 adopts the rubber strip sealing.The metope assembly is established and is opened the door 18 greatly, and wide is 3m, opens for bilateral translation, and monolateral mobile width is 1.5m, and 18 standard-sized sheets that open the door greatly can reach 3m.
It below only is preferred embodiment of the present utility model, according to above-mentioned design of the present utility model, those skilled in the art can also make various modifications and conversion to this, as, the roof truss assembly is connected with roof assembly, the form of roof assembly and size dimension, the conversion and the modification of big opening structure, yet similar this conversion and modification all belong to essence of the present utility model.

Claims (7)

1. full expand formula roofing travelling house, it is characterized in that it is by the roof truss assembly, metope assembly and roof assembly are formed, described roof truss assembly comprises square longitudinal tubule (L tubule) (11), square transverse tube (10) overlaps mutually with square standpipe (9) and is fixed with being connected gusset (12), described metope assembly comprises wallboard (17) and embeds open the door greatly (18) of wallboard (17), described roof assembly comprises that upset roofing (4) is movably connected on the domatic composition opposite opened roof of going up that triangle wallboard (8) was gone up and be supported on to upset metope (3) through power transmission shaft B (6), upset metope (3) vertically is connected in the lap-joint of rear wall plate (7) and square standpipe (9) through power transmission shaft A (5), described power transmission shaft A (5) lower end is through the bevel gear engaged transmission of bevel gear and drive motors A (1), and the front end of power transmission shaft B (6) is established drive motors B (2).
2. full expand formula roofing travelling house according to claim 1 is characterized in that power transmission shaft A (5) is arranged in order coating by rear wall plate fixed cover (15) and upset metope fixed cover (14).
3. full expand formula roofing travelling house according to claim 1 is characterized in that power transmission shaft B (6) is arranged in order coating by upset metope fixed cover (14) and upset roofing fixed cover (13).
4. full expand formula roofing travelling house according to claim 3, the roofing fixed cover (13) that it is characterized in that overturning is for being fixed in the shell-like cylindrical shell of upset roofing (4).
5. full expand formula roofing travelling house according to claim 2, the metope fixed cover (14) that it is characterized in that overturning is for being fixed in the shell-like cylindrical shell of upset metope (3).
6. full expand formula roofing travelling house according to claim 2 is characterized in that rear wall plate fixed cover (15) is for being fixed in the shell-like cylindrical shell of rear wall plate (7).
7. full expand formula roofing travelling house according to claim 1, the area of it is characterized in that opening the door greatly (18) account for wallboard (17) the gross area 2/3rds.
CN2009200642099U 2009-04-30 2009-04-30 Full-extension roofing tour building Expired - Fee Related CN201521032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200642099U CN201521032U (en) 2009-04-30 2009-04-30 Full-extension roofing tour building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200642099U CN201521032U (en) 2009-04-30 2009-04-30 Full-extension roofing tour building

Publications (1)

Publication Number Publication Date
CN201521032U true CN201521032U (en) 2010-07-07

Family

ID=42507208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200642099U Expired - Fee Related CN201521032U (en) 2009-04-30 2009-04-30 Full-extension roofing tour building

Country Status (1)

Country Link
CN (1) CN201521032U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301577A (en) * 2018-04-02 2018-07-20 南昌大学 A kind of structure of exterior wall finish layer
CN108396917A (en) * 2018-04-02 2018-08-14 南昌大学 A kind of structure of outer wall board finish coat
CN109113252A (en) * 2018-08-27 2019-01-01 苏州园林发展股份有限公司 A kind of automatic-opening dome structure
CN109440940A (en) * 2018-12-25 2019-03-08 郑州九冶三维化工机械有限公司 A kind of prefabricated buildings with inside corridor
CN110246630A (en) * 2019-06-24 2019-09-17 宁波东方电缆股份有限公司 A kind of tray degassing room
CN113789901A (en) * 2021-10-16 2021-12-14 神州建设集团有限公司 Roof structure is built in room

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301577A (en) * 2018-04-02 2018-07-20 南昌大学 A kind of structure of exterior wall finish layer
CN108396917A (en) * 2018-04-02 2018-08-14 南昌大学 A kind of structure of outer wall board finish coat
CN109113252A (en) * 2018-08-27 2019-01-01 苏州园林发展股份有限公司 A kind of automatic-opening dome structure
CN109440940A (en) * 2018-12-25 2019-03-08 郑州九冶三维化工机械有限公司 A kind of prefabricated buildings with inside corridor
CN110246630A (en) * 2019-06-24 2019-09-17 宁波东方电缆股份有限公司 A kind of tray degassing room
CN113789901A (en) * 2021-10-16 2021-12-14 神州建设集团有限公司 Roof structure is built in room
CN113789901B (en) * 2021-10-16 2022-12-06 神州建设集团有限公司 Roof structure is built in room

Similar Documents

Publication Publication Date Title
CN201521032U (en) Full-extension roofing tour building
CN201268965Y (en) Movable dwelling with foldable roofing
CN101591946A (en) Solar photovoltaic roof and function tile
CN201915496U (en) Sunlight room
CN202454929U (en) Novel distribution box
CN105908832A (en) Folding balcony
CN202969749U (en) Aluminum-wood skylight window
CN103790292A (en) Aluminum wood skylight
CN201495634U (en) Tourist house with turnover roof
CN104389442B (en) Ecologic residential house building module
CN201521030U (en) Pedal type roofing makeshift house
CN201391015Y (en) Clearstory-type tourist room
CN206034953U (en) Energy -saving building house
CN212105306U (en) Novel power distribution room system
CN208039528U (en) A kind of wall and its building of T-steel connection
CN113898062B (en) Assembled rural house with hollow wall and assembling method thereof
CN205954827U (en) Folding balcony
CN205935435U (en) Slope roofing cavity arc glass subassembly
CN203296230U (en) Manual solar protection device for roof
CN206641092U (en) New extremely frigid zones ecology sun glasshouse
CN201411782Y (en) Roof full expansion type tourism house
CN203008411U (en) Industrially-produced environment-friendly and energy-saving intelligent building
CN108252434A (en) A kind of wall and its building of T-steel connection
CN206635954U (en) A kind of construction energy-saving easily Collapsible house
CN204663040U (en) A kind of greenhouse car carwash

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100707

Termination date: 20150430

EXPY Termination of patent right or utility model