CN201268965Y - Movable dwelling with foldable roofing - Google Patents
Movable dwelling with foldable roofing Download PDFInfo
- Publication number
- CN201268965Y CN201268965Y CNU2008201226310U CN200820122631U CN201268965Y CN 201268965 Y CN201268965 Y CN 201268965Y CN U2008201226310 U CNU2008201226310 U CN U2008201226310U CN 200820122631 U CN200820122631 U CN 200820122631U CN 201268965 Y CN201268965 Y CN 201268965Y
- Authority
- CN
- China
- Prior art keywords
- roof panel
- gable
- wall
- roof
- mobile house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model discloses a mobile home with a foldable roofing, which comprises an integral floor structure, four wall bodies, two slanting roofs and two gables. The four wall bodies are mutually connected with the integral floor structure to form a whole; two roof boards and the two gables are rotatably mounted on the wall bodies below the roof boards and the gables respectively through hinges; the two roof boards can rotate inwards round respective hinge shafts to the horizontal superposition state; and two gable boards can turn outwards to the drop state. The roof boards and the gable boards are hinged on the wall bodies respectively below the roof boards and the gable boards, the roof boards are folded to be level, so the total height of the mobile home is reduced to facilitate transportation and hoisting, especially container transportation; and the roof boards can be turned up to form a pitched roof when installed, the indoor space is increased, the operation is simple and the use convenient.
Description
Technical field
The utility model relates to a kind of mobile house, especially a kind of mobile house of collapsible roofing.
Background technology
For convenience the use of mobile house reduces fixing link as far as possible, reduces and uses on-the-spot construction volume, improves service efficiency, and the moulding that is prefabricated in the factory usually of existing mobile house is carried out integral body then and carried, and can come into operation after being fixed at the scene.Because the use scene is often distant apart from house processing factory, like this, bulky overall structure causes no small difficulty for the transition in house, the house of pinnacle structure especially, and its transition is difficulty more just.
The utility model content
At the problems referred to above, the purpose of this utility model is to provide a kind of mobile house of pinnacle structure of collapsible roofing, this house can fold its pinnacle easily and pack up and reopen, thereby under situation about conveniently installing and using, facilitates for the house transition as far as possible.
For achieving the above object, the mobile house of the collapsible roofing of the utility model comprises whole earth construction, four sides body of wall, two sides pitched roof and both sides gable, and four sides body of wall and whole earth construction interconnect fixing in aggregates; The two sides pitched roof is made of two roof panel, the both sides gable is made of two blocks of wallboards, on the body of wall below two roof panel and two blocks of gable wallboards all are installed in separately by hinge is rotatable, wherein, the setting that interlaces up and down of the hinge of two roof panel, make two roof panel inwardly turn to stacked level mutually around hinge separately, two blocks of gable wallboards can outwards turn to hang around hinge separately; Two roof panel are upwards dug the back, and overlap joint is fixing mutually, and the two overlap edge place is provided with the bridging arrangement of mutual coupling, and two blocks of gable wallboards are upwards dug with two roof panel soffits back that joins and fixed by latch.
Further, described two blocks of gable wallboards are upwards dug to plumbness and are joined with described two roof panel soffits, and fix by latch.
Further, described roof panel and its below body of wall interface, described gable wallboard with its below body of wall interface, two roof panel overlap edge places and gable wallboard and roof panel joint be provided with waterproof thermal-insulated sealing device.
Further, the described waterproof thermal-insulated sealing device of described roof panel and body of wall interface and two roof panel overlap edge place settings is waterproof thermal-insulated double-layer seal adhesive tape; The described waterproof thermal-insulated sealing device that is provided with between described gable wallboard and body of wall and the roof panel is a rubber weather strip.
Further, described waterproof thermal-insulated double-layer seal adhesive tape is fixedly installed on the body of wall of described roof panel below, and roof panel is upwards dug when putting in place, and its lower surface is pressed on the waterproof thermal-insulated double-layer seal adhesive tape automatically, realizes being connected with its below the airtight of body of wall.
Further, on the ridge that described two roof panel overlap joint back forms also spiral-lock one L shaped buckle is arranged, this L shaped buckle is with wherein a roof panel is airtight fixing, and and another piece roof panel abutted surface between be provided with weather strip.
Further, described roof panel inner surface is supported on the air spring, and can under the effect of this air spring, upwards dig automatically, the air spring upper end is connected with roof panel inner surface middle part hinge, and the air spring lower end is rotatable to be supported on the support that is provided with on the mobile house body of wall.
Further, described every its length direction of roof panel upper edge is arranged at intervals with at least two described air springs.
The utility model is by after on the body of wall that roof panel and gable wallboard is hingedly mounted on its below, both can be with the roof panel fold-flat, reduce the whole height in house, be convenient to transportation and lifting, particularly make things convenient for containerized traffic, can when mounted roofing be dug the formation pitched roof again, strengthen the interior space, and it is simple to operate, easy to use.
Description of drawings
Fig. 1 is the utility model mobile house roof panel open mode schematic diagram;
Fig. 2 is an A portion enlarged drawing among Fig. 1;
Fig. 3 is a B portion enlarged drawing among Fig. 1;
Fig. 4 is the utility model mobile house roof panel folded state schematic diagram;
Fig. 5 is the utility model mobile house gable wallboard tip-up state schematic diagram;
Fig. 6 is the utility model mobile house gable wallboard folded state schematic diagram.
The specific embodiment
The mobile house of the collapsible roofing of the utility model comprises whole earth construction, four sides body of wall, two sides pitched roof and both sides gable, and the two sides pitched roof is made of two roof panel, and the both sides gable is made of two blocks of wallboards.
As shown in Figure 1, 2, four sides body of wall 2 interconnects fixing in aggregates with whole earth construction 1, on the body of wall 2 below two roof panel 3,4 are installed in separately by hinge 9 respectively, two roof panel 3,4 can spin upside down along direction shown in the arrow among Fig. 1 around hinge 9 respectively.The operation of digging for convenience of roof panel, two roof panel 3,4 belows are provided with air spring 6, the upper end of air spring 6 is connected with the inner surface hinge of roof panel 3,4, rotatable being installed in the lower end of air spring 6 set up on the body of wall 2 on the fixing support 5, upwards digs under the promotion of the air spring 6 that roof panel 3,4 can be provided with below separately respectively.Long when roof panel, when weight ratio was big, every roof panel can be provided with a plurality of air springs 6 at interval along its length direction.
As shown in Figure 3, the upper end of two roof panel 3,4 is provided with the bridging arrangement of mutual coupling, and after two roof panel were upwards dug under air spring 6 promotes, its free end overlapped connection mutually, and forms the ridge of mobile house thus.Simultaneously, on the ridge also spiral-lock one L shaped buckle 7 is arranged, these buckle 7 one coxostermums fix by screw or rivet and roof panel 3, its opposite side web is withheld on roof panel 4, and and roof panel 4 between also be provided with weather strip 8.After buckle 7 was set, it was reliable firm both can to have guaranteed that two roof panel overlap joint connected, and can guarantee the air-tight state at overlap edge place again, also had aesthetic simultaneously.
After two roof panel 3,4 are upwards dug and are overlapped connection mutually, in order to guarantee airtight joining between roof panel 3,4 and the body of wall 2, as shown in Figure 2, between body of wall 2 upper ends and roof panel 3,4 lower ends waterproof thermal-insulated double-layer seal adhesive tape 10 is set also, sealing adhesive tape 10 is fixed on the body of wall 2, when roof panel 3,4 upwards dig put in place after, its lower end is pressed on the sealant tape 10 automatically, realizes being connected with the airtight of body of wall 2.
As shown in Figure 4, the setting that interlaces up and down of the hinge of two roof panel 3,4, like this, two roof panel 3,4 can inwardly turn to stacked level mutually around hinge 9 separately.
Shown in Fig. 5,6, two blocks of gable wallboards 11 are installed on the body of wall 2 of below separately by hinge 12 equally respectively, and gable wallboard 11 can outwards turn to hang, upwards turn to state with roof panel 3,4 vertical connections along the direction of arrow among the figure around its hinge 12.After gable wallboard 11 upwards is turned to position with roof panel 3,4 vertical connections, by and roof panel between the known latch structure (not shown) that is provided with fix.On roof panel 3,4 inner surfaces at the place that matches with gable wallboard 11, also be provided with rubber weather strip 13, also be provided with same rubber weather strip 13 with gable wallboard 11 places of matching on the gable wallboard 11 below bodies of wall 2, after gable wallboard 11 upwards overturns and puts in place, its periphery is pressed on the weather strip 13 automatically, realize thus with roof panel 3,4 and body of wall 2 between airtight the connection.
Support 5 among Fig. 1 sets up and is fixed on the body of wall 2, and this support 5 also can be simultaneously as the support that presss from both sides the room in the mobile house except can be used for installing the air spring 6.
After the roof panel of mobile house and gable wallboard be arranged to folding form, when needs transition transportation, roof panel is turn to level, simultaneously the gable wallboard is turned down, can make it highly to reduce, thereby be convenient to transportation and lifting, be particularly useful for containerized traffic.Before using the roofing rise is become pitched roof, the interior space is strengthened, the outward appearance novelty is beautiful.
Below two roof panel, air spring is installed, can like a cork two roof panel be risen.After two roof panel rise with its fastening, and then two gable wallboards are mentioned and with the roof panel fastening, the lifting installation process of roofing is promptly accused and is finished, the seam areas of roof panel is equipped with waterproof thermal-insulated double-layer seal band, makes the house have good against weather.
The gable wallboard is dug the back and is fixed with latch, by on its four limit the tongue and groove rubber weather strip being set, guarantees the sealing of its seam crossing.
Claims (8)
1, a kind of mobile house of collapsible roofing is characterized in that, comprises whole earth construction, four sides body of wall, two sides pitched roof and both sides gable, and four sides body of wall and whole earth construction interconnect fixing in aggregates; The two sides pitched roof is made of two roof panel, the both sides gable is made of two blocks of wallboards, on the body of wall below two roof panel and two blocks of gable wallboards all are installed in separately by hinge is rotatable, wherein, the setting that interlaces up and down of the hinge of two roof panel, make two roof panel inwardly turn to stacked level mutually around hinge separately, two blocks of gable wallboards can outwards turn to hang around hinge separately; Two roof panel are upwards dug the back, and overlap joint is fixing mutually, and the two overlap edge place is provided with the bridging arrangement of mutual coupling, and two blocks of gable wallboards are upwards dug with two roof panel soffits back that joins and fixed by latch.
2, mobile house as claimed in claim 2 is characterized in that, described two blocks of gable wallboards are upwards dug to plumbness and joined with described two roof panel soffits, and fix by latch.
3, mobile house as claimed in claim 3, it is characterized in that, described roof panel and its below body of wall interface, described gable wallboard with its below body of wall interface, two roof panel overlap edge places and gable wallboard and roof panel joint be provided with waterproof thermal-insulated sealing device.
4, mobile house as claimed in claim 4 is characterized in that, the described waterproof thermal-insulated sealing device of described roof panel and body of wall interface and two roof panel overlap edge place settings is waterproof thermal-insulated double-layer seal adhesive tape; The described waterproof thermal-insulated sealing device that is provided with between described gable wallboard and body of wall and the roof panel is a rubber weather strip.
5, mobile house as claimed in claim 5, it is characterized in that, described waterproof thermal-insulated double-layer seal adhesive tape is fixedly installed on the body of wall of described roof panel below, roof panel is upwards dug when putting in place, its lower surface is pressed on the waterproof thermal-insulated double-layer seal adhesive tape automatically, realizes being connected with its below the airtight of body of wall.
6, mobile house as claimed in claim 3, it is characterized in that, on the ridge that described two roof panel overlap joint back forms also spiral-lock one L shaped buckle is arranged, this L shaped buckle is with wherein a roof panel is airtight fixing, and and another piece roof panel abutted surface between be provided with weather strip.
7, mobile house as claimed in claim 3, it is characterized in that, described roof panel inner surface is supported on the air spring, and can under the effect of this air spring, upwards dig automatically, the air spring upper end is connected with roof panel inner surface middle part hinge, and the air spring lower end is rotatable to be supported on the support that is provided with on the mobile house body of wall.
8, mobile house as claimed in claim 8 is characterized in that, described every its length direction of roof panel upper edge is arranged at intervals with at least two described air springs.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201226310U CN201268965Y (en) | 2008-09-19 | 2008-09-19 | Movable dwelling with foldable roofing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201226310U CN201268965Y (en) | 2008-09-19 | 2008-09-19 | Movable dwelling with foldable roofing |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201268965Y true CN201268965Y (en) | 2009-07-08 |
Family
ID=40841562
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008201226310U Expired - Fee Related CN201268965Y (en) | 2008-09-19 | 2008-09-19 | Movable dwelling with foldable roofing |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201268965Y (en) |
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101832038A (en) * | 2010-04-30 | 2010-09-15 | 李连英 | Movable house |
| CN101914948A (en) * | 2010-08-03 | 2010-12-15 | 南京工业大学 | Novel composite material prefabricated mobile house |
| WO2011128769A2 (en) | 2010-04-16 | 2011-10-20 | Rodrigo Graf Fernandez | Foldable structures for a construction |
| CN103306375A (en) * | 2013-06-05 | 2013-09-18 | 张家港市盛港绿色防火建材有限公司 | Roof fixing device of integrated house |
| CN105507423A (en) * | 2016-01-29 | 2016-04-20 | 浙江晶尚新能源科技有限公司 | Box-type makeshift house |
| CN106121275A (en) * | 2015-11-03 | 2016-11-16 | 无锡新人居科贸有限公司 | A kind of prefabricated buildings |
| CN108018979A (en) * | 2017-12-13 | 2018-05-11 | 泰州职业技术学院 | A kind of simple building with wind-shielding function |
| CN108222271A (en) * | 2018-03-13 | 2018-06-29 | 万华集成房屋(烟台)有限公司 | Folding house and hinge device for house folding |
| CN108316468A (en) * | 2018-04-27 | 2018-07-24 | 扬州工业职业技术学院 | A kind of novel green building |
| CN111926920A (en) * | 2020-08-20 | 2020-11-13 | 浙江省建工集团有限责任公司 | Flat and urgent module case assembly |
| CN113235979A (en) * | 2021-04-20 | 2021-08-10 | 安徽虎龙建筑工程有限公司 | Folding triangular house |
| CN113323221A (en) * | 2021-07-09 | 2021-08-31 | 江苏金贸科技发展有限公司 | Pitched roof structure capable of being opened and closed |
| CN114263277A (en) * | 2022-01-06 | 2022-04-01 | 赵辉 | Structure is built in quick detachable interim room |
| CN119640986A (en) * | 2024-11-22 | 2025-03-18 | 中国建筑第四工程局有限公司 | A double-layer ACC exterior wall panel and installation method |
-
2008
- 2008-09-19 CN CNU2008201226310U patent/CN201268965Y/en not_active Expired - Fee Related
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011128769A2 (en) | 2010-04-16 | 2011-10-20 | Rodrigo Graf Fernandez | Foldable structures for a construction |
| CN101832038A (en) * | 2010-04-30 | 2010-09-15 | 李连英 | Movable house |
| CN101914948A (en) * | 2010-08-03 | 2010-12-15 | 南京工业大学 | Novel composite material prefabricated mobile house |
| CN103306375A (en) * | 2013-06-05 | 2013-09-18 | 张家港市盛港绿色防火建材有限公司 | Roof fixing device of integrated house |
| CN106121275A (en) * | 2015-11-03 | 2016-11-16 | 无锡新人居科贸有限公司 | A kind of prefabricated buildings |
| CN105507423A (en) * | 2016-01-29 | 2016-04-20 | 浙江晶尚新能源科技有限公司 | Box-type makeshift house |
| CN108018979A (en) * | 2017-12-13 | 2018-05-11 | 泰州职业技术学院 | A kind of simple building with wind-shielding function |
| CN108222271A (en) * | 2018-03-13 | 2018-06-29 | 万华集成房屋(烟台)有限公司 | Folding house and hinge device for house folding |
| CN108222271B (en) * | 2018-03-13 | 2023-08-08 | 万华建筑科技有限公司 | Folding house |
| CN108316468A (en) * | 2018-04-27 | 2018-07-24 | 扬州工业职业技术学院 | A kind of novel green building |
| CN111926920A (en) * | 2020-08-20 | 2020-11-13 | 浙江省建工集团有限责任公司 | Flat and urgent module case assembly |
| CN113235979A (en) * | 2021-04-20 | 2021-08-10 | 安徽虎龙建筑工程有限公司 | Folding triangular house |
| CN113323221A (en) * | 2021-07-09 | 2021-08-31 | 江苏金贸科技发展有限公司 | Pitched roof structure capable of being opened and closed |
| CN114263277A (en) * | 2022-01-06 | 2022-04-01 | 赵辉 | Structure is built in quick detachable interim room |
| CN119640986A (en) * | 2024-11-22 | 2025-03-18 | 中国建筑第四工程局有限公司 | A double-layer ACC exterior wall panel and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201268965Y (en) | Movable dwelling with foldable roofing | |
| US20100064599A1 (en) | Portable Building | |
| CN210002965U (en) | A new type of detachable assembled panel house | |
| CN204850051U (en) | Folding room | |
| CN201901945U (en) | a folding house | |
| CN201915496U (en) | Sunlight room | |
| CN205637377U (en) | Folding type intelligence weather canopy | |
| CN202249485U (en) | Multifunctional door window device | |
| CN204040527U (en) | Multifunction folding fire-proof high-temperature resistant environment protection movable case room | |
| CN103790292A (en) | Aluminum wood skylight | |
| CN110258977A (en) | A kind of multilayer changing of the relative positions nested type can opening roof | |
| CN201521032U (en) | Full-extension roofing tour building | |
| CN107130690A (en) | A kind of movable building system voluntarily deployed and stored | |
| CN112576060A (en) | Rapid building | |
| CN209854922U (en) | Prefabricated assembled reinforced concrete prefabricated house | |
| CN218150042U (en) | A prefabricated box room | |
| CN217325818U (en) | Foldable and expandable movable house | |
| CN201554165U (en) | Open type skylight | |
| CN211647483U (en) | Combined expansion container prefabricated house | |
| CN211817472U (en) | Solar skylight | |
| CN204898877U (en) | Box prefabricated house of folded form | |
| CN209369045U (en) | A kind of multifunction module formula glass sunlight house | |
| CN115262872A (en) | Full-detachable box-type house waterproof roof structure | |
| CN108099751A (en) | It is a kind of can rapid deployment and the double-deck large space solar energy caravan that closes up | |
| CN211714216U (en) | One-way drain valve for assembled external wall panel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090708 Termination date: 20130919 |