CN201512930U - 地暖用复合木地板 - Google Patents

地暖用复合木地板 Download PDF

Info

Publication number
CN201512930U
CN201512930U CN2009201046774U CN200920104677U CN201512930U CN 201512930 U CN201512930 U CN 201512930U CN 2009201046774 U CN2009201046774 U CN 2009201046774U CN 200920104677 U CN200920104677 U CN 200920104677U CN 201512930 U CN201512930 U CN 201512930U
Authority
CN
China
Prior art keywords
floor board
wooden floor
floor
ground heating
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201046774U
Other languages
English (en)
Inventor
郭漫笳
裴艳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Bainianqiaojiang Culture Communication Ltd By Share Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201046774U priority Critical patent/CN201512930U/zh
Application granted granted Critical
Publication of CN201512930U publication Critical patent/CN201512930U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

本实用新型公开了一种地暖用复合木地板,包括上、下面板层,上、下面板层之间设有中间层,所述的中间层由设有通孔的面板压制而成。本实用新型与传统的木地板相比,具有节约能源、降低噪音、透气性好、防变形和抗压能力强的优点。

Description

地暖用复合木地板
技术领域
本实用新型涉及一种木地板,尤其是一种利用多层板压制而成的地暖用复合木地板。
背景技术
目前市场上的复合木地板大体可分为:竹材地板、三层实木复合地板、多层实木复合地板、胶合木地板、强化木质复合地板等。无论是哪种木地板均采用三层或多层面板胶合压制而成,在使用过程中由于受潮、胶水涂布不均匀等问题,造成脱胶开裂的现象,特别是当复合木地板装于地采暖的场合。现有的地采暖大都将热水管埋在水泥地面里,水泥铺设厚度在5.0~10.0cm之间,无法在短期内干透,然后用胶将木地板粘在水泥地上,或者先采用PE垫贴在水泥地上,再铺木地板,若采用传统的复合木地板,存在下列缺陷:木地板受潮后容易造成脱胶开裂;木材是热的不良导体,导热性能较差,对能源是一种浪费;地暖管辐射出的热量不能通过木地板均匀散发出来,使地板受热不均,易造成木地板变形。而且传统复合木地板吸音、隔音效果较差。
实用新型内容
本实用新型要解决的技术问题是克服传统复合木地板易脱胶开裂、易变形、浪费能源的缺点,提供一种透气性好、不易变形、环保的地暖用复合木地板。
为解决上述技术问题,本实用新型包括上、下面板层,上、下面板层之间设有中间层,关键的改进在于:所述的中间层由设有通孔的面板压制而成。
对上述方案的进一步改进:
所述通孔的形状为圆形、方形、平行四边形、三角形、五角形中的任何一种或者至少两种的组合。
所述中间层由1~3层面板压制而成。
本实用新型在中间层上设置了通孔,与传统的复合木地板相比,具有以下有益效果:本实用新型吸潮后,水汽可通过透气的通孔在较短时间内释放,避免水汽在不同面板层之间聚集而导致的复合木地板脱胶开裂;同理,通过通孔热量在较短时间内散发出来,加快了复合木地板的导热速度,室内升温较快,可节省采暖能源约30%,同时降低了污染排放,对全球的环保事业作出了很大的贡献;通孔的设置使复合木地板受热更加均匀,避免了因受热不均而导致复合木地板变形,延长了其使用寿命;中间层的通孔作为缓冲,提高了复合木地板的抗压能力;中间层的通孔阻断了声音的传播,对楼下的噪音影响降低了约40%,同时对室内的噪音有吸音的作用,可降低室内噪音的污染,在噪声控制方面达到了环保要求。
附图说明
下面结合附图和具体实施方式对本实用新型作进一步详细的说明。
图1是本实用新型的结构示意图,
其中,1、上面板层;2、中间层;3上面板层;4、通孔。
具体实施方式
参看图1,可以看出:本实用新型包括上面板层1、下面板层3,上、下面板层之间设有中间层2,所述的中间层2由设有通孔4的面板压制而成。
对上述方案的进一步改进为:
中间层2可设置为一层面板,或者采用2层或者3层面板压制而成。
所述的通孔的形状为圆形。通孔的形状还可以为方形、平行四边形、三角形、五角形中的任何一种,或者为其中任何两种形状的有规律组合或者随机组合,或者为其中任何三种形状的组合,或者为上述各种形状的组合。
采用上述方案后,本实用新型与传统的木地板相比,具有节约能源、降低噪音、透气性好、防变形和抗压能力强的优点。

Claims (3)

1.一种地暖用复合木地板,其包括上、下面板层,上、下面板层之间设有中间层,其特征在于:所述的中间层由设有通孔的面板压制而成。
2.根据权利要求1所述的地暖用复合木地板,其特征在于所述通孔的形状为圆形、方形、平行四边形、三角形、五角形中的任何一种或者至少两种的组合。
3.根据权利要求1所述的地暖用复合木地板,其特征在于所述中间层由1~3层面板压制而成。
CN2009201046774U 2009-09-15 2009-09-15 地暖用复合木地板 Expired - Lifetime CN201512930U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201046774U CN201512930U (zh) 2009-09-15 2009-09-15 地暖用复合木地板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201046774U CN201512930U (zh) 2009-09-15 2009-09-15 地暖用复合木地板

Publications (1)

Publication Number Publication Date
CN201512930U true CN201512930U (zh) 2010-06-23

Family

ID=42484338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201046774U Expired - Lifetime CN201512930U (zh) 2009-09-15 2009-09-15 地暖用复合木地板

Country Status (1)

Country Link
CN (1) CN201512930U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003058A (zh) * 2010-11-12 2011-04-06 郭漫笳 低温辐射采暖地板
GB2482917A (en) * 2010-08-20 2012-02-22 Andrew Coia Flooring member for use with under floor heating
CN106760395A (zh) * 2016-12-10 2017-05-31 安徽银龙泵阀股份有限公司 一种热压复合木地板

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2482917A (en) * 2010-08-20 2012-02-22 Andrew Coia Flooring member for use with under floor heating
GB2482917B (en) * 2010-08-20 2013-01-09 Andrew Coia Flooring member
CN102003058A (zh) * 2010-11-12 2011-04-06 郭漫笳 低温辐射采暖地板
CN106760395A (zh) * 2016-12-10 2017-05-31 安徽银龙泵阀股份有限公司 一种热压复合木地板

Similar Documents

Publication Publication Date Title
CN201512930U (zh) 地暖用复合木地板
CN201111530Y (zh) 防水多层实木地板
CN104847028B (zh) 一种保温隔声垫板及其加工方法
CN201326263Y (zh) 由横竖拼板构成芯板的三层实木复合地板
CN201224977Y (zh) 隔音隔热地板
CN202152518U (zh) 新型镁质板
CN205530778U (zh) 一种预制层叠式真空墙体结构
CN205255193U (zh) 一种复合刨花板高强度防火结构
CN201474245U (zh) 超耐磨浸渍纸实木层压木质地板
CN203420447U (zh) 一种由实木板和密度板构成的防潮地板
CN206220340U (zh) 一种新型砖块
CN201390002Y (zh) 一种电壁炉架的复合板材
CN110653897A (zh) 一种环保型防虫胶合板
CN206635985U (zh) 建筑楼地面用保温隔声垫
CN201658036U (zh) 天然竹木夹芯夹层家具板
CN201288407Y (zh) 一种隔音地板
CN201972552U (zh) 低碳防火门
CN204646005U (zh) 新型夹板模压空心门
CN204781382U (zh) 一种防火保温板
CN201433675Y (zh) 新型实木门
CN210421502U (zh) 一种纤维水泥板外墙转角处节点结构
CN201730269U (zh) 一种新型保温复合材料
CN202483021U (zh) 一种防火保温隔音板结构
CN201446593U (zh) 设置有加强筋的复合人造板
CN207686118U (zh) 一种轻质防裂集成墙板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ground heating laminated wooden floor board

Effective date of registration: 20110321

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2011990000085

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20120229

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2011990000085

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ground heating laminated wooden floor board

Effective date of registration: 20120426

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2012990000175

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20130822

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2012990000175

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ground heating laminated wooden floor board

Effective date of registration: 20130822

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2013990000602

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20140924

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2013990000602

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ground heating laminated wooden floor board

Effective date of registration: 20140925

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Guo Manjia|Pei Yanli

Registration number: 2014990000805

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20151029

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Guo Manjia|Pei Yanli

Registration number: 2014990000805

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ground heating laminated wooden floor board

Effective date of registration: 20151102

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2015990000944

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170710

Granted publication date: 20100623

Pledgee: China Co truction Bank Corp Shijiazhuang Zhongshan West Road subbranch

Pledgor: Pei Yanli|Guo Manjia

Registration number: 2015990000944

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170906

Address after: Shijiazhuang City, Hebei Province, West Bridge 050000 Xinshi North Road, No. 399

Patentee after: Hebei bainianqiaojiang culture communication Limited by Share Ltd

Address before: 050000 Hebei province Shijiazhuang City Xinshi North Road, No. 399

Patentee before: Guo Manjia

CX01 Expiry of patent term

Granted publication date: 20100623

CX01 Expiry of patent term